A pressure drawdown test is simply a series of bottom-hole pressure

measurements made during a period of flow at constant production rate.

Usually the well is closed prior to the flow test for a period of time sufficient to allow

the pressure to stabilize throughout the formation, i.e., to reach static pressure.

1. PRESSURE DRAWDOWN TEST

As discussed by Odeh and Nabor,1 transient flow condition prevails to a

value of real time approximately equal to

Semi-steady-state conditions are established at a time value of

Page 3: PENGUJIAN DRAWDOWN

Idealized rate schedule and pressure response for drawdown

testing

Page 4: PENGUJIAN DRAWDOWN

Idealized rate schedule and pressure response for drawdown

testing

Page 5: PENGUJIAN DRAWDOWN

Three periods for

analysis:

• Transient or early flow

period is usually used to

analyze flow

characteristics;

• Late transient period is

more completed; and

• Semi-steady-state flow

period is used in

reservoir limit tests.

FLOW HISTORY CLASSIFICATIONS

Page 6: PENGUJIAN DRAWDOWN
Page 7: PENGUJIAN DRAWDOWN
Page 8: PENGUJIAN DRAWDOWN
Page 9: PENGUJIAN DRAWDOWN
Page 10: PENGUJIAN DRAWDOWN
Page 11: PENGUJIAN DRAWDOWN
Page 12: PENGUJIAN DRAWDOWN
Page 13: PENGUJIAN DRAWDOWN
Page 14: PENGUJIAN DRAWDOWN
Page 15: PENGUJIAN DRAWDOWN
Page 16: PENGUJIAN DRAWDOWN
Page 17: PENGUJIAN DRAWDOWN

PR :

Hitung Permeabilitas efektif

dan skin-nya