Proposed Retail Rate Proposed Retail Rate ChangeChange
Effective January 1, 2008Effective January 1, 2008
ProcessProcess
2006 Retail Financial Plan & Water 2006 Retail Financial Plan & Water Rate StudyRate Study
Capital Improvement Program Capital Improvement Program Changes – schedule and costsChanges – schedule and costs
Operating Costs UpdateOperating Costs Update Capital Funding UpdateCapital Funding Update Retail Financial Plan UpdateRetail Financial Plan Update
Retail Financial Plan &Retail Financial Plan &Water Rate StudyWater Rate Study
Recommended Five-Year Rate Recommended Five-Year Rate Structure:Structure: 20072007 13%13% 20082008 13%13% 20092009 11%11% 20102010 8%8% 20112011 3%3%
Capital Improvement Program Capital Improvement Program UpdateUpdate
Deferred Joint Water Storage Tank Project at least 5-Deferred Joint Water Storage Tank Project at least 5-years $4Myears $4M
Deferred Sierra Pump Station improvements required Deferred Sierra Pump Station improvements required by Joint Water Storage Tank Project $500Kby Joint Water Storage Tank Project $500K
Reduced Auburn-Folsom Road 24” Pipeline Project Reduced Auburn-Folsom Road 24” Pipeline Project cost by $1.5M - cost savings of partnering with Placer cost by $1.5M - cost savings of partnering with Placer CountyCounty
Eliminated Kokila Reservoir Pressure Reducing Station Eliminated Kokila Reservoir Pressure Reducing Station (due to optimizing pressures within Bacon Zone) (due to optimizing pressures within Bacon Zone) $200K$200K
Eliminated Bacon Pump Station stand-by generator Eliminated Bacon Pump Station stand-by generator (due to optimizing pressures to reduce pumping (due to optimizing pressures to reduce pumping requirements within the Bacon Zone) $600Krequirements within the Bacon Zone) $600K
Re-scheduled several steel water line replacements Re-scheduled several steel water line replacements based on current condition assessments to defer costsbased on current condition assessments to defer costs
Added $300k for retail area groundwater studyAdded $300k for retail area groundwater study
Impact of CIP UpdateImpact of CIP Update
Eliminated First Recommended Debt Eliminated First Recommended Debt FinancingFinancing Reduces operating cost by $500,000Reduces operating cost by $500,000
Altered Timing and Size of Altered Timing and Size of Succeeding Debt FinancingsSucceeding Debt Financings
Operating Costs UpdateOperating Costs Update
Decreased: Conservation programsDecreased: Conservation programs Increased: Engineering professional Increased: Engineering professional
services, Transmission & Distribution services, Transmission & Distribution maintenancemaintenance
Pressure Zone TestingPressure Zone Testing
Capital Funding UpdateCapital Funding Update
Increased connection fees receivedIncreased connection fees received Increased property taxes receivedIncreased property taxes received
Retail Financial Plan UpdateRetail Financial Plan Update
Recommended Five-Year Rate Recommended Five-Year Rate Structure:Structure: 20072007 13%13% 20082008 7%7% 20092009 7%7% 20102010 7%7% 20112011 4%4%
Additional ConsiderationAdditional Consideration
Dry year planning and fundingDry year planning and funding