REPUBLIC SQUARE – transformation August, 2010

description

Transforming an underutilised urban park into the crown jewel of Austins urban open spaces.

Transcript of Republic Sq P1aand1b

Page 1: Republic Sq P1aand1b

REPUBLIC SQUARE – transformationAugust, 2010

Page 2: Republic Sq P1aand1b

THE PARK

Page 3: Republic Sq P1aand1b

THE ORIGIN

Page 4: Republic Sq P1aand1b

THE HISTORY

Page 5: Republic Sq P1aand1b

GOALS AND OBJECTIVES

PRESERVE AND ENHANCE - sense of place

HISTORIC INTERPRETATION – tell the story

CREATE A HUB OF ACTIVITY – celebrate the shade of the great oaks, create a stage, a catalyst for growth

REDEFINE THE SPACE – promote flexibility and a scale of events from 2 people meeting for lunch

to 2000 watching a performance or shopping at the farmers market

Page 6: Republic Sq P1aand1b

THE COHESION - PROJECT FOR PUBLIC SPACES WORKSHOP

Page 7: Republic Sq P1aand1b

HISTORIC LAYERS – The Auction Oak in the 1970's

Page 8: Republic Sq P1aand1b

HISTORIC LAYERS – The Auction Oak in 2007

Page 9: Republic Sq P1aand1b

HISTORIC LAYERS – The Square in the 1980's

Page 10: Republic Sq P1aand1b

HISTORIC LAYERS

Page 11: Republic Sq P1aand1b

HISTORIC LAYERS

Page 12: Republic Sq P1aand1b

HISTORIC LAYERS

Page 13: Republic Sq P1aand1b

HISTORIC LAYERS

Page 14: Republic Sq P1aand1b

THE ANALYSIS

Page 15: Republic Sq P1aand1b

THE VISION – RESET THE PARK

Page 16: Republic Sq P1aand1b

THE VISION

Page 17: Republic Sq P1aand1b

THE VISION – DESIGN

Page 18: Republic Sq P1aand1b

THE VISION – DESIGN

Page 19: Republic Sq P1aand1b

THE VISION – DESIGN

Page 20: Republic Sq P1aand1b

THE VISION – DESIGN

Page 21: Republic Sq P1aand1b

THE MASTERPLAN

Page 22: Republic Sq P1aand1b

THE VISION – GATHERING

Page 23: Republic Sq P1aand1b

THE VISION - PHASING PLAN

Page 24: Republic Sq P1aand1b

THE PARK – phase 1. Root RX of the CRZ

Page 25: Republic Sq P1aand1b

THE PARK – phase 1. Sidewalk Demolition

Page 26: Republic Sq P1aand1b

THE PARK – phase 1. Demolition of the original sidewalks

Page 27: Republic Sq P1aand1b

THE PARK – phase 1. Root mapping and demolition of the existing retaining wall

Page 28: Republic Sq P1aand1b

THE PARK – phase 1. Berm removal

Page 29: Republic Sq P1aand1b

THE PARK – phase 1. Berm removal

Page 30: Republic Sq P1aand1b

THE PARK – phase 1. Berm removal

Page 31: Republic Sq P1aand1b

THE PARK – phase 1. Berm removal

Page 32: Republic Sq P1aand1b

PHASE 1b. The deck design development

Page 33: Republic Sq P1aand1b

PHASE 1b. The deck construction drawings

Page 34: Republic Sq P1aand1b

PHASE 1b. Surveying footings and air-spading

Page 35: Republic Sq P1aand1b

PHASE 1b. Air-spading

Page 36: Republic Sq P1aand1b

PHASE 1b . Protection of roots – non invasive excavation

Page 37: Republic Sq P1aand1b

PHASE 1b. Root protection

Page 38: Republic Sq P1aand1b

PHASE 1b. Setting steel reinforcing and forms around roots

Page 39: Republic Sq P1aand1b

PHASE 1b. Concrete pours

Page 40: Republic Sq P1aand1b

PHASE 1b . Backfill and protection

Page 41: Republic Sq P1aand1b

PHASE 1b . Minimally invasive construction methodology

Page 42: Republic Sq P1aand1b

PHASE 1b. Perimeter above-grade beam

Page 43: Republic Sq P1aand1b

PHASE 1b. Perimeter above grade beam

Page 44: Republic Sq P1aand1b

PHASE 1b. Stone delivery for columns

Page 45: Republic Sq P1aand1b

PHASE 1b. Column stone veneer

Page 46: Republic Sq P1aand1b

PHASE 1b. Secondary Root RX treatment at the critical root zone

Page 47: Republic Sq P1aand1b

PHASE 1b. Cap stone mock-up

Page 48: Republic Sq P1aand1b

PHASE 1b. Columns and stone veneer material

Page 49: Republic Sq P1aand1b

PHASE 1b. Tree grate template around the Auction Oak

Page 50: Republic Sq P1aand1b

PHASE 1b. Perimeter wall stone veneer placement

Page 51: Republic Sq P1aand1b

PHASE 1b. Perimeter wall stone veneer placement

Page 52: Republic Sq P1aand1b

PHASE 1b. Stone veneer and structural steel placement

Page 53: Republic Sq P1aand1b

PHASE 1b. Structural steel placement

Page 54: Republic Sq P1aand1b

PHASE 1b. Structural steel placement

Page 55: Republic Sq P1aand1b

PHASE 1b. Ipe decking placement

Page 56: Republic Sq P1aand1b

PHASE 1b. Lighting placement

Page 57: Republic Sq P1aand1b

PHASE 1b. Punch list

Page 58: Republic Sq P1aand1b

PHASE 1b. Punch list

Page 59: Republic Sq P1aand1b

PHASE 1b. The deck

Page 60: Republic Sq P1aand1b

PHASE 1b. The deck details

Page 61: Republic Sq P1aand1b

PHASE 1b. The deck details

Page 62: Republic Sq P1aand1b

PHASE 1b. The deck