REQUEST FOR PRO POSAL APPENDIX H 006 A T A Ex SHEAR TEST 14KF057 UNDISTURBED FIELD VANE WATER LEVEL...
Transcript of REQUEST FOR PRO POSAL APPENDIX H 006 A T A Ex SHEAR TEST 14KF057 UNDISTURBED FIELD VANE WATER LEVEL...
Ope
RE
Ge
13‐
CLIENerators of Joh
EQUEST
APP
eotechnic
‐006‐A T
T: TradePorthn C. Munro
A
FOR PRO
PENDIX H
cal Inves
Taxi A Ex
InternationaHamilton Int
April 2015
OPOSAL
H
stigation
xpansion
al Corporatioernational A
n
n
on, irport (YHM)
COARSE
MEDIUM
SILT & CLAYSAND
1
1570002.5
FIGURE NO.
COB
BLES
FINE MEDIUMGRAVEL
VERY FINE
FINE
SAND
FINE COARSE
SILT
COARSE
MEDIUM COARSE
SANDCLAY
CLAY SILT GRAVEL
GRAVEL COBBLES
14KF057PML REF.
SAMPLE NO.PARTICLE SIZE DISTRIBUTION CHART
UNIFIED
REMARKS Borehole14-7, Sample 1, Depth 0.10 to 0.13 m
GRANULAR BASE
M.I.T.
U.S. BUREAUFINE MEDIUM
0
10
20
30
40
50
60
70
80
90
100
0.001 0.010 0.100 1.000 10.000 100.000
CU
MU
LA
TIV
E P
ER
CE
NT
PA
SS
ING
GRAIN SIZE IN MILLIMETERS
Granular B Specifications
U.S. STANDARD SIEVE SIZES HYDROMETER
270 200 140 100 80 60 40 20 16 14 10 8 4 1/4" 3/8" 1/2" 3/4" 1" 1-1/2" 2" 3"
0.001 0.005 0.01 0.05 0.1 0.5 1 .0 5.0 10 .0 50 .0 100.0
COARSE
MEDIUM
SILT & CLAYSAND
2
1570002.6
FIGURE NO.
COB
BLES
FINE MEDIUMGRAVEL
VERY FINE
FINE
SAND
FINE COARSE
SILT
COARSE
MEDIUM COARSE
SANDCLAY
CLAY SILT GRAVEL
GRAVEL COBBLES
14KF057PML REF.
SAMPLE NO.PARTICLE SIZE DISTRIBUTION CHART
UNIFIED
REMARKS Borehole 14-14, Sample 1, Depth 0.15 to 0.34 m
GRANULAR BASE
M.I.T.
U.S. BUREAUFINE MEDIUM
0
10
20
30
40
50
60
70
80
90
100
0.001 0.010 0.100 1.000 10.000 100.000
CU
MU
LA
TIV
E P
ER
CE
NT
PA
SS
ING
GRAIN SIZE IN MILLIMETERS
Granular B Specifications
U.S. STANDARD SIEVE SIZES HYDROMETER
270 200 140 100 80 60 40 20 16 14 10 8 4 1/4" 3/8" 1/2" 3/4" 1" 1-1/2" 2" 3"
0.001 0.005 0.01 0.05 0.1 0.5 1 .0 5.0 10 .0 50 .0 100.0
COARSE
MEDIUM
SILT & CLAYSAND
3
1570002.3
FIGURE NO.
COB
BLES
FINE MEDIUMGRAVEL
VERY FINE
FINE
SAND
FINE COARSE
SILT
COARSE
MEDIUM COARSE
SANDCLAY
CLAY SILT GRAVEL
GRAVEL COBBLES
14KF057PML REF.
SAMPLE NO.PARTICLE SIZE DISTRIBUTION CHART
UNIFIED
REMARKS Borehole 14-1, Sample 2, Depth 0.33 to 1.9 m
GRANULAR SUBBASE
M.I.T.
U.S. BUREAUFINE MEDIUM
0
10
20
30
40
50
60
70
80
90
100
0.001 0.010 0.100 1.000 10.000 100.000
CU
MU
LA
TIV
E P
ER
CE
NT
PA
SS
ING
GRAIN SIZE IN MILLIMETERS
Granular B Specifications
U.S. STANDARD SIEVE SIZES HYDROMETER
270 200 140 100 80 60 40 20 16 14 10 8 4 1/4" 3/8" 1/2" 3/4" 1" 1-1/2" 2" 3"
0.001 0.005 0.01 0.05 0.1 0.5 1 .0 5.0 10 .0 50 .0 100.0
COARSE
MEDIUM
PARTICLE SIZE DISTRIBUTION CHART
UNIFIED
REMARKS Borehole 14-6, Sample 1, Depth 0.17 to 0.97 m
GRANULAR SUBBASE
M.I.T.
U.S. BUREAUFINE MEDIUM
CLAY
CLAY SILT GRAVEL
GRAVEL COBBLES
14KF057PML REF.
SAMPLE NO.
VERY FINE
FINE
SAND
FINE COARSE
SILT
COARSE
MEDIUM COARSE
SAND
SILT & CLAYSAND
4
1570002.4
FIGURE NO.
COB
BLES
FINE MEDIUMGRAVEL
0
10
20
30
40
50
60
70
80
90
100
0.001 0.010 0.100 1.000 10.000 100.000
CU
MU
LA
TIV
E P
ER
CE
NT
PA
SS
ING
GRAIN SIZE IN MILLIMETERS
Granular B Specifications
U.S. STANDARD SIEVE SIZES HYDROMETER
270 200 140 100 80 60 40 20 16 14 10 8 4 1/4" 3/8" 1/2" 3/4" 1" 1-1/2" 2" 3"
0.001 0.005 0.01 0.05 0.1 0.5 1 .0 5.0 10 .0 50 .0 100.0
COARSE
MEDIUM
MEDIUM
MEDIUM
5
1570002.1
FIGURE NO.
COB
BLES
FINE MEDIUMGRAVEL
GRAVEL
GRAVEL COBBLES
14KF057
SILT & CLAYSAND
VERY FINE
FINE
SAND
UNIFIED
REMARKS Borehole 14-2, Sample 1, Depth 2.0 - 2.3 m
CLAYEY SILT, TRACE SAND
M.I.T.
U.S. BUREAU
COARSE
SANDCLAY
CLAY
PML REF.
SAMPLE NO.PARTICLE SIZE DISTRIBUTION CHART
SILT
FINE COARSE
SILT
COARSEFINE
0
10
20
30
40
50
60
70
80
90
100
0.001 0.010 0.100 1.000 10.000 100.000
CU
MU
LA
TIV
E P
ER
CE
NT
PA
SS
ING
GRAIN SIZE IN MILLIMETERS
U.S. STANDARD SIEVE SIZES HYDROMETER
270 200 140 100 80 60 40 20 16 14 10 8 4 1/4" 3/8" 1/2" 3/4" 1" 1-1/2" 2" 3"
0.001 0.005 0.01 0.05 0.1 0.5 1 .0 5.0 10 .0 50 .0 100.0
COARSE
MEDIUM
MEDIUM
MEDIUM
6
157002.2
FIGURE NO.
COB
BLES
FINE MEDIUMGRAVEL
GRAVEL
GRAVEL COBBLES
14KF057
SILT & CLAYSAND
VERY FINE
FINE
SAND
UNIFIED
REMARKS Borehole 14-11, Sample 1, Depth 1.5 to 2.0 m
CLAYEY SILT, TRACE SAND
M.I.T.
U.S. BUREAU
COARSE
SANDCLAY
CLAY
PML REF.
SAMPLE NO.PARTICLE SIZE DISTRIBUTION CHART
SILT
FINE COARSE
SILT
COARSEFINE
0
10
20
30
40
50
60
70
80
90
100
0.001 0.010 0.100 1.000 10.000 100.000
CU
MU
LA
TIV
E P
ER
CE
NT
PA
SS
ING
GRAIN SIZE IN MILLIMETERS
U.S. STANDARD SIEVE SIZES HYDROMETER
270 200 140 100 80 60 40 20 16 14 10 8 4 1/4" 3/8" 1/2" 3/4" 1" 1-1/2" 2" 3"
0.001 0.005 0.01 0.05 0.1 0.5 1 .0 5.0 10 .0 50 .0 100.0
LIST OF ABBREVIATIONS
PENETRATION RESISTANCE
Standard Penetration Resistance N: - The number of blows required to advance a standard split spoon
sampler 0.3 m into the subsoil. - Driven by means of a 63.5 kg hammer falling freely a distance of 0.76 m.
Dynamic Penetration Resistance: The number of blows required to advance a 51 mm, 60 degree cone, fitted
to the end of drill rods, 0.3 m into the subsoil. The driving energy being 475 J per blow.
DESCRIPTION OF SOIL
The consistency of cohesive soils and the relative density or denseness of cohesionless soils are described in
the following terms:
CONSISTENCY N (blows/0.3 m) c (kPa) DENSENESS N (blows/0.3 m)
Very Soft 0 - 2 0 - 12 Very Loose 0 - 4
Soft 2 - 4 12 - 25 Loose 4 - 10
Firm 4 - 8 25 - 50 Compact 10 - 30
Stiff 8 - 15 50 - 100 Dense 30 - 50
Very Stiff 15 - 30 100 - 200 Very Dense > 50
Hard > 30 > 200
WTPL Wetter Than Plastic Limit
APL About Plastic Limit
DTPL Drier Than Plastic Limit
TYPE OF SAMPLE
SS Split Spoon TW Thinwall Open
WS Washed Sample TP Thinwall Piston
SB Scraper Bucket Sample OS Oesterberg Sample
AS Auger Sample FS Foil Sample
CS Chunk Sample RC Rock Core
ST Slotted Tube Sample USS Undisturbed Shear Strength
PH Sample Advanced Hydraulically RSS Remoulded Shear Strength
PM Sample Advanced Manually
SOIL TESTS
Qu Unconfined Compression LV Laboratory Vane
Q Undrained Triaxial FV Field Vane
Qcu Consolidated Undrained Triaxial C Consolidation
Qd Drained Triaxial PML-GEO-508A Rev. 2009-04
1
2
3
GS
GS
GS
Upon completion ofaugeringCave at 1.2 mNo free water
1.2
1.5
PAVEMENT STRUCTURE: 160 mm ofasphalt, over 170 mm of granular base,damp, over, 860 mm of granular subbase,occasional cobbles, damp
CLAYEY SILT: Grey clayey silt, somesand, trace gravel, DTPLBOREHOLE TERMINATED AT 1.5 m
(kPa)
kN/m3
UN
IT W
EIG
HT
LE
GE
ND
LIQUID LIMIT
NU
MB
ER
CHECKED BY
GRAIN SIZEDISTRIBUTION (%)
GROUND ELEVATION
PLASTIC LIMIT
SA SI&CL
Hamilton International Airport, Hamilton, Ontario
WL
LOCATION
Apron 2 Design Works
W
D. Brice
KH
BORING DATE:
REMOLDED FIELD VANEWATER LEVEL OBSERVED DURING /UPON COMPLETION OF DRILLING
POCKET PENETROMETER
POCKET TORVANE
LAB SHEAR TEST
14KF057
UNDISTURBED FIELD VANE
WATER LEVEL MEASURED INMONITORING WELL
PML REF.:
BL
OW
S/0
.3m
N -
VA
LU
ES
LOG OF BOREHOLE NO. 14-1
10 20 30
NU
MB
ER
SOIL PROFILE
20 40 60 80
TECHNICIAN
DESCRIPTIONDEPTH
in
METRES
NOTES:
K. Hanes
PROJECT
GROUND WATER
OBSERVATIONS
AND REMARKS
LE
GE
ND
SAMPLES
TY
PE WP
WATER CONTENT
50 100 150 200
0.0
ENGINEER
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
10.0
11.0
12.0
13.0
14.0
15.0
16.0
17.0
BLOWS/0.3M
BORING METHOD
WATER CONTENT %
W
WL
Continuous Flight Solid Stem Augers
GROUND ELEVATION
TY
PE
SHEAR STRENGTH Cu
DYNAMIC CONE PENETRATION
STANDARD PENETRATION TEST
BL
OW
S/0
.3m
N -
VA
LU
ES
EL
EV
AT
ION
SC
AL
E
WP
GR
2014 12 15
LOG OF BOREHOLE REV. 08/2012 PETOMAC.GDT 2015 01 19
1 GS 1
Upon completion ofaugeringCave at 2.0 mNo free water
10 89
0.18
1.2
1.9
3.0
TOPSOIL: Dark brown silt, trace sand,trace clay, moistSILT: Brown silt, some sand, trace clay,trace gravel, damp
CLAYEY SILT: Brown clayey silt, tracesand, trace gravel, APL
becoming DTPL
BOREHOLE TERMINATED AT 3.0 m
(kPa)
kN/m3
UN
IT W
EIG
HT
LE
GE
ND
LIQUID LIMIT
NU
MB
ER
CHECKED BY
GRAIN SIZEDISTRIBUTION (%)
GROUND ELEVATION
PLASTIC LIMIT
SA SI&CL
Hamilton International Airport, Hamilton, Ontario
WL
LOCATION
Apron 2 Design Works
W
D. Brice
KH
BORING DATE:
REMOLDED FIELD VANEWATER LEVEL OBSERVED DURING /UPON COMPLETION OF DRILLING
POCKET PENETROMETER
POCKET TORVANE
LAB SHEAR TEST
14KF057
UNDISTURBED FIELD VANE
WATER LEVEL MEASURED INMONITORING WELL
PML REF.:
BL
OW
S/0
.3m
N -
VA
LU
ES
LOG OF BOREHOLE NO. 14-2
10 20 30
NU
MB
ER
SOIL PROFILE
20 40 60 80
TECHNICIAN
DESCRIPTIONDEPTH
in
METRES
NOTES:
K. Hanes
PROJECT
GROUND WATER
OBSERVATIONS
AND REMARKS
LE
GE
ND
SAMPLES
TY
PE WP
WATER CONTENT
50 100 150 200
0.0
ENGINEER
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
10.0
11.0
12.0
13.0
14.0
15.0
16.0
17.0
BLOWS/0.3M
BORING METHOD
WATER CONTENT %
W
WL
Continuous Flight Solid Stem Augers
GROUND ELEVATION
TY
PE
SHEAR STRENGTH Cu
DYNAMIC CONE PENETRATION
STANDARD PENETRATION TEST
BL
OW
S/0
.3m
N -
VA
LU
ES
EL
EV
AT
ION
SC
AL
E
WP
GR
2014 12 15
LOG OF BOREHOLE REV. 08/2012 PETOMAC.GDT 2015 01 19
1
2
GS
GS
Upon completion ofaugeringCave at 1.0 mNo free water
0.27
0.58
1.5
TOPSOIL: Dark brown silt, trace sand,trace gravel, moistSILT: Brown silt, some sand, trace clay,trace gravel, dampCLAYEY SILT: Brown clayey silt, somesand, trace gravel, DTPLBOREHOLE TERMINATED AT 1.5 m
(kPa)
kN/m3
UN
IT W
EIG
HT
LE
GE
ND
LIQUID LIMIT
NU
MB
ER
CHECKED BY
GRAIN SIZEDISTRIBUTION (%)
GROUND ELEVATION
PLASTIC LIMIT
SA SI&CL
Hamilton International Airport, Hamilton, Ontario
WL
LOCATION
Apron 2 Design Works
W
D. Brice
KH
BORING DATE:
REMOLDED FIELD VANEWATER LEVEL OBSERVED DURING /UPON COMPLETION OF DRILLING
POCKET PENETROMETER
POCKET TORVANE
LAB SHEAR TEST
14KF057
UNDISTURBED FIELD VANE
WATER LEVEL MEASURED INMONITORING WELL
PML REF.:
BL
OW
S/0
.3m
N -
VA
LU
ES
LOG OF BOREHOLE NO. 14-3
10 20 30
NU
MB
ER
SOIL PROFILE
20 40 60 80
TECHNICIAN
DESCRIPTIONDEPTH
in
METRES
NOTES:
K. Hanes
PROJECT
GROUND WATER
OBSERVATIONS
AND REMARKS
LE
GE
ND
SAMPLES
TY
PE WP
WATER CONTENT
50 100 150 200
0.0
ENGINEER
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
10.0
11.0
12.0
13.0
14.0
15.0
16.0
17.0
BLOWS/0.3M
BORING METHOD
WATER CONTENT %
W
WL
Continuous Flight Solid Stem Augers
GROUND ELEVATION
TY
PE
SHEAR STRENGTH Cu
DYNAMIC CONE PENETRATION
STANDARD PENETRATION TEST
BL
OW
S/0
.3m
N -
VA
LU
ES
EL
EV
AT
ION
SC
AL
E
WP
GR
2014 12 15
LOG OF BOREHOLE REV. 08/2012 PETOMAC.GDT 2015 01 19
1 GS
Upon completion ofaugeringOpenNo free water
0.20
0.90
1.8
3.0
TOPSOIL: Dark brown silt, trace sand,trace clay, moistSILT: Brown silt, some sand, trace gravel,dampCLAYEY SILT: Brown clayey silt, somesand, APL
becoming DTPL
BOREHOLE TERMINATED AT 3.0 m
(kPa)
kN/m3
UN
IT W
EIG
HT
LE
GE
ND
LIQUID LIMIT
NU
MB
ER
CHECKED BY
GRAIN SIZEDISTRIBUTION (%)
GROUND ELEVATION
PLASTIC LIMIT
SA SI&CL
Hamilton International Airport, Hamilton, Ontario
WL
LOCATION
Apron 2 Design Works
W
D. Brice
KH
BORING DATE:
REMOLDED FIELD VANEWATER LEVEL OBSERVED DURING /UPON COMPLETION OF DRILLING
POCKET PENETROMETER
POCKET TORVANE
LAB SHEAR TEST
14KF057
UNDISTURBED FIELD VANE
WATER LEVEL MEASURED INMONITORING WELL
PML REF.:
BL
OW
S/0
.3m
N -
VA
LU
ES
LOG OF BOREHOLE NO. 14-4
10 20 30
NU
MB
ER
SOIL PROFILE
20 40 60 80
TECHNICIAN
DESCRIPTIONDEPTH
in
METRES
NOTES:
K. Hanes
PROJECT
GROUND WATER
OBSERVATIONS
AND REMARKS
LE
GE
ND
SAMPLES
TY
PE WP
WATER CONTENT
50 100 150 200
0.0
ENGINEER
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
10.0
11.0
12.0
13.0
14.0
15.0
16.0
17.0
BLOWS/0.3M
BORING METHOD
WATER CONTENT %
W
WL
Continuous Flight Solid Stem Augers
GROUND ELEVATION
TY
PE
SHEAR STRENGTH Cu
DYNAMIC CONE PENETRATION
STANDARD PENETRATION TEST
BL
OW
S/0
.3m
N -
VA
LU
ES
EL
EV
AT
ION
SC
AL
E
WP
GR
2014 12 15
LOG OF BOREHOLE REV. 08/2012 PETOMAC.GDT 2015 01 19
1
2
GS
GS
Upon completion ofaugeringCave at 1.0 mNo free water
0.94
1.5
PAVEMENT STRUCTURE: 110 mm ofasphalt, over 100 mm of granular base,damp, over 725 mm of granular subbase,occasional cobbles, dampSILT: Brown silt, some sand, trace clay,trace gravel, dampBOREHOLE TERMINATED AT 1.5 m
(kPa)
kN/m3
UN
IT W
EIG
HT
LE
GE
ND
LIQUID LIMIT
NU
MB
ER
CHECKED BY
GRAIN SIZEDISTRIBUTION (%)
GROUND ELEVATION
PLASTIC LIMIT
SA SI&CL
Hamilton International Airport, Hamilton, Ontario
WL
LOCATION
Apron 2 Design Works
W
D. Brice
KH
BORING DATE:
REMOLDED FIELD VANEWATER LEVEL OBSERVED DURING /UPON COMPLETION OF DRILLING
POCKET PENETROMETER
POCKET TORVANE
LAB SHEAR TEST
14KF057
UNDISTURBED FIELD VANE
WATER LEVEL MEASURED INMONITORING WELL
PML REF.:
BL
OW
S/0
.3m
N -
VA
LU
ES
LOG OF BOREHOLE NO. 14-5
10 20 30
NU
MB
ER
SOIL PROFILE
20 40 60 80
TECHNICIAN
DESCRIPTIONDEPTH
in
METRES
NOTES:
K. Hanes
PROJECT
GROUND WATER
OBSERVATIONS
AND REMARKS
LE
GE
ND
SAMPLES
TY
PE WP
WATER CONTENT
50 100 150 200
0.0
ENGINEER
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
10.0
11.0
12.0
13.0
14.0
15.0
16.0
17.0
BLOWS/0.3M
BORING METHOD
WATER CONTENT %
W
WL
Continuous Flight Solid Stem Augers
GROUND ELEVATION
TY
PE
SHEAR STRENGTH Cu
DYNAMIC CONE PENETRATION
STANDARD PENETRATION TEST
BL
OW
S/0
.3m
N -
VA
LU
ES
EL
EV
AT
ION
SC
AL
E
WP
GR
2014 12 15
LOG OF BOREHOLE REV. 08/2012 PETOMAC.GDT 2015 01 19
1
2
GS
GS
Upon completion ofaugeringOpenNo free water
0.97
1.5
PAVEMENT STRUCTURE: 90 mm ofasphalt, over 80 mm of granular base,damp, over 800 mm of granular subbase,dampSILT: Brown silt, some sand, trace clay,trace gravel, dampBOREHOLE TERMINATED AT 1.5 m
(kPa)
kN/m3
UN
IT W
EIG
HT
LE
GE
ND
LIQUID LIMIT
NU
MB
ER
CHECKED BY
GRAIN SIZEDISTRIBUTION (%)
GROUND ELEVATION
PLASTIC LIMIT
SA SI&CL
Hamilton International Airport, Hamilton, Ontario
WL
LOCATION
Apron 2 Design Works
W
D. Brice
KH
BORING DATE:
REMOLDED FIELD VANEWATER LEVEL OBSERVED DURING /UPON COMPLETION OF DRILLING
POCKET PENETROMETER
POCKET TORVANE
LAB SHEAR TEST
14KF057
UNDISTURBED FIELD VANE
WATER LEVEL MEASURED INMONITORING WELL
PML REF.:
BL
OW
S/0
.3m
N -
VA
LU
ES
LOG OF BOREHOLE NO. 14-6
10 20 30
NU
MB
ER
SOIL PROFILE
20 40 60 80
TECHNICIAN
DESCRIPTIONDEPTH
in
METRES
NOTES:
K. Hanes
PROJECT
GROUND WATER
OBSERVATIONS
AND REMARKS
LE
GE
ND
SAMPLES
TY
PE WP
WATER CONTENT
50 100 150 200
0.0
ENGINEER
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
10.0
11.0
12.0
13.0
14.0
15.0
16.0
17.0
BLOWS/0.3M
BORING METHOD
WATER CONTENT %
W
WL
Continuous Flight Solid Stem Augers
GROUND ELEVATION
TY
PE
SHEAR STRENGTH Cu
DYNAMIC CONE PENETRATION
STANDARD PENETRATION TEST
BL
OW
S/0
.3m
N -
VA
LU
ES
EL
EV
AT
ION
SC
AL
E
WP
GR
2014 12 15
LOG OF BOREHOLE REV. 08/2012 PETOMAC.GDT 2015 01 19
1
2
3
GS
GS
GS
Upon completion ofaugeringCave at 1.2 mNo free water
0.97
1.5
PAVEMENT STRUCTURE: 95 mm ofasphalt, over 130 mm of granular base,damp, over 740 mm of granular subbase,dampCLAYEY SILT: Grey clayey silt, tracesand, trace gravel, APLBOREHOLE TERMINATED AT 1.5 m
(kPa)
kN/m3
UN
IT W
EIG
HT
LE
GE
ND
LIQUID LIMIT
NU
MB
ER
CHECKED BY
GRAIN SIZEDISTRIBUTION (%)
GROUND ELEVATION
PLASTIC LIMIT
SA SI&CL
Hamilton International Airport, Hamilton, Ontario
WL
LOCATION
Apron 2 Design Works
W
D. Brice
KH
BORING DATE:
REMOLDED FIELD VANEWATER LEVEL OBSERVED DURING /UPON COMPLETION OF DRILLING
POCKET PENETROMETER
POCKET TORVANE
LAB SHEAR TEST
14KF057
UNDISTURBED FIELD VANE
WATER LEVEL MEASURED INMONITORING WELL
PML REF.:
BL
OW
S/0
.3m
N -
VA
LU
ES
LOG OF BOREHOLE NO. 14-7
10 20 30
NU
MB
ER
SOIL PROFILE
20 40 60 80
TECHNICIAN
DESCRIPTIONDEPTH
in
METRES
NOTES:
K. Hanes
PROJECT
GROUND WATER
OBSERVATIONS
AND REMARKS
LE
GE
ND
SAMPLES
TY
PE WP
WATER CONTENT
50 100 150 200
0.0
ENGINEER
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
10.0
11.0
12.0
13.0
14.0
15.0
16.0
17.0
BLOWS/0.3M
BORING METHOD
WATER CONTENT %
W
WL
Continuous Flight Solid Stem Augers
GROUND ELEVATION
TY
PE
SHEAR STRENGTH Cu
DYNAMIC CONE PENETRATION
STANDARD PENETRATION TEST
BL
OW
S/0
.3m
N -
VA
LU
ES
EL
EV
AT
ION
SC
AL
E
WP
GR
2014 12 15
LOG OF BOREHOLE REV. 08/2012 PETOMAC.GDT 2015 01 19
1 GS
Upon completion ofaugeringOpenNo free water
0.09
1.41.5
TOPSOIL: Dark brown silt, trace clay,trace sand, trace gravel, moistSILT: Brown silt, some sand, trace gravel,damp
CLAYEY SILT: Dark brown clayey silt,some sand, DTPLBOREHOLE TERMINATED AT 1.5 m
(kPa)
kN/m3
UN
IT W
EIG
HT
LE
GE
ND
LIQUID LIMIT
NU
MB
ER
CHECKED BY
GRAIN SIZEDISTRIBUTION (%)
GROUND ELEVATION
PLASTIC LIMIT
SA SI&CL
Hamilton International Airport, Hamilton, Ontario
WL
LOCATION
Apron 2 Design Works
W
D. Brice
KH
BORING DATE:
REMOLDED FIELD VANEWATER LEVEL OBSERVED DURING /UPON COMPLETION OF DRILLING
POCKET PENETROMETER
POCKET TORVANE
LAB SHEAR TEST
14KF057
UNDISTURBED FIELD VANE
WATER LEVEL MEASURED INMONITORING WELL
PML REF.:
BL
OW
S/0
.3m
N -
VA
LU
ES
LOG OF BOREHOLE NO. 14-8
10 20 30
NU
MB
ER
SOIL PROFILE
20 40 60 80
TECHNICIAN
DESCRIPTIONDEPTH
in
METRES
NOTES:
K. Hanes
PROJECT
GROUND WATER
OBSERVATIONS
AND REMARKS
LE
GE
ND
SAMPLES
TY
PE WP
WATER CONTENT
50 100 150 200
0.0
ENGINEER
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
10.0
11.0
12.0
13.0
14.0
15.0
16.0
17.0
BLOWS/0.3M
BORING METHOD
WATER CONTENT %
W
WL
Continuous Flight Solid Stem Augers
GROUND ELEVATION
TY
PE
SHEAR STRENGTH Cu
DYNAMIC CONE PENETRATION
STANDARD PENETRATION TEST
BL
OW
S/0
.3m
N -
VA
LU
ES
EL
EV
AT
ION
SC
AL
E
WP
GR
2014 12 15
LOG OF BOREHOLE REV. 08/2012 PETOMAC.GDT 2015 01 19
1
2
3
GS
GS
GS
Upon completion ofaugeringOpenNo free water
0.16
1.2
2.1
3.0
TOPSOIL: Dark brown silt, trace sand,trace gravel, moistSILT: Brown silt, some sand, trace clay,trace gravel, damp
CLAYEY SILT: Brown clayey silt, tracegravel, trace sand, APL
becoming DTPL
BOREHOLE TERMINATED AT 3.0 m
(kPa)
kN/m3
UN
IT W
EIG
HT
LE
GE
ND
LIQUID LIMIT
NU
MB
ER
CHECKED BY
GRAIN SIZEDISTRIBUTION (%)
GROUND ELEVATION
PLASTIC LIMIT
SA SI&CL
Hamilton International Airport, Hamilton, Ontario
WL
LOCATION
Apron 2 Design Works
W
D. Brice
KH
BORING DATE:
REMOLDED FIELD VANEWATER LEVEL OBSERVED DURING /UPON COMPLETION OF DRILLING
POCKET PENETROMETER
POCKET TORVANE
LAB SHEAR TEST
14KF057
UNDISTURBED FIELD VANE
WATER LEVEL MEASURED INMONITORING WELL
PML REF.:
BL
OW
S/0
.3m
N -
VA
LU
ES
LOG OF BOREHOLE NO. 14-9
10 20 30
NU
MB
ER
SOIL PROFILE
20 40 60 80
TECHNICIAN
DESCRIPTIONDEPTH
in
METRES
NOTES:
K. Hanes
PROJECT
GROUND WATER
OBSERVATIONS
AND REMARKS
LE
GE
ND
SAMPLES
TY
PE WP
WATER CONTENT
50 100 150 200
0.0
ENGINEER
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
10.0
11.0
12.0
13.0
14.0
15.0
16.0
17.0
BLOWS/0.3M
BORING METHOD
WATER CONTENT %
W
WL
Continuous Flight Solid Stem Augers
GROUND ELEVATION
TY
PE
SHEAR STRENGTH Cu
DYNAMIC CONE PENETRATION
STANDARD PENETRATION TEST
BL
OW
S/0
.3m
N -
VA
LU
ES
EL
EV
AT
ION
SC
AL
E
WP
GR
2014 12 15
LOG OF BOREHOLE REV. 08/2012 PETOMAC.GDT 2015 01 19
Upon completion ofaugeringOpenNo free water
0.11
1.5
TOPSOIL: Dark brown silt, trace sand,trace gravel, moistSILT: Brown silt, some sand, trace gravel,trace clay, damp
BOREHOLE TERMINATED AT 1.5 m
(kPa)
kN/m3
UN
IT W
EIG
HT
LE
GE
ND
LIQUID LIMIT
NU
MB
ER
CHECKED BY
GRAIN SIZEDISTRIBUTION (%)
GROUND ELEVATION
PLASTIC LIMIT
SA SI&CL
Hamilton International Airport, Hamilton, Ontario
WL
LOCATION
Apron 2 Design Works
W
D. Brice
KH
BORING DATE:
REMOLDED FIELD VANEWATER LEVEL OBSERVED DURING /UPON COMPLETION OF DRILLING
POCKET PENETROMETER
POCKET TORVANE
LAB SHEAR TEST
14KF057
UNDISTURBED FIELD VANE
WATER LEVEL MEASURED INMONITORING WELL
PML REF.:
BL
OW
S/0
.3m
N -
VA
LU
ES
LOG OF BOREHOLE NO. 14-10
10 20 30
NU
MB
ER
SOIL PROFILE
20 40 60 80
TECHNICIAN
DESCRIPTIONDEPTH
in
METRES
NOTES:
K. Hanes
PROJECT
GROUND WATER
OBSERVATIONS
AND REMARKS
LE
GE
ND
SAMPLES
TY
PE WP
WATER CONTENT
50 100 150 200
0.0
ENGINEER
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
10.0
11.0
12.0
13.0
14.0
15.0
16.0
17.0
BLOWS/0.3M
BORING METHOD
WATER CONTENT %
W
WL
Continuous Flight Solid Stem Augers
GROUND ELEVATION
TY
PE
SHEAR STRENGTH Cu
DYNAMIC CONE PENETRATION
STANDARD PENETRATION TEST
BL
OW
S/0
.3m
N -
VA
LU
ES
EL
EV
AT
ION
SC
AL
E
WP
GR
2014 12 15
LOG OF BOREHOLE REV. 08/2012 PETOMAC.GDT 2015 01 19
1 GS 1
Upon completion ofaugeringOpenNo free water
8 91
0.15
0.91
3.0
TOPSOIL: Dark brown silt, trace sand,trace clay, moistSILT: Brown silt, some sand, trace clay,trace gravel, moist to dampCLAYEY SILT: Brown clayey silt, somesand, trace gravel, DTPL
BOREHOLE TERMINATED AT 3.0 m
(kPa)
kN/m3
UN
IT W
EIG
HT
LE
GE
ND
LIQUID LIMIT
NU
MB
ER
CHECKED BY
GRAIN SIZEDISTRIBUTION (%)
GROUND ELEVATION
PLASTIC LIMIT
SA SI&CL
Hamilton International Airport, Hamilton, Ontario
WL
LOCATION
Apron 2 Design Works
W
D. Brice
KH
BORING DATE:
REMOLDED FIELD VANEWATER LEVEL OBSERVED DURING /UPON COMPLETION OF DRILLING
POCKET PENETROMETER
POCKET TORVANE
LAB SHEAR TEST
14KF057
UNDISTURBED FIELD VANE
WATER LEVEL MEASURED INMONITORING WELL
PML REF.:
BL
OW
S/0
.3m
N -
VA
LU
ES
LOG OF BOREHOLE NO. 14-11
10 20 30
NU
MB
ER
SOIL PROFILE
20 40 60 80
TECHNICIAN
DESCRIPTIONDEPTH
in
METRES
NOTES:
K. Hanes
PROJECT
GROUND WATER
OBSERVATIONS
AND REMARKS
LE
GE
ND
SAMPLES
TY
PE WP
WATER CONTENT
50 100 150 200
0.0
ENGINEER
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
10.0
11.0
12.0
13.0
14.0
15.0
16.0
17.0
BLOWS/0.3M
BORING METHOD
WATER CONTENT %
W
WL
Continuous Flight Solid Stem Augers
GROUND ELEVATION
TY
PE
SHEAR STRENGTH Cu
DYNAMIC CONE PENETRATION
STANDARD PENETRATION TEST
BL
OW
S/0
.3m
N -
VA
LU
ES
EL
EV
AT
ION
SC
AL
E
WP
GR
2014 12 15
LOG OF BOREHOLE REV. 08/2012 PETOMAC.GDT 2015 01 19
1
2
GS
GS
Upon completion ofaugeringOpenNo free water
0.12
1.1
1.5
TOPSOIL: Dark brown silt, trace sand,trace gravel, moistSILT: Brown silt, some sand, trace gravel,trace clay, damp
CLAYEY SILT: Brown clayey silt, somesand, APLBOREHOLE TERMINATED AT 1.5 m
(kPa)
kN/m3
UN
IT W
EIG
HT
LE
GE
ND
LIQUID LIMIT
NU
MB
ER
CHECKED BY
GRAIN SIZEDISTRIBUTION (%)
GROUND ELEVATION
PLASTIC LIMIT
SA SI&CL
Hamilton International Airport, Hamilton, Ontario
WL
LOCATION
Apron 2 Design Works
W
D. Brice
KH
BORING DATE:
REMOLDED FIELD VANEWATER LEVEL OBSERVED DURING /UPON COMPLETION OF DRILLING
POCKET PENETROMETER
POCKET TORVANE
LAB SHEAR TEST
14KF057
UNDISTURBED FIELD VANE
WATER LEVEL MEASURED INMONITORING WELL
PML REF.:
BL
OW
S/0
.3m
N -
VA
LU
ES
LOG OF BOREHOLE NO. 14-12
10 20 30
NU
MB
ER
SOIL PROFILE
20 40 60 80
TECHNICIAN
DESCRIPTIONDEPTH
in
METRES
NOTES:
K. Hanes
PROJECT
GROUND WATER
OBSERVATIONS
AND REMARKS
LE
GE
ND
SAMPLES
TY
PE WP
WATER CONTENT
50 100 150 200
0.0
ENGINEER
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
10.0
11.0
12.0
13.0
14.0
15.0
16.0
17.0
BLOWS/0.3M
BORING METHOD
WATER CONTENT %
W
WL
Continuous Flight Solid Stem Augers
GROUND ELEVATION
TY
PE
SHEAR STRENGTH Cu
DYNAMIC CONE PENETRATION
STANDARD PENETRATION TEST
BL
OW
S/0
.3m
N -
VA
LU
ES
EL
EV
AT
ION
SC
AL
E
WP
GR
2014 12 15
LOG OF BOREHOLE REV. 08/2012 PETOMAC.GDT 2015 01 19
1
2
3
GS
GS
GS
Upon completion ofaugeringOpenNo free water
0.36
1.5
PAVEMENT STRUCTURE: 80 mm ofasphalt, over 165 mm of pulverizedasphalt, over 35 mm of asphalt, over 80mm of brown sandy silt, trace gravel,dampCLAYEY SILT: Brown clayey silt, somesand, trace gravel, DTPL to APLBOREHOLE TERMINATED AT 1.5 m
(kPa)
kN/m3
UN
IT W
EIG
HT
LE
GE
ND
LIQUID LIMIT
NU
MB
ER
CHECKED BY
GRAIN SIZEDISTRIBUTION (%)
GROUND ELEVATION
PLASTIC LIMIT
SA SI&CL
Hamilton International Airport, Hamilton, Ontario
WL
LOCATION
Apron 2 Design Works
W
D. Brice
KH
BORING DATE:
REMOLDED FIELD VANEWATER LEVEL OBSERVED DURING /UPON COMPLETION OF DRILLING
POCKET PENETROMETER
POCKET TORVANE
LAB SHEAR TEST
14KF057
UNDISTURBED FIELD VANE
WATER LEVEL MEASURED INMONITORING WELL
PML REF.:
BL
OW
S/0
.3m
N -
VA
LU
ES
LOG OF BOREHOLE NO. 14-13
10 20 30
NU
MB
ER
SOIL PROFILE
20 40 60 80
TECHNICIAN
DESCRIPTIONDEPTH
in
METRES
NOTES:
K. Hanes
PROJECT
GROUND WATER
OBSERVATIONS
AND REMARKS
LE
GE
ND
SAMPLES
TY
PE WP
WATER CONTENT
50 100 150 200
0.0
ENGINEER
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
10.0
11.0
12.0
13.0
14.0
15.0
16.0
17.0
BLOWS/0.3M
BORING METHOD
WATER CONTENT %
W
WL
Continuous Flight Solid Stem Augers
GROUND ELEVATION
TY
PE
SHEAR STRENGTH Cu
DYNAMIC CONE PENETRATION
STANDARD PENETRATION TEST
BL
OW
S/0
.3m
N -
VA
LU
ES
EL
EV
AT
ION
SC
AL
E
WP
GR
2014 12 15
LOG OF BOREHOLE REV. 08/2012 PETOMAC.GDT 2015 01 19
1
2
GS
GS
Upon completion ofaugeringOpenNo free water
0.88
1.5
PAVEMENT STRUCTURE: 145 mm ofasphalt, over 195 mm of granular base,damp, over 540 mm of granular subbase,dampCLAYEY SILT: Brown clayey silt, tracegravel, DTPLBOREHOLE TERMINATED AT 1.5 m
(kPa)
kN/m3
UN
IT W
EIG
HT
LE
GE
ND
LIQUID LIMIT
NU
MB
ER
CHECKED BY
GRAIN SIZEDISTRIBUTION (%)
GROUND ELEVATION
PLASTIC LIMIT
SA SI&CL
Hamilton International Airport, Hamilton, Ontario
WL
LOCATION
Apron 2 Design Works
W
D. Brice
KH
BORING DATE:
REMOLDED FIELD VANEWATER LEVEL OBSERVED DURING /UPON COMPLETION OF DRILLING
POCKET PENETROMETER
POCKET TORVANE
LAB SHEAR TEST
14KF057
UNDISTURBED FIELD VANE
WATER LEVEL MEASURED INMONITORING WELL
PML REF.:
BL
OW
S/0
.3m
N -
VA
LU
ES
LOG OF BOREHOLE NO. 14-14
10 20 30
NU
MB
ER
SOIL PROFILE
20 40 60 80
TECHNICIAN
DESCRIPTIONDEPTH
in
METRES
NOTES:
K. Hanes
PROJECT
GROUND WATER
OBSERVATIONS
AND REMARKS
LE
GE
ND
SAMPLES
TY
PE WP
WATER CONTENT
50 100 150 200
0.0
ENGINEER
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
10.0
11.0
12.0
13.0
14.0
15.0
16.0
17.0
BLOWS/0.3M
BORING METHOD
WATER CONTENT %
W
WL
Continuous Flight Solid Stem Augers
GROUND ELEVATION
TY
PE
SHEAR STRENGTH Cu
DYNAMIC CONE PENETRATION
STANDARD PENETRATION TEST
BL
OW
S/0
.3m
N -
VA
LU
ES
EL
EV
AT
ION
SC
AL
E
WP
GR
2014 12 15
LOG OF BOREHOLE REV. 08/2012 PETOMAC.GDT 2015 01 19
1
2
GS
GS
Upon completion ofaugeringOpenNo free water
0.51
1.5
PAVEMENT STRUCTURE: 250 mm ofasphalt, over 150 mm of pulverizedasphalt, over 110 mm of granular base,dampCLAYEY SILT: Brown clayey silt, somesand, trace gravel, DTPLBOREHOLE TERMINATED AT 1.5 m
(kPa)
kN/m3
UN
IT W
EIG
HT
LE
GE
ND
LIQUID LIMIT
NU
MB
ER
CHECKED BY
GRAIN SIZEDISTRIBUTION (%)
GROUND ELEVATION
PLASTIC LIMIT
SA SI&CL
Hamilton International Airport, Hamilton, Ontario
WL
LOCATION
Apron 2 Design Works
W
D. Brice
KH
BORING DATE:
REMOLDED FIELD VANEWATER LEVEL OBSERVED DURING /UPON COMPLETION OF DRILLING
POCKET PENETROMETER
POCKET TORVANE
LAB SHEAR TEST
14KF057
UNDISTURBED FIELD VANE
WATER LEVEL MEASURED INMONITORING WELL
PML REF.:
BL
OW
S/0
.3m
N -
VA
LU
ES
LOG OF BOREHOLE NO. 14-15
10 20 30
NU
MB
ER
SOIL PROFILE
20 40 60 80
TECHNICIAN
DESCRIPTIONDEPTH
in
METRES
NOTES:
K. Hanes
PROJECT
GROUND WATER
OBSERVATIONS
AND REMARKS
LE
GE
ND
SAMPLES
TY
PE WP
WATER CONTENT
50 100 150 200
0.0
ENGINEER
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
10.0
11.0
12.0
13.0
14.0
15.0
16.0
17.0
BLOWS/0.3M
BORING METHOD
WATER CONTENT %
W
WL
Continuous Flight Solid Stem Augers
GROUND ELEVATION
TY
PE
SHEAR STRENGTH Cu
DYNAMIC CONE PENETRATION
STANDARD PENETRATION TEST
BL
OW
S/0
.3m
N -
VA
LU
ES
EL
EV
AT
ION
SC
AL
E
WP
GR
2014 12 15
LOG OF BOREHOLE REV. 08/2012 PETOMAC.GDT 2015 01 19
1234
GSGSGSGS
Upon completion ofaugeringOpenNo free water
0.310.45
0.84
1.5
PAVEMENT STRUCTURE: 205 mm ofasphalt, over 105 mm of granular base,dampSILT: Grey to brown silt, some sand,trace clay, trace gravel, dampCLAYEY SILT: Brown clayey silt, tracesand, APLbecoming DTPLBOREHOLE TERMINATED AT 1.5 m
(kPa)
kN/m3
UN
IT W
EIG
HT
LE
GE
ND
LIQUID LIMIT
NU
MB
ER
CHECKED BY
GRAIN SIZEDISTRIBUTION (%)
GROUND ELEVATION
PLASTIC LIMIT
SA SI&CL
Hamilton International Airport, Hamilton, Ontario
WL
LOCATION
Apron 2 Design Works
W
D. Brice
KH
BORING DATE:
REMOLDED FIELD VANEWATER LEVEL OBSERVED DURING /UPON COMPLETION OF DRILLING
POCKET PENETROMETER
POCKET TORVANE
LAB SHEAR TEST
14KF057
UNDISTURBED FIELD VANE
WATER LEVEL MEASURED INMONITORING WELL
PML REF.:
BL
OW
S/0
.3m
N -
VA
LU
ES
LOG OF BOREHOLE NO. 14-16
10 20 30
NU
MB
ER
SOIL PROFILE
20 40 60 80
TECHNICIAN
DESCRIPTIONDEPTH
in
METRES
NOTES:
K. Hanes
PROJECT
GROUND WATER
OBSERVATIONS
AND REMARKS
LE
GE
ND
SAMPLES
TY
PE WP
WATER CONTENT
50 100 150 200
0.0
ENGINEER
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
10.0
11.0
12.0
13.0
14.0
15.0
16.0
17.0
BLOWS/0.3M
BORING METHOD
WATER CONTENT %
W
WL
Continuous Flight Solid Stem Augers
GROUND ELEVATION
TY
PE
SHEAR STRENGTH Cu
DYNAMIC CONE PENETRATION
STANDARD PENETRATION TEST
BL
OW
S/0
.3m
N -
VA
LU
ES
EL
EV
AT
ION
SC
AL
E
WP
GR
2014 12 15
LOG OF BOREHOLE REV. 08/2012 PETOMAC.GDT 2015 01 19
100 m60 m 80 m40 m20 m
SCALE
0 m
BH 14-1
BH 14-2
BH 14-3
BH 14-4
BH 14-5
BH 14-15
BH 14-10
BH 14-11
BH 14-6
BH 14-9
BH 14-8
BH 14-12
BH 14-14
BH 14-13
BH 14-16
BH 14-7
T
A
X
I
W
A
Y
A
L
P
H
A
T
A
X
I
W
A
Y
B
R
A
V
O
APRON 2
APRON 2
EXPANSION
WORK AREA
N
NOTE:
REFERENCE:
LEGEND:
THE INFERRED STRATIGRAPHY REFERRED TO IN THE REPORT IS BASED ON THE DATA
FROM THESE BOREHOLES SUPPLEMENTED BY GEOLOGICAL EVIDENCE. THE ACTUAL
STRATIGRAPHY BETWEEN THE BOREHOLES MAY VARY.
BOREHOLE LOCATION PLAN REPRODUCED FROM DRAWING SUPPLIED BY CLIENT.
KEY PLAN
APRON 2 DESIGN WORKS
HAMILTON INTERNATIONAL AIRPORT
HAMILTON, ONTARIO
WSP CANADA INC.
BOREHOLE LOCATION PLAN
DRAWN
CHECKED
APPROVED
D. BRICE
K. HANES
G. MITCHELL
DATE SCALE PML REF. DWG. NO.
JANUARY
2015
AS SHOWN 14KF057 1
BOREHOLE