Protection, Substation Automation & Network Control ... · DEWA Frame contract, Dubai ......
-
Upload
truongtruc -
Category
Documents
-
view
229 -
download
1
Transcript of Protection, Substation Automation & Network Control ... · DEWA Frame contract, Dubai ......
Project Reference 9-4ABB maximizes the benefits of IEC 61850 for customers around the globe
Protection, Substation Automation & Network Control
ABB’s experience in implementing IEC 61850-based substation automation solutions in new and retrofit installations brings a variety of benefits to users:
– Enhanced efficiency and safety through optimized solutions with scalable system architectures for all types of substation projects, customer philosophies and availability requirements
– Improved data management and user-understandable data
– Full exploitation of the functional capabilities of the components used
– Maximum system performance with functionality and interoperability proven by in-house SVC*
– Guaranteed system openness for future hardware and functional extension and improved efficiency through high-quality tool-supported engineering
Verified IEC 61850 conformance
Based on the vast experience in protection and substation automation (SA) as well as the expertise in IEC 61850, ABB has fully implemented the new standard in its products, systems and tools. To verify the proper implementation of IEC 61850 throughout its portfolio, ABB has established a System Verification Centre (SVC*). Each and every product, system component, application and tool is tested in a real-life system environment to prove its appropriate working and performance – functionally and interactively. Complete systems are verified to ensure they fully meet the requirements in terms of communication, integration, functionality and performance.
EGL Laufenburg 380 kV Substation, SwitzerlandThe world’s first HV substation with IEC 61850-compliant SA and multi-vendor integration1st step: Bay wise retrofit of eleven out of 17 bays:– New IEC 61850 - compliant control and redundant protec-
tion– Gateway to existing 3rd party station HMI– Integration of 3rd party Main 2 IEDs via IEC 61850
2nd step: Replacement of old 3rd party station level system:– Implementation of new IEC 61850 station HMI– Full reuse of engineering data from original SCD file
Sustainable concept for stepwise migration
Eletrosul’s three 230/69 kV S/Ss, BrazilNew Atlântida S/S and expansion of Osório and Gravataí 3 S/Ss– 115x REx670 for control and protection– Redundant station HMIs and gateways to NCC– Dynamic information objects mapped to SAGE system &
NCC
Successful integration of SA with 3rd party supervisory system
ABB’s IEC61850-compliant solutions around the globe
EDP Distribuiçao Energia’s six HV/MV stations, PortugalMigration of important nodes to IEC 61850 SA systems– Standardized high-quality operator interfaces, functions
and system layouts for optimal operation and maintenance– Control and protection IEDs of REx670 and 54x series– Comprehensive GOOSE-based, distributed functionality
for enhanced operational safety and reduced wiring cost
Efficient project implementation
Teck Cominco’s Waneta 230/63 kV S/S, CanadaHybrid solution with an IEC 61850 ring and a LON star– REx670 for control and protection– REX500 and REF542+ controllers– Integration of third party IEDs– Redundant station level
Reliable power supply for the world’s largest fully integrated lead and zinc smelters
ENELVEN’s and ENELCO’s Soler & Médanos S/Ss,VenezuelaIEC 61850 is key to the utilities’ strategy for SA throughout their grids– Uniform system architecture with redundant station level
for high availability– Control & protection IEDs of REx670 and 54x series– High-quality operator interface with proven applications for
control and monitoring of the entire 138/24kV & 115/13.8kV substations
Enhanced efficiency with harmonized SA systems for new and retrofit substations
EWA’s Financial Harbour, Sitra & Buquwwah S/Ss, BahrainThe three 220/66/11kV GIS substations strengthen the grid and increase the reliability of the power supply
– Redundant Station HMIs with redundant, independent gateways
– One product family, REx670, for control and protection– Bay/Section control unit REC670 for all three voltage levels– REB500 busbar and breaker failure protection (220 kV)
with IEC 61850 communication interface– Integration of 3rd party protection IEDs via IEC-103/
IEC 61850 converter IEC 61850 introduced in ABB‘s first substations for EWA Bahrain
Senelec’s Hann 90/30 kV S/S, SenegalRefurbishment of Senelec‘s most important substation– IEC 61850-compliant control and protection– Redundant station level system– Integration with NCC and Dispatching Centers
Future-proof solution for existing 90kV AIS as well as new 30kV GIS
DEWA Frame contract, DubaiSupply of 125 IEC 61850-based SA systemsState-of-the-art systems for new 132/11kV & 132/22kV S/Ss:– Short lead times realized by highly qualified project team– Redundancy concept, independent key components and
physically separated communication networks– Proven technology and functionality
Safeguarded investment into interoperable systems for any make of switchgear
Six new HV substations for PGCIL, India400/220 kV GIS S/S at Maharanibagh, 400/220kV AIS S/Ss at Bhatapara, Fatehbad, Raigarh and Rajagarh, 400kV AIS S/S at BinaPGCIL’s new substations will be controlled and monitored by IEC 61850-based SA systems featuring:
– Redundant Station HMI using MicroSCADA Pro– One product family, REx670, for control and protection– REC670 bay control unit for all voltage levels– REB500 numerical busbar protection system with
IEC 61850 communication interface– Integration of 3rd party Main 2 IEDs on IEC 61850 platform– Redundant gateways for integration with Network Control
and Dispatching Centers
The customer’s philosophy as well as requirements for functionality and availability are being met
SA for PT PLN’s five retrofit 150 kV S/Ss, Indonesia– RTU 560 independent gateway to NCC and station HMI– REx670 for decentralized control, protection and monitoring
Optimal life cycle management through future-proof retrofit concept
NTC’s six new 161/22.8 kV S/Ss, TaiwanDemanding industrial application– SA systems with more than 300 IEDs integrated– 279 protection and control IEDs of REx670 and 54x series– Integration of 3rd party meters, RTUs, D-UPS, DC charger,
mimic controllers and PLC via Modbus/RP570– Fully redundant hot-standby station HMIs and servers
Enhanced monitoring and control of six substations including station ancillary equipment
Rio Tinto/Hamersley Iron’s 220 kV Juna Downs S/S, Australia– REx670 series IEDs for control and redundant protection– RTU 560 with DNP 3.0 and MicroSCADA Pro HMI with
terminal service feature provide access for telecontrol, relay interrogation and setting
Robust SA system design ensures continuous local and remote data and command access
ABB’s IEC61850-compliant solutions around the globe Federal Grid Company’s Ochakovo 500/220/110 kV S/S, RussiaSA system for station upgraded to GIS technology– Integration of more than 500 IEDs– 399 IEDs integrated via IEC 61850– 219 cubicles with REx670 for control and protection– 75 protection cubicles for opposite line ends
Largest SA project worldwide with REx670 series IEDs
Transco and ADWEA power mega-projects in Abu DhabiSupply of 18 IEC 61850-compliant SA and protection systems for new 11 –400kV GIS S/Ss, e.g. Reem Island, Saadiyat Island and Raha Beach
– Uniform system architecture with fully redundant station HMIs and integrated gateways to LDC
– REC 670 bay control unit for transmission level– REF 545 bay control unit for distribution stations– REB 500 numerical busbar and breaker failure protection
with IEC 61850 communication interface– Integration of 3rd party Main 2 IEDs using IEC 61850
Optimized systems help secure reliable power supply for prestigious mega-projects in Abu Dhabi
New installation
Retrofit/migration
© C
opyr
ight
200
9 A
BB
. All
right
s re
serv
ed.
ABB: The system integrator
Based on the vast experience in substation automation (SA) and expertise in IEC 61850, ABB has fully implemented the new standard in its portfolio of products, systems and tools. Through the combination with excellent system integration capabilities, ABB can offer optimized solutions for new installations, modernization and migration projects.
We design interoperable and open systems with scalable architectures for any type, size and topology of substation to
– meet customer’s availability and performance requirements – accommodate user-specific operational philosophies – enhance safety and efficiency of system operation – lower life cycle cost in operation and maintenance– support life cycle management and safeguard customer’s
investments
We offer
– Proficient project execution in every phase – Future-proof solutions with all substation functions
supported by IEC 61850, from the switchgear to the NCC gateway, and openness for further:
- Extension, e.g. by size and functionality; - Optimization, e.g. usage of IEC 61850-compliant
non-conventional instrument transformers; - Integration, e.g. with remote control centers for
telecontrol or to power stations. – Maximum level of product integration for enhanced
performance and functionality of the systems based on excellent system integration capabilities as well as a complete IEC 61850-compliant portfolio
– Comprehensive, high-quality service and support for systems and products that is responsive and customer-oriented
ABB maximizes the benefits from IEC 61850 in substation automation, monitoring, control and protection for your new, retrofit and migration projects
ABB – We support your quest for excellence in the competitive power market
For more information please refer to the responsible ABB sales engineer for your country or to the address mentioned below.
ABB Switzerland Ltd Power SystemsBruggerstrasse 72CH-5400 Baden, Switzerland Phone: +41 58 585 77 44 Fax: +41 58 585 55 77 E-mail: [email protected] www.abb.com/substationautomation
Innovation, Experience and Competence at your service