Network Overview Document Version EIC-v01.6 Date 23/Nov/2010 Last Update 16/Dec/2010
PT. Eigen Network Network Overview
Document History
Version Description Date Author Contributors Notes
1.0 – 1.3 Start Document 23/11/2010 – 7/12/2010
EM MEE, DD Internal
1.4 Updates Document History; Outstanding Issues; Added Some Details; Some Minor Design Changes
13/12/2010 EM MEE, DD Internal
1.5 Updates Cable Length Updates; New Section: Operations; Updates on Protection, Jakarta/SG PoP, Ketapang CLS
14/12/2010 EM MEE, DD, PC Release Candidate
1.6 Updates Assignment Matrix Updates
16/12/2010 EM MEE, DD,PC,SH
Release
2
PT. Eigen Network Network Overview
Content
1. Executive Summary
2. EIC Physical Route
3. Estimated Cable Length
4. Types of Cable
5. Equipment Configuration
6. Cable Landing Station
7. Landing Points
8. Assignment Matrix
9. Outstanding Issues
10. Operations
3
PT. Eigen Network Network Overview
EXECUTIVE SUMMARY
1
4
PT. Eigen Network Network Overview
Executive Summary
EIC – Eigen International Cable
Connecting Jakarta – Batu Pahat - Singapore via Sumatera
Mostly 24 FPs cable; Minimum Design Capacity 320 Gbps/FP End to End (Jakarta – Singapore)
120 – 200 Gbps Initial Equipage
(Preferable) ready for 40 G transmission or more
1400+ km Terrestrial Segments; 500+ km Submarine Segments
5
PT. Eigen Network Network Overview
EIC PHYSICAL ROUTE
2
6
PT. Eigen Network Network Overview
EIC Route Overview
7
Changi North
Batam
Batu Pahat
Dumai
Ketapang Jakarta
Fig. 2.1 – EIC
PT. Eigen Network Network Overview
EIC Physical Route (1)
8
Dumai
Batu Pahat
Batam
Singapore
EIC-S1
EIC-S2
EIC-S3
Fig. 2.2 – EIC Part 1
Double Armor
Single Armor
PT. Eigen Network Network Overview
EIC Physical Route (2)
9
Fig. 2.3 – EIC Part 2
Dumai
Ketapang
EIC-S4
Pekanbaru
Jambi
Palembang
B. Lampung
PT. Eigen Network Network Overview
EIC Physical Route (3)
10
EIC-S5
Ketapang
Jakarta
Fig. 2.4 – EIC Part 3
Double Armor
Single Armor
PT. Eigen Network Network Overview
EIC Physical Route (4)
11
Pantai Mutiara CLS
Cyber 2
Fig. 2.5 – EIC Part 4
PT. Eigen Network Network Overview
EIC Physical Route (5)
12
SG PoP Global Switch
Changi North - BMH
Fig. 2.6 – EIC Part 5
PT. Eigen Network Network Overview
Cable Stub at Singapore Offshore
13
Single Armor
Double Armor
Fig. 2.7 –EIC S1 with Stub at Singapore Offshore
Changi North
Batam
Cable Stub
PT. Eigen Network Network Overview
ESTIMATED CABLE LENGTH
3
14
PT. Eigen Network Network Overview
EIC Estimated Cable Length
15
SG PoP (Global Switch)
SG BMH
BATAM BMH
BATAM
BATU PAHAT DUMAI CLS & BMH
PEKANBARU
JAMBI
PALEMBANG
LAMPUNG
KETAPANG CLS & BMH JAKARTA CLS & BMH
CYBER 2
MARINE
TERRESTRIAL
209 km
474.7 km
282 km
352 km
95.67 km
134.6 km 19 km
195.8 km
188.4 km
46.15 km
0.4 km
21 km
Fig. 3.1 – EIC Cable Estimation
15 km (Stub)
PT. Eigen Network Network Overview
EQUIPMENT CONFIGURATION
4
16
PT. Eigen Network Network Overview
Equipment
17
SG PoP (Global Switch)
SG BMH
BATAM BMH
BATAM
BATU PAHAT DUMAI
PEKANBARU
JAMBI
PALEMBANG
LAMPUNG
KETAPANG
JAKARTA CYBER 2
MARINE
TERRESTRIAL
• Singapore • Batu Pahat • Cyber 2
Dedicated
SDH/Mux
• Several places (Sumatera )
OA
• Singapore • Batam • Batu Pahat • Dumai • Pekan Baru • Jambi • Palembang • Lampung • Jakarta CLS • Jakarta Cyber2
DWDM
/
OADM
Fig. 4.1 – EIC Equipment Configuration
PT. Eigen Network Network Overview
Day-1 Lightpath/Channel Configuration
18
60 Gbps (JKT – SG)
Cyber 2 SG PoP
Jakarta Ketapang
Lampung Palembang Pekanbaru Jambi
Batu Pahat
Dumai Batam Transmission Capacity 60 Gbps
(JKT-LMP-PLM-JB-PBR-DM-BTM-SG) Each Intermediate Drop @ 10 Gbps
Fig. 4.2 – Direct and Transit Transmission Capacity
20 Gbps (JKT – BP) ? 60 Gbps (BP – SG)
PT. Eigen Network Network Overview
Day-1 Connectivity
19
Cyber 2 SG PoP
Bandar Lampung
Palembang Pekanbaru Jambi
Batu Pahat
Dumai Batam
60 Gbps
10 Gbps (Max.)
Fig. 4.3 – Logical Connectivity
PT. Eigen Network Network Overview
Client Interfaces – Traffic Matrix
20
Between Singapore Jakarta
Singapore - -
Jakarta 4x10G Ethernet
4xSTM-16
8xSTM-4
16xSTM-1
-
Batam 2x1G Ethernet
1xSTM-16
1xSTM-4
4xSTM-1
2x1G Ethernet
1xSTM-16
1xSTM-4
4xSTM-1
Dumai As Batam As Batam
Pekanbaru As Batam As Batam
Jambi As Batam As Batam
Palembang As Batam As Batam
Bandar Lampung As Batam As Batam
Batu Pahat 4x10G Ethernet
4xSTM-16
8xSTM-4
16xSTM-1
1x10G Ethernet
2xSTM-16
4xSTM-4
8xSTM-1
Table 4.1 – Traffic Matrix for EIC System
PT. Eigen Network Network Overview
Protection on Terrestrial Segment
21
DUMAI
PEKANBARU
JAMBI
PALEMBANG
LAMPUNG
KETAPANG
209 km
475 km
278 km
380 km
76 km
Main Path
Protection Path
Fig. 4.4 – Main and Protection Path Dumai – Ketapang
.
.
.
Protection Path via Another Provider
(have not yet fixed)
• Wavelengths • Dark Fiber
Protection Level
• Equipment • Physical / Cable
Cut
Addressed Failures
PT. Eigen Network Network Overview
Possible OLA Placement (TBC)
22
Dumai Duri Gelombang Sorek Rengat Kemuning
Tua B. Thambi
B. Lencir S. Lilin Prabumulih Baturaja Kemuning Bandar Jaya
Pekanbaru Jambi
Palembang Ketapang
Pantai Mutiara CLS
Cyber 2
Bandar Lampung
Terrestrial
Submarine
Fig. 4.5 – Possible OLA in Sumatera
PT. Eigen Network Network Overview
TYPES OF CABLE
5
23
PT. Eigen Network Network Overview
EIC Cable Portion
24
Cable Portion Total Length (km)
Submarine Cable 579.95 (including stub)
Total DA Total SA
216.51 363.44
Terrestrial Cable 1453.77
Total Cable 2033.72
Table 5.1. EIC Total Cable Portion
The EIC Cable Portion are divided into Submarine cable portion and Terrestrial cable portion.
G.654 and G.655 cable type will be used for Submarine and Terrestrial, respectively.
The total cable length can be seen in Table 1.
PT. Eigen Network Network Overview
EIC Submarine Cable Portion
25
Double Armor G.654 (km)
Single Armor G.654 (km)
Dumai Batu Pahat Batam
Changi North
20,6 125 50,2 46,4 132 10 4,59 38,9 2,66
Ketapang Jakarta CLS
37,6 55,2 41,8
12,34
Fig. 5.1 – EIC Submarine Cable type
PT. Eigen Network Network Overview
EIC Terrestrial Cable Portion
26
Terrestrial G.655 (km)
Batam BMH Batam CLS Changi North
Jakarta CLS Cyber 2 19
21 Global Switch
0.4
Dumai 1400 +
Ketapang
Fig. 5.2 – EIC Terrestrial Cable type
PT. Eigen Network Network Overview
Number of Cables & Fibers
27
SG PoP (Global Switch)
SG BMH
BATAM BMH
BATAM
BATU PAHAT DUMAI
PEKANBARU
JAMBI
PALEMBANG
LAMPUNG
KETAPANG JAKARTA
CYBER 2
MARINE
TERRESTRIAL
24 FPs
24 FPs
24 FPs
24 FPs
24 FPs
24 FPs 24 FPs
24 FPs
24 FPs
24 FPs
2 x 24 FPs ( 2 cables)
48 FPs
Fig. 5.3 – Number of Cables & Fibers
24 FPs
PT. Eigen Network Network Overview
BUILDINGS
6
28
PT. Eigen Network Network Overview
Amplifier or Regen Sites
29
Equipment
Building – Amplifier or Regen Sites
ODF ODF
Terrestrial duct
TERRESTRIAL CONTRACTOR TERMINATES TERRESTRIAL CABLE ON ODF
EQUIPMENT SUPPLIER CONNECTS EQUIPMENT TO ODF PROVIDING IN – STATION CABLING
TERRESTRIAL CABLE
Terrestrial duct
TERRESTRIAL CONTRACTOR TERMINATES TERRESTRIAL CABLE ON ODF
EQUIPMENT SUPPLIER PROVIDES ODF
Fig. 6.1 – Amplifier or Regen site
PT. Eigen Network Network Overview
Jakarta CLS & NOC
30
Fig. 6.2 – Cable Landing Station for Jakarta
MARINE CABLE
TERRESTRIAL CABLE
Equipment
Cable Landing Station/NOC
ODF ODF BMH (CLS CONTRACTOR)
Duct (< 20m) Terrestrial duct
MARINE CONTRACTOR TERMINATES MARINE CABLE ON ODF
TERRESTRIAL CONTRACTOR TERMINATES TERRESTRIAL CABLE ON ODF
EQUIPMENT SUPPLIER CONNECTS EQUIPMENT TO ODF PROVIDING IN – STATION CABLING
EQUIPMENT SUPPLIER PROVIDES ODF
PT. Eigen Network Network Overview
Ketapang Cable Landing Station
31
Fig. 6.3 – Cable Landing Station for Ketapang
MARINE CABLE
TERRESTRIAL CABLE
Equipment
Cable Landing Station
ODF ODF BMH (CLS CONTRACTOR)
Duct (< 20m) Terrestrial duct
MARINE CONTRACTOR TERMINATES MARINE CABLE ON ODF
TERRESTRIAL CONTRACTOR TERMINATES TERRESTRIAL CABLE ON ODF
EQUIPMENT SUPPLIER CONNECTS EQUIPMENT TO ODF PROVIDING IN – STATION CABLING
EQUIPMENT SUPPLIER PROVIDES ODF
PT. Eigen Network Network Overview
Dumai Cable Landing Station
32
Fig. 6.4 – Cable Landing Station for Dumai
MARINE CABLE
TERRESTRIAL CABLE
Equipment
Cable Landing Station
ODF ODF BMH (CLS CONTRACTOR)
Duct (< 20m) Terrestrial duct
MARINE CONTRACTOR TERMINATES MARINE CABLE ON ODF
TERRESTRIAL CONTRACTOR TERMINATES TERRESTRIAL CABLE ON ODF
EQUIPMENT SUPPLIER CONNECTS EQUIPMENT TO ODF PROVIDING IN – STATION CABLING
EQUIPMENT SUPPLIER PROVIDES ODF
Terrestrial Duct for future connection
FUTURE TERRESTRIAL CABLE CONNECTION
PT. Eigen Network Network Overview
Batu Pahat Cable Landing Station
33
Fig. 6.5 – Cable Landing Station for Batu Pahat
Cable Landing Station
ODF ODF
Equipment
MARINE CONTRACTOR TERMINATES MARINE CABLE ON ODF
EQUIPMENT SUPPLIER CONNECTS EQUIPMENT TO ODF PROVIDING IN – STATION CABLING
MARINE CABLE
BMH (CLS CONTRACTOR)
EQUIPMENT SUPPLIER PROVIDES ODF
FUTURE TERRESTRIAL CABLE CONNECTION
Duct (< 50m)
Terrestrial duct
PT. Eigen Network Network Overview
Batam Cable Landing Station
34
Fig. 6.6 – Cable Landing Station for Batam
Equipment
Cable Landing Station
EQUIPMENT SUPPLIER CONNECTS EQUIPMENT TO ODF PROVIDING IN – STATION CABLING
ODF ODF
400 m Terrestrial duct
MARINE CABLE
BMH
EQUIPMENT SUPPLIER PROVIDES ODF
CLS CONTRACTOR TO CONSTRUCT BMH & INSTALL TERRESTRIAL DUCT AND FIBER
TERRESTRIAL CABLE
MARINE CABLE SUPPLIER TO SPLICE THE FIBER
FUTURE TERRESTRIAL CABLE CONNECTION
Terrestrial duct
PT. Eigen Network Network Overview
Connection to Singapore PoP
35
Fig. 6.7 – PoP connection for Singapore
Equipment
Global Switch
EQUIPMENT SUPPLIER CONNECTS EQUIPMENT TO ODF PROVIDING IN – STATION CABLING
ODF
21 km Terrestrial duct
MARINE CABLE
TERRESTRIAL CABLE
BMH
EQUIPMENT SUPPLIER PROVIDES ODF
CUSTOMER CONNECTION
MARINE CABLE SUPPLIER TO SPLICE ONTO THE TERRESTRIAL FIBER
TERRESTRIAL CONSTRUCTOR TO PROVIDE TERRESTRIAL DUCT AND INSTALL FIBER
ODF
Customer Connect is
Provided within the Building
PT. Eigen Network Network Overview
Connection to Jakarta PoP
36
Fig. 6.8 – PoP connection for Jakarta
Equipment
Cyber 2
EQUIPMENT SUPPLIER CONNECTS EQUIPMENT TO ODF PROVIDING IN – STATION CABLING
ODF
19 km Terrestrial duct
MARINE CABLE
TERRESTRIAL CABLE
CLS
EQUIPMENT SUPPLIER PROVIDES ODF
CUSTOMER CONNECTION
BMH
TERRESTRIAL CONSTRUCTOR TO PROVIDE TERRESTRIAL DUCT AND INSTALL FIBER
ODF
Customer Connect is
Provided within the Building
PT. Eigen Network Network Overview
LANDING POINTS
7
37
PT. Eigen Network Network Overview
Ketapang Landing Point
38
BMH
CLS
Fig. 7.3 – Ketapang Landing Point
PT. Eigen Network Network Overview
…
39
PT. Eigen Network Network Overview
ASSIGNMENT MATRIX
8
40
PT. Eigen Network Network Overview
Legend & Abbreviation
CLS = Cable Landing Station
CME = Civil Mechanical & Electrical
NOC = Network Operation Center
ODF/DDF = Optical/Digital Distribution Frame
RPL = Route Position List
SITAC =Site Acquisition
41
A = Approve
As = Assist R = Responsible S = Supervise
Ac = Accountable
PT. Eigen Network Network Overview
General Checklist
42
Preparation
Matrix
Engineering
Matrix
Supply
Matrix
Construction
Installation
Matrix
Testing
Matrix
Training
Matrix
PT. Eigen Network Network Overview
…
43
PT. Eigen Network Network Overview
Cross-Border Checklist
44
Submarine Cable
Equipment
Installation Testing
Station
PT. Eigen Network Network Overview
…
45
PT. Eigen Network Network Overview
OUTSTANDING ISSUES
9
46
PT. Eigen Network Network Overview
…
47
PT. Eigen Network Network Overview
OPERATIONS
10
48
PT. Eigen Network Network Overview
…
49