RAPDRP – A IN KARNATAKA Feb’ 2014
description
Transcript of RAPDRP – A IN KARNATAKA Feb’ 2014
1
RAPDRP – A IN KARNATAKA
Feb’ 2014
RESTRUCTURED ACCELERATED POWER DEVELOPMENT AND REFORMS PROGRAMME (R-APDRP)
2
Go-Live Status of ESCOM’s of Karnataka
Town Integration ( Full Stack with MDA & Energy Audit) Schedule – Cumulative
Month Up to
Jan’ 13Up to
Feb’ 13Up to
Mar’ 13Up to
Apr’ 13Up to
May’ 13Up to
Jun’ 13Up to Jul’ 13
Up to Aug’ 13
Up to Sep’ 13
Up to Oct’ 13
Up to Nov’ 13
Up to Dec’ 13
Up to Jan’ 14
Target 10 18 40 40 50 50 50 50 53 55 75 91 98
Achieved 6 10 31 31 46 46 46 46 46 46 46 51
3
RESTRUCTURED ACCELERATED POWER DEVELOPMENT AND REFORMS PROGRAMME (R-APDRP)
ESCOM MBC live Full Stack with Energy Audit
BESCOM 25 11
CESC 12 5
GESCOM 21 11
HESCOM 29 23
MESCOM 11 1
TOTAL 98 51
Module wise / ESCOM’s Wise Status as on Jan 2014
CRITICAL ISSUES OF PROJECT IMPLEMENTATION
RESTRUCTURED ACCELERATED POWER DEVELOPMENT AND REFORMS PROGRAMME (R-APDRP)
Issues Status
System Stabilization
• Stabilization of the RAPDRP System post Data Centre Crash on 25th Oct 2013 and 5th Nov 2013
• Performance of online system and reconciliation of the offline application.
Software Simplification
• Driven by BESCOM in consultation with other ESCOMs.• Progress so far.
GIS • Deployment of GIS based integrated Network analysis Module NEPLAN pending from ITIA
• Incremental data updates on Network and Consumers.
MDAS • The legacy meter replacement to DLMS meters is in progress.• Modem installation is in progress. (Module wise progress)
4
CRITICAL ISSUES OF PROJECT IMPLEMENTATION
RESTRUCTURED ACCELERATED POWER DEVELOPMENT AND REFORMS PROGRAMME (R-APDRP)
Issues Status
Energy Audit
• SIM card not communicating in some cases• Modems burnt at sites- CPRI report awaited• Gaps in GIS Incremental update and PART B network up gradation
Training • Effective end user training to be imparted.• ESCOMs identified Super user not trained.• Training environment to be deployed by ITIA for hands on
training.
GIS Additional licenses and servers
• Currently application server can cater to 40 concurrent web user at the bandwidth of 512kbps.
• Maximum concurrency of 217 users at peak hours at present (Without Bangalore 46 SDO going live)
• ITIA requested for Change request .• BESCOM Board has opined to constitute a committee to deliberate
the issue .
5
6
RESTRUCTURED ACCELERATED POWER DEVELOPMENT AND REFORMS PROGRAMME (R-APDRP)
RESTRUCTURED ACCELERATED POWER DEVELOPMENT AND REFORMS PROGRAMME (R-APDRP)
% progress taken SDO wise
CCC Operational across ESCOMs except MESCOM
ESCOM Total Town
s
Total SDOs
Office Infrastructure
Primary Network
Secondary Network
MBC Go Live
GIS Network Approved
GIS Consumer Approved
Meter-Modems installed
Full Stack Go-Live
BESCOM 25 73 73 100% 73 100% 73 100% 73 100% 73 100% 73 100% 61 84% 27 40%
CESC 12 19 19 100% 19 100% 19 100% 19 100% 19 100% 19 100% 6 32% 19 100%
GESCOM 21 23 23 100% 23 100% 21 91% 23 100% 23 100% 23 100% 17 74% 23 100%
HESCOM 29 37 37 100% 37 100% 26 70% 37 100% 37 100% 37 100% 26 70% 37 100%
MESCOM 11 17 17 100% 17 100% 10 59% 17 100% 17 100% 16 94% 1 6% 4 24%
Total 98 169 169 100% 169 100% 149 88% 169 100% 169 100% 168 99% 111 66% 110 65%
Of the 159 observations, 94 have been closed The remaining 65 items are planned to be completed by Feb 2014
8
PriorityCurrent Status
High Low Medium NAGrand Total
Closed 14 30 16 8 68In Progress 22 7 10 39Open 7 8 12 27Duplicate 2 14 16
Pending Sign-Off 1 1
Pending Clarification
2 4 2 8
Grand Total 48 49 40 22 159
RESTRUCTURED ACCELERATED POWER DEVELOPMENT AND REFORMS PROGRAMME (R-APDRP)
Of the 159 observations, 94 have been closed The remaining 65 items are planned to be completed by Feb 2014
9
Module In Progress Open Closed Duplicate Pending Sign-Off
Pending Clarification
Grand Total
Connection Management
10 1 15 2 2 30
GIS 11 9 19 5 44
IDAM 1 1
MBC 1 1
MDAS&EA 1 1
MIS 2 4 2 8
NEPLAN 1 1
System Security 1 1
WAMS 12 10 39 9 1 1 72
Grand Total 36 21 78 16 1 7 159
RESTRUCTURED ACCELERATED POWER DEVELOPMENT AND REFORMS PROGRAMME (R-APDRP)