Use witb lYba¥idn · . 50 mcg per 0.5 mL, 80 mcg per 0.5 mL, I20 mcg per 0.5 mL, I50 mcg per
Provision of water to MCG and Punt Rd oval Issues · WRF - Class A Demand Notes Summer demand...
Transcript of Provision of water to MCG and Punt Rd oval Issues · WRF - Class A Demand Notes Summer demand...
Water Recycling Facility
• Provision of water to Yarra Park– Create a sustainable Yarra Park
– Improve the condition of park (MCC managed in 2010)
– Sewer mining v Stormwater capture alternatives
• Provision of water to MCG and Punt Rd oval– Reduce potable water use by 60% (Toilet flushing)
– Environmental enabler (with EPC)
– Corporate and social responsibility
• Issues– Perception of noise and odour issues
– Construction in a heritage listed park
– Authorities (CWW - draft recycled water management plan)
WRF Water Balance
• Production– 600kL/day summer
– 200kL/day winter
Class A Process
Yarra Park 2010
General Layout
Melbourne Cricket Club Class A Water Recycling Scheme
General Layout
MCG holding tank
MCG Distribution System
Construction – Tree Protection
Wall Construction Methodology
Wall Construction Methodology
Pump Station