1 SIMAR INFRASTRUCTURES LIMITED 218, Simar House, Virat Nagar Panipat-132 103 (Haryana) Tel: +91-1804013599 [email protected] –www.simar.co.in RANGE OF SERVICES We offer services in Engineering, Designing, Fabrication, Erection, Testing, Commissioning, Operation & Maintenance of Refineries Petrochemicals Fertilizers Thermal Power Plants up to 800 MW Fabrication Shops (Pressure Parts, Structures) Note: We work under the inspection of Boiler Inspectors / Lloyds / EIL / TPI thereby strictly following quality norms of IBR regulations,EIL, TPI & Lloyds Quality Policy.

Transcript of Refineries Petrochemicals Fertilizers Thermal Power Plants ... · Operation and maintenance of...

Page 1: Refineries Petrochemicals Fertilizers Thermal Power Plants ... · Operation and maintenance of Boiler, Turbine generator including BOP of 165 MW combined cycle based power plant at

1

SIMAR INFRASTRUCTURES LIMITED 218, Simar House, Virat Nagar Panipat-132 103 (Haryana) Tel: +91-1804013599 [email protected] –www.simar.co.in

RANGE OF SERVICES

We offer services in

Engineering, Designing, Fabrication, Erection, Testing,

Commissioning, Operation & Maintenance of

Refineries

Petrochemicals

Fertilizers

Thermal Power Plants up to 800 MW

Fabrication Shops (Pressure Parts, Structures)

Note:

We work under the inspection of Boiler Inspectors / Lloyds / EIL / TPI thereby strictly

following quality norms of IBR regulations,EIL, TPI & Lloyds Quality Policy.

Page 2: Refineries Petrochemicals Fertilizers Thermal Power Plants ... · Operation and maintenance of Boiler, Turbine generator including BOP of 165 MW combined cycle based power plant at

2

SIMAR INFRASTRUCTURES LIMITED 218, Simar House, Virat Nagar Panipat-132 103 (Haryana) Tel: +91-1804013599 [email protected] –www.simar.co.in

Operation & Maintenance, Mechanical, Electrical and C & I, Field operations of Power Plants Consisting of

Switchyards, Switchgears, Boilers, Turbines, BOP, AHP, CHP, Water Management System of Thermal Power plants.

Sr. No

Description of Works Plant / Client Name

Duration Status

1.

Mechanical Maintenance of rotary parts on round the clock basis for PNC at IOCL (Refineries Division) Panipat Naphtha Cracker, Panipat, Haryana.

IOCL 24 Months Continue…

2.

AMC for Rotary Equipment maintenance & Workshop Mechanical Maintenance at ISRL petrochemical Complex, Panipat, Haryana

ISRL 36+24 Months

Continue...

3.

Operation and maintenance of Boiler, Turbine generator including BOP of 165 MW combined cycle based power plant at HMEL, Bathinda Refinery (Punjab).

STEAG/HMEL 24 months Completed

4. Operation & Maintenance and Electrical and C&I of Ore Beneficiation Plant of Zinc of 4.7 million MT of Hindustan Zinc limited, Zawar Mines, Udaipur Rajasthan.

Hindustan Zinc Limited

36 Months Continue…

5.

Operation & Maintenance services of 1X108 MW Gas based Power Plant at TATA POWER-Rithala Plant, Delhi

TATA-TPDDDL 24 Months Continue...

6.

Composite Electrical works in upcoming Oil Refinery including Erection, Testing & commissioning of Transformers, LT/ HT Bus bars, HT/LT Motors, Laying HT/LT Cables & installation of C&I system at Dangote Refinery Nigeria.

Dangote Refinery 18 Months Continue…

7.

Mechanical Field Works at IIR Butyl Rubber Plant-Structural Steel Fabrication & Erection, Equipment Erection (Static & Rotary), ABG Piping, Bolt Torqueing etc…

Reliance Sibur Elastomers

Private Limited 12 Months Continue…

8. Under Ground Piping Works

Reliance Sibur Elastomers

Private Limited 8 Months Continue…

9.

Structural, Piping and Equipment(Static & Rotary) Installation Works 5000 MT at Reliance Industries, Jamnagar, SEZ 1 and SEZ 2 Steam Supper Heater Project

Reliance/ Linde Engineering India

Ltd 09 Months Completed

Page 3: Refineries Petrochemicals Fertilizers Thermal Power Plants ... · Operation and maintenance of Boiler, Turbine generator including BOP of 165 MW combined cycle based power plant at

3

SIMAR INFRASTRUCTURES LIMITED 218, Simar House, Virat Nagar Panipat-132 103 (Haryana) Tel: +91-1804013599 [email protected] –www.simar.co.in

10.

Piping & Structural Steel works of Mechanical Contract for Additive Dosing tank In DTA RTF.(30000 IND)

Reliance

Jamnagar

Refinery 06 Months Completed

11. Stack Height Increase, CFN Piping and Flue Gas Duct jobs at SEZ-FCCU Reliance Industries Limited Jamnagar Gujarat.

Reliance Jamnagar Refinery

2.5 Month Completed

12

IBR Related Piping Modification/ Inspection Jobs at SEZ-FCCU Area Reliance Industries Limited Jamnagar Gujarat.

Reliance

Jamnagar

Refinery 1.5 Month Completed

11. Service contract for ‘Rotary & Static Equipment Maintenance’ at ISRL petrochemical Complex, Rubber plant, Panipat, Haryana.

ISRL Panipat

36 Months Continue...

12.

Fabrication, Erection, Testing and Commissioning of Piping along with Rotating Equipment’s includes CS,AS,SS,P91, 904L, LTCS, Rubber Line, Jacketed piping, Cast Iron (5,10,000 Inch Meter) of 2 Million Tonne Capacity Di Ammonia Phosphate Fertilizer Plant at OCFL Paradeep Orissa

OCFL 24 Months Completed

13.

Fabrication, Erection, Testing and commission of piping (Executed Qty: - 74000 INM which includes P-91, P-11, 22, SS- 304L, 316L, 310 L,CS) of combined cycle of 72 MW including commissioning of HRSG, GTG and STG at OMPL (Petrochemical Complex) at Mangalore, Karnataka.

OMPL/TOYO/ THERMAX

12 Months Completed

14.

Erection, testing & commissioning of complete sulphur furnace package with burners, Boiler drum, furnaces, IBR & NIBR piping at IOCL, Panipat Refinery.

IOCL/ISGEC 06

Months Completed

15.

Structural Steel Fabrication/ Mechanical and other related Works at SFS- SEZ, RIL- Jamnagar J3 Project

Reliance

Jamnagar

Refinery 30 Months Completed

16. Structural Erection works-MEG area

Reliance

Jamnagar 08 Months Completed

16. Mechanical structural erection at SEZ PCG area Reliance

Jamnagar 01 Year Completed

Page 4: Refineries Petrochemicals Fertilizers Thermal Power Plants ... · Operation and maintenance of Boiler, Turbine generator including BOP of 165 MW combined cycle based power plant at

4

SIMAR INFRASTRUCTURES LIMITED 218, Simar House, Virat Nagar Panipat-132 103 (Haryana) Tel: +91-1804013599 [email protected] –www.simar.co.in

17. Circular Platform Erection works SEZ-MEG area Reliance

Jamnagar 02 Months Completed

18. Turn around Maintenance of SAP & PAP at 01 MT capacity at ICS-Senegal (International). Includes Piping, Equipment’s(rotary +Static)

ICS Senegal 06 Months Completed

19. Assembly and Erection of steel stack along with Platforms of 74 Mtrs height of 72MW at OMPL, Mangalore, Karnataka (QTY -02 No. stacks).

OMPL/TOYO/ THERMAX

03 Months Completed

20.

Assembly, Erection, Testing and Commissioning of Static and Rotating Equipments(Total Weight 19000 MT) of 02 Million Tonne Capacity Di Ammonia Phosphate Fertilizer Plant at OCFL, Paradeep, Orissa

OCFL 22 Months Completed

21. Fabrication of Pressure Vessels and Evaporators. Y’NAGAR/ ISGEC 1.5 Years Completed

22. Fabrication, Assembly, Welding, Pre/Post Weld Treatment and Hydro Testing of Headers.

Y’NAGAR/ ISGEC 36 Months Completed

23. Inspection and correction of turbine bearing no. 01 to 09, alignment of MOP & Bearing gear at 1x 300 MW MCCPL, Bandhakhar, Chhattisgarh.

MCCPL, CG 01 Months Completed

24.

Annual Overhauling of Turbine & Auxiliaries of Unit 1 & 2 at 2x135 MW, ACBIL, Kasaipali, Chhattisgarh

ACBIL 01 Month Completed

25. Services for erection & commissioning of the Drum Belt at KFCL, JAIPRAKASH ASSOCIATES LIMITED.

KFCL, Kanpur 2 Month Completed

26. Triennial Maintenance (Running Maintenance, Breakdown Works) Contract of Boiler, Turbine, Air Compressors and AC of Stage-I (3 X 800 MW) Units at NTPC Kudgi, Karnataka

NTPC Limited, Kudgi

36 Month Continue…

27.

Triennial Maintenance (Running Maintenance, Breakdown Works) Contract of Balance of Plant (BOP) of Stage-I (2 X 800 MW) Units at NTPC Gadarwara

NTPC Limited

Gadarwara

36 Month

Continue…

28.

Providing Complete mechanical maintenance Service including preventive maintenance, regular maintenance & break down maintenance of Boiler & its Auxiliaries (including ESP), Turbine & its Auxiliaries and BOP and Boiler tubes weld joints repair for Unit-I & II, Kawai Thermal Power Plant, Rajasthan

Adani Power Rajasthan Ltd.

24 Month

Continue…

Page 5: Refineries Petrochemicals Fertilizers Thermal Power Plants ... · Operation and maintenance of Boiler, Turbine generator including BOP of 165 MW combined cycle based power plant at

5

SIMAR INFRASTRUCTURES LIMITED 218, Simar House, Virat Nagar Panipat-132 103 (Haryana) Tel: +91-1804013599 [email protected] –www.simar.co.in

29.

Operation & Maintenance of Ore Beneficiation Plant of Zinc of 2.7 mm MT of Hindustan Zinc limited, Zawar Mines, Udaipur Rajasthan.

Hindustan Zinc Limited

36 Months Continue…

30.

Operations Support Services in Ash Handling Plant (AHP) of 5X800 MW Costal Gujarat Power Limited (CGPL), Mundra Gujarat.

CGPL Gujarat 24 Months

Continue…

31.

Operation & Maintenance Services of Ash Handling Plant (AHP), Mill Reject System (MRS) and Recovery system WRS at 2X700 MW Nabha Power Limited.

L&T Nabha Power

12 + 24 Months

Continue…

32.

Annual Mechanical Maintenance Contract for Boiler & its Auxiliaries, TG & its Auxiliaries, Balance of Plant, Operation Assistance in Water Treatment Plant including material handling and Housekeeping of 3x660MW Super Critical Power Plant of M/S Talwandi Sabo Power Limited,Vill. Banwala, Dist. Mansa, Punjab for Five Years.

STEAG/TSPL

60

Months

Continue…

33.

Operation and maintenance of Boiler, Ash Handling & its Auxiliaries of 3x660 MW Super Critical Thermal Power Plant at Talwandi Sabo, Mansa Punjab.

TSPL/Vedanta Group

36 Months Completed

34.

Routine, Preventive, Predictive Maintenance of Boiler, Turbine and Auxiliaries, All Pumps, DM water plant, Fans of Cooling Towers, Fans, Compressors, HFO system, Ash Handling & BOP etc. of 2x600 MW at LANCO Anpara Power Corporation Ltd, Uttar Pradesh.

LANCO 36 + 36 Months

Continue…

35.

Commissioning Support for Complete Power Plant for Mechanical, Electrical and C&I for BTG, BOP Equipment, Associated Piping, CHP & AHP of 2x600 MW DBPL BADAHARA, Chhattisgarh

DB POWER 24 Months Completed

36.

Complete Maintenance (Routine, Breakdown, Preventive) of Boilers along with its auxiliaries of 4 x 600MW Boilers at Evonik Energy Service(India) Pvt. Limited Jharsuguda

SEL IPP/ EESI 52 Months Completed

37.

Maintenance for the housekeeping and material management of 4 x 600 MW boilers at Evonik Energy Service(India) Pvt. Limited Jharsuguda

SEL IPP/ EESI 36 Months Completed

38.

Field Operations of BOP of 4 x 600 MW Boilers at Evonik Energy Service(India) Pvt. Limited Jharsuguda

SEL IPP/ EESI 42 Months Completed

39.

Annual Maintenance Contract of Boiler, Mill & its Auxiliaries of 4x300 MW KPI Based Rosa Thermal Power Plant , Rosa , Uttar Pradesh.

Reliance Rosa 36 Months Continue…

40.

AMC for Preventive, Running, Predictive and Breakdown Maintenance of Boiler, Turbine

LANCO-Amarkantak

36 Months Continue...

Page 6: Refineries Petrochemicals Fertilizers Thermal Power Plants ... · Operation and maintenance of Boiler, Turbine generator including BOP of 165 MW combined cycle based power plant at

6

SIMAR INFRASTRUCTURES LIMITED 218, Simar House, Virat Nagar Panipat-132 103 (Haryana) Tel: +91-1804013599 [email protected] –www.simar.co.in

Generator with its auxiliaries, Balance of Plant and Ash Handlin Plant of 2X300 MW LANCO Amarkantak Ltd.

41.

AMC for Preventive, Running, Predictive and Breakdown Maintenance of Boiler, Turbine Generator with its auxiliaries, Balance of Plant and Ash Handlin Plant of 2X300 MW LANCO Amarkantak Ltd.

UPCL

24 Months Completed

42.

Operation & Maintenance of Ash Handling Plant CPP Unit 3 & 4 (4X300 MW) at JSW Energy Limited, Bellary, Karnataka.

JSW

36 Month

Continue...

43.

Annual Maintenance, Preventive Maintenance & Breakdown Maintenance of Boiler, Turbine and its Auxiliaries CPP- I,II,III,IV & SBU- I,II at 1690 MW JSW Energy Limited, Bellary Karnataka.

JSW

36 Month

Continue...

44.

AMC for Mechanical Preventive Maintenance & Misc. Services of Boiler and Auxiliaries of SBU 2 and CPP3&4 units Three Units (4X300 MW) at JSW Energy Limited, Bellary, Karnataka.

JSW 24 + 12 Months

Completed

45.

AMC for Mechanical Breakdown Maintenance & Misc. Services of Boiler, CHP and Auxiliaries of SUB2 and CPP3&4 Three Units (4X300 MW) at JSW Energy Limited, Bellary, Karnataka.

JSW 24 + 12 Months

Completed

46.

Maintenance Contract of BTG & Mill Reject System at 2X300 MW TRN Energy Private Limited,Vill-Bhengari, Po- Nawarpara(Tenda), Tehsil-Gharghoda, Raigarh (C.G.)

TRN Energy Limited

36 Months Continue…

47.

Maintenance Work For Electrical and C & I at 2X300 MW TRN Energy Private Limited, Vill-Bhengari, Po-Nawarpara(Tenda), Tehsil-Gharghoda, Raigarh (C.G.)

TRN Energy Limited

36 Months Continue…

48.

Annual Service Contract for Maintenance of Main Plant and Plant Water System at 2X300 MW TRN Energy Private Limited, Vill-Bhengari, Po-Nawarpara(Tenda), Tehsil-Gharghoda, Raigarh (C.G.)

TRN Energy Limited

12 Months Completed

Page 7: Refineries Petrochemicals Fertilizers Thermal Power Plants ... · Operation and maintenance of Boiler, Turbine generator including BOP of 165 MW combined cycle based power plant at

7

SIMAR INFRASTRUCTURES LIMITED 218, Simar House, Virat Nagar Panipat-132 103 (Haryana) Tel: +91-1804013599 [email protected] –www.simar.co.in

49.

Operation & Maintenance of Ash Handling Plant at 2 X 300 MW TRN Energy Pvt.Ltd, Vill-Bhengari, Po-Nawarpara(Tenda), Tehsil-Gharghoda, Raigarh (C.G.)

TRN Energy Limited

12 Months Completed

50.

Maintenance work for Electrical and Control & Instrumentation of 1x300 MW Thermal Power Plant.

Maruthi Clean & Coal power Ltd

12 Months Completed

51.

Complete Operation & Maintenance Services for BTG, BOP, Switch Yard, Electrical and C&I and Auxiliaries including housekeeping for unit-1 &2 at 2 x 270 MW Power Plant at Goindwal Sahib, Punjab.

GVK 36 Months Continue...

52.

Field operations of Boiler, Coal Mills, Fans, DM Plant, FOPH, CW/ RW / FF / SW / PW/ ETP/ STP, Turbine & its Auxiliaries, ESP, Ash Handling Plant, Switch Yard, Switch Gears including HT / LT System etc. of 2 x 270 MW Power Plant at Goindwal Sahib, Punjab.

GVK 36 Months Completed

53.

Annual Mechanical Maintenance & Operations of Boiler Turbine Generator & BOP of 4x135 MW power plants at DCPP of JSPL at Dongamuha, Raigarh.

JSPL 12 Months Continue...

54.

Annual Contract for Operation & Maintenance of Boiler & its auxiliaries, Turbine auxiliaries, CHP, AHP, WTP and BOP at 2x50MW Spectrum Coal & power limited, Chhattisgarh.

ACB-Spectrum Coal & Power

12 + 12 Months

Completed

55.

Operation & Maintenance of 1 X 18 MW solar Power Plant of KEC International at Jalaun, Uttar Pradesh.

KEC International 36 Months Completed

56.

Operation & Maintenance of 5 MW solar Photovoltaic Power Plant at IOCL, Rawra Rajasthan

IOCL 36 Months Continue...

Page 8: Refineries Petrochemicals Fertilizers Thermal Power Plants ... · Operation and maintenance of Boiler, Turbine generator including BOP of 165 MW combined cycle based power plant at

8

SIMAR INFRASTRUCTURES LIMITED 218, Simar House, Virat Nagar Panipat-132 103 (Haryana) Tel: +91-1804013599 [email protected] –www.simar.co.in

57.

Operation and Maintenance of complete Coal Handling Plant – II of 2x210 MW, PTPS-HPGCL, Panipat Haryana

PTPS / TECPRO 07 Months Completed

58.

Operation & Maintenance of Routine/Breakdown/Capital Maintenance of all Electrical & Electronics (C&I) Equipment of Coal handling Plant – III of 2x250 MW, PTPS-HPGCL, Panipat Haryana

PTPS / TECPRO 07 Months Completed

59.

Maintenance of all Equipment’s of Conveyor System (Routine & Breakdown) & Heavy Equipment’s of Coal Handling Plant – II of 2 x 210 MW PTPS-HPGCL, Panipat Haryana

PTPS / HPGCL 07 Months Completed

60.

Complete Mechanical Maintenance of Equipment’s of Conveyor System of Coal Handling Plant-I of 4 x 110 MW Boilers.

PTPS/ HPGCL 24 Months Completed

61.

Complete Mechanical Maintenance of Crusher, RDM, Wagon Tippler, Motors, and other Allied Equipment’s installed at CHP-II of 2 x210 MW PTPS-HPGCL, Panipat Haryana.

PTPS/ HPGCL 15 Months Completed

62.

Renovation & Modernization of Conveyor Belts by replacing existing Toughing Idlers frame with Rollers, Flat Return Idlers, Toughing Training Idlers, Return Training Idlers & Impact Idlers of 20 Toughing Angle with 35 Toughing Angle Idlers & replacement of Vibrating Feeders, Flap Gates, Transfer Chutes of Coal Handling Plant – I of 4 x 110 MW, PTPS-HPGCL, Panipat Haryana.

PTPS/ RMEC 06 Months Completed

63. Complete Maintenance of Tube Coal Mills, RC Feeders & Vibrators & miscellaneous Boiler Works of 210 MW Boiler at Unit – 6

PTPS/ HPGCL 15 Months Completed

64.

Complete Maintenance of Coal Mills, RC Feeders, PF Piping and O&M of Tramp Iron Gates of 2 x 110 MW at Unit – 1 & 2.

PTPS / HPGCL 15 Months Completed

65.

Complete Maintenance of Coal Mills, RC Feeders of 2 x 600 MW Boiler at Unit–1&2

RGTPP/ 15 Months Completed

Page 9: Refineries Petrochemicals Fertilizers Thermal Power Plants ... · Operation and maintenance of Boiler, Turbine generator including BOP of 165 MW combined cycle based power plant at

9

SIMAR INFRASTRUCTURES LIMITED 218, Simar House, Virat Nagar Panipat-132 103 (Haryana) Tel: +91-1804013599 [email protected] –www.simar.co.in

66.

Complete Maintenance of Coal Mills, RC Feeders & Variators & miscellaneous Boiler Works of 210 MW Boiler at Unit – 5

PTPS 15 Months Completed

67.

Complete Maintenance of Coal Mills, RC Feeders & Variators & miscellaneous Boiler Works of 210 MW Boiler at Unit – 5

PTPS/ HPGCL 15 Months Completed

68.

Complete Maintenance of Coal Mills, RC Feeders and PF Piping of 2x300 MW at Unit – 1&2.

DCRTPP/ HPGCL 15 Months Completed

69.

Complete Maintenance of Coal Mills, RC Feeders, PF Piping and O&M of Tramp Iron Gates of 2 x 110 MW at Unit 1 & 2.

PTPS/ HPGCL 15 Months Completed

70.

Complete Maintenance of Coal Mills, RC Feeders and PF Piping of 2x300 MW at Unit – 1&2.

DCRTPP/ HPGCL 15 Months Completed

71.

Routine/Breakdown/Capital Maintenance of all Electrical & Electronics (C&I) Equipment’s of Unit – 7&8

PTPS/ HPGCL 15 Months Completed

72.

Routine, Breakdown & Capital Maintenance of all Electrical & Electronics (C&I) Equipment’s in CHP-II of 2 x 210 MW Boilers.

PTPS/ RMEC 15 Months Completed

73.

Routine/Breakdown/ Capital Maintenance of all Electrical & Electronics (C&I) Equipment of Unit 2x250 MW – 7&8

PTPS/ HPGCL 15 Months Completed

74.

Routine/Breakdown/ Capital Maintenance of all Electrical & Electronics (C&I) Equipment of Coal Handling Plant – III of 2x250 MW

PTPS/ RMEC 15 Months Completed

75. Routine/Breakdown/ Capital Maintenance of all Electrical & Electronics (C&I) Equipment of CHP-II of 2x210 MW Boilers

PTPS/ HPGCL 07 Months Completed

76. Maintenance / Replacement of Fabric / Conveyor Belt Compensators over existing Metallic Expansion Joints of Boiler of 110 MW at Unit -2

PTPS / HPGCL 04 Months Completed

Page 10: Refineries Petrochemicals Fertilizers Thermal Power Plants ... · Operation and maintenance of Boiler, Turbine generator including BOP of 165 MW combined cycle based power plant at

10

SIMAR INFRASTRUCTURES LIMITED 218, Simar House, Virat Nagar Panipat-132 103 (Haryana) Tel: +91-1804013599 [email protected] –www.simar.co.in

Annual Overhauling Works

S. No. Description of Works Plant / Client Name

Duration Status

1. Annual overhauling of Boiler Pressure Part, APH, FAN, Coal Burner, Safety valves 2X600 MW Essar Power M.P Limited ,

Bandhora, Waidhan , M.P

Essar Power M.P Limited

01 Month Continue…

2. Annual Overhauling of Boiler Pressure Part, APH, Fans, ESP &

Coal burner of Unit 1 & 3 of 4x300 MW KPI Based Rosa Thermal Power Plant , Rosa , Uttar Pradesh.

Reliance Rosa 01 Month Continue…

3. Annual Overhauling of Boiler Pressure Part, Esp Duct & Dampers, APH & Fans of Unit 2 of 3X660 MW, Talwandi Sabu Power Plant (TSPL), Mansa, Punjab.

TSPL, Punjab 01 Month Continue…

4. Annual Overhauling of Boiler Pressure Part, Esp Duct & Dampers, APH & Fans of Unit 2 of 3X660 MW, Talwandi Sabu Power Plant (TSPL), Mansa, Punjab.

TSPL, Punjab 01 Month Completed

5. Annual Overhauling of Boiler Pressure Part, Esp Duct & Dampers, APH & Fans of Unit 2 of 3X660 MW, Talwandi Sabu Power Plant (TSPL), Mansa, Punjab.

TSPL, Punjab 01 Month Completed

9. Annual Overhauling of Boiler & its auxiliaries of U #50 at Costal Gujarat Power Limited (TATA POWER-5X800 MW), Mundra.

TATA POWER -CGPL

02 Months Completed

10. Annual Overhauling of Boiler & its auxiliaries of Unit #40 at Costal Gujarat Power Limited (TATA POWER-5X800 MW), Mundra

TATA POWER -CGPL

02 Months Completed

11. Annual Overhauling of Pressure Parts of Boiler unit #1 and Unit #2 at 2x600 MW CLP Jhajjar- Haryana

CLP 2 Months Completed

12. Annual Overhauling of APH & Fans of unit #1 at 2x600 MW CLP Jhajjar- Haryana

CLP 01 Month Completed

13. Misc. work During Overhauling including Vortex Plate & APH tube replacement in 4 x135 MW JSPL, Korba, CG

JSPL 01 Month Completed

14. Annual Overhauling of ESP, APH of SBU #2, CPP3 at 4X300 MW JSW Energy, Bellary

JSW 02 Month Completed

15. Annual Overhauling of Boiler and Turbine with auxiliaries at 4X300 MW JSW Energy, Bellary

JSW 02 Months Completed

16. Annual Overhauling of LT Motors at 4X300 MW JSW Energy, Bellary

JSW 02 Months Completed

17. Annual Overhauling of Boiler & it’s auxiliaries at 4X135 MW JSPL, Raighar.

JSPL 02 Months Completed

18. Annual Overhaul activities of Boiler, Burner, Valve, Pressure Parts ,ESP, Mills, Ducts and Dampers, APH & Fans of SBU 2, 2x300 MW

JSW/Bellary 09 Days Completed

19. Annual Overhaul activities of Boiler, Burner, Valve, Pressure Parts ,ESP, Mills, Ducts and Dampers, APH & Fans of CPP3, 2x300 MW

JSW/Bellary 45 days Completed

20. Capital Overhauling of Pressure Parts, Burners, Pent & Dog SEL IPP/ EESI 01 Completed

Page 11: Refineries Petrochemicals Fertilizers Thermal Power Plants ... · Operation and maintenance of Boiler, Turbine generator including BOP of 165 MW combined cycle based power plant at

11

SIMAR INFRASTRUCTURES LIMITED 218, Simar House, Virat Nagar Panipat-132 103 (Haryana) Tel: +91-1804013599 [email protected] –www.simar.co.in

House, Fans – (ID/FD/PA/SA), Valves, Ducting, Pumps, Compressors, Gates and Dampers etc. of 2 x 600 MW Power Plants at Jharsuguda.

Month

21. Annual Overhauling of Turbine, Boiler and its Auxiliaries, APH & Fans with auxiliaries at CPP 2 at JSW Energy, Bellary

JSW Energy Limited

01 Months Completed

22. Annual turbine, Generator overhauling of Unit -II & IV at Guru Gobind Sinagh Thermal Power Station , Rupnagar, Punjab.

GGSSTTP 01 Months Completed

23. Capital Overhauling of ESP & Bag Filters of 2 x 600 MW Power Plants at Jharsuguda.

SEL IPP/ EESI 01 Month Completed

24. Capital Overhauling of Coal Mills, Gates & Dampers of 2 x 600 MW Power Plants at Jharsuguda.

SEL IPP/ EESI 01 Month Completed

25. Capital Overhauling of Air Pre Heaters of 2 x 600 MW Power Plants at Jharsuguda.

SEL IPP/ EESI 01 Month Completed

26. Replacement of Support/Guide Bearing of APH of 2 x 600 MW at Hisar.

HPGCL/REL 01 Month Completed

27. Capital overhauling of unit-3 of 110Mw at PTPS Panipat complete pressure parts.

PTPS 1.5 Months Completed

28. Commissioning Support for Mechanical Maintenance Work of Power Plant Equipment’s, Piping, Valves etc. at 2x700 MW NPL Rajpura, Punjab

NPL 06 Months Completed

29. Annual Overhauling of Boiler- Boiler Pressure Parts, IBR HP Valve, BED Nozzles etc. For 135 MW Power Plant at Angul, Orissa.

JSPL 1.5 Months Completed

30. Annual Overhauling of Boiler Pressure Parts, IBR HP Valve, BED Nozzles etc. For4x 135 MW Captive Power Plant at Dongamahua, Tamnar, Raigadh.

JSPL 01 Month Completed

30. Annual Overhauling and Annual Maintenance of Boiler, Boiler Pressure Parts, IBR HP Valve, BED Nozzles etc. For4x 135 MW Captive Power Plant at Dongamahua, Tamnar, Raigadh.

JSPL 01 Month Completed

31. Capital Overhauling of Pressure Parts (First pass & Second Pass ) of Unit # 5 of 210 MW capacity at PTPS, Panipat

PTPS /HPGCL 01 Month Completed

32. Capital Overhauling of Pressure Parts (First pass & Second Pass ) of Unit # 4 of 110 MW capacity at PTPS, Panipat

PTPS / HPGCL 01 Month Completed

33. Capital Overhauling of Pressure Parts, Burner, RAH, Pent House, Ducting, Scaffolding in the Furnace, of 210 MW Boiler at Unit – 2

PSEB/ ALSTOM 01 Month Completed

34. Capital Overhauling of Pressure Parts, Burner, RAH, Pent House, Ducting, Scaffolding in the Furnace, of 210 MW Boiler at Unit – 2

PSEB/ ALSTOM 01 Month Completed

35. Capital Overhauling of Pressure Parts, Burner, RAH, Pent House, Ducting, Scaffolding in the Furnace, of 210 MW Boiler at Unit – 3

PSEB/ ALSTOM 01 Month Completed

36. Mini Overhauling of the Pressure Parts, Burner, RAH, Pent House, Ducting, Erection of the Sky Climber, ESP at Unit -4

PSEB/ PCP 01 Month Completed

37. Mini Overhauling of the Pressure Parts, Burner, RAH, Pent House, Ducting, Erection of the Sky Climber, ESP at Unit 5

PSEB/ PCP 01 Month Completed

Page 12: Refineries Petrochemicals Fertilizers Thermal Power Plants ... · Operation and maintenance of Boiler, Turbine generator including BOP of 165 MW combined cycle based power plant at

12

SIMAR INFRASTRUCTURES LIMITED 218, Simar House, Virat Nagar Panipat-132 103 (Haryana) Tel: +91-1804013599 [email protected] –www.simar.co.in

38. Capital Overhauling of RAH, ESP, Dampers & Gates & Ducting of 210 MW Boiler at Unit-6

PTPS / HPGCL 01 Month Completed

39. Overhauling of RAH, ESP, Dampers & Gates & Ducting of 210 MW Boiler at Unit-6

PTPS/ RMEC 01 Month Completed

40. Overhauling of complete Pressure Parts, Pent House, APH of 110 MW Boiler at Unit-2

PTPS/ HPGCL 01 Month Completed

41. Overhauling of Pressure Parts, Cleaning, Washing & Repairing of the Pent House of 110 MW Boiler at Unit – 3

PTPS/ HPGCL 01 Month Completed

42. Overhauling of RAH, ESP, Gates & Dampers, various Ducts of 210 MW Boiler at Unit-5

PTPS/ HPGCL 01 Month Completed

43. Repair/Rectification of 6 Nos. Damaged ESP Fields / ESP Structure along with Replacement of the Slide Bearing of 210 MW Boiler at Unit-6

PTPS/ HPGCL 01 Month Completed

44. Overhauling of Instrument Air Compressor of 110 MW Boiler at Unit-2

PTPS/ HPGCL 01 Month Completed

45. Overhauling Work of Repairing of Pent House, Boiler Drum Internals, Inspection and Repairing of Hangers of 110 MW of Unit -3.

PTPS / HPGCL 01 Month Completed. Doing from last 7 years

Page 13: Refineries Petrochemicals Fertilizers Thermal Power Plants ... · Operation and maintenance of Boiler, Turbine generator including BOP of 165 MW combined cycle based power plant at

13

SIMAR INFRASTRUCTURES LIMITED 218, Simar House, Virat Nagar Panipat-132 103 (Haryana) Tel: +91-1804013599 [email protected] –www.simar.co.in

Major Experience of Electrical and C & I jobs in Power Plant, Refinery or Petro Chemicals

Sr. No

Description of Works Plant / Client Name

Duration Status

1. Composite Electrical works in upcoming Oil Refinery including Erection, Testing & commissioning of Transformers, LT/ HT Bus bars, HT/LT Motors, Laying HT/LT Cables & installation of C&I system at Dangote Refinery Nigeria.

Dangote Refinery

18 Months

Continue…

2. Assembly Erection, Testing & Commissioning of H&M Equipment’s for Kano Hydro Electric Project for Skipper Nigeria Limited, at Tiga Site, Nigeria

Skipper Nigeria Limited

8 Months Continue…

3. Complete Operation & Maintenance Services for BTG, BOP, Switch Yard, Electrical and C&I and Auxiliaries including housekeeping for unit-1 &2 at 2 x 270 MW Power Plant at GOINDWAL Sahib, Punjab.

GVK 36 Months

Continue...

4. Maintenance Work For Electrical and C & I at 2X300 MW TRN Energy Private Limited, Vill-Bhengari, Po-Nawarpara (Tenda), Tehsil-Gharghoda, Raigarh (C.G.)

TRN Energy Limited

36 Months

Continue…

6. Commissioning Support for Complete Power Plant for Mechanical, Electrical and C&I for BTG, BOP Equipment, Associated Piping, CHP & AHP of 2x600 MW DBPL BADAHARA, Chhattisgarh

DB POWER 24 Months

Completed

7. Operation & Maintenance of 5 MW solar Photovoltaic Power Plant at IOCL, Rawra Rajasthan

IOCL 36 Months

Continue...

8. Maintenance Work for Electrical and Control & Instrumentation of 1x300 MW Thermal Power Plant.

Maruti Clean & Coal power Ltd

12 Months

Completed

9. Operation and maintenance of Boiler, Turbine generator including BOP & Electrical and C&I of 165 MW combined cycle based power plant at HMEL, Bathinda (Punjab).

STEAG/HMEL 24 months

Completed

10. Operation & Maintenance of 1 X 18 MW solar Power Plant of KEC International at Jalaun, Uttar Pradesh.

KEC International

36 Months

Completed

11. Annual Maintenance Contract for Electrical and C&I System and Technical Support Services including Module Cleaning of 3X25 MW Solar Power Plant of Hindustan Power

Hindustan Power

36 Months

Completed

Page 14: Refineries Petrochemicals Fertilizers Thermal Power Plants ... · Operation and maintenance of Boiler, Turbine generator including BOP of 165 MW combined cycle based power plant at

14

SIMAR INFRASTRUCTURES LIMITED 218, Simar House, Virat Nagar Panipat-132 103 (Haryana) Tel: +91-1804013599 [email protected] –www.simar.co.in

CONTACT DETAILS

Registered Office:

208, Virat Nagar Panipat, Haryana

Corporate Office:

218, Virat Nagar Panipat, Haryana

Contact Person:

1. Harsimran Singh

Mob:+91-9355650017

Email: [email protected]

2. Amar Kumar Singh- DGM Contracts

Mob:+91-8684000421

Email: [email protected]

Registered Office:

Suite 106, National Engineering Centre

CBD, Abuja, FCT

Corporate Office:

4, Amore Street off Toyin Street, Ikeja, Lagos

State

Contact Person:

1. Mr. Amandeep Singh

Mob: +234 8180 382 394

Email: [email protected]

2. Mr. PN Gopa Kumar

Mob: +234 7084 905 677