    PT.KPJBTanjung Jati "B" Expansion Project

    PLANT NAME SUBJECT

    TJB "B" Unit 3 Annual Outage Work Schedule of PJBS Based On Submitted PTW Document

    Work Description Location Start FinishAug-12

    9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue

    A GENERATOR16361 1 TRANSFORMER GENERATOR INSPECTION FOR 1ST OUTA 3TR-TF001 21-Aug 25-Aug ELectric 516361 2 TRANSFORMER GENERATOR INSPECTION FOR 1ST OUTA 3TR-TF002A 21-Aug 25-Aug ELectric 516361 3 TRANSFORMER GENERATOR INSPECTION FOR 1ST OUTA 3TR-TF002B 21-Aug 25-Aug ELectric 516361 4 TRANSFORMER GENERATOR INSPECTION FOR 1ST OUTA 3TR-TF005 21-Aug 25-Aug ELectric 5

    16348 5 INSPECTION & CLEANING GENERATOR FOR 1ST OUTAGE 21-Aug 9-Sep ELectric 20

    16365 6 GIS INSPECTION & CLEANING FOR 1ST OUTAGE 21-Aug 2-Sep ELectric 13

    B AVR & SOOT BLOWER

    16405 1 SOOT BLOWER INSPECTION FOR 1ST OUTAGE 21-Aug 27-Aug 7

    16406 2 SOOT BLOWER INSPECTION FOR 1ST OUTAGE 28-Aug 29-Aug 2

    16407 3 SOOT BLOWER INSPECTION FOR 1ST OUTAGE 28-Aug 7-Sep 11

    16397 4 BOILER IGNITER INSPECTION FOR 1ST OUTAGE IGNITER 1-Sep 5-Sep 5

    16359 5 AVR INSPECTION FOR 1ST OUTAGE 21-Aug 9-Sep 20

    16359 6 AVR INSPECTION FOR 1ST OUTAGE 21-Aug 9-Sep 20

    16367 7 UPS INSPECTION FOR 1ST OUTAGE 2-Sep 5-Sep 4

    16371 8 DC SYSTEM INSPECTION & CLEANING FOR 1ST OUTAGE 4-Sep 7-Sep 4

    Work Order

    NoWork Group

    Duration

    (Days)

    3GEN-GM001(GENERA

    TOR UNIT 3)

    GIS/SUBSTATION 500 KV

    1L-16L & 1R-16R (LONG

    RERTRACTABLE)

    17L-22L & 17R-22R (HALF

    RERTRACTABLE)

    A1-A18, B1-B14 & C1-C18

    (WALL DESLAGGER)

    AVR GEN-EXC004

    AVR GEN-EXC005

    UPS UNIT 3 TYPE PEW

    1120-220/220-EAN

    CHARGER NO.1 SN 5967

  • Electrical Division Copy Right 2012

    PT.KPJBTanjung Jati "B" Expansion Project

    PLANT NAME SUBJECT

    TJB "B" Unit 3 Annual Outage Work Schedule of PJBS Based On Submitted PTW Document

    Work Description Location Start FinishAug-12

    9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue

    Work Order

    NoWork Group

    Duration

    (Days)

    16371 9 DC SYSTEM INSPECTION & CLEANING FOR 1ST OUTAGE 4-Sep 7-Sep 4

    16396 10 INSPECTION FLAME SCANNER FOR 1ST OUTAGE 6-Sep 10-Sep 5

    C TURBINE AUX

    16388 1 MOTOR INSPECTION FOR 1ST OUTAGE 3LOT-M010B 22-Aug 24-Aug 3

    16388 2 MOTOR INSPECTION FOR 1ST OUTAGE 3LOT-M020B 22-Aug 24-Aug 3

    16388 3 MOTOR INSPECTION FOR 1ST OUTAGE 3LOT-M050B 22-Aug 24-Aug 3

    16388 4 MOTOR INSPECTION FOR 1ST OUTAGE 3LOT-M080B 22-Aug 24-Aug 3

    16388 5 MOTOR INSPECTION FOR 1ST OUTAGE 3LOT-M120B 22-Aug 24-Aug 3

    16388 6 MOTOR INSPECTION FOR 1ST OUTAGE 3LOT-M010A 21-Aug 23-Aug 3

    16388 7 MOTOR INSPECTION FOR 1ST OUTAGE 3LOT-M020A 21-Aug 23-Aug 3

    16388 8 MOTOR INSPECTION FOR 1ST OUTAGE 3LOT-M050A 21-Aug 23-Aug 3

    16388 9 MOTOR INSPECTION FOR 1ST OUTAGE 3LOT-M080A 21-Aug 23-Aug 3

    16388 10 MOTOR INSPECTION FOR 1ST OUTAGE 3LOT-M120A 21-Aug 23-Aug 3

    16388 11 MOTOR INSPECTION FOR 1ST OUTAGE 21-Aug 22-Aug 2

    CHARGER NO.2 SN 5968

    FLAME SCANNER/ DETECTOR

    3LOS-M060 (MAIN OIL TANK

    TRANS. P. MOTOR)

  • Electrical Division Copy Right 2012

    PT.KPJBTanjung Jati "B" Expansion Project

    PLANT NAME SUBJECT

    TJB "B" Unit 3 Annual Outage Work Schedule of PJBS Based On Submitted PTW Document

    Work Description Location Start FinishAug-12

    9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue

    Work Order

    NoWork Group

    Duration

    (Days)

    16388 12 MOTOR INSPECTION FOR 1ST OUTAGE 21-Aug 22-Aug 2

    16388 13 MOTOR INSPECTION FOR 1ST OUTAGE 21-Aug 22-Aug 2

    16388 14 MOTOR INSPECTION FOR 1ST OUTAGE 21-Aug 22-Aug 2

    16388 15 MOTOR INSPECTION FOR 1ST OUTAGE 21-Aug 22-Aug 2

    16388 16 MOTOR INSPECTION FOR 1ST OUTAGE 21-Aug 22-Aug 2

    16388 17 MOTOR INSPECTION FOR 1ST OUTAGE 21-Aug 22-Aug 2

    16388 18 MOTOR INSPECTION FOR 1ST OUTAGE 21-Aug 22-Aug 2

    16388 19 MOTOR INSPECTION FOR 1ST OUTAGE 3COTC-M060A 24-Aug 25-Aug 2

    16388 20 MOTOR INSPECTION FOR 1ST OUTAGE 3COTC-M060B 24-Aug 25-Aug 2

    16388 21 MOTOR INSPECTION FOR 1ST OUTAGE 3CCCW-M090 24-Aug 25-Aug 2

    3LOS-M080 (MAIN OIL

    COND. FILTER. P. MOTOR)

    3LOS-M010A (MOP A MOTOR)

    3LOS-M010B (MOP B MOTOR)

    3GSS-M011A (GLAND STEAM

    EXHAUSTER MOTOR A)

    3GSS-M011B (GLAND STEAM

    EXHAUSTER MOTOR B)

    3LOS-M020A (MOT VAPOUR XTRACTOR A

    MOTOR)

    3LOS-M020AB (MOT VAPOUR XTRACTOR B

    MOTOR)

    ZZZZ

  • Electrical Division Copy Right 2012

    PT.KPJBTanjung Jati "B" Expansion Project

    PLANT NAME SUBJECT

    TJB "B" Unit 3 Annual Outage Work Schedule of PJBS Based On Submitted PTW Document

    Work Description Location Start FinishAug-12

    9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue

    Work Order

    NoWork Group

    Duration

    (Days)

    16388 22 MOTOR INSPECTION FOR 1ST OUTAGE 3WD-M010A 24-Aug 25-Aug 2

    16388 23 MOTOR INSPECTION FOR 1ST OUTAGE 3WD-M010B 24-Aug 25-Aug 2

    16388 24 MOTOR INSPECTION FOR 1ST OUTAGE 3WD-M020A 24-Aug 25-Aug 2

    16388 25 MOTOR INSPECTION FOR 1ST OUTAGE 3WD-M020B 24-Aug 25-Aug 2

    16388 26 MOTOR INSPECTION FOR 1ST OUTAGE 3SO-M001 25-Aug 26-Aug 2

    16388 27 MOTOR INSPECTION FOR 1ST OUTAGE 3SO-M002 25-Aug 26-Aug 2

    16388 28 MOTOR INSPECTION FOR 1ST OUTAGE 3SO-M001A 25-Aug 26-Aug 2

    16388 29 MOTOR INSPECTION FOR 1ST OUTAGE 3SO-M001B 25-Aug 26-Aug 2

    16388 30 MOTOR INSPECTION FOR 1ST OUTAGE 3LOM-M330 23-Aug 24-Aug 2

    16388 31 MOTOR INSPECTION FOR 1ST OUTAGE 3EHS-M010A 23-Aug 24-Aug 2

    16388 32 MOTOR INSPECTION FOR 1ST OUTAGE 3EHS-M010B 23-Aug 24-Aug 2

    16388 33 MOTOR INSPECTION FOR 1ST OUTAGE 3EHS-M015A 23-Aug 24-Aug 2

    16388 34 MOTOR INSPECTION FOR 1ST OUTAGE 3EHS-M015B 23-Aug 24-Aug 2

  • Electrical Division Copy Right 2012

    PT.KPJBTanjung Jati "B" Expansion Project

    PLANT NAME SUBJECT

    TJB "B" Unit 3 Annual Outage Work Schedule of PJBS Based On Submitted PTW Document

    Work Description Location Start FinishAug-12

    9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue

    Work Order

    NoWork Group

    Duration

    (Days)

    16388 35 MOTOR INSPECTION FOR 1ST OUTAGE 3CAE-M010A 23-Aug 24-Aug 2

    16388 36 MOTOR INSPECTION FOR 1ST OUTAGE 3CAE-M010B 23-Aug 24-Aug 2

    16388 37 MOTOR INSPECTION FOR 1ST OUTAGE 3CW-MMO11A 23-Aug 24-Aug 2

    16388 38 MOTOR INSPECTION FOR 1ST OUTAGE 3CW-MMO11A 23-Aug 24-Aug 2

    16388 39 MOTOR INSPECTION FOR 1ST OUTAGE 21-Aug 22-Aug 2

    D BOILER AUX

    16380 1 INSPECTION & CLEANING PANEL FOR 1ST OUTAGE 22-Aug 23-Aug ELectric 2

    16380 2 INSPECTION & CLEANING PANEL FOR 1ST OUTAGE 22-Aug 23-Aug ELectric 2

    16380 3 INSPECTION & CLEANING PANEL FOR 1ST OUTAGE 22-Aug 23-Aug ELectric 2

    16380 4 INSPECTION & CLEANING PANEL FOR 1ST OUTAGE 22-Aug 23-Aug ELectric 2

    16380 5 INSPECTION & CLEANING PANEL FOR 1ST OUTAGE 22-Aug 23-Aug ELectric 2

    16380 6 INSPECTION & CLEANING PANEL FOR 1ST OUTAGE 22-Aug 23-Aug ELectric 2

    16380 7 INSPECTION & CLEANING PANEL FOR 1ST OUTAGE 22-Aug 23-Aug ELectric 2

    16380 8 INSPECTION & CLEANING PANEL FOR 1ST OUTAGE 22-Aug 23-Aug ELectric 2

    3LOS-M050 (EMERGENCY

    OP)

    3APC-DP901 (IDFAN A DIST

    PANEL)3APC-DP902

    (IDFAN B DIST PANEL)

    3DP-PAN 712A (COAL FEEDER

    A LCP)3DP-PAN 712B (COAL FEEDER

    B LCP)3DP-PAN 712C (COAL FEEDER

    C LCP)3DP-PAN 712D (COAL FEEDER

    D LCP)3DP-PAN 712E (COAL FEEDER

    E LCP)3DP-PAN 712F (COAL FEEDER

    F LCP)

  • Electrical Division Copy Right 2012

    PT.KPJBTanjung Jati "B" Expansion Project

    PLANT NAME SUBJECT

    TJB "B" Unit 3 Annual Outage Work Schedule of PJBS Based On Submitted PTW Document

    Work Description Location Start FinishAug-12

    9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue

    Work Order

    NoWork Group

    Duration

    (Days)

    16380 9 INSPECTION & CLEANING BOARD FOR 1ST OUTAGE 22-Aug 23-Aug ELectric 2

    16380 10 INSPECTION & CLEANING BOARD FOR 1ST OUTAGE 22-Aug 23-Aug ELectric 2

    16377 11 INSPECTION & CLEANING BOARD FOR 1ST OUTAGE 28-Aug 29-Aug ELectric 2

    16377 12 INSPECTION & CLEANING BOARD FOR 1ST OUTAGE 28-Aug 29-Aug ELectric 2

    16377 13 INSPECTION & CLEANING BOARD FOR 1ST OUTAGE 28-Aug 29-Aug ELectric 2

    16377 14 INSPECTION & CLEANING BOARD FOR 1ST OUTAGE 27-Aug 28-Aug ELectric 2

    00

    3BAD-PAN501 (DCC

    LOC.CONTROL PANEL)3GG-PAN 862

    (LOW PRESS. SEAL AIR FAN

    LCP)3APC-TF 810A (380 ESP UNIT

    BOARD A)3APC-TF 810B (380 ESP UNIT

    BOARD B)3DC-MCC 501 (DC BOILER UNIT MOTOR

    STARTER)3APC-TF501B (380V LOW

    VOLAGE BOARD)

  • Electrical Division Copy Right 2012

    NOTED BY CHECKED BY

    Unit 3 Annual Outage Work Schedule of PJBS Based On Submitted PTW DocumentAug-12 Sep-12

    29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri

  • Electrical Division Copy Right 2012

    NOTED BY CHECKED BY

    Unit 3 Annual Outage Work Schedule of PJBS Based On Submitted PTW DocumentAug-12 Sep-12

    29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri

  • Electrical Division Copy Right 2012

    NOTED BY CHECKED BY

    Unit 3 Annual Outage Work Schedule of PJBS Based On Submitted PTW DocumentAug-12 Sep-12

    29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri

  • Electrical Division Copy Right 2012

    NOTED BY CHECKED BY

    Unit 3 Annual Outage Work Schedule of PJBS Based On Submitted PTW DocumentAug-12 Sep-12

    29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri

  • Electrical Division Copy Right 2012

    NOTED BY CHECKED BY

    Unit 3 Annual Outage Work Schedule of PJBS Based On Submitted PTW DocumentAug-12 Sep-12

    29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri

  • Electrical Division Copy Right 2012

    NOTED BY CHECKED BY

    Unit 3 Annual Outage Work Schedule of PJBS Based On Submitted PTW DocumentAug-12 Sep-12

    29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri

    Outage Schedule