Proposed 2014/15 Special Rate Variation - Infrastructure.

30
Proposed 2014/15 Special Rate Variation - Infrastructure

Transcript of Proposed 2014/15 Special Rate Variation - Infrastructure.

Page 1: Proposed 2014/15 Special Rate Variation - Infrastructure.

Proposed 2014/15 Special RateVariation - Infrastructure

Page 2: Proposed 2014/15 Special Rate Variation - Infrastructure.

Local Government Financial Sustainability

TCorp (April 2013) assessed Council’s current Financial Sustainability Rating (FSR) as MODERATE with a short term Outlook rating of NEUTRAL

TCorp definition of financial sustainability is:

“A local government will be financially sustainable over the long term when it is able to generate sufficient funds to provide the levels of service and infrastructure agreed with its community”

Page 3: Proposed 2014/15 Special Rate Variation - Infrastructure.

Local Government Financial

TCorp recommendations to assist in improving Council’s position is to:• SOURCE additional revenue, such as Special

Rate Variations (SRV) to improve financial flexibility and to assist in reducing the Infrastructure Backlog

• USE debt funding (loan borrowings)• DEVISE programs and strategies to contain

rising costs and improve efficiencies

Page 4: Proposed 2014/15 Special Rate Variation - Infrastructure.

Local Government Financial Sustainability

TCorp recommendations to assist in improving the position• IMPROVE Asset Management Plans (AMPs)

and integration into the 10 Year Long Term Financial Plan (LTFP)

• INCREASE spending on maintenance and infrastructure renewal, balancing this with the need for capital expenditure on new assets

Page 5: Proposed 2014/15 Special Rate Variation - Infrastructure.

Local Government Financial Sustainability

NSW Local Government Infrastructure Audit Report (June 2013) assessed Council’s infrastructure management as MODERATE• Confirmed the large local government

infrastructure backlog in NSW• Estimated $7.4 billion as at 30 June 2012

(Compared to NSW total rate income 2011/12 $6.8 billion)

• $4.5 billion (61%) relates to road/bridge assets and $1 billion relates to buildings

Page 6: Proposed 2014/15 Special Rate Variation - Infrastructure.

Local Government Financial Sustainability

Some councils face real and significant challenges in terms of maintaining and renewing the infrastructure• Council’s backlog - equates to $19.327 M• Includes $6.587 M road related assets• Current Replacement Value of the road related

assets as at 30 June 2013 totalled - $415.65 M• Council’s AMP identifies that Council requires

additional funds to sustain the current and expected level of services.

Page 7: Proposed 2014/15 Special Rate Variation - Infrastructure.

Singleton’s Productivity & Efficiency Improvements

• Revised organisation structure and reduced number of executive by two positions.

• New recycling contract in place which has identified $4 million in savings over 10 years.

• Efficiencies with introduction of technology eg, new website, e-planning, tablets devices.

• Rationalisation of assets including land disposal and plant and equipment.

• Reviewing of Council’s Light Motor Vehicle Fleet.

Page 8: Proposed 2014/15 Special Rate Variation - Infrastructure.

Singleton’s Initiatives to Improve Financial Sustainability

Asset Management Planning• Traditionally, the focus on infrastructure asset

management was provision of new assets• However it is becoming more and more apparent

that it is no longer sustainable to focus on the investment in the creation of new assets alone

• Must also recognise long term lifecycle costs of ongoing operation, maintenance and renewal of existing assets

Page 9: Proposed 2014/15 Special Rate Variation - Infrastructure.

Singleton’s Initiatives to Improve Financial Sustainability • Developed asset management Strategy • Developed Asset Management Plans for all

asset classes • Developed a 4 Year Works Program• Increased funding through resources for regions

for local transport infrastructure• Risk based rehabilitation of urban/rural roads• Introduced new technology to gain efficiency• Reviewed asset management processes• Contracted specialist providers to assist e.g.

Morrison Low and JRA

Page 10: Proposed 2014/15 Special Rate Variation - Infrastructure.

NSW Government Initiatives to Reduce Infrastructure Backlog

NSW Local Infrastructure Renewal Scheme (LIRS)

Helping councils meet the increasing challenge of infrastructure renewal by providing interest subsidy on council borrowings over a 10 year period

(Normal term for council has been 15 years)

Round One 2012/13

10 Year Loan $2,200,000 for the replacement of Bourkes Crossing Bridge @ 5.35%.• Interest $656,234 Subsidy 4% $480,924 Net

Interest cost of $175,310

Page 11: Proposed 2014/15 Special Rate Variation - Infrastructure.

NSW Government Initiatives to Reduce Infrastructure Backlog

Round Two 2013/14

10 Year Loan $4,000,000 loan to be raised for road and culvert works.• Works program to be finalised shortly.• Interest $1,227,000 Subsidy 3% $645,000 net

cost of borrowings of $582,000 based on an interest rate of 5.50%

Page 12: Proposed 2014/15 Special Rate Variation - Infrastructure.

NSW Government Initiatives to Reduce Infrastructure Backlog

Round Three 2013/14 (Closes 31 December)• Application for infrastructure backlog works• Provide a 3% interest subsidy on loans taken

out over 10 years for infrastructure backlog works as well as for projects providing infrastructure to enable new housing.

• Report to Council 16 December 2013 to consider an application for Singleton Regional Livestock Markets for $2.5 million.

Page 13: Proposed 2014/15 Special Rate Variation - Infrastructure.

Proposed Infrastructure Levy

Special Rate Variation will provide additional funds to:

1. Increased heavy patching on local sealed roads $250K

2. Re-sheeting of unsealed road by adding pavement material - $200K

3. Seal unsealed roads where it is value for money - $250K

Page 14: Proposed 2014/15 Special Rate Variation - Infrastructure.

Expected changes in Infrastructure in 10 years

In 10 years time, 5% of our roads will turn into poor condition

Good Condition Road Poor Condition Road

Wollombi Road, Broke, NSW 2330Middle Fallbrook Road, Middle Fallbrook NSW 2330

Page 15: Proposed 2014/15 Special Rate Variation - Infrastructure.

Expected changes in Infrastructure in 10 years

Poor Condition BridgeGood Condition Bridge

In 10 years time, 10% of our bridges will turn into poor condition

Herbert Street Bridge, Broke, NSW 2330Oak Park Bridge, Middle Fallbrook Road, Middle Fallbrook NSW 2330

Page 16: Proposed 2014/15 Special Rate Variation - Infrastructure.

Expected changes in Infrastructure in 10 years

In 10 years time, 30% of our roads will turn into poor condition

Good Condition Unsealed Road Bad Condition Unsealed Road

Mount Royal Road, Mount Royal, NSW 2330 Putty Valley Road, Putty, NSW 2330

Page 17: Proposed 2014/15 Special Rate Variation - Infrastructure.

Transport Infrastructure

The Transport Infrastructure network comprises of:• 644.3 km Sealed Roads,• 82.6 km Unsealed Roads,• 82.8 km Regional Roads,• 3997 m Bridges and Major Culverts,• 28264 m Minor culverts and drainage structures,• 21.37km Footpaths & other paved areas,• 176.4km Kerb & Gutter,• 15 Bus shelters, and• 8,827 m2 Sealed Car Parks

These infrastructure assets have a replacement value of $415.65 M.

Page 18: Proposed 2014/15 Special Rate Variation - Infrastructure.

Average Rate Comparison

Page 19: Proposed 2014/15 Special Rate Variation - Infrastructure.

Average Rate Comparison

Page 20: Proposed 2014/15 Special Rate Variation - Infrastructure.

Average Rate Comparison2011/12 – Neighbouring

CouncilsCouncil Average Residential

Rate Average

Farmland RateAverage

Business Rate

Cessnock City $934 $1,867 $2,789

Dungog Shire $689 $1,939 $793

Maitland City $865 $2,232 $4,464

Muswellbrook Shire $630 $2,552 $1,732

Singleton $669 $1,241 $1,352

Upper Hunter $576 $2,610 $974

Page 21: Proposed 2014/15 Special Rate Variation - Infrastructure.

Scenario 1 – No SVR

• Apply IPART rate pegging % for 2014/15• Rate peg amount of 2.3%• Rate peg announced by IPART December 2013• Generates ordinary rate income of $320,860 pa• Income used to maintain existing levels of

service or may result in reduction• Current budget contributed $880,000 to strategic

and capital projects.

Page 22: Proposed 2014/15 Special Rate Variation - Infrastructure.

Scenario 2 – 5% Single Year Increase above rate peg limit for 2014/15

• S508(2) application for a single year 2014/15

• Road Infrastructure works• Increase to be permanently retained in

rate income base• Rate peg amount of 2.3% + 5.0%• Generates additional ordinary rate income

of $700,000 pa

Page 23: Proposed 2014/15 Special Rate Variation - Infrastructure.

Impact of Levy on Ratepayers

Average Rate Minister’s Increase 2.3% Minister’s Increase of 2.3% + 5% SRV

Annual Increase of SRV

Weekly Increase of SRV

Residential Singleton $755.87 $792.94 $37.07 $0.71

Residential Rural Residential

$1,060.41 $1,112.30 $51.89 $1.00

Residential Village $502.52 $527.15 $24.63 $0.47

Residential Ordinary $745.24 $781.84 $36.60 $0.70

Business Singleton $1,762.87 $1,849.23 $86.36 $1.66

Business Mount Thorley $2,277.91 $2,389.51 $111.60 $2.15

Business Village $866.54 $908.98 $42.44 $0.82

Business Ordinary $981.28 $1,029.34 $48.06 $0.92

Farmland Ordinary $1,352.34 $1,418.37 $66.03 $1.27

Coal Mine $103,930.65 $109,009.09 $5,078.44 $97.66

Coal Rights $1.64 $1.68 $0.04 $0.00

Page 24: Proposed 2014/15 Special Rate Variation - Infrastructure.

Impact of Levy on Ratepayers

• Excluding the revaluation impacts the SRV increase will have a minimal impact of less than $1.00 on the average rate assessment.

• Number of rate assessments – 10,514• Number of pensioner concessions – 1,034• Maximum pensioner concession claim - $425 Ordinary

Rates/Domestic Waste Management Service $250, Water $87.50 and Sewerage $87.50

• For Residential and Farmland ratepayers who experience permanent financial hardship, the Council’s Hardship Relief Policy may also provide rate relief.

Page 25: Proposed 2014/15 Special Rate Variation - Infrastructure.

Draft Community Engagement Strategy

• The Strategy is based on International Association for Public Participation (IAP2) principles of engagement

• It identifies stakeholder groups, outlines key communications and messages to be released throughout the engagement period and key consultation tools for engaging with the community

• Council will be able to make an informed decision about whether or not to proceed with an application for a Special Rate Variation, based on feedback from the community

Page 26: Proposed 2014/15 Special Rate Variation - Infrastructure.

Engagement Timeframe

• The guidelines for 2014/15 Special Rate Variation and minimum rate applications were released by the Division of Local Government in September.

• Councils are required to notify IPART in December if they intend to lodge an application for a Special Rate Variation, with the application due in February 2014.

• This is a tight timeframe and means that community engagement needs to take place over the January period as discussed with IPART.

Page 27: Proposed 2014/15 Special Rate Variation - Infrastructure.

Community Engagement Strategy

9th December 2013• Council meeting to resolve to undertake

community engagement process.

16th December 2013• Community engagement and statutory public

exhibition process commence. Local paper advertising. Displays at Library and Gym and Swim. Social media interaction.

13th January 2014• Explanatory Newsletter to all households.

Page 28: Proposed 2014/15 Special Rate Variation - Infrastructure.

Community Engagement Strategy

20th January 2014• Telephone survey conducted. Local paper

advertising.

24th January 2014• Rates notices and Council newsletter

communicate “last chance” opportunity to complete online survey and make submission.

5th February 2014• Focus groups and community information

meeting held - 10am Library Meeting Room

Page 29: Proposed 2014/15 Special Rate Variation - Infrastructure.

Community Engagement Strategy

6th February 2014• Focus groups and community information

meeting held - 5pm Library Meeting Room.

6th February 2014• Community engagement and public exhibition

close.

17th February 2014• Council meets to determine whether application

will be lodged with IPART.

Page 30: Proposed 2014/15 Special Rate Variation - Infrastructure.

Council Decision Making

• Councillor Briefing – 2nd December 2013.• Council Meeting – 9th December 2013 –

proposed to resolve to advise IPART of intention to make a formal SRV application in February 2014.

• Council Meeting – 17th February 2014 – consider community feedback and finalising a formal application to IPART by 24th February 2014.