Research on India_Energy and Utilities Sector in India Monthly Update_January 2012

26
Energy and Utilities Sector In India Monthly Update January 2012

description

 

Transcript of Research on India_Energy and Utilities Sector in India Monthly Update_January 2012

Page 1: Research on India_Energy and Utilities Sector in India Monthly Update_January 2012

  Energy and Utilities Sector 

 In India Monthly Update 

January 2012  

Page 2: Research on India_Energy and Utilities Sector in India Monthly Update_January 2012

 

Top Story   

 GAIL to import natural gas from US at significantly lower prices Gas Authority of India Limited (GAIL) has struck a natural gas import deal with a US based company at a price that is much more competitive than the usual price for such deals. Under the contract, GAIL will receive 3.5 mn tonnes annually at a price known as  the  Henry  Hub‐benchmarked  price  which  is  the  pricing  point  for  natural  gas futures  contracts  traded  on  the  New  York  Mercantile  Exchange.  The  import  deal signed by Indian companies till now were at a price calculated as a certain percentage f  Japan  Customs‐cleared  Crude  and  was  significantly  higher  than  the  Henry  Hub oprice.  The move  from GAIL  to  look  at  the US  gas market  is  being viewed as  a  good move because of the substantially lower price. It is expected to expand the source portfolio thereby making it more competitive. Gas production in the US is likely to increase in the coming years and this will exert pressure on global prices. At a time when India’s atural gas production has been falling, the new pricing will help domestic companies xpand. ne   News Update  

 

General  IOC establishing countrywide LPG pipeline grid to cut down costs Indian Oil Corporation (IOC) has decided to establish a LPG pipeline grid across  the country  to  cut  down  the  cost  of  transporting  LPG  and  make  its  business  more efficient. The company is in the process of preparing a project to identify where it can ay  the  pipeline.  The  plan  is  to  lay  pipelines  to  various work  centres where  IOC  is ltransporting LPG as well as in areas where the company has high consumption.  IOC has already laid a pipeline from Tikri Kalan to Bhatinda and is in the process of building a pipeline from Kandla to Loni. Gas Authority of India Limited (GAIL) already as a pipeline in place and discussions are on between IOC and GAIL as to whether the ormer can use this facility. hf BG group scaling down India business, exiting Krishna­Godavari block The Indian subsidiary of UK based BG Group, British Gas Exploration and Production India  (BGEPIL),  has  decided  to  exit  from  the  Krishna‐Godavari  (KG)  offshore  block that it holds jointly with Oil and Natural Gas Corporation (ONGC). The decision to exit the KG block  comes  soon  after  the  group decided  to  divest  its  stake  in Gujarat  Gas 

Energy and Utilities – Monthly Update 

Page 3: Research on India_Energy and Utilities Sector in India Monthly Update_January 2012

Company Limited (GGCL) in November last year. This move of the company is viewed as its strategy to scale down operations in India.  After  BGEPIL’s  exit,  ONGC will  hold  100%  stake  in  the  block  and  its  total  financial liability will be more than INR 5.4 bn. ONGC will have to spend INR 4.9 bn to finish the remaining  minimum  work  programme  and  incur  an  additional  work  programme expenditure of  INR 0.5 bn. However, keeping  in mind the potential of  the block and iven the fact that monetisation of shallow water discovery is easier and faster, ONGC ants to retain the block even after BGEPIL’s exit. 

gw Leap Green Energy receives INR 1 bn funding from JP Morgan JP Morgan Asset Management has  invested INR 1 bn  in Leap Green Energy Pvt. Ltd. Leap Green is a renewable energy producing company having an installed capacity of 100  MW  of  wind  assets.  JP  Morgan  had  earlier  invested  INR  1.07  in  Leap  Green through both equity and convertible debt instruments, which, when converted would ive the former a majority stake. JP Morgan has thus invested over INR 2 bn in Leap gGreen.  JP Morgan’s investment in Leap Green highlights the interest that private equity firms have been showing in renewable energy producing companies. In the past 6 months, a umber of deals have taken place in this sector with the biggest of them being an INR 0 bn investment by Goldman Sachs in ReNew Wind Power. n1 New Zealand company helping set up aviation bio jet fuel plant in India LanzaTech, a renewable energy company from New Zealand is in talks with Indian Oil Corporation  (IOC)  and  Jindal  Steel  &  Power  Limited  (JSPL)  for  setting  up  plants  to produce commercial bio jet fuel from ethanol. To begin operations in India, LanzaTech will open an office in the country in the first half of 2012. IOC and JSPL are already in discussions  for collaborating  to produce  fuel ethanol  from  industrial off‐gases using LanzaTech's technology. JSPL will supply the off‐gases while IOC will make, store and upply the fuel and a demonstration scale plant is expected to be set up within a year sand a half.  The plan only includes sharing of technology and LanzaTech will not be making any investment  in  the plant and machinery. The company has  the technology  to convert carbon  monoxide,  syngas  and  steel  mill  off‐gases  into  ethanol  and  is  holding discussions  with  a  number  of  major  steel  producers  in  the  country.  The  company elieves that even if 10% of the 5 mn barrels of aviation fuel used globally each day is ubstituted with its aviation bio jet fuel, it will be a huge market for LanzaTech. bs

Energy and Utilities – Monthly Update 

 State run companies bidding for BG Group’s controlling stake in GGCL State‐run oil companies and the Adani Group have signed non‐disclosure agreements with the BG Group for the controlling stake of the latter in Gujarat Gas Company Ltd (GGCL).  State  run  companies  that  have  signed  agreements  to  bid  for  BG’s  stake  in 

Page 4: Research on India_Energy and Utilities Sector in India Monthly Update_January 2012

GGCL include Oil India Ltd and Gujarat State Petroleum Corporation. GAIL (India) Ltd is yet to receive approval to bid.  GGCL was  incorporated  in  1980  and  is  the  country’s  largest  private‐sector  city  gas distributor. The company distributes 3.5 mn metric standard cubic meters of natural gas  to about 350,000 compressed natural gas consumers each day.  It has a pipeline etwork  of  3,900  km  and  42  CNG  stations.  BG  group  holds  65.12%  stake  in  the ompany while the rest is held by Indian and other foreign institutions. nc PE investors in BPCL and GAIL’s JV looking to exit Private  equity  investors  are  looking  to  exit  their  3  year  old  investment  in  Bharat Petroleum  Corporation  Limited  (BPCL)  and  GAIL  (India)  Limited’s  joint  venture, Central UP Gas Limited (CUGL). Private equity firms IL&FS Investment Managers Ltd and  IDFC  Private  Equity  own  15%  stake  each  in  the  company  while  Asian Development bank (ADB) owns about 20%. Ernst & Young which has been appointed s  the  banker  for  the  transaction  is  looking  for  potential  buyers  and  has  already ainvited bids from a few mid‐market private equity firms.  CUGL was set up in 2005 for developing city gas distribution projects and operates in anpur and Bareilly. The company had revenues of INR 650 mn in FY 2011 which is xpected to go upto INR 800 mn in FY 2012. Ke Reliance gets government’s nod for INR 80 bn investment in its D6 gas block Reliance Industries’ INR 80 bn investment plan for developing 4 satellite fields in its D6  gas  block  off  India’s  east  coast  has  received  the  government’s  approval.  The investment plan which was lying with authorities for two years, waiting for approval, ill  help  increase  the  falling  output  from  the  company’s  gas  field  in  the  Krishna w

Godavari basin.  The 4 satellite fields will have the capacity of producing 10 mn cubic metres of gas per day  by 2016.  This will  be  very useful  to  the  company which has  been witnessing  a 35% drop in production at its D6 block in the past 15 months. Last year, Reliance had ied up with UK’s BP Plc. to further develop the D6 block due to lagging targets. The ritish company said that production from the block could rise from 2014. tB Tata Power secures project financing for Mithapur plant Tata Power has secured funds worth INR 3.65 bn for a 25 MW solar photovoltaic plant to be located in Mithapur, Gujarat. The project will be financed through a mix of debt and equity in the ratio 70:30.  Tata Power will receive INR 1.1 bn in equity and 2.55 bn in INR‐termed loans. The company’s subsidiary, Tata Power Renewable Energy Ltd as  completed  the  pre‐disbursement  conditions  and  received  the  first  loan isbursement in early December, last year. hd 

Energy and Utilities – Monthly Update 

Page 5: Research on India_Energy and Utilities Sector in India Monthly Update_January 2012

The debt requirements of the company were secured from various lenders including the State Bank of India and Export Import Bank of India. Tata Power has also signed a ower purchase agreement with Gujarat's state distribution company for the output roduced in the plant. pp ONGC to takeover BG Group’s exploration blocks Oil and Natural Gas Corporation (ONGC) is taking over BG Group Plc’s stake in three offshore exploration blocks held by  the  latter. Though ONGC  is buying BG’s stake,  it will not make any payments. Instead it will receive INR 2.6 bn from BG on account of the group’s past liabilities. BG had decided to exit these blocks as a part of its strategy o align its global portfolio. It will now be left with only one exploration block, in the rishna Godavari basin, which it holds along with ONGC and Oil India. 

tK India’s largest solar power plant being commissioned by Adani Group India’s  largest  solar  power  plant  is  being  commissioned  in Kutch,  Gujarat  by Adani Power.  The  plant  has  a  capacity  of  40 MW and marks Adani's  first  big  foray  in  the renewable energy sector. The company claims to have commissioned the solar power plant in just 150 days and plans to expand its capacity to 100 MW in future. The plant s using solar PV technology. It has over 400,000 solar PV modules mounted on 21600 istructures.  Power generated from the plant will be sent to a substation in Netra, situated 20 km from the project site, through a 66 kV line. Adani Power is currently operating 3300 MW at Mundra with 4 units of 330 MW each and 3 units of 660 MW each. It is in the rocess  of  commissioning  two  more  units  of  660  MW  by  March  which  will  make undra the single largest thermal power plant in India. 

pM INR 7.23 bn worth orders won by KEC International in transmission business Mumbai‐based  infrastructure  company  KEC  International  Ltd  has  secured  orders worth INR 7.23 bn in its transmission business from Saudi Arabia, United States and Afghanistan. The order  from Saudi Electricity Company was  for  constructing 68 km 110 kV/132 kV double circuit overhead transmission  lines and 13 km underground cable works on  a  turnkey basis.  The order  is worth  INR 3.1 bn  and  the  completion period is 21 months. The US order, worth INR 1.55 bn, was from Isolux Ingenieria S.A. for supplying 345 kV transmission towers and has to be completed within 12 months. The  order  from  Afghanistan  was  from  Da  Afghanistan  Breshna  Sherkat  and  was procured  under  a  consortium  arrangement.  The  INR  1.04  bn  order  was  for onstruction of 220 kV double  circuit overhead  transmission  lines between Kunduz cand Taloqan substations on turnkey basis.  The company’s wholly owned subsidiary SAE Towers has also secured orders worth INR  1.54  bn  from  US,  Brazil  and  Mexican  countries  for  supplying  towers.  KEC International has also bagged contracts  in  its other areas of business such as power 

Energy and Utilities – Monthly Update 

Page 6: Research on India_Energy and Utilities Sector in India Monthly Update_January 2012

sIystems, water, cable and telecom. The total worth of orders won by the company is NR 12.53 bn.  NPCC wins contract from ONGC to build offshore platforms in Mumbai High Abu  Dhabi  based  National  Petroleum  Construction  Company  (NPCC)  has  won  a contract worth INR 8.02 bn from Oil and Natural Gas Corporation (ONGC) for building offshore platforms in Mumbai High. According to the agreement signed between the companies, NPCC will build the WO‐16 cluster and SB‐14 wellhead platforms project at  the  offshore  field.  The  work  at  the  field  involves  engineering,  procurement, fabrication,  installation,  hook‐up,  pre‐commissioning  and  commissioning  for  five wellhead platforms. While the designing and engineering works will be carried out at PCC Engineering Limited in Mumbai, the fabrication work will be done in Abu Dhabi. N

The completion of the project has been scheduled for May 2013.  NPCC and ONGC have executed several engineering and construction projects  in the past.  In April  2011, NPCC  completed  the B‐22  field  development project  and RS‐12 ell platform project, both of which  took 18 months. Currently,  it  is  involved  in  the evelopment of a 6 wellhead platforms project, scheduled to be completed in April. wd Spanish company setting up manufacturing unit for turbine blades in India Spanish  wind  turbine  manufacturer  Gamesa  Corporacion  has  set  up  a  plant  at Vadodara, Gujarat to manufacture blades for its turbine systems. Gamesa has invested INR 1.75 bn for setting up the new facility which will be used to produce blades for the  company’s  850  kW  and  2  MW  turbine  systems.  The  plant  has  already manufactured its first blade for the 850 kW turbine and is scheduled to produce 390 lades by 2013. The blades produced in the facility will be primarily supplied to the bnorthern states including Gujarat, Rajasthan, Madhya Pradesh and Maharashtra.  The new plant  is part of  the  INR 3.8 bn  investments Gamesa had announced  in Mar 2011 for strengthening its manufacturing base in India. The company also intends to build  a  factory  to  produce  nacelles  in  Tamil  Nadu.  It  also  operates  as  a wind  farm eveloper in India and has wind farms with capacities exceeding 2100 MW in various tages of development in the country. ds First unit of CLP India’s Jhajjar project begins generation The  first  660  MW  unit  of  CLP  India’s  Mahatma  Gandhi  Thermal  Power  Project (MGTPP) in Jhajjar, Haryana has started generation. Haryana will receive 90% of the electricity produced  in  this power plant. This  is  expected  to help  the  state which  is currently  suffering  from  a  power  shortage.  The  second  of  the  two  660 MW  unit  is xpected  to be ready  for power generation within  the next 5‐6 months. The project as started in Jan 2009 and its total cost is around INR 65 bn. 

ew   

Energy and Utilities – Monthly Update 

Page 7: Research on India_Energy and Utilities Sector in India Monthly Update_January 2012

Suzlon subsidiary wins order from US company Suzlon Group’s German subsidiary RE Power Systems SE has won an order to supply 73 turbines to a US wind power developer for a 150 MW project in Oklahoma. This is Suzlon’s  second  largest  project  in  the  US.  The  delivery  and  initial  operation  of  the turbines  has  been  planned  for  the  second  half  of  the  year.  This  order  from  the  US company  once  again  highlights  Suzlon’s  strong  competitive  positioning  in  the  US market. Suzlon, which is the fifth largest wind turbine maker in the world, along with ts subsidiaries had a collective order backlog of 4734 MW till October last year. The ompany has since gone on to announce additional orders worth 997.5 MW. ic Oil India studying possible purchase of Cove Energy India’s  second  largest  state‐run  energy  explorer,  Oil  India  Ltd.,  is  considering  a possible purchase of UK based Cove Energy Plc. which has assets in east Africa. Cove nergy  put  itself  up  for  sale  last  week  and  Oil  India  has  since  been  studying Edocuments related to it.   The growing demand for gas in India and the resultant shortage in supply is  forcing domestic companies to look outside the country for oil and gas deposits. Cove Energy is partial owner of a field in Mozambique that may have enough gas to be converted into liquid form and shipped to countries including India. The European company in hich BlackRock Inc. has a stake has a market value of INR 50 bn and bids for it may xceed INR 65 bn. we After Sabine, GAIL in talks with Macquarie for long­term LNG supplies GAIL (India) Ltd is expecting to sign a deal with Macquarie Energy to buy 2 mn tonnes of liquefied natural gas (LNG) annually for two decades from the Freeport LNG project in the US. The deal is expected to be signed within a month. Macquarie Group’s energy marketing and trading arm, Macquarie Energy, and Freeport LNG Expansion LP, are eveloping  and  marketing  liquefaction  capacity  at  the  LNG  import  terminal  in dFreeport from where GAIL will receive supplies.  In Dec 2011, GAIL had entered into an agreement with Sabine Pass Liquefaction LLC to  buy  3.5 mn  tonnes  of  LNG  annually  for  over  20  years  at  a  price  indexed  to  the Henry Hub price. This price is considerably lower than the global crude‐oil prices. The eal with Macquarie will also be linked to Henry Hub and will help GAIL to get LNG at ompetitive rates. dc Oil India in talks to buy stake in US firm’s shale gas reserves Oil  India  Ltd.  (OIL)  is  in  talks with  a  US  company  to  buy  around  25%  stake  in  the latter’s shale gas acreage near Texas. The deal will cost OIL around INR 10.3 bn. This move  will  help  OIL  acquire  expertise  in  the  segment  which  may  soon  become mportant and lucrative in India with shale gas blocks expected to be auctioned in the ountry in coming years. ic 

Energy and Utilities – Monthly Update 

Page 8: Research on India_Energy and Utilities Sector in India Monthly Update_January 2012

Indian companies are rapidly acquiring stakes in US shale gas assets. Many state‐run companies  such  as  GAIL  (India)  Ltd,  Hindustan  Petroleum  Corp.  Ltd,  Bharat Petroleum Corp.  Ltd,  Indian Oil Corp.  Ltd  and ONGC Videsh Ltd have  shown a keen interest  in  investing  in  US  shale  gas  assets.  Although  no  exact  figures  are  available egarding shale gas reserves in India, estimates vary from 300‐2100 trillion cubic feet tcf). r( Suzlon to develop 3000 MW wind projects in Andhra Pradesh Suzlon  Energy  Ltd.,  India’s  largest  wind  turbine  manufacturer  has  signed  the memorandum of  understanding  (MoU) with  the  government of Andhra Pradesh  for developing wind power projects in the state. The company will develop projects with a  cumulative  capacity  of  3000 MW between  2012  and  2016 with  an  investment  of around  INR  180  bn.  Under  the  MoU,  the  state  government  will  assist  Suzlon  in obtaining  the  necessary  permission,  registrations,  approvals  and  clearance  for eveloping the wind farms. Suzlon in turn will help in bringing in investments into the dstate through its customers investing in wind energy.  The MoU covers the development of wind farms across the state. The districts where wind  farms  are  planned  to  be  developed  are  Tallimadugula,  Alankarayanipeta, Gandikota, Varjakarur and Tirumalayapalli. The state is a key emerging wind market n India and has a number of medium to low wind sites which suit Suzlon's new S9X uite of turbines. is RIL considers buying back shares to curb price fall  Reliance  Industries  Ltd.  (RIL)  is  considering  buying  back  its  shares  after  the  stock slumped 35% in 2011. Discussions regarding this will be held at the company’s board meeting  scheduled  for  20th  Jan.  The  company however  has  not  divulged details  on how many shares it plans to repurchase or given a timeframe. RIL has been struggling to increase its share price ever since output from its biggest field began declining. The INR 614.9 bn that  the company held  in cash and equivalents as on 30th Sep will be sed  for buying back  the  shares. The  last  time RIL bought back  shares were  in Dec 004 when it spent INR 30 bn to purchase 10% of is equity at INR 570 each. u2 ConocoPhillips, ONGC partnership for developing India’s deepwater oilfields Oil  and Natural  Gas  Corporation  (ONGC)  and US  based  ConocoPhillips  are  in  early‐stage talks to forge a partnership to help develop India's deepwater oilfields. The deal which is still far away from completion could result in the US company taking stakes in as many as 19 deepwater oil and gas blocks of ONGC. The Indian company might in eturn  ask  ConocoPhillips  for  stakes  in  US  shale  gas  projects  so  that  it  can  gain r

Energy and Utilities – Monthly Update 

expertise in this field and later use it to develop shale gas projects in India.  Imports account  for about 80% of  India’s crude oil needs. The country  is  looking  to expand production from its domestic fields in a bid to reduce its import dependence. ONGC  is  under  pressure  to  bring  in  foreign  partners who will  help  in  boosting  the 

Page 9: Research on India_Energy and Utilities Sector in India Monthly Update_January 2012

falling  output  by  tapping  new deepwater  discoveries.  For  this  reason,  the  company ad approached a number of Asian oil firms and opened a data room allowing them to tudy ONGC’s deepwater projects off India's eastern and western coasts. hs Captive power companies unhappy with CIL’s new pricing mechanism Indian  Captive  Power  Producers  Association  (ICPPA)  is  opposing  the move  of  Coal India  Ltd.  (CIL)  to  shift  to  a  new  pricing  mechanism  for  thermal  coal  since  the beginning of 2012. They feel that this move of CIL has caused price of certain grades of coal to go up by as much as 179%. The shift to the new mechanism has resulted in rices  of  ‘C’,  ‘D’  and  ‘E’  grades  of  coal  to  rise  by  over  100%  although  CIL  has  been pjustifying it as only a marginal hike.   The new pricing mechanism is based on ‘Gross Calorific Value’ (GCV), where price is determined on the basis of  the quality of  the coal as against  the earlier used  ‘Useful Heat  Value’  (UHV)  system  where  price  was  determined  after  deducting  ash  and moisture  content  from  the  standard  formula.  The  ICPPA  has  also  accused  CIL  of discrimination by stating that the latter has been charging higher prices from captive ower  producers  (CPP)  than  from  independent  power  producers  (IPP).  The  prices harged from CPPs are up to 60% higher than those charged from IPPs. pc ONGC hoping  to commission North Tapti and B­series  fields between Feb and May Oil  and Natural Gas Corporation  Ltd.  (ONGC)  is  hoping  to  start  production  from  its North Tapti and B‐series offshore marginal gas fields between Feb and Apr this year. he total cost of developing the two fields will be over INR 20 bn and the estimated 

 

Tpeak production from them will be around 3.44 mn cubic metres a day (mcmd).  The North Tapti field was initially scheduled to be commissioned in Mar 2011 but it failed due to technical complications. The technical issues have been resolved and the company is hopeful of starting production by Feb. Meanwhile, the development of the ‐series field is going on and production from a part of the field is expected to begin y Apr‐May. Bb Cairn India gets government’s nod to raise output from Rajasthan block The Rajasthan government has given Cairn India Ltd. approval to raise output from its field in Mangala. Production at the field can increase by 25000 barrels a day and total output  from  the  field  can now go up  to 150000 barrels  a day as against  the  earlier 25000. London based Vedanta Resources Plc which acquired Cairn India in Dec 2011 1

Energy and Utilities – Monthly Update 

has plans to double capacity at the Cairn India assets.  Cairn India has 70% stake in the Rajasthan block while the rest is owned by state‐run Oil and Natural Gas Corporation Ltd. Vedanta got approval  from  the Government of India to acquire Cairn India’s stake on condition that it pays a share of royalties from the fields. Vedanta and its unit Sesa Goa Ltd. acquired a 59% stake in Cairn India from 

Page 10: Research on India_Energy and Utilities Sector in India Monthly Update_January 2012

sahareholders,  including Cairn Energy Plc  for INR 460.36 bn  in Dec 2011, 16 months fter the deal was announced in Aug 2010.  Moser Baer adopts MIST technology in its PV business In  order  to  improve  its  photovoltaic  cell  efficiency,  Moser  Baer  India  Limited  is adopting  MIST  (Metal  and  Intrinsic  layer  Semiconductor  Technology)  in  its  PV business. Adopting this technology will help efficiency of PV cells to increase by up to 21%. This will be particularly useful for the company during a time when oversupply f PV modules, continuously falling prices and stiff competition from foreign players ois proving to be very challenging for it.  Moser  Baer  is  one  of  the  few  companies  in  the world which  can manufacture  both crystalline silicon and thin film modules. Both these technologies will be leveraged to anufacture the highly efficient MIST cells. Over the past few years, extensive R&D is eing carried out in Moser Baer’s labs in Netherlands and India. mb OVL looking for stake in OAO Novatek’s subsidiary A consortium of  Indian  firms  led by Oil  and Natural Gas Corporation Ltd’s overseas arm, ONGC Videsh  Ltd  (OVL)  is  holding  discussions with Russia’s  OAO Novatek  for acquiring a 15% stake in its subsidiary OAO Yamal LNG for developing a natural gas field. The deal will also include collaboration for a natural gas liquefaction project and oint marketing of liquefied natural gas (LNG). The other members of the consortium jare GAIL (India) Ltd, Indian Oil Corporation Ltd and Petronet LNG Ltd.  OAO  Yamal  LNG  has  the  license  for  exploration  and  development  of  the  South Tambeyskoye field. OAO Novatek which presently owns 80% of the unit is offering a 9%  stake  in  the  project.  A  stake  purchase  here would  be  beneficial  for  India  as  it ould add to the country’s energy security. 

2w   News Update  

 

Regulatory 

Energy and Utilities – Monthly Update 

 Gujarat government extends deadline for projects under its solar program The Gujarat state government has extended the deadline  for completing all projects under the state’s solar program till Jan 28. Projects that are not completed within the stipulated  time  are  set  to  lose  their  preferential  payment  rates.  The  Gujarat government  is  promoting  these  solar  plants  by  providing  sites,  distribution infrastructure and quick approval  to projects built  in  its designated  solar park. The electricity regulator of the state has agreed to pay plants completed by the extended deadline INR 15 per kWh for 12 years. However,  the rates will be  lowered by up  to 32% for projects completed after the mentioned date. 

Page 11: Research on India_Energy and Utilities Sector in India Monthly Update_January 2012

 Gujarat was  the  first  state  in  India  to  invite  companies  to build photovoltaic plants. More  than  900 MW of  plants were  supposed  to  be  built  by  the  end  of  2011  in  the state. While  some  companies  such  as Azure Power, Welspun Energy Ltd  and Green Infra Ltd have already completed their projects, others sought for an extension to the deadline due to factors such as delays in acquiring land and heavy rains that blocked access to sites. Some of the big companies that are building plants in Gujarat include Adani Power Ltd, Lanco  Infratech Ltd, Tata Power and GMR  Infrastructure Ltd. The companies had to deposit INR 5 mn for each MW of capacity they won, which would be forfeited on failure to complete the project on time.  Ministry of Power to soon take decision on smart grid projects The Ministry of Power is likely to take a decision regarding 8 smart grid technologies‐related  projects  worth  INR  5  bn  in  the  next  two  months.  Plans  for  smart  grid technologies  related  pilot  projects  are  likely  to  be  submitted  by  around  14  state utilities this month. After the submission of the plans, the Ministry is likely to choose  or 8 projects on a pilot basis. Each project is expected to cost between INR 0.5 to 0.6 7bn and will take 12 to 18 months for completion.  The projects will focus on integrating the sources of renewable energy with the grid, reducing  the  aggregate  technical  &  commercial  losses  and  peak  load management. round 50% of  the  total  cost of  the project will be borne by  the Ministry while  the est will be paid by the state utilities. Ar 150 MW to be added to India’s solar power by Feb 2012 The Ministry  of New and Renewable Energy has  said  that  around 150 MW of  solar power projects under  the  Jawaharlal Nehru National  Solar Mission  (JNNSM) will  be commissioned in the country within the first  two months of the year. Around 80‐90 W of projects will be commissioned in January while the rest will be commissioned M

in February.  India has more than 250 MW of operational solar power at present. The target under the  first phase of  JNNSM  is  to  commission 1000 MW of grid‐connected solar power projects by 2013.  Issues of  financing and  factors  such as high  cost of  raw materials ike solar panels and modules are being carefully considered, thus paving the way for ndian banks to fund these projects. lI 

Energy and Utilities – Monthly Update 

Government directs RIL  to sign gas supply deals with 16  firms on  the priority list The Ministry  of  Petroleum & Natural  Gas  has  directed  Reliance  Industries  (RIL)  to sign  natural  gas  sale  and  purchase  agreements  with  16  leading  consumers  on  the priority list. The decision was taken due to concerns that a further fall in investment could  affect  the  economy  very  badly.  The  company  had  earlier  explained  to  the ministry its inability to supply to these users because of the sharp dip in output from 

Page 12: Research on India_Energy and Utilities Sector in India Monthly Update_January 2012

its KG‐D6 block. RIL has been reluctant in committing supplies to more consumers as he  likely supply cuts  in  future would put  these customers  in a  tight spot once  they tmake investments counting on these supply contracts.  At present, the unmet allocation to the priority sector is just less than 4 million metric standard cubic metres a day (mmscmd) which  is about a tenth of RIL’s 42 mmscmd gas  output.  The  company  needs  around  52  mmscmd  to  meet  its  obligation  to  all priority  consumers.  The  fertilizer  sector  gets  about  15  mmscmd  of  RIL’s  KG‐D6 block’s output. While output  in the country has been steadily declining, demand has been on a rise. The country’s power ministry wants an extra 55 mmscmd gas for new projects of 14000 MW over the next five years, while the fertilizer ministry wants an extra 64 mmscmd over the same period. With imported gas being three to four times ostlier,  the  falling gas output  is affecting  the country’s  investment prospects  in  the anufacturing and power sectors. 

cm India invites Bangladesh to set up power projects in north eastern states The  Indian  Government  has  invited  Bangladesh  to  set  up  power  projects  in  the country,  particularly  in  the  north  eastern  regions  saying  such  joint  ventures would benefit both countries. Cooperation between the two countries will help in evacuation of power from the north eastern states to Bangladesh and from Bangladesh to various parts  of  India.  The  forthcoming meeting  of  the  Steering  Committee  on  Power  to  be held  at  the  level  of  Secretaries  between  the  two  countries  will  be  instrumental  in discussing  the  details  of  such  cooperation.  India’s  liberal  policies,  permitting  100% FDI  in  projects  related  to  electricity  generation,  transmission  and  distribution  will lso  be  beneficial  for  further  development  of  such  joint  ventures  between  the  two ountries. ac Wind farm tax breaks to end soon The Government of India has decided to discontinue a tax break for wind farms from the  beginning  of  FY  2013,  thus  potentially  stalling  growth  in  the  over  INR  150  bn wind power market. New installations may fall by 15% and investments may decline by INR 28 bn if the government goes ahead with its decision. It has stated that the tax ncentive will be discontinued from 31st Mar 2012 or with the introduction of a new itaxation framework, depending on which comes first.  At  present,  the  wind  power  market  is  dominated  by  Suzlon  Energy  Ltd.  which supplies about half of all new wind installations in India. A few big companies such as General  Electric  Co.,  Siemens  AG,  and  Gamesa  Corporacion  Tecnologica  SA  are expanding their manufacturing capacity in India in an attempt to take away Suzlon’s market share. Meanwhile, the Ministry of New and Renewable Energy has said that it avors  an  alternate  subsidy  called  generation‐based  incentive.  Under  this  system, ind power producers are paid INR 500 for every MWh fed to the grid. 

fw  

Energy and Utilities – Monthly Update 

Page 13: Research on India_Energy and Utilities Sector in India Monthly Update_January 2012

Indian government setting up solar firm to help achieve solar capacity target The Government of India is setting up a company with an initial capital of INR 20 bn to develop  federal  solar projects  in  the  country. The  aim of  the  company will  be  to help  India  achieve  its  target  of  20  GW  of  solar  energy  capacity  by  2022.  The  new ompany, Solar Energy Corporation, will gradually take over responsibility for federal csolar projects from NTPC Vidyut Vyapar Nigam Ltd., a subsidiary of NTPC Ltd.  The  government  is  also  looking  to  infuse more  capital  in  their  renewable  financing company,  The  Indian Renewable Energy Development Agency, which now has  total reserves of about INR 13 bn. Also, road shows are being planned in the US and Europe to attract foreign investments in the renewable energy sector, especially solar energy, for the next phase of the solar program which will be launched at the beginning of FY 013.  India  is  aiming  to  increase solar  capacity by 4‐7 GW during  this phase which nds in 2017. 2e   News Update  

 

Expansion Plans  Shell’s LNG terminal at Hazira to be expanded Shell  and  Total  which  operate  a  liquefied  natural  gas  (LNG)  terminal  at  Hazira, Gujarat, have decided to increase the terminal's capacity to 10 mn tonnes per annum (mtpa). At present,  the  terminal’s  capacity  is 3.6 mtpa which will  be  expanded  to 5 mtpa  by  2013.  With  new  gas  pipelines  being  laid  in  the  country  and  with  LNG consumption being on the rise, the company intends to further increase capacity to 10 tpa. Increasing capacity from 5 mtpa to 10 mtpa may cost the company up to INR 40 m

bn depending on the technology which will be used for re‐gasifying LNG.  The Hazira terminal began with a capacity of 2.5 mtpa and was expanded to 3.6 mtpa in  Dec  2008.  Shell  uses  the  terminal  only  for  re‐gasifying  spot  LNG  and  capacity utilization at the terminal has been fairly good. The anticipated deficit in domestic gas will cause many companies to rely on sourcing Re‐gasified Liquid Natural Gas. Shell as already initiated the process of seeking environmental approvals for the capacity xpansion. he Talma Chemical venturing into solar power business Talma Chemical Industries is planning to venture into the solar power business and is investing  INR  17  bn  for  this  purpose.  The  company  has  also  launched  a  special purpose vehicle called Visual Percept Solar Projects  to develop  the solar projects.  It ill  have  a  generation  capacity  of  100  MW  and  will  be  based  on  photovoltaic echnology. wt 

Energy and Utilities – Monthly Update 

Page 14: Research on India_Energy and Utilities Sector in India Monthly Update_January 2012

The  company  believes  that  the  renewable  energy  segment,  especially  solar  energy, provides good opportunity in the asset‐based investment business. With India aiming to  increase  its solar power generation capacity  to 20000 MW by 2020, many power utilities such as Tata Power Company, Reliance Power, GMR Energy and Adani Power re  expanding  into  renewable  energy.  The  sector  has  also  been  very  attractive  for oreign companies to invest in. af Reliance and Shell setting up LNG terminal in the country Reliance  Power  and Royal Dutch  Shell  are  in  talks  to  set  up  a  liquefied  natural  gas (LNG) terminal in the country. The terminal will be used by Reliance Power to secure supplies for its gas‐fired power plant. The two companies are in talks to form a joint enture in which both companies will hold equal stake and Kakinada port in Andhra vPradesh will own a minority stake.  The LNG terminal is likely to be set up at Kakinada and will require an investment of NR 30 bn. It will be used to import and supply gas to Reliance Power's 2400 MW, gas‐ired plant in Andhra Pradesh which is set to become operational this year. If Azure Power sets up first 5 MW solar power plant under JNNSM Azure  Power  has  commissioned  a  5 MW  solar  power  plant  in  Rajasthan’s  Kathauti village. This is Azure’s third solar plant in the state in a span of 2 years and the first 5 MW plant under the Jawaharlal Nehru National Solar Mission (JNNSM). The company took  only  11  months  to  commission  the  plant  starting  from  signing  of  the  power purchase agreement. The plant which is set up under Phase I Batch I of the JNNSM will upply power to Rajasthan Rajya Vidyut Utpadan Nigam Ltd and is expected to reduce scarbon emissions by up to 5500 metric tonnes per year.  Apart  from  generating  electricity,  the  plant  will  also  help  in  boosting  the  local economy. The project has  employed many  locals  thereby generating  income  for  the community. Azure Power also plans to carry out community awareness programs in rder  to make villagers aware of PV  technology. The  company has been allotted 40 W out of JNNSM's total allocation of 500 MW. 

oM Mahindra Solar One commissions its first 5 MW solar power plant Mahindra Solar One has successfully commissioned its first 5 MW solar power plant. The  plant  is  situated  in  Jodhpur,  Rajasthan  and  is  part  of  the  Jawaharlal  Nehru National  Solar  Mission  (JNNSM)  policy.  The  plant  is  unique  in  the  sense  that  it generates  the  highest  output  per  MW  compared  to  any  other  solar  plant  in  the country. It uses the tracker technology which maximizes the energy from the sun. It is lso the first solar power project to get non‐recourse financing, showing the banking a

Energy and Utilities – Monthly Update 

sector’s confidence in the solar industry.  The 5 MW plant was commissioned in a record time of just 100 days. It is expected to provide electricity to around 60000 rural homes and result in the reduction of 8000 

Page 15: Research on India_Energy and Utilities Sector in India Monthly Update_January 2012

tonnes  of  carbon  dioxide  emissions  per  year.  Mahindra  Solar  plans  to  play  a ignificant  role  in  the  country’s  solar  power  generation.  Along  with  their  partner iran Energy, they have already won 50 MW of solar projects under the JNNSM. 

sK Mahanadi Coalfields setting up 1600 MW power plant Mahanadi Coalfields Limited (MCL) is setting up a 1600 MW power plant with super critical  technology  in  Sundargarh, Orissa. MCL  is  the  only  coal  company  in  India  to venture into power generation. The company wants to utilize its huge undespatchable oal reserve in the Basundhara area of Sundargarh as well as invest its surplus funds ccreatively.  The  coal  based  power  plant which will  have  two  units  of  800 MW  based  on  super critical technology is estimated to cost around INR 90 bn. The project will be funded through a debt‐equity ratio of 70:30 with MCL holding 26% of the stake. This may go up to 49% but the management will be under a private partner. The partner will be selected  through  competitive bidding  and  a prospective bidders’ meet was  recently held  in  Bhubaneswar which  saw  participation  from 42  interested parties.  The  Coal inistry  has  given  approval  to  the  project  and  the  power  plant  is  likely  to  be perational during the Twelfth Plan Period. Mo Bhilwara Energy setting up 120 MW hydro project in Nepal ndia’s  Bhilwara  Energy  Limited  (BEL),  a  part  of  the  LNJ  Bhilwara  Group,  is undertaking  a  120 MW  hydroelectric  project  in  Nepal.  A  consortium  of  Indian  and Nepali Banks  is giving  loans of about  INR 6.63 bn which  is  required  for  the project. This  project  will  be  BEL’s  first  hydroelectric  project  outside  India.  The  project  is expected to not only help Nepal harness its hydro power potential, but will also help India  in  terms of power supplies. Over 90% of  the  land required  for  the project has lready  been  acquired  by  the  company  and  preconstruction  activities  have  already abegun.  The total cost of the project is INR 10.2 bn. While IDBI Bank is the lead lender, other banks  in  the  consortium  include  Oriental  Bank  of  Commerce,  Punjab  &  Sind  Bank, Exim  Bank,  PTC  Financial  Services  and  Everest  Bank  of  Nepal.  Bhilwara  Group currently  has  300  MW  of  installed  capacity  and  another  800  MW  of  hydro  power project  is  under  construction  in  Tawang,  Arunachal  Pradesh.  The  group  is  also oraying  into  wind  power  generation  with  a  50  MW  wind  farm  in  Maharashtra’s atara district which is likely to be commissioned by Mar 2012. fS Moser Baer sets up 5 MW solar farm in Rajasthan Moser Baer India Ltd. has installed a 5 MW solar farm in Jodhpur, Rajasthan. The solar farm which is spread across an area of 60 acres has a capacity equivalent to powering 70000  households.  It  is  part  of  the  INR  52  bn  investment  that  the  company  has promised the states of Gujarat, Orissa, West Bengal and Rajasthan, for projects worth 

Energy and Utilities – Monthly Update 

Page 16: Research on India_Energy and Utilities Sector in India Monthly Update_January 2012

300MW. The farm has been built under the Jawaharlal Nehru National Solar Mission (JNNSM).  The solar farm was built using 13000 amorphous silicon thin‐film modules, delivering 380W. It will generate around 92 mn units of electricity per annum and save carbon missions  equivalent  to  8400  tonnes  annually.  Rajasthan  is  currently  producing 0MW of solar energy and by Mar 2013 it aims to increase this to 150MW. e8 Abound Solar, Solarsis commission 1 MW solar plant in Andhra Pradesh Abound  Solar  and  Solar  Integration  Systems  India  Private  Limited  (Solarsis)  has commissioned a 1 MW solar photovoltaic plant in Kadiri, Andhra Pradesh. The plant has  been  commissioned  less  than  a  year  after  the  two  companies  announced  a partnership targeting the solar energy sector in India. The project was commissioned under  the Rooftop and Other Small Solar Power Generation Plant  (RPSSGP) scheme nder the Jawaharlal Nehru National Solar Mission (JNNSM) and is the first project in ndhra Pradesh to use Abound Solar Cadmium Telluride (CdTe) thin‐film modules. uA   Industry Expert Speak  GAIL to  import natural gas from US at the much  lower Henry Hub prices – A K Balyan, Managing Director & Chief Executive Oficer, Petronet LNG “It is a good effort by GAIL. It enlarges the source portfolio and impacts traditional gas uppliers, ushering  in a more  competitive environment. We will  also  look  to  source as from the US,” sg Mahindra  Solar One  commissions 5 MW  solar power plant  in Rajasthan  – Dr. Farooq Abdullah, Union Cabinet Minister, Ministry of New and Renewable Energy “The New & Renewable Energy Ministry recognizes the  important role Solar Energy plays for our country’s energy security. The JNNSM policy is crafted to create a robust and scalable solar  industry and  I am delighted to be  launching one of  the  first solar lants commissioned under this scheme by a respected corporate  like the Mahindra roup.” pG Rajasthan  to be major hub  for solar energy development – Ashok Gehlot,   Minister, Rajasthan “The  state  of  Rajasthan  will  be  a  frontrunner  to  produce  electricity  through  solar energy. Presently, Rajasthan is producing 80MW of solar energy and by next March it aims  to  produce  150MW.  Barmer,  Jaisalmer  and  Phalodi  is  making  history  in  the generation of Solar Energy and going forward we aim to make Rajasthan a solar hub of the country.” 

Chief

 

Energy and Utilities – Monthly Update 

Page 17: Research on India_Energy and Utilities Sector in India Monthly Update_January 2012

 Transaction Detail (November 2011 – January 2012) 

 

 

Date  Buyer  Target Deal Size (INR mn) 

% stake  Deal Status Type of 

Transaction 

2  5th Jan2012 

Zephyr Peacock  Gadhia Solar  5000  NA  Completed  Private Equity 

2  3rd Jan2012 

Mitsubishi Electric 

Corporation Messung Group  NA  NA  Completed  M&A 

2  3rd Jan2012 

Tata Power  MEC Coal  NA  15  Planned  Private Equity 

2 c 2nd De2011 

Reliance Industries Ltd 

Terra Power LLC  NA  NA  Completed  Private Equity 

2  1st Dec2011 

IL&FS Private Equity 

IL&FS Energy Development Company Ltd 

2300  NA  Completed  Private Equity 

1 c 6th De2011 

PTC India Financial Services 

Mytrah Energy India Ltd 

1000  NA  Completed  Private Equity 

8  th Dec2011 

Vedanta Resources Plc 

Cairn India Ltd  211600  30  Completed  Private Equity 

1 v 8th No2011 

Deutsche Investitions‐ und Entwicklungsgese

llschaft 

Azure Power Ind td. ia Pvt. L

680  NA  Completed  Private Equity 

7  th Nov2011 

Macquarie SBI Infrastructure 

Fund 

Soham Renewable 

Energy India Pvt. Ltd. 

3750  NA  Completed  Private Equity 

4  th Nov2011 

Sesa Goa Ltd Goa Energy 

Private Limited 537  100  Completed  Private Equity 

3  rd Nov2011 

Briggs & Stratton Corporation 

Premier Power Equipments and Products Pvt. Ltd 

149  NA  Completed  M&A 

  

Energy and Utilities – Monthly Update 

Page 18: Research on India_Energy and Utilities Sector in India Monthly Update_January 2012

 Annual Financial Results – Revenue (INR mn)  

Company  FY ‘08  FY ‘09  FY ‘10  FY ‘11 

Accurate Transformers Ltd.  1,801.2  1,847.0  1,912.5  NA 

Aditya Birla Nuvo Ltd.  119,039.7  138,939.7  157,699.4  183,529.9 

Alfa Transformers Ltd.  347.29  317.334  198.347  199.634 

Areva T&D India Ltd.  26,412.1  35,658.8  40,200.4  NA 

Asian Electronics Ltd.  2,185.177  2,139.941  2,478.879  1,508.399 

Best & Crompton Engineering Ltd.  1,942.2  2,510.6  2,411.0  NA 

Bharat Bijlee Ltd.  5,623.9  5,447.0  6,551.4  6,970.4 

Bharat Heavy Electricals Ltd.  194,013.4  265,477.1  331,991.9  418,975.5 

Bharat Petroleum Corp. Ltd.  1,112,431.1  1,365,571.2  1,238,167.2  1,536,449.7 

Birla Power Solutions Ltd.   2,167.1  2,247.7  2,381.3  3,583.3 

C & C Constructions Ltd.  5,358.7  7,471.1  11,695.9  NA 

Cairn India Ltd.  12,509.2 *  11,168.3  16,230.3  102,779.3 

Crompton Greaves Ltd.  68,720.1  87,372.6  91,408.7  100,051.1 

Cummins India Ltd.  27,261.0  36,162.5  28,509.2  39,537.3 

Easun Reyrolle Ltd.  1,949.0  1,604.2  2,574.1  2,987.2 

ECE Industries Ltd.  1,994.506  2,105.508  1,480.417  1,856.637 

Emco Ltd.  9,442.5  9,962.6  11,059.0  10,618.5 

Eon Electric Ltd  2,643.313  2,606.445  2,301.334  1,206.089 

Energy and Utilities – Monthly Update 

Page 19: Research on India_Energy and Utilities Sector in India Monthly Update_January 2012

Company  FY ‘08  FY ‘09  FY ‘10  FY ‘11 

GAIL India Ltd.  188,379.1  247,818.0  270,353.0  351,066.5 

Gammon India Ltd.  26,434.6  51,661.8  70,474.8  88,136.5 

Genus Power Infrastructures Ltd.  4,675.9  5,581.1  6,541.3  7,141.8 

Goldstone Infratech Ltd.  508.214  463.72  672.289  690.019 

Greaves Cotton Ltd.  11,941.6 *  10,667.0 *  13,936.1 *  17,069.2 

Gujarat Gas Co. Ltd.  13,012.5  14,196.7  18,493.3  NA 

Havells India Ltd.   50,029.3  54,774.9  51,625.7  56,126.3 

Honda Siel Power Products Ltd.  2,525.5  2,336.5  3,085.7  4,103.8 

ICSA (India) Ltd.  6,728.5  11,222.4  12,379.1  14,048.7 

IMP Powers Ltd.  1,342.9  1,906.6  1,927.0  2,491.5 

Indian Oil Corporation Ltd  2,280,113.6  2,862,330.2  2,502,393.3  3,082,561.7 

Indo Tech Transformers Ltd.  1,900.265  2,068.977  981.297  1,109.694 

Indraprastha Gas Ltd.  7,059.8  8,527.7  10,781.2  17,440.7 

IVRCL Ltd.  38,559.9  50,808.7  58,466.8  68,507.0 

Jyoti Ltd.  2,080.2  2,533.3  2,911.0  3,838.3 

Jyoti Structures Ltd.  13,737.9  18,393.6  21,297.7  23,996.2 

Kalpataru Power Transmission Ltd.  26,757.6  32,517.5  40,371.7  43,586.4 

Kaushalya Infrastructure Development Corporation Ltd. 

700.528  822.804  830.331  920.489 

KEC International Ltd.  28,144.7  34,290.9  39,077.5  44,765.0 

Kirloskar Brothers Ltd.  20,590.4  24,633.3  26,697.5  26,517.2 

Energy and Utilities – Monthly Update 

Page 20: Research on India_Energy and Utilities Sector in India Monthly Update_January 2012

Company  FY ‘08  FY ‘09  FY ‘10  FY ‘11 

Kirloskar Oil Engines Ltd.  NA  NA  17,783.0  23,701.0 

KSB Pumps Ltd.  5,981.0  5,653.0  6,102.2  NA 

Larsen & Toubro Ltd.  292,118.6  401,949.6  435,285.3  515,624.4 

Mahindra & Mahindra Ltd.  244,452.9  269,197.6  316,879.2  370,254.4 

Marsons Ltd.  533.268  394.106  724.529  1,057.08 

Moser Baer India Ltd.   20,887.6  24,730.0  24,518.5  26,108.3 

NCC Ltd.  36,581.3  47,864.6  58,973.1  62,298.7 

NHPC Ltd.  29,329.1  34,937.7  51,680.0  51,472.8 

NTPC Ltd.  386,930.0  427,197.0  483,115.9  574,831.7 

Numeric Power Systems Ltd.  4,259.6  4,433.6  4,602.3  5,094.4 

Oil and Natural Gas Corp. Ltd.  975,173.9  1,052,756.6  1,026,655.8  1,201,955.1 

Oil India Ltd.  62,773.0  72,308.0  79,335.3  83,668.6 

Petronet LNG Ltd.  65,553.1  84,287.0  106,490.9  131,972.9 

Power Grid Corporation Of India Ltd.  46,232.1  56,900.3  71,276.6  86,520.0 

PTC India Ltd.  39,101.5  65,337.2  78,043.1  91,069.8 

Reliance Industries Ltd.  1,371,466.6  1,511,354.9  2,037,397.2  2,658,106.0 

Roto Pumps Ltd.  400.153  500.996  498.557  594.367 

Shakti Pumps (India) Ltd.  1,043.727 *  1,067.492 *  1,322.36 *  1,799.819 

Shilchar Technologies Ltd.  700.03  471.296  710.833  934.709 

Siemens Ltd.  96,858.4  93,070.2  96,272.4  NA 

Energy and Utilities – Monthly Update 

Page 21: Research on India_Energy and Utilities Sector in India Monthly Update_January 2012

Company  FY ‘08  FY ‘09  FY ‘10  FY ‘11 

Suzlon Energy Ltd.  136,794.3  260,817.0  206,196.6  178,791.3 

Transformers and Rectifiers (India) Ltd. 

3,057.1  4,305.0  5,197.1  5,421.4 

Triveni Engineering & Industries Ltd.  16,179.0  19,129.1  22,608.6  NA 

Voltamp Transformers Ltd.  5,553.5  6,489.1  5,419.7  5,262.9 

W.S. Industries (India) Ltd.  2,269.9  2,248.4  2,220.5  2,574.5 

Websol Energy Systems Ltd.  1,006.3  1,391.2  1,169.1 *  2,255.5 

*Change in financial year   Annual Financial Results – Income (INR mn)  

Company  FY ‘08  FY ‘09  FY ‘10  FY ‘11 

Accurate Transformers Ltd.  71.0  69.5  62.1  NA 

Aditya Birla Nuvo Ltd.  1,507.8  (4,357.3)  1,545.6  8,221.0 

Alfa Transformers Ltd.  26.888  34.99  7.369  (4.306) 

Areva T&D India Ltd.  2,263.2  1,920.0  1,867.4  NA 

Asian Electronics Ltd.  (1,541.099)  50.277  (13.771)  (925.583) 

Best & Crompton Engineering Ltd.  (23.3)  173.7  (191.3)  NA 

Bharat Bijlee Ltd.  724.9  475.3  412.2  735.3 

Bharat Heavy Electricals Ltd.  28,593.4  31,151.7  43,269.2  60,533.6 

Bharat Petroleum Corp. Ltd.  17,695.5  6,337.6  16,323.6  16,349.6 

Birla Power Solutions Ltd.   55.3  31.7  13.5  98.7 

Energy and Utilities – Monthly Update 

Page 22: Research on India_Energy and Utilities Sector in India Monthly Update_January 2012

Company  FY ‘08  FY ‘09  FY ‘10  FY ‘11 

C & C Constructions Ltd.  408.3  329.7  623.6  NA 

Cairn India Ltd.  7,847.5 *  6,870.2  10,511.1  63,344.0 

Crompton Greaves Ltd.  4,067.2  5,599.0  8,598.7  8,886.7 

Cummins India Ltd.  3,249.1  4,629.1  4,438.7  5,909.9 

Easun Reyrolle Ltd.  252.8  27.1  459.5  (36.6) 

ECE Industries Ltd.  181.568  60.165  81.219  20.907 

Emco Ltd.  643.6  523.8  1,280.5  (583.9) 

Eon Electric Ltd  135.221  56.329  28.516  2,634.839 

GAIL India Ltd.  27,829.0  28,263.5  33,278.3  40,209.7 

Gammon India Ltd.  712.9  563.2  457.0  1,100.3 

Genus Power Infrastructures Ltd.  477.8  132.0  263.9  610.8 

Goldstone Infratech Ltd.  97.067  62.718  67.323  32.347 

Greaves Cotton Ltd.  1,041.7 *  444.8 *  1,174.7 *  1,684.3 

Gujarat Gas Co. Ltd.  1,606.5  1,741.7  2,577.5  NA 

Havells India Ltd.   1,609.6  (1,601.6)  695.6  3,035.7 

Honda Siel Power Products Ltd.  247.3  156.4  126.9  296.6 

ICSA (India) Ltd.  1,092.9  1,512.1  1,215.1  1,254.3 

IMP Powers Ltd.  93.6  157.2  45.9  27.8 

Indian Oil Corporation Ltd  79,127.4  25,994.0  107,131.9  78,307.2 

Indo Tech Transformers Ltd.  389.844  389.68  (83.868)  (227.441) 

Energy and Utilities – Monthly Update 

Page 23: Research on India_Energy and Utilities Sector in India Monthly Update_January 2012

Company  FY ‘08  FY ‘09  FY ‘10  FY ‘11 

Indraprastha Gas Ltd.  1,744.6  1,724.7  2,155.0  2,597.7 

IVRCL Ltd.  2,834.4  2,279.0  2,155.6  506.0 

Jyoti Ltd.  104.7  46.4  80.7  118.6 

Jyoti Structures Ltd.  699.6  851.0  833.9  997.7 

Kalpataru Power Transmission Ltd.  1,647.9  1,106.6  1,781.8  1,988.6 

Kaushalya Infrastructure Development Corporation Ltd. 

24.943  35.59  28.396  28.111 

KEC International Ltd.  1,721.6  1,168.1  1,896.6  2,056.5 

Kirloskar Brothers Ltd.  1,361.9  852.7  1,127.7  970.2 

Kirloskar Oil Engines Ltd.  NA  NA  1,312.1  1,737.3 

KSB Pumps Ltd.  715.1  707.9  583.9  NA 

Larsen & Toubro Ltd.  23,253.6  37,894.6  54,507.4  44,561.7 

Mahindra & Mahindra Ltd.  15,711.2  14,054.1  24,785.6  30,797.3 

Marsons Ltd.  7.67  (7.354)  21.846  51.695 

Moser Baer India Ltd.   (2,022.9)  (3,637.5)  (3,939.3)  (8,487.6) 

NCC Ltd.  1,674.8  1,813.4  2,827.4  2,221.9 

NHPC Ltd.  12,070.4  11,848.9  21,755.6  23,161.6 

NTPC Ltd.  74,699.0  80,925.0  88,376.5  93,482.3 

Numeric Power Systems Ltd.  426.2  384.7  379.3  409.5 

Oil and Natural Gas Corp. Ltd.  198,722.6  197,953.4  194,035.3  224,559.3 

Oil India Ltd.  17,796.0  21,616.8  26,104.4  28,837.3 

Energy and Utilities – Monthly Update 

Page 24: Research on India_Energy and Utilities Sector in India Monthly Update_January 2012

Company  FY ‘08  FY ‘09  FY ‘10  FY ‘11 

Petronet LNG Ltd.  4,746.5  5,184.4  4,045.0  6,196.2 

Power Grid Corporation Of India Ltd.  14,484.7  16,906.1  20,409.4  26,719.1 

PTC India Ltd.  482.8  940.9  1,072.7  1,660.3 

Reliance Industries Ltd.  195,678.3  149,713.0  245,033.7  192,940.1 

Roto Pumps Ltd.  30.318  33.05  41.544  53.886 

Shakti Pumps (India) Ltd.  71.443 *  78.073 *  107.549 *  178.909 

Shilchar Technologies Ltd.  32.123  0.217  15.354  11.62 

Siemens Ltd.  5,995.5  7,046.0  7,577.7  NA 

Suzlon Energy Ltd.  10,301.0  2,364.8  (9,825.6)  (13,239.7) 

Transformers and Rectifiers (India) Ltd. 

346.0  452.4  516.4  415.2 

Triveni Engineering & Industries Ltd.  1,219.8  1,743.6  697.5  NA 

Voltamp Transformers Ltd.  799.0  1,148.0  825.3  517.8 

W.S. Industries (India) Ltd.  169.1  158.4  (115.7)  (402.6) 

Websol Energy Systems Ltd.  52.5  105.6  (57.2) *  24.2 

*Change in financial year            

Energy and Utilities – Monthly Update 

Page 25: Research on India_Energy and Utilities Sector in India Monthly Update_January 2012

Events Calendar  

         

                      

International Multi Disciplinary Conference on Solar Energy Date: 1st – 3rd February 2012 Venue: Chennai, Tamil Nadu 

ararajan Organizer: Meenakshi SundEngineering College Website: www.imdcse.org Contact ID: [email protected] Contact No: +91 44 2480 1636 

Trends in Renewable Energy, Sources, Applic tion  & Technologiea s s (TRESAT­2012) Date: 1st – 3rd February 2012 Venue: Chennai, Tamil Nadu Organizer: Centre for Nanoscience & 

rsity y.com

Nanotechnology, Sathyabama univeWebsite: www.centrefornanotechnolog  Contact ID: [email protected] Contact No: +91 44 2450 3065 / 3814 

Fifth National Conference on Advances in Energy onversion Technol C ogies (AECT 2012) Date: 2nd – 4th February 2012 

anipal, Karnataka y 

Venue: MOrganizer: Manipal Institute of Technolog

12Website: 

aect20www.conference.manipal.edu/  Contact ID: [email protected]/ Contact No: +91 9845282635 

2012 International Conference on Product Develop ent nd Renewable m  a Energy Resources (ICPDRE 2012) Date: 18th – 19th February 2012 Venue: Coimbatore, Tamil Nadu 

 of n Technology 

Organizer: International Associationatio/

Computer Science and InformWebsite: www.iacsit.org/icpdre  Contact ID: [email protected] Contact No: +86 28 8652 7868 

National Conference on Emerging Technologies  n Renewable En

REEi ergy & 

E2012) Electrical Engineering (ETDate: 25th – 26th February 2012 Venue: Bhilwara, Rajasthan Organizer: Institute of Technology & Management, Bhilwara Website: www.itm‐bhilwara.ac.in/ETREEE‐2012.php Contact ID: conference@itm‐bhilwara.ac.in 

The Solar Future: India II Date: 29th February – 1st March 2012 Venue: Jaipur, Rajasthan Organizer: Solarplaza 

.inWebsite: www.thesolarfuture  olarplaza.comContact ID: p.vanderlinden@s  

Contact No: +31 10 280 9198 

           

Energy and Utilities – Monthly Update 

Page 26: Research on India_Energy and Utilities Sector in India Monthly Update_January 2012

Research on India (ROI) is a leading source for market research on various sectors in ndia  that  offers  premium  research  content  from  worldwide  publishers  of  market 

orts.  Iresearch rep Contact us:  

mW: https://www.researchonindia.co   ; International: +91 (33) 4027 6214/5 T

E: India (Toll Free): 1800 102 1133: [email protected]     Connect with Us 

      Disclaimer: This monthly update is published for general information only based on press articles and company releases. Research on India has not independently verified any of information and is not responsible for any loss or damage arising from use of this document.  

Energy and Utilities – Monthly Update