Reply to pre-bid queries in respect of Selection of ...himachalservices.nic.in/hpridc/Reply to pre...
Transcript of Reply to pre-bid queries in respect of Selection of ...himachalservices.nic.in/hpridc/Reply to pre...
Page 1 of 38
Reply to pre-bid queries in respect of Selection of Project Management and Construction Supervision Consultant (PMCSC) for Construction
of the Highway Tunnel parallel to the Dhalli Tunnel under the Shimla Smart City Mission Dohwa Engineering Co. Ltd.
1 Section 2.
Instructions to
Consultants
E. Data Sheet
Page No 32
2.4 The Client will provide the
following inputs, project data,
reports, etc. to facilitate the
preparation of the Proposals: The feasibility and detailed design of Dhalli tunnel in Shimla prepared by M/s GC- RITES-SECON JV comprising of GEOCONSULT ZT GmbH (Lead Firm), Hoelzlstrasse 563, A-5071 Wals/Salzburg, Austria and RITES Ltd., RITES Bhawan, 1, Sector-29, Gurgaon-122001 and SECON Pvt. Ltd., #147, 7B Road, Expert Industrial Park, Whitefield,
Banglore-560066
The feasibility and detailed design
Report is essential for consultant
to understand the project
thoroughly and prepare
comprehensive proposal.
The Consultant would like to
request available download link.
Agreed, the requisite reports have been uploaded on
the HPRIDC website which can be accessed at the
following link http://himachalservices.nic.in/hpridc/
2 Section 6. Terms
of Reference
Page No 69
Under this project, detailed engineering design, preparation of safeguards documents and preparation of BoQ, cost estimates and bidding documents of approximately 3800 meters of tunnels was undertaken for implementation either through direct financing or through PPP mode. For de-congestion of vehicle traffic in the state capital Shimla the following tunnels were studied and proposed for
implementation:-
1) Lift to Lakkar Bazar
(Idgah) having total length
350 meters approx. 2) List to Himfed Petrol-
Pump having total length
On the ToR, it is stated that detailed design was conducted for approximately 3800 metres of tunnels., However, for this PMC project, only 2660 metres, adding up 1) to 4), are proposed for the consultancy service. For Consultant’s thorough understanding on the Project features, the consultant would like
to request detailed Project Features
such as Approach Road part
included in this contract.
DPR consultant under HPSRP-1 has prepared
detailed engineering design, safeguards
documents , BoQ, cost estimates and bidding
documents of tunnels in Shimla as mentioned in
section 6 Tor page 69.
Please note that the scope of current
consultancy is confined only to one tunnel i.e.
Sanjauli- Dhalli Tunnel having length of 160
metres approximately.
Page 2 of 38
950 meters approx. 3) Himfed Petrol Pump to IGMC having total length 1200
meters approx.
4) Sanjauli-Dhalli tunnel having
length of 160 meters approx.
3 Section 6.
Terms of
Reference
Page No.
74-75, 79
Designs / DPRs
i. PMC shall carry out designs and
design reviews observing the best
engineering practices. PMC shall
also prepare designs, review DPRs
following best engineering
practices. WB guidelines and
Employers rules and regulations,
IRC publications, Indian Bureau of
Standards and any other developed
countries standards shall be
followed in the order of appearance
here above. When a set of
standards is followed for design,
the review shall normally follow
that set of standards. Design/design
review and DPRs shall have to
cater to site requirements,
construction amenability and least
life cycle cost aspects.
ii. PMC will assist the client in
reviewing and finalizing of
designs and DPR prepared for
PIU by M/s GC-RITES-
SECON JV comprising of
GEOCONSULT ZT GmbH
(Lead Firm), Hoelzlstrasse 563,
A-5071 Wals/Salzburg, Austria
and RITES Ltd., RITES
Bhawan, 1, Sector-29, Gurgaon-
On the ToR, Detailed Scope of
Consultancy, Designs
/DPRs part mentions that PMC
shall carry out designs and
design reviews. On the other hand, “Monitoring /
Execution of Project” part
mentions PMC would assist the
Client in reviewing document
prepared by Design Consultant. The consultant would like to seek
if the Re-Design / Design Report
is included in the deliverable. Or,
The consultant is requested to
review the design report which
was prepared by the Design
Consultant.
PMC has to review, update and finalize the existing
design
Page 3 of 38
122001 and SECON Pvt. Ltd.,
#147, 7B Road, Expert
Industrial Park, Whitefield,
Banglore-560066. Monitoring / Execution of Project
c. Construction Supervision
Consultant
(1) For project preparatory
works/consultancy
(a) To assist the client in
reviewing and finalization of all
the documents prepared by the
Design Consultant/ any other
consultant.
4 Section 6. Terms of Reference Page No. 80 & 100
c. Construction Supervision
Consultant (1) For project preparatory
works/consultancy (2) During Construction of Tunnel
and approaches (3) Post construction/consultancy
The primary responsibility for day
to day supervision of works will be
of the HPRIDC and the consultant
role will be to assist the
HPPWD/HPRIDC in respect of
Quality assurance and Technical
Audit of works.
On the ToR, page 80, During
Construction of Tunnel and
approaches, it is mentioned that the
Consultant shall carry out duties of
the “Project Manager (Engineer)”. However, on Page 100, it is stated
that the primary responsibility for
day to day supervision of works
will be of the HPRIDC and the
Consultant role will be assisting
HPRIDC. Please clarify who if separate
Construction Supervision
Consultant will be selected or
PMC’s work scope
includes Construction Supervision
Consultancy and act as the “Project Manager (Engineer)”.
PMC’s work scope includes Construction
Supervision Consultancy and also to act as
overall Project Manager consultant.
Moreover, the intending consulting firms are
required to submit separate manpower
deployment along with price breakups for initial
PMC activities before award of civil works and
PMC activities including Construction
Supervision post award of civil works.
Page 4 of 38
5 Section 6. Terms of Reference Page No. 83
Location & Duration of the Services and Deliverables The PMC will have to establish its
main office in Shimla. The selected
Consultant will be responsible for
making his own arrangements for
accommodation for the office of the
Team Leader and all associated
staff stationed in Shimla as well as
for at-site staff. The Consultant
should also make his own
arrangements for office furniture,
equipment, stationeries,
photocopiers, communication
facilities like telephones, web
connections, facsimiles, etc.
including maintenance thereof and
vehicles for transportation of office
staff, etc. (including operation,
maintenance, insurances and repairs
thereof).
It is stated that PMC will have to establish main office in Shimla.
If PMC’s work scope includes
Construction Supervision
Consultancy, Site Office shall be
also prepared at Project Site.
In this regard, the Consultant
would like to seek clarification
if Contractor will provide Site
Office for PMC
The consultant have to set up office at Shimla as the
proposed tunnel falls within the municipal limits of
Shimla. The consultant has to factor office
accommodation cost in his/her bid as mentioned in
the Page 83 of Section-II, Detailed Scope of
Consultancy.
6 Section 6. Terms of Reference Page No. 83
Location & Duration of the
Services and Deliverables The
PMC services will be carried out
over the entire project preparation
(6 months), implementation
period (18 months)
plus one additional one year.
The Consultant would like to seek
clarification if “plus one
additional one year” is mentioning
“Defect Liability Period.“
Yes, it is Defect Liability Period.
7. Section 6. Terms of Reference Page No. 83
Location & Duration of the Services and Deliverables The Consultant shall submit the
inception report no later than
4 weeks after …….. ……… The targets and approximate duration of various tasks/deliverables of PMC consultancy are scheduled below:
The Schedule of various tasks/deliverables of PMC
Consultancy is missing. Please
clarify.
Consultant have to provide reports as per RFP
TOR Section -2 (Page no. 84).
Page 5 of 38
8. Data Sheet & Section 6. Terms of Reference Page No. 34 & 86
Data Sheet 14.1.2: Estimated input of Key
Experts’ time-input: 222
person-months. Terms of Reference
VI Staffing: The total indicative
man-months requirement of key
professional staff inputs is about
234.
There is difference in key professional’s M/M. - Data Sheet: 222 MM - Terms of Reference: 234 MM
Please clarify.
Please refer to Annexure-I, page 95.
Key professional staff man month=222,
Sub professional staff= 234
Requirement of Key professional staff IT-ICT
Manager (Expert) has been deleted from the
current proposal. Hence man months of Key
Professional staff turns 210
9. Section 6.
Terms of
Reference
Page No. 88
• Team Leader cum Infrastructure
Expert:
He should have previously worked
as Team Leader or in similar
capacity on at least two Project
Management works of major road
tunnel projects costing more than
US$ 100 Million or at least 150 km
length of road project.(which
includes at least 1500 m of road
tunnels works)
It is stated the proposed T/L should
have experience of major road
tunnel projects work which project
costs more than US$ 100 Million. The Consultant would like to
seek if the Project Cost means
total Construction Cost or
Consultancy Value.
Project Cost means total Construction Cost of
project.
10. Section 6. Terms of Reference Page No. 89
• Deputy Team Leader cum
Project Management Expert: He
should have previously worked as
Team Leader or in similar capacity
on at least two Project Management
works of major road tunnel projects
of Two- laning/four
laning/expressway costing more
than US$ 100 Million or at least
100 km length of the project.(which
includes at least
1000 m of road tunnel works)
It is stated the proposed DTL
should have experience of road
tunnel projects work which
project costs more than US$ 100
Million. The Consultant would like to
seek if the Project Cost means
total Construction Cost or
Consultancy Value.
Please refer reply at sr.no. 9
11. Section 6. Terms of Reference Page No. 91
• Senior Quality Cum Material Engineer He should have handled at least 2 similar highway tunnel
It is stated the proposed Senior
Quality Cum Material Engineer
should have experience of
Yes,
i) US $ 50 means US$ 50 million.
ii) Project Cost means total Construction Cost or
Page 6 of 38
projects costing not less than US$ 50 as Material Engineer/Geo-technical Engineer.
similar highway tunnel projects
which project costs more than
US$ 50.
The Consultant would like to
seek if i) US$50 means US$
50million ii) if the Project Cost
means total Construction Cost
or Consultancy Value.
Consultancy Value.
12
Item 1(v) of
Terms of
Reference
(ToR), Item
Section II
(Design/
DPRs), Section
II (b), Key
Deliverables
Page No. 84
Provide training to the PIU staff
Prepare a Road Safety Action Plan
It is not evident from the Key
Deliverables what timelines are
required for execution and delivery
of some activities including the
training plan and road safety action
plan over the 48 months of services
as desired by the Client. This may
please be clarified.
The period of consultancy is 36 months including
Defect Liability Period of 12 months. The
consultant can finalize the training schedule in
consultation with the Employer. There will be
maximum of six training with batch of 30-40
participants.
13. Under
Monitoring &
Execution of
project, under
item (c)
Construction
Supervision
Consultant,
item 5.
Training and
capacity
building
Page No 82
It is understood that all these
training shall be on tunnel
engineering including the
construction of tunnel. However, the
list includes identification of
equipment / instrument and their
procurement etc.
Please clarify the topics of the
capacity building training to be
imparted to the PIU staff and other
stakeholders.
Please refer to Task 6: Training and Technology
Transfer, of ToR for QATA.
14. Section 3. ToR
of QATA, Task
8
Reporting requirements
Since timelines for deliverables for
main PMC services have not been
specified, it is not understood if the
Deliverables of QATA are separate from the
deliverables of PMC
Page 7 of 38
Page No 107 deliverables of the QATA including
progress reports have to be separate
or combined with the reporting
deliverables of the main PMC
services. This may please be
clarified.
15. Required
Qualifications
& Experience
of Key
Personnel
Page No 93
The qualifications of Road Safety
Engineering Specialist on page 93-
94 states “ The candidate will be at least a
Graduate in civil engineering with
post-graduation specialization in
Highway Engineering and
additional specialist training and
qualifications directly relevant to
engineering aspects of traffic and
transport safety in roads design/
construction/ management.”
Experience in Road Safety and
Traffic Engineering is more relevant
for the Candidate with post-
graduation in Transport
Planning/Engineering. Therefore, It
is suggested to specify that “The
Candidate will be at least a
Graduate in civil engineering with
post-graduation specialization in
Highway Engineering/ Transport
Planning/ Transport Engineering”.
Please clarify and confirm.
Please refer to corrigendum 1.
16. Clause No.
24.1 (a) of
SCC, Professional
Liability
Insurance
(PLI)
Page No 99
As per Clause No. 24.1(a) of SCC,
the Consultant shall provide
Professional Liability Insurance
with a minimum coverage of twice
the amount of the contract.
In this regard, it is submitted that
all projects funded by world bodies
such as World Bank. ADB, AfDB,
and JICA etc., the Consultants are
required to take PLI cover
equivalent to consultancy contract
amount. In view of the above, the
Client may kindly consider to
modify this clause by stating that
the consultant shall take PLI cover
equivalent to Consultancy Contract
amount and NOT twice the amount
of the contract.
As per RFP
17. Clause 42.3 of
SCC,
As per clause 42.3 of SCC, Price
Adjustment applies for the
As per guidelines issued by
Ministry of Road Transport &
As per RFP.
Page 8 of 38
Price
Adjustment
Page No 101
remuneration part only. Highways, Government of India
vide their letter no.RW- NH-
35071/2/2013-S&R(B) dated 26th
February 2014, it has been
communicated that escalation
@5% per year (after every 12
months starting from 13th month)
will, henceforth, be extended to
cover all items of the Contract i.e.
remuneration, all miscellaneous
items and expenses etc. and NOT
only remuneration. This should be
made applicable in this RFP also.
18. Clause 42.3
(2) of SCC Price
Adjustment on
Remuneration
in Local
Currency
Page No 101
As per Clause 42.3 (2) of SCC in
the revised RFP, it is stated that the
price adjustment on remuneration
for Local Currency shall be adjusted
on the basis of the rates set forth in
Appendix D.
It is observed that in the RFP
Appendix C is for both foreign and
local currency Remuneration cost
Estimate and Appendix ‘D’ is for
Reimbursable Expenses Cost
Estimate. Since Appendix ‘D’ has
no part of remuneration, Appendix
‘D’ may be replaced by Appendix
‘C’ in this Clause.
Please refer to corrigendum 1.
19. Clause No.
45.1(a) of
SCC Advance
Payment
Page No 103
As per Clause No.45.1 (a) of SCC,
An advance payment of 3% in
foreign currency and of 7% in local
currency shall be made within 30
days after the receipt of an advance
bank payment guarantee.
The Client is requested that since at
the initial stage there would be
significant expenses for the
mobilization of experts, the
Consultant needs more funds.
Hence, the Client may provide an
advance payment of 10% of the
contract value in both foreign and
local currency.
As per RFP
20. Clause 1(b)
Page No 79
For Project Preparatory Work
/Consultancy
The Consultants are of the opinion
that the reviewing and finalizing
Reviewing and finalizing road inventory survey
shall also include bridges, culverts, and other
cross drainage structures falling on the road
Page 9 of 38
………Review of road inventory
survey……..
road inventory survey shall also
include bridges, culverts, and
other cross drainage structures.
Kindly consider and confirm.
approaching the Sanjauli-Dhalli Tunnel, under
scope of work.
21. Clause 1 (c)
Page No 79
For Project Preparatory Work
/Consultancy ……….Reviewing geotechnical
investigation data……
As per the ToR the Consultants are
required to carry-out reviewing and
finalizing of all design data, GEO
Technical investigation data etc. At the bidding stage it is not
possible for the consultants to
determine the scope and quantum
GEO technical investigations.
Therefore, the Client is requested
to consider and confirm that GEO
Technical investigation will be
carried out by the Civil works
Contractor or else the Supervision
Consultants be allowed to engage a
separate GEO Technical
investigation team to carry out
investigation or redesign and
provisional sum be provided to
cater for payment of such design
efforts and connected investigation;
if so required. However,
engagement of experts and GEO
technical investigation team will be
with the approval of Client
Soft copy of DPR is made available on the
HPRIDC website. Please go through the Geo-
technical report. Consultant has to review and
finalize the existing DPR with GEO Technical
investigation data etc. and if any suggestion,
please incorporate in the RFP document.
22. Annexure-I,
Key
Personal
Page No 95
Details of Man-Month of Key
Professional and their sub-
professional staff Sl. No. 4 Senior Bridge/Tunnel,
structural Engineer
Since the Bridges and Tunnels
construction / supervision are two
separate domains it is requested to
the client to provide separate
positions, input and qualifications
requirement for bridge Engineer
Please refer to corrigendum 1.
Page 10 of 38
and tunnel expert. Kindly consider and confirm.
23. Clause 13 of
TOR of
QATA
Page No 105
The objective of training consists in
upgrading the capabilities of the
HPPWD / HPRIDC engineers and
technicians in-charge of project
implementation in view of their
future management duties of similar
works, is to be used as an
opportunity and a vector to transfer
Technical know-how. The training
session will be conducted by Sr.
Quality Assurance/Control
Engineers proposed in the key staff
of the Consultant’s team. The
methodology adopted will be based
on our skills and experience with
training and technology transfer in
other road construction projects,
particularly in India. The
Consultants will hold training
session as follows: One session
each at Shimla, Mandi, Hamirpur
and Dharamshala will be held during
the progress of the work. The point
covered will be mainly to focus
attention on the main important
items of works and test parameters
thereof.
In this regard, it is recommended
that a provisional sum may please
be provided by the Client for the
said Training program, so that all
Consultants are at par in their
assessment for the Financial
Proposal to meet this requirement. Further, in case the provisional sum
may not be provided, you are
requested to indicate the duration
of each training sessions to be
conducted and the number of
participants as this will have
financial implications.
Tentatively six number trainings for 30-40
participants batch size.
24. Section 7 :Terms of Reference
Page No 89-93
1) Deputy Team Leader cum Project Management Expert Post-Graduate Degree in Civil Engineering and having MBA Degree HR development / Graduate level Degree of Instituti
The Consultants would like to submit that
1) A number of experts are available
who hold PG in Civil engineering
in relevant fields but do not have
MBA Degree in HR and capable of
1) Please refer to corrigendum 1.
Page 11 of 38
onal Development 2) Senior Highway Engineer cum
Project Planning Expert
Post-graduate
in Civil
Engineering 3) Senior Quality cum Materials Engineer The candidate will be at least a
Post-Graduate in Civil Engineering
and preferably with post-graduate
qualification in Highway /
Geotechnical Engineering.
4) Road Safety Engineering
Specialist Graduate in Civil Engineering with
post-graduation specialization in
Highway Engineering
carrying out similar assignments.
Therefore, the Consultants request
the Client to amend the
requirement as mentioned below
for the position of Deputy Team
Leader
- Post-Graduate Degree in Civil
Engineering/other related fields
OR MBA Degree HR development
/ Graduate level Degree of
Institutional
Development
2) A number of experts are available
who hold Post- graduate degree in
other Civil Engineering related
fields also and are capable of
carrying out similar assignment.
Therefore, the Consultant request
the Client to consider the same with
the existing requirement for the
position of Senior Highway
Engineer cum Project Planning
Expert3) A number of experts
are available who hold Post-
graduate degree in Soil and
Foundation Engineering,
therefore, the Consultants request
the Client to consider the same
with the existing requirement
5) A number of Experts are
available who hold
post-graduation specialization in
Transportation Engineering or
Transportation Planning. Therefore,
the Consultants request the Client to
2) As per RFP 3) As per RFP 4) As per corrigendum 1
Page 12 of 38
consider the same with the existing
requirement for the position of
Road Safety Engineering
Specialist Kindly confirm.
25. Section 7 :Terms of Reference
Page No 90
Senior Highway Engineer cum Project Planning Expert - 7 years as full time on site project
manager for Administrator and
supervision of High way contracts
of similar size and complexity as of
the proposed contract.
- 5 years of experience of
similar kind of assignment in
Developed and Developing country
outside of India with FIDIC
conditions of contract.
- He shall have also thorough
knowledge and experience in
highway and tunnel designs having
flexible and rigid pavements of at
least 3-4 such projects and fully
familiar with international ‘best
practices’.
The Consultants would like to
submit that criteria stipulated for
the position require expert
having experience on design
and construction supervision/
construction projects. The
Consultants request the Client to
split the position in two viz. (i)
Senior Highway Design Engineer
cum Project Planning Expert and
(ii) Senior Highway Engineer and
provide criteria and man-months
accordingly. Kindly confirm
As per RPF
26. Section 7 :Terms of Reference
Page No 90
Senior Bridge / Tunnel cum Structural Engineers - He should have worked for at least 5 years on bridge and tunnel construction projects including design, drawing and construction of bridges and tunnels.
Generally, Bridge Expert do not work on Tunnel projects and visa-a versa. Therefore, the Consultants request the Client to split the Positions into two viz. (i) Senior Bridge / Structural Engineer, and (ii) Tunnel Engineer and provide criteria and man-
month
accordingly.
Please refer to corrigendum 1.
Page 13 of 38
27. Section 7
:Terms of
Reference
Page No 91
Senior Quality cum Materials
Engineer - He should have handled at least 2 similar highway tunnel projects costing not less than US$ 50 as Material Engineer/Geo- technical Engineer.
As very less number of Quality
cum Materials Engineer are
available who have worked on
tunnel projects, therefore, the
Consultants request the Client to
amend the requirement as
mentioned below
- He should have handled at least 2
highway projects costing not less
than US$ 50 as Material
Engineer/Geo- technical Engineer.
Experience on Tunnel project is
advantageous.
As per RPF
28. Section 7 :Terms of Reference
Page No 91
Procurement cum Contract Management Expert He shall have experience of
procurement and Management of at
least 5 green field PPP projects.
As very less number of Procurement cum Contract Management Experts are available in India who have worked on green field PPP projects, therefore, the Consultants request the Client to amend the requirement as mentioned below :
- He shall have experience of
procurement and Management of
major highway projects including
PPP projects.
As per RPF
29. Section 7 :Terms of Reference,
Annexure –I
Page No 95
Sub Professional Staff The Consultants request the Client to provide Qualification and Experience requirement of Sub Professional Staff. As no evaluation marks are
provided for Sub Professional Staff,
the Consultants understand that
CVs of Sub Professional Staff are
not required to be submitted during
Yes, consultant have to provide the detail of Sub
professional staff only after the work award to the
successful bidder but their name time/man-months
input is required as per form TECH-6.
Page 14 of 38
bidding stage and may be provided
after the award of the project. Kindly confirm.
30. Additional Point Page No 36
Extension of Time
Owing to the Global COVID-19
Pandemic, there are multiple travel
restrictions and many nations are
on lockdown. This has necessitated
Work from home protocols for
many companies. Due to the non-movement of
people, couriers etc. and lockdown
situations prevalent in many parts
of the world, the Client is requested
to provide sufficient time post issue
of the pre bid clarification minutes,
to allow Consultants to suitably
address and respond to the RFP. A one-month extension of the
current bid submission date is
humbly submitted for kind
consideration.
As Courier services are now operational and keeping
in view the urgency of assignment bid submission
date cannot be extended.
AECOM
31. ITC, Page 6 of
RFP
For decongestion of vehicle traffic
in The state capital Shimla the
following Tunnels were studied
and proposed For implementation:-
1) Lift to Lakkar Bazar (Idgah)
having total length 350 meters
We request you to kindly clarify
how many tunnels (all 4 or only
Dhalli Tunnel) are to be supervised
under this PMC project.
Only Sanjauli-Dhalli tunnel having length of
160 meters approx. is under the scope of
present assignment.
Page 15 of 38
approx. 2) List to Himfed Petrol-Pump having
total length 950 meters
approx.
3 ) Himfed Petrol Pump to
IGMC having total length 1200
meters approx.
4) Sanjauli-Dhalli tunnel
having length of 160 meters approx.
32. ITC, Page 7 of
RFP
It is clarified that the
Consultancy Services for “Project
Management and Construction
Supervision Consultant” (PMC)
for construction of highway
tunnel parallel to the Dhalli Tunnel
under the Shimla Smart
City
shall be funded by the Govt. of
India under the Smart City
Mission.
33. Data Sheet, Clause 2.3, page 31
of RFP Date of pre-proposal
conference: June 10, 2020. Time:
1100 Hours Indian Standard Time
(IST)
Amid the current situation in the
country due to lockdown, we
request you to kindly conduct pre-
bid meeting through video
conferencing so that all the
shortlisted consultants can attend it
otherwise it will not be possible to
attend it in Shimla for most of the
consultant. You are requested to
Agreed
Page 16 of 38
consider our genuine request and
share the details
34. Data Sheet, clause 21.1, Page 36 &
37 of RFP Specific experience of the
Consultant (as a firm) relevant
to the Assignment: 5 Marks
Adequacy and quality of the
proposed methodology, and
workplan in responding to
the Terms of Reference
(TORs): 25 Marks
We understand that selection of
highly competent firm for this
PMC would depend upon firm’s
past experience relevant to the
assignment and Quality and
competence of the key staff
proposed.
We request you to assign high
marks to the firm past experience
in comparison to the Methodology
& work plan proposed which is the
normal practice in the industry.
We suggest:
Specific experience of the
Consultant (as a firm) relevant to
the Assignment should be
minimum: 20 Marks
Adequacy and quality of the
proposed methodology, and work
plan in responding to the Terms
of Reference (TORs): 10 Marks
Please refer to corrigendum 1.
35. Data Sheet, Clause 21.1, Page 37
of
RFP
Key Experts’ qualifications
and
competence for the Assignment:
Sr Position Point
Position at Sr. No. 1,2,3 & 6
requires International Experience
including experience in developing
countries. Assigning equal marks
for the positions requiring
International Experience in
comparison to the
Domestic/National experience
position is not fair and justified too.
Please refer to corrigendum 1.
Page 17 of 38
.
N
o
s
1. Team Leader
cum
Infrastructure
Expert
5
2. Deputy Team
Leader cum
Project
Management
Expert
5
3. Senior Highway
Engineer cum
Project Planning
Expert(s) with
relevant Indian
experience in
project
management
5
4. Senior Bridge/
Tunnel /
Structural
Engineer
5
5. Senior Quality
cum material
Expert
5
6. Procurement
cum contract
management
Expert(
Including PPP
Project)
5
7 Financial
Management
5
Also Team Leader/Dy. Team
Leader/Sr. Highway Engineer
should not be assigned same marks
in comparison to the lower level
positions. In view of same we
request you to consider the
suggested marking for key experts
as below.
Sr
.
N
o
Position Point
s
1. Team Leader
cum
Infrastructure
Expert
12
2. Deputy Team
Leader cum
Project
Management
Expert
8
3. Senior Highway
Engineer cum
Project Planning
Expert(s) with
relevant Indian
experience in
project
management
5
4. Senior Bridge/
Tunnel /
Structural
Engineer
5
5. Senior Quality 5
Page 18 of 38
Expert
8. Legal Expert(
Civil contract &
consultancy
agreement)
5
9. Senior
Environment
Expert
5
10 Road Safety
Expert
5
11 Senior Social
Development
Expert
5
12 IT- ICT
Manager Expert
5
cum material
Expert
6. Procurement
cum contract
management
Expert(
Including PPP
Project)
6
7 Financial
Management
Expert
3
8. Legal Expert(
Civil contract &
consultancy
agreement)
3
9. Senior
Environment
Expert
3
10 Road Safety
Expert
5
11 Senior Social
Development
Expert
3
12 IT- ICT
Manager Expert
2
36. Section II, Page 74 of RFP,
Design/DPR’s: PMC shall carry
out designs and design reviews
observing the best engineering
practices. PMC shall also
prepare designs, review DPRs
following best engineering practices.
We understand that carrying out
the design of the project is not in
the scope of PMC. PMC will only
review the designs submitted by the
DPR consultant/Contractor.
Kindly confirm.
PMC Will not only review but also update and
finalize existing design of tunnel.
Page 19 of 38
37 Required Qualification &
Experience of Key Personnel,
page 88 of RFP Team Leader
cum Infrastructure Expert
The Team Leader cum
Infrastructure Expert of this
consultancy assignment should
possess a Post Graduate
Degree in Civil Engineering and
shall have long experience in
management of infrastructure
project with various financing
and procurement
arrangements, economic and
financial analyses
of bids, supervision of highway
engineers, understanding of the
bidding and contract documents,
FIDIC 2010 documents and
overseeing (project) consultancies.
He should have at least 15 years of
professional experience, out of
which he should have worked as
Team Leader/Project Manager or
equivalent for minimum of 5 years
on supervision/construction of
Highway Tunnel Projects, involving
flexible and rigid pavements. His
experience should include
international assignments of at least
of 5 years having handled highway
The Qualification and experience
requirement of Team
Leader is very stringent in many
parameters like.
We request to have minimum
qualification of Degree in Civil
Engineering/Mining Engineering
and Post Graduate degree in
Civil/Mining will be preferred.
b)
Should have experience on FIDIC
contracts of 6 years Should also
have experience in OPRC
contracts Should also have
experience in PPP projects.
We request you to kindly keep this
experience requirement as per
present contract conditions as
based on all above 3 parameters its
very difficult to find an expert.
c)
He should have previously worked
as Team Leader or in similar
capacity on at least two Project
Management works of major road
tunnel projects costing more than
Please refer to corrigendum 1..
Page 20 of 38
tunnel projects of similar or large
size and complexity in
Developed countries and about 6
years on similar projects in
developing countries, including in
Asia. The candidate should have a
proven record of
managerial capability through
directing/ managing of major civil
engineering works, including
projects of a similar magnitude and
various kinds of consultancy
services. He should have worked for
period of about 6 years in project
incorporating the FIDIC Conditions
of Contract. He shall have worked
for a period of @2years in projects
incorporating FIDIC2010
Condition of Contracts. Knowledge
of international ‘best practices’ in
latest conditions of contract,
construction, contract management
and modern highway construction
technology as well as consultancy
services is important. He should
have previously worked as Team
Leader or in similar capacity on at
least two Project Management
works of major road tunnel
projects costing more than US$ 100
Million or at least 150 km length of
US$ 100 Million or at least 150
km length of road project.(which
includes at least 1500 m of road
tunnels works)
We don’t understand why the
client is asking for experience of
150 Kms length of road and 1500
m of road tunnels. Generally in
MoRTH and NHAI they require
only 40% length of experience of
total project length. Accordingly
we request the client to consider
in similar way.
d)
The candidate shall be conversant
with the documents in several
times of project delivery
Methods (OPRC, design-bid-
build) design-build-Finance-
operate- and maintain (DBFOM),
and PPP like BOT and Annuity
mode.
We feel if the current project is
based on FIDIC then the
requirement of TL should be
accordingly as it is very difficult
to find a person having worked
Page 21 of 38
road project.(which includes at least
1500 m of road tunnels works) The
candidate shall be conversant with
the documents in several times of
project delivery methods (OPRC,
design-bid-build) design-build-
Finance-operate- and maintain
(DBFOM), and PPP like
BOT and Annuity mode. He should
have at least five years of
experience as Team Leader or
equivalent of in above said kind of
projects. He should have wide
experience of monitoring the PPP
projects and various kinds of
consultancy services.
on all type of contracts as
mentioned above.
May kindly consider.
38.
Deputy Team Leader cum
Project
Management
Expert:
The Deputy Team Leader of this
consultancy assignment should
possess a Post Graduate Degree in
Civil Engineering and having MBA
Degree HR development/ graduate
level degree of Institutional
Development.
He shall have good enough
experience of institutional
development and HR development.
He should have at least
12 years of professional
Its very difficult that a expert having
Masters in Civil Engineer also have
MBA in HR development /Graduate
level degree of Institutional
development, request you to kindly
eliminate the additional
qualification of MBA Degree HR
development/ graduate level degree
of Institutional Development
We request client to consider a
expert having Graduate Degree in
Civil Engineering and preferably
Master Degree in Project
Management
Similarly having experience of 5
Please refer to corrigendum 1.
Page 22 of 38
experience,
out of which he should have worked
as Team Leader/Project Manager or
equivalent for minimum of 5 years
on supervision/construction of
Highway Tunnel Projects, involving
flexible and rigid pavements. His
experience should include
international assignments of at least
of 5 years having handled highway
projects of similar or large size and
complexity in developed countries
and about 4 years on similar projects
in developing countries, including in
Asia.
years in developed and 4 years in
developing countries is very
stringent.
Already Team leader is required
having experience in developed
countries, we request you to kindly
keep the experience of DTL to
developing countries only.
Unnecessarily this experience of
developed countries will increase
the cost of the consultancy which is
not required.
39. Senior Highway Engineer
cum
Project Planning
Expert:
He shall be at least post graduate in
Civil Engineering with 10 years of
Professional experience out of which
7 years as full time on site project
manager for Administrator and
supervision of High way contracts of
similar size and complexity as of the
proposed contract. He shall have at
least 5 years of experience of similar
kind of assignment in Developed and
Developing country outside of
India with FIDIC conditions of
contract.
We request you to kindly consider
Graduate in Civil Engineering as
essential qualification for this
position and PG in Civil Engineering
can be kept as preferential
qualification.
Also request you to kindly eliminate
the experience requirement of
Developed countries from this
position also as it is not required as
per our experience on other projects
and again it will increase the cost of
the consultancy services..
As per RPF
Page 23 of 38
40. Annexure-I, Page 95 of RFP
Sub Professional staff for following
Key Professional
We understand that Sub
Professional staff for following
Key Professional, their CV are not
required to be submitted along with
Technical proposal at this stage and
required to be submitted after signing
of contract by the successful bidder.
Kindly confirm.
Yes, consultant have to provide the CV of sub
professional staff after the work awarded to
successful bidder but name time/man month input
is required as per form TECH-6
41. Requirement of Office, vehicle, and
other support staff
RFP no where specify the
requirement of offices, Vehicles and
other office support staff. Request
you to kindly provide/specify the
minimum quantity for these heads so
that all the bidders are on same
platform and it will be easy for the
client to compare the financial bids
while evaluating them. Also, clarity
the fees will inclusive of taxes or not.
Please refer to page 83 of ToR , The consultancy
fees is exclusive of taxes.
42. Senior Quality cum Materials
Engineer (Team Leader’s Office):
The candidate will be at least a Post
Graduate in civil Engineering and
preferably with post graduate
qualification in Highway/Geo-
technical
Kindly relax the educational
qualification to graduate in civil
engineering as essential qualification
and post graduate qualification in
Highway/Geo-technical Engineering.
as preferential qualification.
As per RPF
43. Senior Environmental Expert:
The candidate shall be civil engineer
with a post graduate with specialization
in Environmental Engineering/
environmental sciences or related field
Generally, Environment Engineers are
Graduate in Environment Science,
We request you to kindly consider
Master in Environmental
Science/Engineering for this position
and eliminate the requirement of
Graduate in civil engineering
As per RPF
Page 24 of 38
GEODATA
Sl.
No
RFP Clause Ref RFP Clause Description Consultant request HPRIDC’s Reply
44
17.1_Data
Sheet_ Pg#35
The Consultants shall have the option
of submitting their Proposals
electronically.“No”
As we all know that due to Covid19
there is still lot of travel restriction in
India. Hence we request HPRIDC to
please provide an option to submit the
Proposal online.
As postal services/Courier services are operational
hence only hard copy submission will be accepted.
45 21.1_Data
Sheet_ Pg#36
Criteria, sub-criteria, and point
system for the evaluation of the Full
Technical Proposals:
Points (i) Specific experience of the
Consultant (as a firm) relevant to the
Assignment:
Considering the fact that this important
project falls in a Hilly terrain, we feel
that HPRIDC should consider
experience of similar geography /
terrain / Himalayan region experience.
Please consider giving weight age for
such projects.
Agreed.
46 Clause v_
Section 6_
PG#71Objective
& scope
of
consultancy_
Terms
of
Reference
Provide training to the PIU staff in
project formulation, management,
monitoring and evaluation, financial,
road safety and environmental
management aspects of the Project.
PMC will be fully associated with
PIUin implementation of projectworks.
May we know how many people are
expected to be trained and number of
training days?
May we also know if HPRIDC would
provide any facilities for organizing
such training? Please clarify.
Tentatively six number trainings for 30-40
participants batch size.
No, HPRIDC would not provide any facility for
organizing such trainings.
47 Clause
vii_
Section 6_
PG#72
Objective &
scope of
consultancy_
Through direction of the PIU provide
hand-holding support to the
Department of Transport and Police
Department, HPPWD in traffic
management, muck/debris disposal as
May we know if these activities are
expected to be handled by the
proposed team only or consultant
would be required to deploy more
resources on payment basis? Please
clarify.
Consultant has to prepare Traffic Management
Plan, muck /debris disposal plan in the DPR and
implement all proposal at site with the assistance of
client. The consultant have to assess the
deployment of resources accordingly.
Page 25 of 38
48 Clause i_
Section 7_ Pg74
& 75_Detailed
scope of
consultancy
services
PMC shall carry out design sand
design reviews observing the best
engineering practices.
May we know HPRIDC’s expectations
whether specific designs to be
prepared by the consultant? We seek
this clarity since at other place it is
mentioned that “PMC will assist the
client in reviewing and finalizing of
designs and DPR prepared for PIU by
M/s GC-ROTESSESCON JV. Kindly
clarify
PMC has to review, update and finalize the existing
design and DPR prepared for PIU by M/s GC-
ROTESSESCON JV.
49 Clause
iii_Section
7_Pg
75_Detailed
scope of
consultancy
services
Overall responsibility for
overseeingthe implementation of
Environmental and Social Impact
Assessment (ESIA), Environmental
and SocialManagement
Plan(ESMP),BiodiversityManagement
Plan (BMP), Resettlement Action
Plan(s), Gender Action Plan, Labor
Management Procedure, and Labor
Influx Management & Gender Based
Violence Mitigation Plan by
coordinating with the PIU and
ensuring deliverables are in accordance
with the ESMF envisaged in the DPR.
In this respect, PMC will liaise with
and facilitate interaction with
necessary institutional
stakeholders,communities, organizing
of community level consultations,
facilitating datacollection for socio-
economic surveys and impact
assessments.
We understand that the responsibility
of consultant will be limited to
overseeing such activities and not to
undertake development of fresh plans/
studies by itself. Please clarify
Not only overseeing the activities but also liaise
with, and facilitates interactions with institutional
stakeholders and assist client in proper
implementation of all related activities.
Page 26 of 38
50 Location &
duration of the
services and
deliverables_
Section 7_
Pg#83_Terms of
Reference
The PMC will have to establish
itsmain office in Shimla. The selected
Consultant will be responsible for
making his own arrangements for
accommodation for the office of the
Team Leader and all associated staff
stationedinShimlaaswellasformat-site
staff. The Consultant should also make
his own arrangements for office
furniture, equipment, stationeries,
photocopiers, communication facilities
like telephones, web connections,
facsimiles, etc. includingmaintenance
thereof and vehicles for transportation
of office staff, etc. (including operation,
maintenance, insurances and repairs
thereof).
May we know if consultant needs to
set up two separate offices- One in
Shimla and other at-site?
We request client to please provide
office space at Shimla.
The consultant has to set up only one office at
Shimla as the site is within municipal limit of
Shimla city. Further, client won’t provide any office
space at Shimla.
51 Section 6_
Pg#88_Required
qualification &
experience of
Key Personnel
Team Leader cum Infrastructure
Expert: The Team Leader cum
Infrastructure Expert of this
consultancy assignment should possess
a Post Graduate Degree in Civil
Engineering
We would like to share that normally
when a person undertakes Post
Graduation Degree it is limited to the
area of specialization. For tunnel
projects normally other government
agencies like MoRTH /NHAI
/NHIDCL/PWDs/ State Road
Development corporation accepts any
such specialized field like Structures /
Mining / Rock Mechanics /
Geotechnical / Equivalent
qualification. We request HPRIDC to
please consider the same.
Please refer to corrigendum 1.
Page 27 of 38
52 Section 7_
Pg#88_Required
qualification &
experience of
Key Personnel
Team Leader cum Infrastructure
Expert: He should have worked for
period of about 6 years in projects
incorporating the FIDIC Conditions of
Contract. He shall have worked for a
period of @2years in projects
incorporating FIDIC2010
ConditionofContracts.
May we know if HPRIDC is looking
for about 6 years FIDIC projects
experience or 2 years? We feel two
years is enough? Please consider.
HPRIDC is looking for about 6 years FIDIC
projects experience
53 Section 7_
Pg#88_Required
qualification &
experience of
Key Personnel
Deputy Team Leader cum Project
Management Expert: The Deputy
Team Leader of this consultancy
assignment should possess a Post
Graduate Degree in Civil Engineering
and having MBA Degree HR
development/ graduate level degree of
Institutional Development.
HPRIDC is looking for two PG
qualifications (one in Civil and other
MBA in HR) for this position.
We feel that it would be more
appropriate that the candidate has B.
Tech in Civil Engineering and PG in
Management / Engineering as MBA in
HR might not serve the intended
Purpose. Please consider.
Please refer to corrigendum 1.
54 Section 7_
Pg#92_Required
qualification &
experience of
Key Personnel
IT-ICT Manager: He shall be a B.Tech
/B.E. graduate/ MCA
withspecialization in Computer
Science, Information Technology,
Information Systems or the equivalent.
He shall be fully knowledgeable in
current IT hardware and software
matters as well as ICT
communications/connectivity matters,
particularly as relevant to technical and
business information management
requirements in the public sector
context in India. He shall have
extensive professional experience (at
least 5 years) and adequate
Considering the fact that the subject
project is basically an engineering
project, we have not seen IT-ICT
Manager position for similar projects.
May we know the specific role which
this Manager is going to perform? In
addition, we also request HPRIDC to
please review the experience
requirement as it is very difficult to
find IT-ICT profiles who has worked
on similar Tunnel project related to
ITICTMIS integration.
Agreed, IT-ICT Manager position for the the
current proposal has been deleted.
Please refer to corrigendum 1.
Page 28 of 38
professional skill in the
implementation, operation and
management of IT and ICT assets and
facilities and in the facilitation of IT
based activity monitoring systems for
program management purposes,
preferably in public sector contexts. He
shall have skills and experience in
framing the necessary policies,
operating rules and processes for the
administration, security and
performance monitoring of the IT-ICT
resources of a major organization
having widely-dispersed operations
and user-groups. He shall have
completed at least 2 major similar
projects related to IT-ICTMIS
integration and related capacity
Development in India’s public sector.
55 General Prebid meeting: 10.06.2020
Bid submission: 13.07.2020
We request HPRIDC to please
Provide at least 4 weeks’ time from
the date of release of Prebid
clarifications.
15 days after release of Pre- Bid clarification are
sufficient for RFP submission.
Lombardi
56 Form Tech 4
(FTP only) Page
48
Technical Approach and methodology
Work Plan
Organization and Staffing
Please clarify if there is any limit (on
number of pages) for making
submission to this section
No, there is no limit.
57 Form Tech 4
(STP only) Page
49
Since it is Full Technical Proposal, we
understand that this form is not to be
submitted in the technical submission.
Please confirm
Agreed this form is not to be submitted in the
technical submission.
Page 29 of 38
58 Form Tech 5
(work schedule
and Planning for
deliverables)
Page 50
There are two stages of services:
(i) Pre-construction deliverables in the first
6 months of assignment
(ii) Project Monitoring and Supervision
during construction stage during next
18 months of construction
Please confirm if in this form we supply
information about pre-construction
stage deliverable only.
The consultants have to submit deliverables for both
stages as per the TOR.
59 Form Tech 6
(Team
composition,
assignment and
key expert’s
input) Page 51
The man-month requirement of the Key
Experts and of Non Key Experts are
already defined in Annexure-I on page
95 of RFP.
It is really difficult to establish the
activity wise deployment of expert
during construction. We suggest that
this form be cancelled
As per RFP only. The firms have to submit activity
wise deployment of Key experts.
60 Form Tech 6
(Continued - CV
Page 53
Contact information for references in
the employing organization At the time of EOI submission details
of key personnel were submitted.
Please confirm that CV of same
personnel is to be submitted / or we can
change the personnel.
Please appreciate that any expert with
20 years experience who had worked
with say 7 different organizations
cannot provide contact detail in the
organization now.
It is suggested that the contact details
of only the latest employer be asked
1) Key personnels proposed at REoI stage can be
replaced with others at RFP stage with the
condition that other key personnels should have
higher qualification and more experience.
2) Agreed.
61 Form FIN 2 Page
59
We understand that the total cost of
Financial Proposal, to be provided in
this form, is exclusive of GST.
Please confirm
Yes, total cost of financial proposal is excluding all
indirect taxes as well as GST. (Both amount with
taxes and without taxes has to be mentioned
separately)
Page 30 of 38
62 Form FIN 3 Page
60
Column 5, regarding time input in
person months The person months are already given in
Annexure I on page 95. Like we
mentioned in point 4 above that It is
really difficult to establish the activity
wise deployment of expert during
construction at this stage, the format
shall be simple Man month ; Rate ;
Amount
Please refer reply at Sr.No.59.
63 Page 71 point iv
Page 102 Point 8
Page 71 point iv
Assist the Client in preparation of
bidding documents, updating cost
estimates, bid invitations and bid
evaluations
Page 102 Point 8
Study of Contract Agreement between
PIU and Contractors
Please clarify if point 8 on page 102
means that Contractor is already
finalized. We don’t think so.
No, contractor is not finalized yet.
64. Page 95
Annexure I
Sub Professional staff We understand that the Sub professional
staff details are to be provided only after
the work award to the winning bidder.
Yes, consultant have to provide the detail of Sub
professional staff only after the work award to the
successful bidder but their name time/man-months
input is required as per form TECH-6.
65
Page 61
Appendic C
C1 and C2 We understand that this information is
NOT to be provided at bidding stage.
Please confirm
No, this information is required at bidding stage.
66 Section 8
Conditions of
Contract and
Contract Forms
Clause 24.1
page 99
(a) Professional Liability Insurance with
a minimum coverage of twice the
amount of Contract
We suggest to change it to :
Professional Liability Insurance with a
minimum coverage equal to the amount
of Contract
As per RFP Provisions.
67 Section 3
Technical
Proposal page
41
Power of Attorney Please suggest that if the Authorized
signatory remains same, if the POA
submitted at the time of submission of
EOI will hold good or a fresh POA will
be required
Fresh POA is required with Technical Bid
submission.
TPF
Page 31 of 38
68 Team Leader
cum
Infrastructure
Expert
Page 88
The Team Leader cum
Infrastructure Expert of this
consultancy assignment should
possess a Post Graduate Degree
in Civil Engineering....
We request you to kindly allow
'Graduate Degree in Civil Engineering'
Please refer to corrigendum 1.
69 Team Leader
cum
Infrastructure
Expert Page 88
Line No 10
His experience should include
international assignments of at
least of 5 years having handled
highway tunnel projects of
similar or large size and
complexity in developed
countries and about 6 years on
similar projects in developing
countries, including in Asia.
1.We request you to kindly modify the
criteria are as follows:
His experience should include
international assignments of at least of
5 years having handled highway tunnel
projects of similar or large size and
complexity in about 6 years on similar
projects in developing countries,
including in Asia.
2. The International experience means
India Experience / Projects shall be
considered, Please confirm.
Please refer to corrigendum 1.
70 Team Leader
cum
Infrastructure
Expert Page 88
Line No 23
He should have previously worked
as Team Leader or in similar
capacity on at least two Project
Management works of major road
tunnel projects costing more than
US$ 100 Million or at least 150
km length of road project.(which
includes at least 1500 m of road
tunnels works) The candidate
shall be conversant with the
documents in several times of
project delivery methods (OPRC,
design-bid-build) design-build-
Finance-operate- and-maintain
(DBFOM), and PPP like BOT
and Annuity mode.
We request you to kindly allow criteria
as follows:
He should have previously worked as
Team Leader or in similar capacity on
at least two Project Management works
of major road tunnel projects costing
more than US$ 100 Million or at least
50 km length of road project.(which
includes at least 1500 m of road tunnels
works) The candidate shall be
conversant with the documents in
several times of project delivery
methods (OPRC, design-bid-build) /
design-build-Finance-operate- and-
maintain (DBFOM), / PPP like BOT
/ Annuity mode.
Please refer to corrigendum 1.
71 Deputy Team
Leader cum
Project
Management
Expert Page 89
The Deputy Team Leader of this
consultancy assignment should
possess a Post Graduate Degree
in Civil Engineering and having
MBA Degree HR development/
We request you to kindly allow
criteria as follows:
Essential : Graduate Degree in Civil
Engineering
Preferred: MBA Degree HR
Please refer to corrigendum 1.
Page 32 of 38
graduate level degree of
Institutional Development.
development/ graduate level degree of
Institutional Development
72 Deputy Team
Leader cum
Project
Management
Expert Page 89
Line No. 13
His experience should include
international assignments of at
least of 5 years having handled
highway projects of similar or
large size and complexity in
developed countries and about 4
years on similar projects in
developing countries, including in
Asia.
We request you to kindly modify the
criteria are as follows:
His experience should include
international / national assignments
of at least of 5 years having handled
highway projects of similar or large
size and complexity and about 4 years
on similar projects in developing
countries, including in Asia.
As per corrigendum 1.
73 Deputy Team
Leader cum
Project
Management
Expert Page 89
Line No. 25
He should have previously
worked as Team Leader or in
similar capacity on at least two
Project Management works of
major road tunnel projects of
Two- laning/four
laning/expressway costing more
than US$ 100 Million or at least
100 km length of the
project.(which includes at least
1000 m of road tunnel works).
The candidate shall be conversant
with the documents in several
times of project delivery methods
(OPRC) design-build-Finance-
operate-and-maintain
(DBFOM), and PPP like BOT
and Annuity mode.
We request you to kindly modify the
criteria are as follows:
He should have previously worked as
Team Leader or in similar capacity on
at least two Project Management
works of major road tunnel projects of
Two- laning/four laning/expressway
costing more than US$ 100 Million or
at least 50 km length of the
project.(which includes at least 1000
m of road tunnel works). The
candidate shall be conversant with the
documents in several times of project
delivery methods (OPRC) design-
build-Finance-operate-and-
maintain (DBFOM)/ PPP / BOT /
Annuity mode.
As per corrigendum 1.
74 Senior
Highway
Engineer cum
Project
Planning
Expert
Page 90
He shall be at least post graduate
in Civil Engineering
We request you to kindly allow
'Graduate Degree in Civil
Engineering'
As per RFP.
Page 33 of 38
75 Senior
Highway
Engineer cum
Project
Planning
Expert
Page 90
He shall have at least 5 years of
experience of similar kind of
assignment in Developed and
Developing country outside of
India with FIDIC conditions of
contract.
We request you to kindly modify the
criteria are as follows:
He shall have at least 5 years of
experience of similar kind of
assignment in Developing country of
India with FIDIC conditions of
contract.
As per RFP.
76 Senior Bridge/
Tunnel cum
Structural
Engineers
Page 90
The candidate will be a graduate
in the field of Civil Engineering
and Post Graduation in Structural
Design/ Engineering.
We request you to kindly allow the
Qualification are as follows:
Essential : Graduate Degree in Civil
Engineering
Preferred: Post Graduation in
Structural Design/ Engineering.
Please refer to corrigendum 1..
77 Senior Bridge/
Tunnel cum
Structural
Engineers
Page 90
Out of which he should have
worked for at least 5 years on
bridge and tunnel construction
projects including design,
drawing and construction of
bridges and tunnels. He should
have at least 5 years experience in
rehabilitation/repair/ maintenance
of bridges and tunnels.
We request you to kindly modify the
criteria are as follows:
Out of which he should have worked
for at least 5 years on bridge
construction projects including
design, drawing and construction of
bridges. He should have at least 5
years experience in
rehabilitation/repair/ maintenance of
bridges.
The Tunnel Expert position should
be seperate.
Please refer to corrigendum 1.
78 Senior Quality
cum Materials
Engineer
(Team Leader’s
Office)
Page 91
The candidate will be at least a
Post Graduate in civil
Engineering and preferably with
post graduate qualification in
Highway/Geo-technical
Engineering.
We request you to kindly allow the
Qualification are as follows:
Essential : Graduate Degree in Civil
Engineering
Preferred: Post graduate qualification
in Highway/Geo-technical
Engineering.
As per RFP
79 Procurement
cum Contract
Management
expert
(including PPP
project)
He shall be at least civil engineer
having post graduation in
Management or MBA with
Finance/Project Management.
We request you to kindly allow the
Qualification are as follows:
Essential : Graduate Degree in Civil
Engineering
Preferred: post graduation in
Management or MBA with
As per RFP.
Page 34 of 38
Page 91 Finance/Project Management.
80 Procurement
cum Contract
Management
expert
(including PPP
project)
Page 91
He shall have experience of
procurement and Management of
at least 5 green field PPP projects.
We request you to kindly modify the
criteria are as follows:
He shall have experience of
procurement and Management of at
least 2 green field PPP projects.
As per RFP.
81 Legal Expert
(Civil Contracts
and
Agreements)
Page 93
Graduate qualifications in Law,
preferably with additional
specialization in Corporate Law
and Legislative drafting.
We request you to kindly modify the
criteria are as follows:
Essential: Graduate qualifications in
Law
In addition / Preferred: Specialization
in Corporate Law and Legislative
drafting
As per RFP
82 Legal Expert
(Civil Contracts
and
Agreements)
Page 93
The candidate shall be conversant
with the Indian and
international documents for PPP
projects.
We request you to kindly modify the
criteria are as follows:
The candidate shall be conversant
with the Indian or international
documents for PPP projects.
As per RFP.
83 Road Safety
Engineering
Specialist
Page 83
The candidate will be at least a
Graduate in civil engineering
with post-graduation
specialization in Highway
Engineering and additional
specialist training and
qualifications directly relevant to
engineering aspects of traffic and
transport safety in roads
design/construction/management.
We request you to kindly modify the
criteria are as follows:
Essential : Graduate Degree in Civil
Engineering
Preferred: Post-graduation
specialization in Highway
Engineering
In additional specialist training and
qualifications directly relevant to
engineering aspects of traffic and
transport safety in roads
design/construction/management.
Please refer to corrigendum 1..
Page 35 of 38
84 Road Safety
Engineering
Specialist
Page 83
He shall have least 15 years of
relevant professional experience,
including at least 5 years directly
in the Road Safety field, both in
developed countries and in
under developed countries in
Asia.
We request you to kindly modify the
criteria are as follows:
He shall have least 15 years of
relevant professional experience,
including at least 5 years directly in
the Road Safety field, both in
developed countries or in under
developed countries in Asia
Please refer to corrigendum 1.
85 Sub
professional
staff
Page 88 to 95
- We request you to kindly provide
Educational qualification and
experience required for Sub
professional staff
Page 88 to 95
Consultant can propose sub professional staff as per their
requirement to handle the project activities efficiently.
85 DPR Page 75
Clause ii)
PMC will assist the client in
reviewing and finalizing of
designs and DPR prepared for
PIU by M/s GC-RITES-SECON
JV comprising of
GEOCONSULT ZT GmbH (Lead
Firm), Hoelzlstrasse 563, A-5071
Wals/Salzburg, Austria and
RITES Ltd., RITES Bhawan, 1,
Sector-29, Gurgaon-122001 and
SECON Pvt. Ltd., #147, 7B
Road, Expert Industrial Park,
Whitefield, Banglore-560066.
We request you to kindly provide the
soft copy of DPR.
The copy of DPR has been uploaded on the HPRIDC
website.
86. Sub
Professional
staff Page 37
Clause (iii)
{Notes to Consultant: each
position number corresponds to
the same for the Key Experts in
Form TECH-6 to be prepared by
the Consultant}
The sub professional staff CV did not
required submitting at tender stage.
This is general practice in India for
tender.
Kindly Confirm.
Agreed but their name time/man-months input is required
as per form TECH-6.
87 non-judicial
stamp and
Notary
Power of Attorney and MOU Due to COVID-19 the Stamp Papers
and Notary not available. Hence, we
request you to allow submitting the
form in Company letterhead.
Kindly Confirm.
As per RFP.
Page 36 of 38
88 Proposal
Submission
Page 36
Data Sheet
The Proposals must be submitted
no later than:
Date: 13 July, 2020
Time: 15:00 Hours (IST)
We, are extremely keen in
participating for the above project.
However, due to pandemic disease of
Coronavirus (COVID-19) the work
environment is totally disturbed.
The legal documents like Power of
Attorney (POA), Memorandum of
Understanding (MOU), Affidavit’s
etc. are not at all possible to prepare
as
the stamp paper vendor providers are
still currently closed and due to which
we are unable to get the stamp paper
and notarize them.
Hence we request you to kindly
extend the due date of submission by
minimum upto 3 weeks after the
current due date, which will enable us
submit a comprehensive bid
document.
As per RFP.
Arvee Associates
89 Required
Qualifications &
Experience of
Key Personnel:
Road Safety
Engineering
Specialist Page
no.93
The candidate will be at least a
Graduate in civil engineering
with post-graduation
specialization in Highway
Engineering and additional
specialist training and
qualifications directly relevant to
engineering aspects of traffic
and transport safety in roads
design / construction /
management.
We request you to include Traffic &
Transportation and change it as
follows:
The candidate will be at least a
Graduate in civil engineering with
post-graduation specialization in
Highway Engineering or Traffic &
Transportation and additional
specialist training and qualifications
directly relevant to engineering
aspects of traffic and transport safety
Please refer to corrigendum 1.
Page 37 of 38
in roads
design/construction/management.
90 Required
Qualifications &
Experience of
Key Personnel:
Financial
Expert Page
no.92
He shall posses an MBA Degree
(or equivalent) in Finance.
We request you to kindly consider
“Chartered Accountancy” course as
eligible qualification, as is being
considered by World Bank in other
projects.
Please refer to corrigendum 1.
91 Required
Qualifications &
Experience of
Key Personnel:
Senior Bridge /
Tunnel cum
Structural
Engineer Page
no.90
He will have relevant
professional experience of at
least 10 years. Out of which he
should have worked for at least 5
years on bridge and tunnel
construction projects including
design, drawing and construction
of bridges and tunnels. He
should have at least 5 years
experience in
rehabilitation/repair/
maintenance of bridges and
tunnels. He should have also
experience in structural design,
drawing and construction of
minor bridges and tunnels and
all kinds of CD works.
It is unlikely to find a person who has
experience in design, construction of
both tunnels and bridges.
We therefore request you to kindly
divide the positions separately as
Senior Bridge / Structural Engineer
and Tunnel Engineer/Expert.
Please refer to corrigendum 1.
92 Section 2.
Instructions to
Consultants
C. Submission,
Opening and
21.1. Criteria, Sub-criteria, and
point system for the evaluation
of the Full Technical Proposals:
I) Specific experience of the
Consultant (as a firm) relevant to
We presume that experience in
railway tunnel projects will also be
considered under the specific
experience of firm and Key Personnel.
Kindly clarify.
Agreed
Specific experience of the Consultant (as a firm) relevant to
the assignment means Experience in similar types of
assignments with same topographical conditions which
Page 38 of 38
Evaluation Page
no.36
the assignment: includes :
1. Overall experience related to tunnel/road tunnel
/railway tunnel projects
2. Experience of similar projects in developed
countries
3. Experience of similar projects in developing
countries
4. Experience of similar projects in mountainous/steep
terrain
93 Section 2.
Instructions to
Consultants
C. Submission,
Opening and
Evaluation Page
no.38
iii) Key Experts’ qualifications
and competence for the
Assignment:
3) Relevant experience in the
region (working level fluency in
local language(s)/knowledge of
local culture or administrative
system, government
organization, etc. - 10%
We presume that the relevant
experience in the neighboring states of
Himachal Pradesh will also be
considered.
Kindly Clarify.
Yes, relevant experience in the neighboring states of