PT Eigen Network - Network Planning & Overview

49
Network Overview Document Version EIC-v01.6 Date 23/Nov/2010 Last Update 16/Dec/2010

Transcript of PT Eigen Network - Network Planning & Overview

Page 1: PT Eigen Network - Network Planning & Overview

Network Overview Document Version EIC-v01.6 Date 23/Nov/2010 Last Update 16/Dec/2010

Page 2: PT Eigen Network - Network Planning & Overview

PT. Eigen Network Network Overview

Document History

Version Description Date Author Contributors Notes

1.0 – 1.3 Start Document 23/11/2010 – 7/12/2010

EM MEE, DD Internal

1.4 Updates Document History; Outstanding Issues; Added Some Details; Some Minor Design Changes

13/12/2010 EM MEE, DD Internal

1.5 Updates Cable Length Updates; New Section: Operations; Updates on Protection, Jakarta/SG PoP, Ketapang CLS

14/12/2010 EM MEE, DD, PC Release Candidate

1.6 Updates Assignment Matrix Updates

16/12/2010 EM MEE, DD,PC,SH

Release

2

Page 3: PT Eigen Network - Network Planning & Overview

PT. Eigen Network Network Overview

Content

1. Executive Summary

2. EIC Physical Route

3. Estimated Cable Length

4. Types of Cable

5. Equipment Configuration

6. Cable Landing Station

7. Landing Points

8. Assignment Matrix

9. Outstanding Issues

10. Operations

3

Page 4: PT Eigen Network - Network Planning & Overview

PT. Eigen Network Network Overview

EXECUTIVE SUMMARY

1

4

Page 5: PT Eigen Network - Network Planning & Overview

PT. Eigen Network Network Overview

Executive Summary

EIC – Eigen International Cable

Connecting Jakarta – Batu Pahat - Singapore via Sumatera

Mostly 24 FPs cable; Minimum Design Capacity 320 Gbps/FP End to End (Jakarta – Singapore)

120 – 200 Gbps Initial Equipage

(Preferable) ready for 40 G transmission or more

1400+ km Terrestrial Segments; 500+ km Submarine Segments

5

Page 6: PT Eigen Network - Network Planning & Overview

PT. Eigen Network Network Overview

EIC PHYSICAL ROUTE

2

6

Page 7: PT Eigen Network - Network Planning & Overview

PT. Eigen Network Network Overview

EIC Route Overview

7

Changi North

Batam

Batu Pahat

Dumai

Ketapang Jakarta

Fig. 2.1 – EIC

Page 8: PT Eigen Network - Network Planning & Overview

PT. Eigen Network Network Overview

EIC Physical Route (1)

8

Dumai

Batu Pahat

Batam

Singapore

EIC-S1

EIC-S2

EIC-S3

Fig. 2.2 – EIC Part 1

Double Armor

Single Armor

Page 9: PT Eigen Network - Network Planning & Overview

PT. Eigen Network Network Overview

EIC Physical Route (2)

9

Fig. 2.3 – EIC Part 2

Dumai

Ketapang

EIC-S4

Pekanbaru

Jambi

Palembang

B. Lampung

Page 10: PT Eigen Network - Network Planning & Overview

PT. Eigen Network Network Overview

EIC Physical Route (3)

10

EIC-S5

Ketapang

Jakarta

Fig. 2.4 – EIC Part 3

Double Armor

Single Armor

Page 11: PT Eigen Network - Network Planning & Overview

PT. Eigen Network Network Overview

EIC Physical Route (4)

11

Pantai Mutiara CLS

Cyber 2

Fig. 2.5 – EIC Part 4

Page 12: PT Eigen Network - Network Planning & Overview

PT. Eigen Network Network Overview

EIC Physical Route (5)

12

SG PoP Global Switch

Changi North - BMH

Fig. 2.6 – EIC Part 5

Page 13: PT Eigen Network - Network Planning & Overview

PT. Eigen Network Network Overview

Cable Stub at Singapore Offshore

13

Single Armor

Double Armor

Fig. 2.7 –EIC S1 with Stub at Singapore Offshore

Changi North

Batam

Cable Stub

Page 14: PT Eigen Network - Network Planning & Overview

PT. Eigen Network Network Overview

ESTIMATED CABLE LENGTH

3

14

Page 15: PT Eigen Network - Network Planning & Overview

PT. Eigen Network Network Overview

EIC Estimated Cable Length

15

SG PoP (Global Switch)

SG BMH

BATAM BMH

BATAM

BATU PAHAT DUMAI CLS & BMH

PEKANBARU

JAMBI

PALEMBANG

LAMPUNG

KETAPANG CLS & BMH JAKARTA CLS & BMH

CYBER 2

MARINE

TERRESTRIAL

209 km

474.7 km

282 km

352 km

95.67 km

134.6 km 19 km

195.8 km

188.4 km

46.15 km

0.4 km

21 km

Fig. 3.1 – EIC Cable Estimation

15 km (Stub)

Page 16: PT Eigen Network - Network Planning & Overview

PT. Eigen Network Network Overview

EQUIPMENT CONFIGURATION

4

16

Page 17: PT Eigen Network - Network Planning & Overview

PT. Eigen Network Network Overview

Equipment

17

SG PoP (Global Switch)

SG BMH

BATAM BMH

BATAM

BATU PAHAT DUMAI

PEKANBARU

JAMBI

PALEMBANG

LAMPUNG

KETAPANG

JAKARTA CYBER 2

MARINE

TERRESTRIAL

• Singapore • Batu Pahat • Cyber 2

Dedicated

SDH/Mux

• Several places (Sumatera )

OA

• Singapore • Batam • Batu Pahat • Dumai • Pekan Baru • Jambi • Palembang • Lampung • Jakarta CLS • Jakarta Cyber2

DWDM

/

OADM

Fig. 4.1 – EIC Equipment Configuration

Page 18: PT Eigen Network - Network Planning & Overview

PT. Eigen Network Network Overview

Day-1 Lightpath/Channel Configuration

18

60 Gbps (JKT – SG)

Cyber 2 SG PoP

Jakarta Ketapang

Lampung Palembang Pekanbaru Jambi

Batu Pahat

Dumai Batam Transmission Capacity 60 Gbps

(JKT-LMP-PLM-JB-PBR-DM-BTM-SG) Each Intermediate Drop @ 10 Gbps

Fig. 4.2 – Direct and Transit Transmission Capacity

20 Gbps (JKT – BP) ? 60 Gbps (BP – SG)

Page 19: PT Eigen Network - Network Planning & Overview

PT. Eigen Network Network Overview

Day-1 Connectivity

19

Cyber 2 SG PoP

Bandar Lampung

Palembang Pekanbaru Jambi

Batu Pahat

Dumai Batam

60 Gbps

10 Gbps (Max.)

Fig. 4.3 – Logical Connectivity

Page 20: PT Eigen Network - Network Planning & Overview

PT. Eigen Network Network Overview

Client Interfaces – Traffic Matrix

20

Between Singapore Jakarta

Singapore - -

Jakarta 4x10G Ethernet

4xSTM-16

8xSTM-4

16xSTM-1

-

Batam 2x1G Ethernet

1xSTM-16

1xSTM-4

4xSTM-1

2x1G Ethernet

1xSTM-16

1xSTM-4

4xSTM-1

Dumai As Batam As Batam

Pekanbaru As Batam As Batam

Jambi As Batam As Batam

Palembang As Batam As Batam

Bandar Lampung As Batam As Batam

Batu Pahat 4x10G Ethernet

4xSTM-16

8xSTM-4

16xSTM-1

1x10G Ethernet

2xSTM-16

4xSTM-4

8xSTM-1

Table 4.1 – Traffic Matrix for EIC System

Page 21: PT Eigen Network - Network Planning & Overview

PT. Eigen Network Network Overview

Protection on Terrestrial Segment

21

DUMAI

PEKANBARU

JAMBI

PALEMBANG

LAMPUNG

KETAPANG

209 km

475 km

278 km

380 km

76 km

Main Path

Protection Path

Fig. 4.4 – Main and Protection Path Dumai – Ketapang

.

.

.

Protection Path via Another Provider

(have not yet fixed)

• Wavelengths • Dark Fiber

Protection Level

• Equipment • Physical / Cable

Cut

Addressed Failures

Page 22: PT Eigen Network - Network Planning & Overview

PT. Eigen Network Network Overview

Possible OLA Placement (TBC)

22

Dumai Duri Gelombang Sorek Rengat Kemuning

Tua B. Thambi

B. Lencir S. Lilin Prabumulih Baturaja Kemuning Bandar Jaya

Pekanbaru Jambi

Palembang Ketapang

Pantai Mutiara CLS

Cyber 2

Bandar Lampung

Terrestrial

Submarine

Fig. 4.5 – Possible OLA in Sumatera

Page 23: PT Eigen Network - Network Planning & Overview

PT. Eigen Network Network Overview

TYPES OF CABLE

5

23

Page 24: PT Eigen Network - Network Planning & Overview

PT. Eigen Network Network Overview

EIC Cable Portion

24

Cable Portion Total Length (km)

Submarine Cable 579.95 (including stub)

Total DA Total SA

216.51 363.44

Terrestrial Cable 1453.77

Total Cable 2033.72

Table 5.1. EIC Total Cable Portion

The EIC Cable Portion are divided into Submarine cable portion and Terrestrial cable portion.

G.654 and G.655 cable type will be used for Submarine and Terrestrial, respectively.

The total cable length can be seen in Table 1.

Page 25: PT Eigen Network - Network Planning & Overview

PT. Eigen Network Network Overview

EIC Submarine Cable Portion

25

Double Armor G.654 (km)

Single Armor G.654 (km)

Dumai Batu Pahat Batam

Changi North

20,6 125 50,2 46,4 132 10 4,59 38,9 2,66

Ketapang Jakarta CLS

37,6 55,2 41,8

12,34

Fig. 5.1 – EIC Submarine Cable type

Page 26: PT Eigen Network - Network Planning & Overview

PT. Eigen Network Network Overview

EIC Terrestrial Cable Portion

26

Terrestrial G.655 (km)

Batam BMH Batam CLS Changi North

Jakarta CLS Cyber 2 19

21 Global Switch

0.4

Dumai 1400 +

Ketapang

Fig. 5.2 – EIC Terrestrial Cable type

Page 27: PT Eigen Network - Network Planning & Overview

PT. Eigen Network Network Overview

Number of Cables & Fibers

27

SG PoP (Global Switch)

SG BMH

BATAM BMH

BATAM

BATU PAHAT DUMAI

PEKANBARU

JAMBI

PALEMBANG

LAMPUNG

KETAPANG JAKARTA

CYBER 2

MARINE

TERRESTRIAL

24 FPs

24 FPs

24 FPs

24 FPs

24 FPs

24 FPs 24 FPs

24 FPs

24 FPs

24 FPs

2 x 24 FPs ( 2 cables)

48 FPs

Fig. 5.3 – Number of Cables & Fibers

24 FPs

Page 28: PT Eigen Network - Network Planning & Overview

PT. Eigen Network Network Overview

BUILDINGS

6

28

Page 29: PT Eigen Network - Network Planning & Overview

PT. Eigen Network Network Overview

Amplifier or Regen Sites

29

Equipment

Building – Amplifier or Regen Sites

ODF ODF

Terrestrial duct

TERRESTRIAL CONTRACTOR TERMINATES TERRESTRIAL CABLE ON ODF

EQUIPMENT SUPPLIER CONNECTS EQUIPMENT TO ODF PROVIDING IN – STATION CABLING

TERRESTRIAL CABLE

Terrestrial duct

TERRESTRIAL CONTRACTOR TERMINATES TERRESTRIAL CABLE ON ODF

EQUIPMENT SUPPLIER PROVIDES ODF

Fig. 6.1 – Amplifier or Regen site

Page 30: PT Eigen Network - Network Planning & Overview

PT. Eigen Network Network Overview

Jakarta CLS & NOC

30

Fig. 6.2 – Cable Landing Station for Jakarta

MARINE CABLE

TERRESTRIAL CABLE

Equipment

Cable Landing Station/NOC

ODF ODF BMH (CLS CONTRACTOR)

Duct (< 20m) Terrestrial duct

MARINE CONTRACTOR TERMINATES MARINE CABLE ON ODF

TERRESTRIAL CONTRACTOR TERMINATES TERRESTRIAL CABLE ON ODF

EQUIPMENT SUPPLIER CONNECTS EQUIPMENT TO ODF PROVIDING IN – STATION CABLING

EQUIPMENT SUPPLIER PROVIDES ODF

Page 31: PT Eigen Network - Network Planning & Overview

PT. Eigen Network Network Overview

Ketapang Cable Landing Station

31

Fig. 6.3 – Cable Landing Station for Ketapang

MARINE CABLE

TERRESTRIAL CABLE

Equipment

Cable Landing Station

ODF ODF BMH (CLS CONTRACTOR)

Duct (< 20m) Terrestrial duct

MARINE CONTRACTOR TERMINATES MARINE CABLE ON ODF

TERRESTRIAL CONTRACTOR TERMINATES TERRESTRIAL CABLE ON ODF

EQUIPMENT SUPPLIER CONNECTS EQUIPMENT TO ODF PROVIDING IN – STATION CABLING

EQUIPMENT SUPPLIER PROVIDES ODF

Page 32: PT Eigen Network - Network Planning & Overview

PT. Eigen Network Network Overview

Dumai Cable Landing Station

32

Fig. 6.4 – Cable Landing Station for Dumai

MARINE CABLE

TERRESTRIAL CABLE

Equipment

Cable Landing Station

ODF ODF BMH (CLS CONTRACTOR)

Duct (< 20m) Terrestrial duct

MARINE CONTRACTOR TERMINATES MARINE CABLE ON ODF

TERRESTRIAL CONTRACTOR TERMINATES TERRESTRIAL CABLE ON ODF

EQUIPMENT SUPPLIER CONNECTS EQUIPMENT TO ODF PROVIDING IN – STATION CABLING

EQUIPMENT SUPPLIER PROVIDES ODF

Terrestrial Duct for future connection

FUTURE TERRESTRIAL CABLE CONNECTION

Page 33: PT Eigen Network - Network Planning & Overview

PT. Eigen Network Network Overview

Batu Pahat Cable Landing Station

33

Fig. 6.5 – Cable Landing Station for Batu Pahat

Cable Landing Station

ODF ODF

Equipment

MARINE CONTRACTOR TERMINATES MARINE CABLE ON ODF

EQUIPMENT SUPPLIER CONNECTS EQUIPMENT TO ODF PROVIDING IN – STATION CABLING

MARINE CABLE

BMH (CLS CONTRACTOR)

EQUIPMENT SUPPLIER PROVIDES ODF

FUTURE TERRESTRIAL CABLE CONNECTION

Duct (< 50m)

Terrestrial duct

Page 34: PT Eigen Network - Network Planning & Overview

PT. Eigen Network Network Overview

Batam Cable Landing Station

34

Fig. 6.6 – Cable Landing Station for Batam

Equipment

Cable Landing Station

EQUIPMENT SUPPLIER CONNECTS EQUIPMENT TO ODF PROVIDING IN – STATION CABLING

ODF ODF

400 m Terrestrial duct

MARINE CABLE

BMH

EQUIPMENT SUPPLIER PROVIDES ODF

CLS CONTRACTOR TO CONSTRUCT BMH & INSTALL TERRESTRIAL DUCT AND FIBER

TERRESTRIAL CABLE

MARINE CABLE SUPPLIER TO SPLICE THE FIBER

FUTURE TERRESTRIAL CABLE CONNECTION

Terrestrial duct

Page 35: PT Eigen Network - Network Planning & Overview

PT. Eigen Network Network Overview

Connection to Singapore PoP

35

Fig. 6.7 – PoP connection for Singapore

Equipment

Global Switch

EQUIPMENT SUPPLIER CONNECTS EQUIPMENT TO ODF PROVIDING IN – STATION CABLING

ODF

21 km Terrestrial duct

MARINE CABLE

TERRESTRIAL CABLE

BMH

EQUIPMENT SUPPLIER PROVIDES ODF

CUSTOMER CONNECTION

MARINE CABLE SUPPLIER TO SPLICE ONTO THE TERRESTRIAL FIBER

TERRESTRIAL CONSTRUCTOR TO PROVIDE TERRESTRIAL DUCT AND INSTALL FIBER

ODF

Customer Connect is

Provided within the Building

Page 36: PT Eigen Network - Network Planning & Overview

PT. Eigen Network Network Overview

Connection to Jakarta PoP

36

Fig. 6.8 – PoP connection for Jakarta

Equipment

Cyber 2

EQUIPMENT SUPPLIER CONNECTS EQUIPMENT TO ODF PROVIDING IN – STATION CABLING

ODF

19 km Terrestrial duct

MARINE CABLE

TERRESTRIAL CABLE

CLS

EQUIPMENT SUPPLIER PROVIDES ODF

CUSTOMER CONNECTION

BMH

TERRESTRIAL CONSTRUCTOR TO PROVIDE TERRESTRIAL DUCT AND INSTALL FIBER

ODF

Customer Connect is

Provided within the Building

Page 37: PT Eigen Network - Network Planning & Overview

PT. Eigen Network Network Overview

LANDING POINTS

7

37

Page 38: PT Eigen Network - Network Planning & Overview

PT. Eigen Network Network Overview

Ketapang Landing Point

38

BMH

CLS

Fig. 7.3 – Ketapang Landing Point

Page 39: PT Eigen Network - Network Planning & Overview

PT. Eigen Network Network Overview

39

Page 40: PT Eigen Network - Network Planning & Overview

PT. Eigen Network Network Overview

ASSIGNMENT MATRIX

8

40

Page 41: PT Eigen Network - Network Planning & Overview

PT. Eigen Network Network Overview

Legend & Abbreviation

CLS = Cable Landing Station

CME = Civil Mechanical & Electrical

NOC = Network Operation Center

ODF/DDF = Optical/Digital Distribution Frame

RPL = Route Position List

SITAC =Site Acquisition

41

A = Approve

As = Assist R = Responsible S = Supervise

Ac = Accountable

Page 42: PT Eigen Network - Network Planning & Overview

PT. Eigen Network Network Overview

General Checklist

42

Preparation

Matrix

Engineering

Matrix

Supply

Matrix

Construction

Installation

Matrix

Testing

Matrix

Training

Matrix

Page 43: PT Eigen Network - Network Planning & Overview

PT. Eigen Network Network Overview

43

Page 44: PT Eigen Network - Network Planning & Overview

PT. Eigen Network Network Overview

Cross-Border Checklist

44

Submarine Cable

Equipment

Installation Testing

Station

Page 45: PT Eigen Network - Network Planning & Overview

PT. Eigen Network Network Overview

45

Page 46: PT Eigen Network - Network Planning & Overview

PT. Eigen Network Network Overview

OUTSTANDING ISSUES

9

46

Page 47: PT Eigen Network - Network Planning & Overview

PT. Eigen Network Network Overview

47

Page 48: PT Eigen Network - Network Planning & Overview

PT. Eigen Network Network Overview

OPERATIONS

10

48

Page 49: PT Eigen Network - Network Planning & Overview

PT. Eigen Network Network Overview

49