PROGRAM PEMBANGUNAN KERETA API DAN PENGEMBANGAN PELABUHAN PULAU BAAI DI PROPINSI BENGKULU
RENCANA PENGEMBANGAN GRID PULAU KECIL SOLAR PV...
Transcript of RENCANA PENGEMBANGAN GRID PULAU KECIL SOLAR PV...
RENCANA PENGEMBANGAN GRID PULAU KECIL SOLAR PV DAN PV DIESEL
DI PROVINSI NUSA TENGGARA TIMUR
PETA PROVINSI NUSA TENGGARA TIMUR
Kotamadya
Kabupaten
Kecamatan
Desa/Kelurahan
1
21
306
3268
Jumlah Jiwa 5.356.567
GEOGRAFIS : KEPULAUAN
NAMA PULAU TERDEPAN DI PROPINSI NUSA TENGGARA TIMUR
(Perbatasan T.leste & Australia)
Pulau Dana Rote (Kab. Rote Ndao) Pulau Dana Sabu ( Kab. Sabu Raijua)
Pulau Manggudu (Kab. Sumba Timur) Pulau Batek (Kab. Kupang)
Ikonik PROVINSI NUSA TENGGARA TIMUR
AREA KUPANG
AREA SUMBA
AREA FBT
AREA FBB
SEKTOR NTT
Tarif
Pembangkit
Unit Area 2008 2009 2010 2011 2012 2013
Kupang 120.595 122.331 130.331 176.808 243.029 269.821
Growth (%) 8,9% 1,4% 6,5% 35,7% 37,5% 11,0%
Flores Bagian Barat 58.807 60.539 65.729 89.881 127.962 145.835
Growth (%) 9,8% 2,9% 8,6% 36,7% 42,4% 14,0%
Sumba 21.037 21.581 24.341 31.866 57.449 48.348
Growth (%) 11,8% 2,6% 12,8% 30,9% 80,3% -15,8%
Flores Bagian Timur 45.917 49.104 54.041 77.471 95.603 99.842
Growth (%) 12,7% 6,9% 10,1% 43,4% 23,4% 4,4%
Wilayah NTT 246.356 253.555 274.442 376.026 524.043 563.846
Growth (%) 10,0% 2,9% 8,2% 37,0% 39,4% 7,6%
PELANGGAN
PT. PLN (Persero) Wil. NTT
Kondisi Kelistrikan PLN Wilayah NTT 02 FEBRUARI 2016
D
D
D
D
D
SISTEM RUTENG
D. MAMPU : 7,28 MW
B. MALAM : 8,47 MW
DEFISIT : -1,19 MW
SISTEM AESESA
D. MAMPU : 2,55 MW
B. MALAM : 2,29 MW
CAD. : 0,26 MW
D
D D
D D
D
D
D
D
D
D
D
D
D
SISTEM LARANTUKA
D. MAMPU : 3,70 MW
B. MALAM : 4,17 MW
DEFISIT : -0,47 MW
SISTEM ADONARA
D. MAMPU : 2,70 MW
B. MALAM : 3,39 MW
DEFISIT : -0,69 MW
SISTEM LEMBATA
D. MAMPU : 3,10 MW
B. MALAM : 2,91 MW
CAD. : 0,19 MW
SISTEM KALABAHI
D. MAMPU : 4,92 MW
B. MALAM : 4,16 MW
CAD. : 0,76 MW
SISTEM ATAMBUA
D. MAMPU : 7,60 MW
B. MALAM : 7,90 MW
DEFISIT : - 0,30 MW
SISTEM KEFAMENANU
D. MAMPU : 4,77 MW
B. MALAM : 4,41 MW
CAD. : 0,36 MW
SISTEM SO’E
D. MAMPU : 5,12 MW
B. MALAM : 5,00 MW
CAD. : 0,12 MW
SISTEM KUPANG
D. MAMPU : 49,23 MW
B. MALAM : 53,40 MW
DEFISIT : -4,17 MW
SISTEM ROTE
D. MAMPU : 3,50 MW
B. MALAM : 3,28 MW
CAD. : 0,22 MW
SISTEM SABU
D. MAMPU : 1,28 MW
B. MALAM : 1,16 MW
CAD. : 0,12 MW
SISTEM MAUMERE
D. MAMPU : 11,50 MW
B. MALAM : 10,95 MW
CAD. : 0,55 MW
SISTEM ENDE
D. MAMPU : 7,35 MW
B. MALAM : 9,49 MW
DEFISIT : -2,14 MW
SISTEM WAINGAPU
D. MAMPU : 6,35 MW
B. MALAM : 5,64 MW
CAD. : 0,71 MW
SISTEM WAIKABUBAK + WAITABULA
D. MAMPU : 5,32 MW
B. MALAM : 6,52 MW
DEFISIT : -1,20 MW
SISTEM BAJAWA
D. MAMPU : 5,00 MW
B. MALAM : 5,60 MW
DEFISIT : -0,60 MW
SISTEM LABUAN BAJO
D. MAMPU : 4,40 MW
B. MALAM : 4,20 MW
CAD. : 0,20 MW
AREA FBB
AREA FBT
AREA KUPANG
AREA SUMBA
SISTEM BETUN
D. MAMPU : 2,59 MW
B. MALAM : 2,39 MW
CAD. : 0,20 MW
1. Berdasarkan Pembangkit
2. Berdasarkan Area Kerja
• Pasokan energi primer didominasi bahan
bakar fosil : 59,12 % dari BBM PLTD Sewa, 20,49 % dari BBM PLTD sendiri, 13,98 % dari PLTU, 3,53 % dari PLTP, 2,80 % dari PLTM/PLTMH, 0,07 % dari PLTS
Status Komposisi Pembangkit PLN NTT ( Desember 2015)
• Pasokan Energi Listrik Berdasarkan Area
Kerja yang didominasi oleh : 1. Area Kupang : 58,28 % 2. Area FBB : 20,07 % 3. Area FBT : 14,44 % 4. Area Sumba : 7,21 %
2010
26,40%
2011
41,55%
2012
53,22%
2013
54,77%
2014
58,53%
Okt 2015
58,44%
2016
63,2%
2017
65,7%
2018
68,7%
2019
70,9%
2020
73,2%
~
~
PEMETAAN PER KABUPATEN
Sumba Barat Daya
57,051 KK
5,254 plg RT
66 Desa
Sumba Barat&Tengah
37,361 KK
5,107 plg RT
53 Desa
Sumba Timur
49,549 KK
12,259 plg RT
86 Desa
Manggarai Barat
45,706 KK
2,990 plg RT
96 Desa
Manggarai&Manggarai Timur
112,225 KK
14,865 plg RT
175 Desa
Nagekeo
27,730 KK
5,299 plg RT
42 Desa
Ngada
29,172 KK
15,172 plg RT
36 Desa
Ende
51,716 KK
27,154 plg RT
97 Desa
Sikka
60,583 KK
22,400 plg RT
65 Desa
Flores Timur
51,560 KK
22,490 plg RT
117 Desa
Lembata
23,210 KK
8,642 plg RT
67 Desa
Alor
39,549 KK
10,354 plg RT
112 Desa
Rote Ndao
25,812 KK
7,604 plg RT
36 Desa
TTS
90,712 KK
15,071 plg RT
125 Desa
Kupang&Sabu
85,509 KK
14,625 plg RT
72 Desa
Kota Kupang
63,518 KK
56,532 plg RT
-
Belu
95,954 KK
11,782 plg RT
123 Desa
TTU
47,212 KK
10,210 plg RT
72 Desa
Proyeksi KK 2011 menurut BPS Jml plg Rumah Tangga (III-09 Juni 2011)
Desa Belum Berlistrik
KENDALA :
1
• Banyaknya KK tidak sebanding dengan banyaknya rumah, misalnya : 2-3 KK dalam 1 rumah
2
• Pelanggan Tersambung untuk 1 kms SUTM sebanyak : 105 pelanggan (investasi = ± Rp. 300 jt)
3 •Pelanggan Tersambung untuk 1 kms SUTR sebanyak : 104 pelanggan (investasi = ± Rp. 200 jt)
4 •Pelanggan Tersambung untuk 1 Transformator sebanyak : 174 pelanggan (investasi = ± Rp. 125 jt)
5 •Sumber daya ekomomi masyarakat (Pertanian, pedangan tenun ikat, pabriakan es batu)
6 •Banyak daerah yang harus melintasi atau melewati kawasan hutan yang membutuhkan proses perijinan
• Rasio Elektrifikasi s/d OKTOBER 2015
DUKUNGAN :
1
• Penguatan / Penambahan Alokasi Anggaran
2 • Kemudahan dan percepatan perijinan
3 • Komunikasi politik anggaran
RE (%) JUML. PEL. JUML. PEL. JUML. PEL. RE (%) RE (%)
TOTAL RT PLN RT NON PLN RT TOTAL PLN TOTAL
1 2 8=6/3 9 10 11 12=10+11 13=10/9 14=12/9
Kota Kupang 99.32 93,090 90,137 447 90,584 96.83 97.31
Kupang 55.90 69,217 33,299 2,592 35,891 48.11 51.85
Sabu Raijua 23.97 25,028 4,946 916 5,862 19.76 23.42
Timor Tengah Selatan 49.16 109,322 43,705 4,670 48,375 39.98 44.25
Timor Tengah Utara 69.25 57,132 30,309 6,600 36,909 53.05 64.60
Belu & Malaka 45.43 81,484 33,945 3,510 37,455 41.66 45.97
Alor 68.30 46,063 27,670 3,160 30,830 60.07 66.93
Rote Ndao 81.42 32,184 22,974 2,309 25,283 71.38 78.56
Ende 79.28 56,436 39,986 3,119 43,105 70.85 76.38
Ngada 97.87 33,247 26,068 2,015 28,083 78.41 84.47
Nagekeo 57.37 27,122 14,445 1,613 16,058 53.26 59.21
Manggarai 59.49 68,790 27,576 4,312 31,888 40.09 46.36
Manggarai Timur 39.94 57,311 19,116 6,892 26,008 33.36 45.38
Manggarai Barat 46.28 53,982 14,928 6,568 21,496 27.65 39.82
Sikka 66.38 68,902 39,658 3,246 42,904 57.56 62.27
Flores Timur 92.20 56,477 43,977 7,543 51,520 77.87 91.22
Lembata 75.17 30,984 17,018 4,842 21,860 54.92 70.55
Sumba Timur 50.99 51,599 21,712 3,305 25,017 42.08 48.48
Sumba Barat 42.83 21,876 7,670 692 8,362 35.06 38.22
Sumba tengah 29.75 12,859 3,302 653 3,955 25.68 30.76
Sumba Barat Daya 29.63 51,734 13,225 953 14,178 25.56 27.41
61.81 1,104,837 575,666 69,957 645,623 52.10 58.44
NUSA
TENGGARA
TIMUR
TOTAL
JUMLAH RUMAH
TANGGA
PROPINSI KABUPATEN
TARGET
2015
REALISASI
Oct-15
============================= ======= ======== ======== ======== ======== ======== ======== ============================ ========= =========
Calendar Year 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
============================= ======= ======== ======== ======== ======== ======== ======== ============================ ========= =========
Total Population (10^3) 5,037 5,120 5,204 5,287 5,372 5,456 5,541 5,627 5,713 5,799 5,885 5,971
Jumlah KK (10^3) 1,104.51 1,131.61 1,158.70 1,185.52 1,212.34 1,238.60 1,264.87 1,291 1,317 1,343 1,369 1,394
- Growth Rate (%) 1.3 1.7 1.6 1.6 1.6 1.6 1.6 1.5 1.5 1.5 1.5 1.5
Growth of Total GDP (%) 5.0 5.8 6.6 7.1 7.5 8.0 6.4 6.4 6.4 6.4 6.4 6.4
Electrification Ratio (% ) 55.5 57.8 63.2 65.7 68.7 70.9 73.2 76.3 79.3 82.4 85.5 88.6
Energy Sales (GWh) 702.3 772.1 851.0 941.4 1,044.2 1,156.9 1,259.3 1,369.0 1,485.2 1,608.3 1,738.6 1,876.7
- Growth Rate (%) 9.8 9.9 10.2 10.6 10.9 10.8 8.8 8.7 8.5 8.3 8.1 7.9
-- Residential 424.6 466.9 511.4 560.7 617.1 676.5 730.2 790.1 853.1 919.4 989.3 1,062.9
-- Commercial 178.9 196.8 217.6 240.8 266.5 295.5 321.2 348.3 377.0 407.3 439.2 473.0
-- Public 73.4 80.3 89.3 100.1 112.7 127.6 140.3 154.0 168.9 185.1 202.6 221.4
-- Industrial 25.4 28.0 32.7 39.8 47.9 57.3 67.6 76.5 86.2 96.5 107.6 119.4
Power Contracted (MVA) 613.6 683.6 754.1 831.6 921.3 1,012.3 1,095.9 1,191.9 1,292.7 1,398.5 1,509.8 1,626.8
-- Residential PLN 437.1 492.7 545.5 603.3 671.0 737.2 798.8 871.6 947.9 1,027.7 1,111.5 1,199.4
-- Commercial 107.5 116.1 125.6 136.0 147.2 159.4 170.7 182.4 194.6 207.3 220.6 234.5
-- Public 54.1 57.8 62.3 67.6 73.7 80.8 86.9 93.5 100.5 108.1 116.3 125.0
-- Industrial 15.0 17.1 20.6 24.6 29.4 34.9 39.5 44.4 49.6 55.3 61.4 67.9
- Growth Rate (%) 16.6 11.4 10.3 10.3 10.8 9.9 8.3 8.8 8.5 8.2 8.0 7.8
Number of Customer 730,287 778,656 864,864 919,568 982,097 1,035,550 1,090,571 1,157,658 1,226,200 1,296,153 1,367,729 1,440,939
-- Total Residential 613,354 653,818 732,100 778,839 833,364 878,767 925,688 984,649 1,045,035 1,106,822 1,170,224 1,235,241
-- Commercial 30,104 31,616 33,132 34,655 36,186 37,725 39,274 40,828 42,388 43,949 45,512 47,079
-- Public 86,692 93,084 99,492 105,931 112,400 118,907 125,453 132,022 138,615 145,214 151,822 158,445
-- Industrial 137 137 140 143 147 151 156 159 163 167 171 175
- Growth Rate (%) 15.2 6.6 11.1 6.3 6.8 5.4 5.3 6.2 5.9 5.7 5.5 5.4
Total Production (GWh) 783.8 873.6 975.4 1,088.1 1,215.0 1,346.9 1,453.0 1,566.8 1,701.9 1,844.4 1,980.1 2,132.6
Energy Requirement (GWh) 749.5 820.6 903.6 998.6 1,106.7 1,224.9 1,332.0 1,446.7 1,568.1 1,697.1 1,833.7 1,979.4
Station Use (%) 3.3 6.1 7.4 8.2 8.9 9.1 8.3 7.7 7.9 8.0 7.4 7.2
T & D Losses (%) +) 6.30 5.91 5.82 5.73 5.65 5.55 5.46 5.37 5.29 5.24 5.19 5.19
Load Factor (%) 55.4 55.1 55.2 55.3 55.3 55.4 55.5 55.5 55.6 55.7 55.7 55.8
Peak Load (MW) 161.4 180.8 201.7 224.71 250.6 277.5 299.0 322.02 349.4 378.2 405.5 436.21
============================= ======= ======== ======== ======== ======== ======== ======== ============================ ========= =========
RENCANA PENGEMBANGAN SISTEM KELISTRIKAN PLN NTT
2016 - 2025
PERKEMBANGAN DAN TARGET ENERGY MIX PEMBANGKIT TENAGA LISTRIK PLN WILAYAH NTT TAHUN 2015 – 2020
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
2013 2014 2015 2016 2017 2018 2019 2020
URAIAN 2013 2014 2015 2016 2017 2018 2019 2020
BBM 96% 83% 80% 72% 54% 27% 16% 17%
Batubara 0% 10% 14% 16% 24% 42% 42% 38%
PLTMG 0% 0% 0% 0% 6% 11% 21% 22%
Panas Bumi 2% 4% 4% 5% 6% 7% 8% 10%
PLTA / PLTMH 2% 3% 3% 7% 8% 12% 12% 11%
PLTS 0.02% 0.05% 0.07% 0.5% 1.0% 1.3% 1.5% 1.8%
s/d
2008
s/d
2009
s/d
2011
s/d 2013
s/d 2015
2 PLTS hybrid (BPPT& PEMDA)
1 PLTS on grid (Lembata)
1 PLTS smart grid (Bilacenge)
6 PLTS Off grid
5 PLTS IPP On grid
94 PLTS Off grid
PERENCANAAN DAN PENGEMBANGAN PLTS
S
PENGEMBANGAN PLTS DI PLN WILAYAH NTT
S
S
S
S
S
S
S
S
S
S
S
S
S
S
PLTS IPP ON GRID ATAMBUA KAP. 1 MWp
PLTS OFF GRID PURA - ALOR KAP. 175 KWp
PLTS OFF GRID WINI
KAP. 60 KWp
PLTS OFF GRID NULE - ALOR KAP. 250 KWp
PLTS ON GRID LEMBATA
KAP. 200 KWp
PLTS IPP ON GRID MAUMERE
KAP. 1 MWp
PLTS IPP ON GRID LABUAN BAJO KAP. 1 MWp
PLTS OFF GRID SOLOR BARAT KAP. 275 KWp
PLTS IPP ON GRID ENDE
KAP. 1 MWp
PLTS ON GRID BILACENGE
KAP. 500 KWp
PLTS IPP ON GRID SUMBA TIMUR KAP. 1 MWp
PLTS IPP ON GRID KUPANG KAP. 5 MWp
PLTS OFF GRID SEMAU KAP. 450 KWp
PLTS OFF GRID RAIJUA KAP. 150 KWp
PLTS OFF GRID NEMBERALA KAP. 50 KWp
PLTS ON GRID SALURA KAP. 150 KWp
S BEROPERASI
RENCANA
L/O/G/O
PT PLN (PERSERO) WILAYAH NTT
EVALUASI PENGOPERASIAN PLTS IPP KUPANG 5 MWp
www.themegallery.com
LATAR BELAKANG
PROSES PEMBANGUNAN PLTS IPP KUPANG 5 MWP 1
2
EVALUASI PEMBEBANAN PLTS IPP KUPANG 3
HASIL PRODUKSI PLTS IPP KUPANG 4
HAL-HAL YANG DIPERHATIKAN PENGOPERASIAN PLTS
KESIMPULAN DAN SARAN 5
IMPLEMENTASI P2MS 6
www.themegallery.com
Proses Pembangunan PLTS IPP Kupang 5 MWp
No Kegiatan Pelaksana Aktual Ket
1 Penetapan pemenang EBTKE 24-Jan-14
2 Penugasan Pembelian Tenaga Listrik Kepada PT
PLN (Persero) MESDM 20-Okt-14
3 Pengurusan Izin-izin yang dibutuhkan (Status Tanah,
Izin Lokasi, Izin Lingkungan, dll) PT LEN
4 Studi Interkoneksi PLTS IPP Kupang 5 MWp PT LEN
5 Rekomendasi Studi Interkoneksi PLTS IPP Kupang
5 MWp PT PLN Wil NTT 21-Nov-14
6 Izin Usaha Penyedian Tenaga Listrik Sementara
untuk PT Len DJK 03-Des-14
7 Izin Prinsip Pembelian Tenaga Listrik PLTS IPP
Kupang 5 MWp DIREKSI PLN 22-Des-14
8 Penyerahan Jaminan Pelaksanaan Tahap I PT LEN 22-Des-14
9 TTD Perjanjian Pembelian Energi Listrik PT PLN NTT –
PT LEN 09-Jan-15
10 Ujicoba Operasi dengan Sistem Kupang PT PLN NTT –
PT LEN 08-Des-15
11 Peresmian PLTS IPP Kupang 5 MWp Presiden RI 27-Des-15
www.themegallery.com
1. Asumsi Interpolasi Dari 20 kW Menjadi 5 MW
Perbedaan output daya
selama 1 menit dapat
mencapai 44.4%
Pada sistem 5 MW, perbedaan
ini setara dengan fluktuasi
sebesar 2,22 MW dalam waktu
1 menit
Dimungkinkan adanya
perubahan yang lebih besar
Hal-hal yang harus diperhatikan Pada Pengoperasian PLTS IPP Kupang 5 MWp
2. Pembahasan Standard Operating Procedure (SOP)
www.themegallery.com
1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00 11.00 12.00 13.00 14.00 15.00 16.00 17.00 18.00 19.00 20.00 21.00 22.00 23.00 24.00
PLTU BOLOK 13,410 13,400 13,500 13,700 13,420 13,520 13,340 13,500 13,550 13,650 13,500 13,240 13,500 13,500 13,200 13,200 13,100 13,050 13,200 13,380 13,500 13,300 13,000 13,420
PLTD KUANINO - - - - - - - - - - - - - - 1,200 1,200 - - 2,200 2,200 2,200 2,200 2,200 -
PLTS TENAU 2,000 2,300 2,300 2,500 2,300 2,300 2,300 2,500 2,300 2,500 2,100 3,300 2,100 3,200 2,200 2,000 2,300 4,400 4,500 4,500 4,500 4,500 4,100 4,300
PLTD SEWA 25,823 25,289 22,401 21,262 21,285 20,085 20,048 20,425 23,030 23,176 23,150 23,090 23,663 23,591 24,650 25,900 27,110 28,565 30,750 30,750 30,750 30,750 26,647 26,359
PLTS IPP KUPANG - - - - - - 1,000 1,200 900 1,800 2,600 2,300 4,300 3,400 2,900 1,200 700 - - - - - - -
TOTAL BEBAN 41,233 40,989 38,201 37,462 37,005 35,905 36,688 37,625 39,780 41,126 41,350 41,930 43,563 43,691 44,150 43,500 43,210 46,015 50,650 50,830 50,950 50,750 45,947 44,079
FREKUENSI (HZ) 50.07 50.13 50.11 50.03 50.03 50.10 50.18 50.22 50.11 50.00 50.23 50.31 50.11 50.17 50.21 49.81 50.22 49.99 49.81 50.00 49.88 50.01 50.01 49.83
BEBAN SISTEM KUPANG pada TANGGAL 19 DESEMBER 2015
DM : 46,1 MW
BP Siang : 43,9 MW
BT Siang : 37,2 MW
Beban
Waktu
PLTS PLTU
PLTD SEWA
www.themegallery.com
Evaluasi Pembebanan PLTS IPP KUPANG 5 MWp Tanggal, 19 Desember 2015
Waktu P ( KW ) F ( Hz ) KET
6:00 278 50.10 5 MWp
6:15 352 50.10 5 MWp
6:30 690 50.10 5 MWp
6:45 1,003 50.10 5 MWp
7:00 1,300 50.20 5 MWp
7:15 914 50.20 5 MWp
7:30 2,210 50.20 5 MWp
7:45 1,800 50.20 5 MWp
8:00 1,300 50.20 5 MWp
8:15 1,200 50.20 5 MWp
8:30 900 50.10 5 MWp
8:45 635 50.10 5 MWp
9:00 937 50.10 5 MWp
9:15 1,700 50.10 5 MWp
9:30 2,100 50.10 5 MWp
9:45 2,100 50.10 5 MWp
10:00 2,600 50.10 5 MWp
10:15 2,600 50.20 5 MWp
10:30 2,600 50.00 5 MWp
10:45 4,000 50.00 5 MWp
11:00 4,200 50.20 5 MWp
11:15 4,600 50.20 5 MWp
11:30 4,200 50.30 5 MWp
11:45 4,200 50.10 5 MWp
12:00 3,500 50.20 5 MWp
12:15 4,100 50.10 5 MWp
12:30 4,100 50.20 5 MWp
12:45 4,200 50.20 5 MWp
13:00 4,200 50.20 5 MWp
13:15 3,900 50.10 5 MWp
13:30 3,900 50.10 5 MWp
13:45 3,800 50.20 5 MWp
14:00 3,400 50.30 5 MWp
14:15 2,000 50.10 5 MWp
14:30 1,500 49.80 5 MWp
14:45 2,520 50.20 5 MWp
15:00 3,300 50.30 5 MWp
15:15 2,130 50.20 5 MWp
15:30 1,850 50.10 5 MWp
15:45 1,210 50.20 5 MWp
16:00 1,820 50.30 5 MWp
16:15 936 49.90 5 MWp
16:30 916 50.00 5 MWp
16:45 880 50.00 5 MWp
17:00 705 50.10 5 MWp
17:15 418 50.20 5 MWp
17:30 278 50.10 5 MWp
Catatan :
- DM : 46,1 MW
- BP Siang : 43,9 MW
- BT Siang : 37,2 MW
Evaluasi Produksi kWh dalam 1 Tahun
Sesuai Data Tgl 19 Des. 2015
- Total Produksi : 27.540 kWh
- Radiasi Matahari : 5,5 kWh/m2/hari
- Jadi dalam setahun : 9,914 MWh
www.themegallery.com
Catatan :
- DM : 52,25 MW
- BP Siang : 50,60 MW
- BT Siang : 40,11 MW
Waktu P ( KW ) F ( Hz ) KET
6:00 2 MWp
6:15 2 MWp
6:30 2 MWp
6:45 150 50.20 2 MWp
7:00 232 50.30 2 MWp
7:15 350 50.30 2 MWp
7:30 450 50.20 2 MWp
7:45 572 50.00 2 MWp
8:00 789 50.10 2 MWp
8:15 907 50.10 2 MWp
8:30 988 49.90 2 MWp
8:45 1,079 50.20 2 MWp
9:00 1,167 50.00 2 MWp
9:15 1,234 50.10 2 MWp
9:30 1,337 50.10 2 MWp
9:45 1,339 50.10 2 MWp
10:00 1,371 50.00 2 MWp
10:15 1,448 50.20 2 MWp
10:30 1,482 50.10 2 MWp
10:45 1,529 50.10 2 MWp
11:00 1,584 50.10 2 MWp
11:15 1,590 50.10 2 MWp
11:30 1,604 50.00 2 MWp
11:45 1,620 50.00 2 MWp
12:00 1,648 50.00 2 MWp
12:15 1,629 50.20 2 MWp
12:30 1,653 50.20 2 MWp
12:45 1,653 50.10 2 MWp
13:00 1,576 50.10 2 MWp
13:15 1,595 50.10 2 MWp
13:30 1,546 50.10 2 MWp
13:45 1,512 50.10 2 MWp
14:00 1,449 50.00 2 MWp
14:15 1,393 50.00 2 MWp
14:30 1,313 50.00 2 MWp
14:45 1,308 50.00 2 MWp
15:00 1,256 49.90 2 MWp
15:15 1,220 50.00 2 MWp
Evaluasi Produksi kWh dalam 1 Tahun
Sesuai Data Tgl 20 Jan. 2016
- Total Produksi : 10.261 kWh
- Radiasi Matahari : 5,12 kWh/m2/hari
- Jadi dalam setahun : 3,687 MWh
Evaluasi Pembebanan PLTS IPP KUPANG 2 MWp Tanggal, 20 Januari 2016
www.themegallery.com
Catatan :
- DM : 52,25 MW
- BP Siang : 50,60 MW
- BT Siang : 40,11 MW
Waktu P ( KW ) F ( Hz ) KET
6:00 2 MWp
6:15 2 MWp
6:30 2 MWp
6:45 164 50.40 2 MWp
7:00 229 50.30 2 MWp
7:15 317 50.20 2 MWp
7:30 450 50.00 2 MWp
7:45 583 49.90 2 MWp
8:00 688 50.10 2 MWp
8:15 800 50.00 2 MWp
8:30 900 50.10 2 MWp
8:45 1,010 50.00 2 MWp
9:00 1,100 50.00 2 MWp
9:15 1,176 50.00 2 MWp
9:30 1,258 50.00 2 MWp
9:45 1,336 50.10 2 MWp
10:00 1,423 50.20 2 MWp
10:15 1,486 50.10 2 MWp
10:30 1,806 50.30 2 MWp
10:45 1,853 50.20 2 MWp
11:00 1,827 50.00 2 MWp
11:15 1,750 50.10 2 MWp
11:30 596 50.10 2 MWp
11:45 1,820 50.30 2 MWp
12:00 1,010 50.20 2 MWp
12:15 1,902 50.10 2 MWp
12:30 1,823 50.00 2 MWp
12:45 1,822 50.00 2 MWp
13:00 1,829 50.20 2 MWp
13:15 649 50.20 2 MWp
13:30 450 50.00 2 MWp
13:45 1,543 50.10 2 MWp
14:00 640 49.80 2 MWp
14:15 1,553 50.00 2 MWp
14:30 1,470 49.90 2 MWp
14:45 1,796 50.00 2 MWp
15:00 1,495 49.90 2 MWp
Evaluasi Produksi kWh dalam 1 Tahun
Sesuai Data Tgl 21 Jan. 2016
- Total Produksi : 10.261 kWh
- Radiasi Matahari : 5,12 kWh/m2/hari
- Jadi dalam setahun : 3,687 MWh
Evaluasi Pembebanan PLTS IPP KUPANG 2 MWp Tanggal, 21 Januari 2016
www.themegallery.com
Proyeksi Produksi PLTS KUPANG 5 MWp
Evaluasi Produksi kWh dalam 1 Tahun
Sesuai Data Tgl 19 Des. 2015
- Total Produksi : 27.540 kWh
- Radiasi Matahari : 5,5 kWh/m2/hari
- Jadi dalam setahun : 9,914 MWh
Evaluasi Produksi kWh dalam 1 Tahun
Sesuai Data Tgl 20 Jan. 2016
- Total Produksi : 11.027 kWh
- Radiasi Matahari : 5,54 kWh/m2/hari
- Jadi dalam setahun : 3,986 MWh
Evaluasi Produksi kWh dalam 1 Tahun
Sesuai Data Tgl 21 Jan. 2016
- Total Produksi : 10.261 kWh
- Radiasi Matahari : 5,12 kWh/m2/hari
- Jadi dalam setahun : 3,687 MWh
www.themegallery.com
Total Produksi Bulan Januari 2016 : 231,834 KWH
0
2000
4000
6000
8000
10000
12000
14000
16000
18000
20000
PRODUKSI
Hasil Produksi PLTS KUPANG 5 MWp untuk Operasi 2 MWp
www.themegallery.com
Kesimpulan dan Saran PLTS IPP Kupang 5 MWp
Pengoperasian PLTS IPP Kupang 5 MWp tercapai apa bila sistem Kupang pada siang hari tidak mengalami pemadaman bergilir.
Pembangkit pada sistem Kupang harus memenuhi N-1, sehingga PLTS 5 MWp dapat dioperasikan secara optimal.
Diusulkan untuk menjaga keandalan sistem Kupang pada saat cuaca mendung harus mempunyai back up daya (batere)
www.themegallery.com
IMPLEMENTASI P2MS
TERIMA KASIH