8/11/2019 R9100 E9230 DC Transfer Box Installation Guide R1.1(201011)
1/13
R9100/E9230
DC Transfer Box Installation Guide
R1.1 (2010-11)
-
8/11/2019 R9100 E9230 DC Transfer Box Installation Guide R1.1(201011)
2/13
-
8/11/2019 R9100 E9230 DC Transfer Box Installation Guide R1.1(201011)
3/13
R9100 E9230 DC Transfer Box Installation Guide R1.0
ZTE Confidential Proprietary 2010 ZTE Corporation. All rights reserved. 1(13)
LEGAL INFORMATION
By accepting this certain document of ZTE CORPORATIN you agree to the following terms. If you do
not agree to the following terms, please notice that you are not allowed to use this document.
Copyright 2009 ZTE CORPORATION. Any rights not expressly granted herein are reserved. This
document contains proprietary information of ZTE CORPORATION. Any reproduction, transfer,
distribution, use or disclosure of this document or any portion of this document, in any form by any
means, without the prior written consent of ZTE CORPORATION is prohibited.
and are registered trademarks of ZTE CORPORATION. ZTEs company name, logo
and product names referenced herein are either trademarks or registered trademarks of ZTECORPORATION. Other product and company names mentioned herein may be trademarks or trade
names of their respective owners. Without the prior written consent of ZTE CORPORATION or the
third party owner thereof, anyones access to this document should not be construed as granting, by
implication, estopped or otherwise, any license or right to use any marks appearing in the document.
The design of this product complies with requirements of environmental protection and personal
security. This product shall be stored, used or discarded in accordance with product manual, relevant
contract or laws and regulations in relevant country (countries).
This document is provided as is and as available. Information contained in this document is subject
to continuous update without further notice due to improvement and update of ZTE CORPORATIONs
products and technologies.
ZTE CORPORATION
Address: NO. 55
Hi-tech Road South
ShenZhen
P.R.China518057
Website: http://dms.zte.com.cn
Email: [email protected]
-
8/11/2019 R9100 E9230 DC Transfer Box Installation Guide R1.1(201011)
4/13
R9100 E9230 DC Transfer Box Installation Guide R1.0
2 2010ZTE CORPORATION. All rights reserved.ZTE Confidential
Proprietary
Revision History
Product Version Document Version Serial Number Reason for Revision
V3.0, V4.0 1.0 First issue
V3.0, V4.0 1.1Having improved thegrounding way.
Author
Date Document VersionPrepared
byReviewed by Approved by
2010-8-9 1.0Liu Zhe
Wang Huarong
Yi HuaMa Wenguang
2010-11-25 1.1Liu Zhe
Wang Huarong
Yi Hua
Ma Wenguang
-
8/11/2019 R9100 E9230 DC Transfer Box Installation Guide R1.1(201011)
5/13
R9100 E9230 DC Transfer Box Installation Guide R1.0
ZTE Confidential Proprietary 2010 ZTE Corporation. All rights reserved. 3(13)
Applicable to : Base station engineering and installation personnel.
Proposal:Before reading this document, it is recommended to understand the following knowledgeand skills
SEQ Knowledge and ski lls Reference material
1 R9100, E9230 installation ZXMBW BSS Quick Install Guide
2
3
Follow-up document:After read this document, you may need the following information
SEQ Reference material Information
1
2
3
-
8/11/2019 R9100 E9230 DC Transfer Box Installation Guide R1.1(201011)
6/13
R9100 E9230 DC Transfer Box Installation Guide R1.0
4 2010ZTE CORPORATION. All rights reserved.ZTE Confidential
Proprietary
1. Remove the black outer sleeve of the unshielded power cable (41.5 mm2, 0.5m) and the shielded
power cable (24 mm2) with the stripping to make the two sub-cables exposed, shown as Fig 1.
The length of the blue sub-cable is 80mm5mm; the length of the black sub-cable is 20mm25mm;
the length of the exposed copper core is about 7mm.
Figure 1 Cut The Black Outer Sleeve of The Power Cable
Do not cut the sub-cables in the DC transfer box! Otherwise, the copper core left in the transferbox may cause short circuit
The power cable of R9100 and E9230 is used in the way of Unshielded Power Cable
(41.5mm2, 0.5m) +DC Transfer Box + Shielded Power Cable (24 mm
2); R9100 power cable
should within 120m and E9230 power cable should within 140m.
-
8/11/2019 R9100 E9230 DC Transfer Box Installation Guide R1.1(201011)
7/13
R9100 E9230 DC Transfer Box Installation Guide R1.0
ZTE Confidential Proprietary 2010 ZTE Corporation. All rights reserved. 5(13)
2. Loosen the four hexagonal screws on the four corners of the top cover with M5 hexagon wrench,
and remove the top cover of the box.
Figure 2 Loosen the screws on the top cover
3. Remove the four M5 fastening screws, four M3 fastening screws and the corresponding copper
lugs in the box with a Phillips screwdriver ( 5) and keep them for use.
Figure 3 Remove the fasten screws in the box
-
8/11/2019 R9100 E9230 DC Transfer Box Installation Guide R1.1(201011)
8/13
R9100 E9230 DC Transfer Box Installation Guide R1.0
6 2010ZTE CORPORATION. All rights reserved.ZTE Confidential
Proprietary
4. Pull the blue sub-cable through the blue heat shrink tube ( 5,15 mm), and insert the exposed
copper core into the copper lug. Finally, cramp the copper core and the copper lug together with
pliers.
Figure 4 Fasten the copper lug and the sub-cable with plier
Copper lug Plier Heat Shrink Tube
5. Push the blue heat shrink tube to the connection end of copper lug, and heat the heat shrink tube
with hot hair or lighter to make the hot heat shrink tube wrap the copper lug tightly. Seal and
insulate the black sub-cable in the same way.
Figure 5 Seal and insulate the sub-cable
-
8/11/2019 R9100 E9230 DC Transfer Box Installation Guide R1.1(201011)
9/13
R9100 E9230 DC Transfer Box Installation Guide R1.0
ZTE Confidential Proprietary 2010 ZTE Corporation. All rights reserved. 7(13)
6. Use a cutter to make a gap on the inner circle of the rubber ring (about 7mm) for the cable entering
into the box, as shown below.
Figure 6 Make a gap on the inner circle
The gap on the inner circle of the rubber ring should not exceed 10mm to assure the goodwater-proof pressure.
7. Push the sub-cable, with heat shrink tube and copper lug fixed, into the box through the cable holes.
OUTPUT cable hole is for the unshielded power cable (41.5mm2, 0.5m) and INPUT cable hole is
for the shielded power cable (24mm2).
Figure 7 Push the sub-cable through the cable hole
-
8/11/2019 R9100 E9230 DC Transfer Box Installation Guide R1.1(201011)
10/13
R9100 E9230 DC Transfer Box Installation Guide R1.0
8 2010ZTE CORPORATION. All rights reserved.ZTE Confidential
Proprietary
8. Fasten the copper lugs of the two sub-cables to the corresponding contacts with two M5 fasten
screws and a Phillips screwdriver ( 5), shown as below.
Note that a curved wiring should be made for the blue sub-cable to keep it from the contacts with thesilkscreen RTM(+) above.
Fasten the unshielded power cable with the M3 fasten screw to the corresponding left contact;
fasten the shielded layer of the shielded power cable with the M3 fasten screw to the corresponding
right contact.
Figure 8 Fasten the sub-cable to the contact
Connect the blue sub-cable to the busbar with silkscreen NEG (-) above; connect the black
sub-cable to the busbar with silkscreen RTM(+) above.
A curved wiring should be made to keep the blue sub-cable from the busbar with the silkscreen
RTM(+) and to avoid heating the blue sub-cable by transient overload of current.
Use a multimeter to measure the resistance value between busbar NEG(-) and RTM(+) to make
sure there is no short circuit.
-
8/11/2019 R9100 E9230 DC Transfer Box Installation Guide R1.1(201011)
11/13
R9100 E9230 DC Transfer Box Installation Guide R1.0
ZTE Confidential Proprietary 2010 ZTE Corporation. All rights reserved. 9(13)
9. Make sure that the rubber ring of the top cover is pressed in the notch and then cover the top cover.
Make sure that there is no rubber ring exposed.
Figure 9 Inspect the sealing of the top cover
10. Fasten the four hexagonal screws on the four corners of the top cover with M5 hexagon wrench.
Figure 10 Fasten the screws on the top cover
Fix the two screws a and b, but not too tight, and then fix screw c and screw d, but not too tight.
Finally, tighten all of the four screws.
-
8/11/2019 R9100 E9230 DC Transfer Box Installation Guide R1.1(201011)
12/13
R9100 E9230 DC Transfer Box Installation Guide R1.0
10 2010ZTE CORPORATION. All rights reserved.ZTE Confidential
Proprietary
11. Loosen and remove the four screws on R9100/E9230 cabinet with M6 hexagon wrench, as shown
below. Align the installation hole on the installation panel to the screw locations on R9100/E9230
cabinet, and fasten the installation panel to the side of R9100/E9230 with the four screws and an
M6 hexagon wrench.
Figure 11 Fasten Installation Panel
The box should be installed on the side of R9100/E9230 near power supply connector
12. Align the box installation holes to the installation holes on the installation panel, as shown below.
Fasten the box to R9100/E9230 cabinet with the screws delivered with the box and an M5 hexagonwrench.
Figure 12 Install the box on the cabinet
-
8/11/2019 R9100 E9230 DC Transfer Box Installation Guide R1.1(201011)
13/13
R9100 E9230 DC Transfer Box Installation Guide R1.0
ZTE Confidential Proprietary 2010 ZTE Corporation. All rights reserved. 11(13)
13. Connect the left grounding terminal of the cabinet to t outdoor copper busbar; and make the
shielded layer of the power cable (24 mm2) grounded with the grounding clip within 1 distance
from the DC transfer box.
Figure 13 Grounding