Public Presentation on OU4 Cleanup Plan - October 12 2010 · GEOTEXTILE SEPARATOR RIP RAP WALL....

17
PUBLIC MEETING PUBLIC MEETING OCTOBER 12, 2010 EXXONMOBIL OIL CORPORATION FORMER BUFFALO TERMINAL BUFFALO NY FORMER BUFFALO TERMINAL, BUFFALO , NY BCP SITE NO. C915201 OPERABLE UNIT 4 PREFERRED CLEANUP ALTERNATIVE PREFERRED CLEANUP ALTERNATIVE

Transcript of Public Presentation on OU4 Cleanup Plan - October 12 2010 · GEOTEXTILE SEPARATOR RIP RAP WALL....

Page 1: Public Presentation on OU4 Cleanup Plan - October 12 2010 · GEOTEXTILE SEPARATOR RIP RAP WALL. CONSTRUCTION SEQUENCING YEAR 2 SLURRY WALL, CAP AND VEGETATIVE STABILIZATION GEOSYNTHETIC

PUBLIC MEETINGPUBLIC MEETINGOCTOBER 12, 2010

EXXONMOBIL OIL CORPORATIONFORMER BUFFALO TERMINAL BUFFALO NYFORMER BUFFALO TERMINAL, BUFFALO, NY

BCP SITE NO. C915201

OPERABLE UNIT 4 PREFERRED CLEANUP ALTERNATIVEPREFERRED CLEANUP ALTERNATIVE

Page 2: Public Presentation on OU4 Cleanup Plan - October 12 2010 · GEOTEXTILE SEPARATOR RIP RAP WALL. CONSTRUCTION SEQUENCING YEAR 2 SLURRY WALL, CAP AND VEGETATIVE STABILIZATION GEOSYNTHETIC

LOCATION OF THE FORMER EXXONMOBIL OIL FACILITY BUFFALO, NEW YORK,

Page 3: Public Presentation on OU4 Cleanup Plan - October 12 2010 · GEOTEXTILE SEPARATOR RIP RAP WALL. CONSTRUCTION SEQUENCING YEAR 2 SLURRY WALL, CAP AND VEGETATIVE STABILIZATION GEOSYNTHETIC

RIVER  ALIGNMENT PRIOR TO 1917

Map Source: 1897 Rand McNally Atlas

Page 4: Public Presentation on OU4 Cleanup Plan - October 12 2010 · GEOTEXTILE SEPARATOR RIP RAP WALL. CONSTRUCTION SEQUENCING YEAR 2 SLURRY WALL, CAP AND VEGETATIVE STABILIZATION GEOSYNTHETIC

RIVER REALIGNMENT WITH OU‐4 CITY OF BUFFALO LANDFILL OPERATIONS 1921‐1951

Page 5: Public Presentation on OU4 Cleanup Plan - October 12 2010 · GEOTEXTILE SEPARATOR RIP RAP WALL. CONSTRUCTION SEQUENCING YEAR 2 SLURRY WALL, CAP AND VEGETATIVE STABILIZATION GEOSYNTHETIC

EXXONMOBIL OIL PURCHASES OU‐4 IN 1951 AND CONSTRUCTS 2 STORAGE TANKS IN 1953

2006

Page 6: Public Presentation on OU4 Cleanup Plan - October 12 2010 · GEOTEXTILE SEPARATOR RIP RAP WALL. CONSTRUCTION SEQUENCING YEAR 2 SLURRY WALL, CAP AND VEGETATIVE STABILIZATION GEOSYNTHETIC

SITE ASSESSMENT 2001 – 2009

COCs for OU‐4:  • DEGRADED GASOLINE AND 

DIESEL FUEL 

• VOC AND SVOCS IN SOIL ANDGROUNDWATER

• METALS IN SITE SOILS

• SHORELINE PETROLEUM STAINING

Page 7: Public Presentation on OU4 Cleanup Plan - October 12 2010 · GEOTEXTILE SEPARATOR RIP RAP WALL. CONSTRUCTION SEQUENCING YEAR 2 SLURRY WALL, CAP AND VEGETATIVE STABILIZATION GEOSYNTHETIC

SHORELINE PETROLEUM STAINING

Page 8: Public Presentation on OU4 Cleanup Plan - October 12 2010 · GEOTEXTILE SEPARATOR RIP RAP WALL. CONSTRUCTION SEQUENCING YEAR 2 SLURRY WALL, CAP AND VEGETATIVE STABILIZATION GEOSYNTHETIC

PREFERRED REMEDY FOR OU‐4PREFERRED REMEDY FOR OU 4

ASPHALT CAP

GRAVEL CAP

SLURRY WALL

VEGETATIVE BANKSTABILZATION

VEGETATEDCAP

RIP RAP

MEASURES

STORMWATERTREATMENTWETLAND

Page 9: Public Presentation on OU4 Cleanup Plan - October 12 2010 · GEOTEXTILE SEPARATOR RIP RAP WALL. CONSTRUCTION SEQUENCING YEAR 2 SLURRY WALL, CAP AND VEGETATIVE STABILIZATION GEOSYNTHETIC

EXISTING CONDITIONS ALONG OU‐4 EMBANKMENT

2006

Page 10: Public Presentation on OU4 Cleanup Plan - October 12 2010 · GEOTEXTILE SEPARATOR RIP RAP WALL. CONSTRUCTION SEQUENCING YEAR 2 SLURRY WALL, CAP AND VEGETATIVE STABILIZATION GEOSYNTHETIC

EXISTING CONDITIONS ALONG OU‐4 EMBANKMENT

2006

Page 11: Public Presentation on OU4 Cleanup Plan - October 12 2010 · GEOTEXTILE SEPARATOR RIP RAP WALL. CONSTRUCTION SEQUENCING YEAR 2 SLURRY WALL, CAP AND VEGETATIVE STABILIZATION GEOSYNTHETIC

CONSTRUCTION SEQUENCINGYEAR 1 

CLEARING BANK REGRADING AND TEMPORARYCLEARING, BANK REGRADING AND TEMPORARY SHEETING

TEMPORARYSHEETING

Page 12: Public Presentation on OU4 Cleanup Plan - October 12 2010 · GEOTEXTILE SEPARATOR RIP RAP WALL. CONSTRUCTION SEQUENCING YEAR 2 SLURRY WALL, CAP AND VEGETATIVE STABILIZATION GEOSYNTHETIC

CONSTRUCTION SEQUENCINGYEAR 1

RIP RAP BANK STABILIZATION

TEMPORARY

GEOTEXTILESEPARATOR

BEDDING STONE

GEOTEXTILESEPARATOR

RIP RAP

BEDDING STONE

GEOTEXTILESEPARATOR

TEMPORARYSHEETING

Page 13: Public Presentation on OU4 Cleanup Plan - October 12 2010 · GEOTEXTILE SEPARATOR RIP RAP WALL. CONSTRUCTION SEQUENCING YEAR 2 SLURRY WALL, CAP AND VEGETATIVE STABILIZATION GEOSYNTHETIC

CONSTRUCTION SEQUENCINGYEAR 1 

RIP RAP STABILIZATION ANDRIP RAP STABILIZATION ANDTEMPORARY VEGETATION FOR EROSION CONTROL

BEDDING STONE

GEOTEXTILESEPARATORGEOTEXTILESEPARATOR

RIP RAP

BEDDING STONE

GEOTEXTILESEPARATOR

Page 14: Public Presentation on OU4 Cleanup Plan - October 12 2010 · GEOTEXTILE SEPARATOR RIP RAP WALL. CONSTRUCTION SEQUENCING YEAR 2 SLURRY WALL, CAP AND VEGETATIVE STABILIZATION GEOSYNTHETIC

CONSTRUCTION SEQUENCINGYEAR 2

SLURRY WALL, CAP AND VEGETATIVE STABILIZATION

GEOSYNTHETIC CLAY LINER

SLURRY

BEDDING STONE

GEOTEXTILESEPARATORGEOTEXTILESEPARATOR

RIP RAP

BEDDING STONE

GEOTEXTILESEPARATOR

SLURRYWALL

Page 15: Public Presentation on OU4 Cleanup Plan - October 12 2010 · GEOTEXTILE SEPARATOR RIP RAP WALL. CONSTRUCTION SEQUENCING YEAR 2 SLURRY WALL, CAP AND VEGETATIVE STABILIZATION GEOSYNTHETIC

CONSTRUCTION SEQUENCINGYEAR 2

SLURRY WALL, CAP AND VEGETATIVE STABILIZATION

GEOSYNTHETIC CLAY LINER

SLURRY

BRUSH MATTRESS

BEDDING STONE

GEOTEXTILESEPARATORGEOTEXTILESEPARATOR

RIP RAP

BEDDING STONE

GEOTEXTILESEPARATOR

SLURRYWALL

Page 16: Public Presentation on OU4 Cleanup Plan - October 12 2010 · GEOTEXTILE SEPARATOR RIP RAP WALL. CONSTRUCTION SEQUENCING YEAR 2 SLURRY WALL, CAP AND VEGETATIVE STABILIZATION GEOSYNTHETIC

POST CONSTRUCTIONMATURE SLOPE

GEOSYNTHETIC CLAY LINER

SLURRY

BEDDING STONE

GEOTEXTILESEPARATORGEOTEXTILESEPARATOR

RIP RAP

BEDDING STONE

GEOTEXTILESEPARATOR

SLURRYWALL

Page 17: Public Presentation on OU4 Cleanup Plan - October 12 2010 · GEOTEXTILE SEPARATOR RIP RAP WALL. CONSTRUCTION SEQUENCING YEAR 2 SLURRY WALL, CAP AND VEGETATIVE STABILIZATION GEOSYNTHETIC

FOR ADDITIONAL INFORMATION PLEASE CONTACT: