Reservoir Geotechnical Challenges and Dam …...Howard Hanson Dam – Drawdown • As quickly as...

30
Reservoir Slope Stability, Vegetation Management, and Dam Material Sources May 7, 2014

Transcript of Reservoir Geotechnical Challenges and Dam …...Howard Hanson Dam – Drawdown • As quickly as...

Page 1: Reservoir Geotechnical Challenges and Dam …...Howard Hanson Dam – Drawdown • As quickly as possible • As fast as need to get storage for next storm • Limited by downstream

Reservoir Slope Stability, Vegetation Management, and Dam Material Sources

May 7, 2014

Page 2: Reservoir Geotechnical Challenges and Dam …...Howard Hanson Dam – Drawdown • As quickly as possible • As fast as need to get storage for next storm • Limited by downstream

2

Outline

• Reservoir Slope Stability

• Reservoir Vegetation, Debris, and Sediment Management

• Dam Material Sources

Page 3: Reservoir Geotechnical Challenges and Dam …...Howard Hanson Dam – Drawdown • As quickly as possible • As fast as need to get storage for next storm • Limited by downstream

3

Reservoir Slope Stability

• Watershed GeoDynamics: Geomorphology study, estimates of sediment delivery to river from landslides

• Shannon & Wilson: Characterization of large landslides

Page 4: Reservoir Geotechnical Challenges and Dam …...Howard Hanson Dam – Drawdown • As quickly as possible • As fast as need to get storage for next storm • Limited by downstream

4

LANDSLIDES – at Dam Site

Partial Excavation Required

Partial Excavation Required

Potential Hazard to Outlet – Plugging, Debris

Consideration for Spillway Construction and Erosion by Reservoir Discharge

Page 5: Reservoir Geotechnical Challenges and Dam …...Howard Hanson Dam – Drawdown • As quickly as possible • As fast as need to get storage for next storm • Limited by downstream

5

LANDSLIDES – in Reservoir

Potential Large Displacement Wave Hazard, Movement could block river.

Movement could block river.

Debris sources from above Reservoir

Low Hazard

Page 6: Reservoir Geotechnical Challenges and Dam …...Howard Hanson Dam – Drawdown • As quickly as possible • As fast as need to get storage for next storm • Limited by downstream

6

LANDSLIDES – in Reservoir

Large Landslide. Slow movement likely. Sudden movement could block river.

Debris sources from above Reservoir

Source zone

Deposit zone

Page 7: Reservoir Geotechnical Challenges and Dam …...Howard Hanson Dam – Drawdown • As quickly as possible • As fast as need to get storage for next storm • Limited by downstream

7

Reservoir Vegetation, Debris, and Sediment Management

• USACE – Seattle and Portland Districts

• Site Visit – Mud Mountain (MMD) and Howard Hanson (HHD)

Page 8: Reservoir Geotechnical Challenges and Dam …...Howard Hanson Dam – Drawdown • As quickly as possible • As fast as need to get storage for next storm • Limited by downstream

8

Mud Mountain Dam

• MMD is a flood control only

• Pool only during flood events

• Few occurrences of high temporary reservoir pool elevations

• Never overtopped spillway

Page 9: Reservoir Geotechnical Challenges and Dam …...Howard Hanson Dam – Drawdown • As quickly as possible • As fast as need to get storage for next storm • Limited by downstream

9

Mud Mountain Dam - Vegetation

• Most of the reservoir is vegetated • Willow shrub land on the lower slopes

• Flooded ~ 3 times / year

• Deciduous species on mid slopes • Flooded ~ 1 to 2 times / year

• Conifer forest on the highest slopes

Page 10: Reservoir Geotechnical Challenges and Dam …...Howard Hanson Dam – Drawdown • As quickly as possible • As fast as need to get storage for next storm • Limited by downstream

10

Mud Mountain Dam – Vegetation Mgt

5/7/2014

Page 11: Reservoir Geotechnical Challenges and Dam …...Howard Hanson Dam – Drawdown • As quickly as possible • As fast as need to get storage for next storm • Limited by downstream

11

Mud Mountain Dam – Vegetation Mgt

• Initially logged; little vegetation management • Vegetation and trees not cut or removed • Log storage areas are cleared • During flood LWD (from upstream sources) can be

backed up for miles • Floating booms to collect LWD • Let LWD pass through outlet if possible • 18 inch opening on bar rack

Page 12: Reservoir Geotechnical Challenges and Dam …...Howard Hanson Dam – Drawdown • As quickly as possible • As fast as need to get storage for next storm • Limited by downstream

12

Mud Mountain Dam – Debris Mgt

5/7/2014

Log boom

Page 13: Reservoir Geotechnical Challenges and Dam …...Howard Hanson Dam – Drawdown • As quickly as possible • As fast as need to get storage for next storm • Limited by downstream

13

Mud Mountain Dam – Debris Mgt

• Lowering pool may be delayed for days or weeks following flood events that deliver large amounts of LWD

• LWD is made available to various stakeholders • Excess LWD temporarily stored in reservoir • Use boats to gather and haul LWD to storage areas • USACE developing management plan to address

LWD management, including disposal

Page 14: Reservoir Geotechnical Challenges and Dam …...Howard Hanson Dam – Drawdown • As quickly as possible • As fast as need to get storage for next storm • Limited by downstream

14

Mud Mountain Dam – Sediment Mgt

• Soil, gravel, cobbles, and boulders flushed through low elevation tunnel through dam

• Recently, USACE passing additional flow through higher tunnel to facilitate downstream fish passage

• Material carried through tunnel damages steel liner • Liner replaced and due for replacement • Used to have rails in invert • Full steel liner now • Lower strength steel lasts longer

Page 15: Reservoir Geotechnical Challenges and Dam …...Howard Hanson Dam – Drawdown • As quickly as possible • As fast as need to get storage for next storm • Limited by downstream

15

Mud Mountain Dam – Sediment Mgt

Page 16: Reservoir Geotechnical Challenges and Dam …...Howard Hanson Dam – Drawdown • As quickly as possible • As fast as need to get storage for next storm • Limited by downstream

16

Mud Mountain Dam – Reservoir Landslides

• USACE takes no actions to prevent landslides • Has no procedures limiting drawdown rate for

potential reservoir slope instability • Has slumping in reservoir • Yearly reconnaissance

Page 17: Reservoir Geotechnical Challenges and Dam …...Howard Hanson Dam – Drawdown • As quickly as possible • As fast as need to get storage for next storm • Limited by downstream

17

Mud Mountain Dam – Drawdown

• As quickly as possible • As fast as need to get storage for next storm • Drawdown limited by downstream flow capacity • ~10 ft/day max rate is typical • Drawdown may be delayed for LWD removal • Slower drawdown now because of sediment in

channel downstream

Page 18: Reservoir Geotechnical Challenges and Dam …...Howard Hanson Dam – Drawdown • As quickly as possible • As fast as need to get storage for next storm • Limited by downstream

18

Howard Hanson Dam

• HHD is multipurpose • Flood

• Summer stream augmentation

• Ecosystem restoration

• Drinking Water (City of Tacoma)

• Pool increase starting Feb., maintained in summer

• Never overtopped spillway

Page 19: Reservoir Geotechnical Challenges and Dam …...Howard Hanson Dam – Drawdown • As quickly as possible • As fast as need to get storage for next storm • Limited by downstream

19

Howard Hanson Dam - Vegetation

• The reservoir has bare slopes • Reservoir is maintained high for months • Above maximum pool, slopes are forested • Reservoir was likely logged during construction

Page 20: Reservoir Geotechnical Challenges and Dam …...Howard Hanson Dam – Drawdown • As quickly as possible • As fast as need to get storage for next storm • Limited by downstream

20

Howard Hanson Dam – Vegetation and Debris Mgt

• Little vegetation management • Vegetation and trees not cut or removed • LWD cannot pass through the dam • More LWD during big floods • Floating booms to collect LWD • Booms anchored at multiple elevations • Use boats to gather and haul LWD to storage areas

Page 21: Reservoir Geotechnical Challenges and Dam …...Howard Hanson Dam – Drawdown • As quickly as possible • As fast as need to get storage for next storm • Limited by downstream

21

Howard Hanson Dam – Debris Mgt

• 50% LWD reintroduced to river downstream • Other LWD is available to various stakeholders • Excess LWD stored in reservoir to decompose

Page 22: Reservoir Geotechnical Challenges and Dam …...Howard Hanson Dam – Drawdown • As quickly as possible • As fast as need to get storage for next storm • Limited by downstream

22

Howard Hanson Dam – Debris Mgt

5/7/2014

Log boom

Dead Trees in Inundation zone

Page 23: Reservoir Geotechnical Challenges and Dam …...Howard Hanson Dam – Drawdown • As quickly as possible • As fast as need to get storage for next storm • Limited by downstream

23

Howard Hanson Dam – Sediment Mgt

• Sediment trapped in reservoir • Have not yet had to remove sediment to maintain

pool • No plan for dealing with sediment • Purchase gravel, cobbles, and boulders. Place

downstream on bank for river to erode • Adaptive management approach

Page 24: Reservoir Geotechnical Challenges and Dam …...Howard Hanson Dam – Drawdown • As quickly as possible • As fast as need to get storage for next storm • Limited by downstream

24

Howard Hanson Dam – Reservoir Landslides

• USACE takes no actions to prevent landslides • Has no procedures limiting drawdown rate for

potential reservoir slope instability • Yearly reconnaissance • Right abutment is a landslide deposit

• Has been seepage problem • Drainage tunnel recently installed/upgraded

Page 25: Reservoir Geotechnical Challenges and Dam …...Howard Hanson Dam – Drawdown • As quickly as possible • As fast as need to get storage for next storm • Limited by downstream

25

Howard Hanson Dam – Drawdown

• As quickly as possible • As fast as need to get storage for next storm • Limited by downstream flow capacity • ~10 ft/day max rate is typical • 13 ft/day two events • Delayed to reduce downstream impacts and for in-

reservoir debris management

Page 26: Reservoir Geotechnical Challenges and Dam …...Howard Hanson Dam – Drawdown • As quickly as possible • As fast as need to get storage for next storm • Limited by downstream

26

MMD – HHD – Operating Costs

• $3.5M / year operating budget • $150k / year LDW and gravel placement

downstream of HHD • 8 people at each dam • Includes boats and land-based equipment

Page 27: Reservoir Geotechnical Challenges and Dam …...Howard Hanson Dam – Drawdown • As quickly as possible • As fast as need to get storage for next storm • Limited by downstream

27

Material Sources Study

• Task is to Determine: • Is suitable rock within reasonable distance of dam site? • Ascertain rock qualities

Page 28: Reservoir Geotechnical Challenges and Dam …...Howard Hanson Dam – Drawdown • As quickly as possible • As fast as need to get storage for next storm • Limited by downstream

28

Material Sources Study

• DNR permitted and active rock pits in hard rock in the Pe Ell/Chehalis area.

• WSDOT-owned pit information • Other rock pits in Pe Ell/Chehalis area • WSDOT’s Aggregate Source Approval (ASA) reports • Not yet synthesized data

Page 29: Reservoir Geotechnical Challenges and Dam …...Howard Hanson Dam – Drawdown • As quickly as possible • As fast as need to get storage for next storm • Limited by downstream

29

Grande Ronde Basalt

• Grande Ronde Basalt is major formation near site • Suitable rock for RCC dam • Previously performed test results

• LA Abrasion • Absorption • Specific Gravity.

• No test results found for alkali reactivity • We will perform alkali reactivity test for a source near dam

Page 30: Reservoir Geotechnical Challenges and Dam …...Howard Hanson Dam – Drawdown • As quickly as possible • As fast as need to get storage for next storm • Limited by downstream

30

Filter Sand / Gravel

• Needed for Rock fill dam • Sources being identified • Glacial outwash deposit in the Chehalis/Centralia

valley – potential source

• Site visits not yet performed