PROPOSED LIST OF ON-GOING SCHEMES FOR THIRD PARTY VALIDATION
Sr # DepartmentNumber of Schemes
Total Estimated Cost
1 Works & Services(Buildings Sector)
13 12354.26
2 Works & Services(Road Sector)
25 6328.421
3 Irrigation 09 4449.221
4 Special Packages 10 3374.349
5 Education 14 20209.758
6 Fisheries 05 2444.327
7 Health 06 5573.506
8 Livestock 09 1236.211
9 Agriculture 06 1214.66
10 Wildlife & Forest 08 1356.277
11 Other Deptts. 15 5995.012
GRAND TOTAL 120 64536.002
2
Sr #
ADP #
Name of SchemeLocation of
scheme/ District
Target Date for
Completion
Estimated Cost
Estimated Exp Up to June 2012
Scope of Physical Work
Physical Achievements
1 2 3 4 6 7 8 9 10
1- BUILDINGS
PHYSICAL PLANNING & HEALTH DEPARTMENT
1 352
Construction of New DistrictJail Nawab Shah for 250Prisoners
Nawabshah30-6-14 287.194
70.000 16% cumulative physical progress
2 417Re-construcation of PeonsColony behind ShahbazBuildings Hyderabad.
Hyderabad 30-06-13 112.45033.000
i) Multi Stories Flats 100 Nos.(G+4)
10 Blocks
ii) C/Walliii)U.G tankiv)H.S.R.
Out of 100 Flats 16 Nos Flats Roof laid
& Finishing in progress 8 Nos.Flats work in progress 8
Nos.flats excavation in progress
Work not started.Completed
Upto 10 ft height column.
HEALTH DEPARTMENT
3 1930Expansion & Improvement of DHQ Hospital in Sindh (1) Badin (2) Khairpur (3) Shikarpur (4) Mithi
Badin, Khairpur, Shikarpur,
Mithi
30.06.2013 2787.395 2142.24
3
4 1937
Expansion & Improvement of DHQ Hospital in Sindh (06 Nos) (1) Thatta (2) Dadu (3) Naushero Feroze (4)Mirpurkhas (5) Sanghar (6) Mirpur Mathelo
Thatta, Dadu, N'Feroze,
Mirpurkhas, Sanghar,
Ghotki
30.06.2014 3248.866 1404.000
5 1956
Up gradation of THQ Hospitals to the level of DHQ Hospital in Sindh (newly created District i) Kamber, ii) Umerkot, iii) Kashmore, iv) Matiari
Kamber, Umerkot,
Kashmore. Matiari
30.06.20152339.932 180.000
SPORTS DEPARTMENT
6 2038
Construction of Sports Stadium in Sindh (8 Nos) Districts)Hala,Kotri,Tandojam, Mithi Sanghar, Shikarpur, Jacobabad & Tando Allahyar (Part-I).
Sindh30.06.2015
225.704 161.191Over all 54% physical
progress
CULTURE DEPARTMENT
7 2095 Estt. of Cultural Complex in Sindh (Phase-II) (Revised)
Umerkot Thatta
Nawabshah Sanghar
2014370.431
199.833Cumulative physical
work approx 44%
COOPERATION DEPARTMENT
8 2186Construction of Sindh Government Co-Operative College Hyderabad. Hyderabad
30.06.2014
118.421 30.000
Admin Block Hostel Block
Catg for grade 1 to 10 flats Catg.IV Flat
Catg. 2nd B'lowGuard Room
U.T.Tank / O.H.TankPump Room
C/WallExt. Dev.
Up to plinth levelExcavation work in
progressUp to plinth levelUp to plinth level
70% completed
4
SOCIAL WELFARE DEPARTMENT
9 2221
Establishment & Strengthening of Darul Atfal & Rehabilitation of Street Children through civil society organization Karachi
Karachi2015
314.54 45.000
Instt. For Boyes / GirlesAdmn. Block
Multi purpose HallBoys Hostel
Girls Hostel
Principal Residence / Staff Flats
Laundry / Generator / Guard Room
Rehabilitation of existing blockC/Wall / Face Lifting / Ext. Dev.
Foundation completedFoundation completedFoundation completedFoundation completed
shuttering of roof in prog
Tender under progress
work in progress.(marble floor polishing)
Bathroom renovation in progress
SPECIAL PROJECTS
10 2571Up gradation of THQ Hospitals at Shahdakot Qubo Saeed Khan, Nasirabad Sujawal and Miro Khan
Kamber Shahdakot 30.06.2015 429.166 75.000
YOUTH AFFAIRS
11 2069 Construction of Regional Youth Development Centre in Sindh (5 Units).
Sindh 30-06-2015 328.711 45.000
12 2071 Construction of Youth Development Centre at Karachi.
Karachi 30-06-2015 350.000 65.000
5
LIVESTOCK DEPARTMENT
13 45 Establishment of Cattle Colonies with District and Private participation Phase-I
Tharparkar, Umerkot & Khairpur
30-06-20141441.45 560.277
GRAND TOTAL 12354.26
6
Sr #ADP
#Name of Scheme
Location of scheme/ District
Target Date for
Completion
Estimated Cost
Estimated Exp Up to June 2012
Scope of Physical WorkPhysical
Achievements
1 2 3 4 6 7 8 9 10
2- ROADS SECTORWORKS & SERVICES GENERAL
1 703Construction / Improvement of Provincial roads in N'Shah District 80 Km
Benazirabad 2013-2014 584.750 372.402
2 705
Construction of Rural Access road for new created District Kamber Shahdadkot. (30 KM).
Kamber/ Shadadkot
2012-13 189.810 149.587
3 710
Construction/Improvement of Provincial Roads in District Khairpur&Naushahro Feroze (80.00 Km)
N'Feroze/ Khairpur.
2012-13 459.259 362.985
IMPROVEMENT
4 731Widening / Reconditioning of Tando Bago to Dehi Digri road mile 0/0-16/0 = 16-0 =(25.76 kms).
Badin 2012-13 86.215 81.500
5 732
W/R of Road from Dombalo to Bhudho Qambrani mile 0/0-9/0 (District Badin) (14.5 kms)Improvement of W&R of Talhar Tando Bago Pangrio road mile 0/0-28/2 =28-2(m)= (45.48 Kms).
Badin 2012-13 61.896 48.000
7
6 734
W/R Badin Khoski Wango road mile 9/0-27/4 (Phase-II) (24' with Asphalt Concrete) (29.5 Km)
Badin 2012-13 445.904 435.995
7 736
W/R of Road from Shahpur Chakar to Jam Sahib via Porho Khan Zardari Road mile 0/0 - 10/6 (17.2 Km) (Asphalt Surface)
Benazirabad 2012-13 206.260 184.975
8 741
Improvement of Hyderabad Shaikh Bhirkio Gulab Leghari road mile 0/0-27/4 = 27-4 (M) = 44.27 Kms.
Hyderabad 2012-13 113.584 130.900
9 744
Widening / Reconditioning of Hamayoon Thull Byepass i/c link to Mian-jo-Goth road mile 0/0-18/0 = 18-0 (M) = 28.98 Kms.
Jacobabad 2012-13 125.768 84.000
10 748W/R of Road from Sobhodero to Sagyoon mile 0/0-7/0. (11.2 km)
Khairpur 2012-13 61.689 55.000
11 756W/R of road from Jiskani to Bozdar Wada Mile 0/0-11/0 (7 Kms)
Khairpur 2012-13 104.456 72.000
12 760
(a) Widening / Reconditioning of road from Mirpurkhas - Khan -Patoyoon Jam Nawaz Ali road mile (0/0-28/4) upto Patayoon pertain to District Mirpurkhas (45.60 km)
Mirpurkhas 2012-13 121.082 91.000
13 766
Widening / Reconditioning Hala –Shahdadpur – Sanghar with asphalt surface Mile 0/0-43/1 = 43-1 = 69.58 Km
Sanghar 2014-15 700.133 106.810
14 767
Widening / Reconditioning Tando Adam – Shahdadpur Road Mile 0/0 - 11/0 = 11-0 = (M) = 17.71 Kms.
Sanghar 2012-13 168.275 100.768
15 768
Construction / Improvement of road from Ruk Garhiyaseen amrot new Sharo Abro Mile 0/0-12/2 Kms. (19.6 Km)
Shikarpur 2012-13 145.565 111.000
8
16 772
W/R of road from Katcha Phattak Pano Akil to Saeed Ali Indher via village illahi Bux Mangi mile 0/0-6/0 (9.60 km)
Sukkur 2012-13 76.063 64.000
17 774
W/R of road from Rohri to Shadi Shaheed mile 0/0-16/0 with Asphalt (29 km).
Sukkur 2013-14 342.281 218.200
18 775
W/R of road from Rohri Arrore Salehpat mile 0/0-17/0 with Asphalt (27.2 km)
Sukkur 2013-14 294.568 180.250
19 779
Widening/Reconditioning Shaikh Bhirkio Tando Allahyar via Bukera Makan Sharif road mile 0/0 -14/0=14 -0(M)= 22.52 Kms.( Under Revision)
Tando Allah yar
2012-13 64.928 67.472
CONSTRUCTION
20 1122
Construction / Reconditioning of road from Khalifo Qasim to Tando Bago - Jhudo road mile0/0-18/0 =18-0 (M) = 28.98 Kms.
Badin 2012-13 100.530 76.046
21 1129Construction of road from N'Feroze to Nawabshah road mile 8/0 to 38/0 & 48/0-54/0 (57.6 Km).
Benazirabad 2014-15 590.056 191.880
22 1130
Construction of Road from Indus Highway at Mile 157/0 to Suprio Bund along Rajwah Inspection Park Mile 0/0-10/0 (16 Kms)
Dadu 2014-15 177.088 31.000
23 1141
Construction of road from Thari Mirwah to Kathore Connecting Wassanabad I/c links mile 0/0-25/0 (40 km)
Khairpur 2014-15 327.770 187.300
BRIDGES
9
24 1672
Construction over head bridge over main Railway at luqman in coloding Approach road up to new rubi canalbridge to pir jo ghot road (2000 RFT)
Khairpur 2014-15 670.858 339.820
25 1674Construction new Bridges on Therhi Pull Mir Wah & Rohri Canal (450 RFT)
Khairpur 2014-15 109.633 85.000
Total 6328.421
10
Sr #ADP
#Name of Scheme
Location of scheme/ District
Target Date for
Completion
Estimated Cost
Estimated Exp Up to June 2012
Scope of Physical WorkPhysical
Achievements
1 2 3 4 6 7 8 9 10
3- IRRIGATION DEPARTMENTDRAINAGE RECLAMATION & TUBEWELLS
1 150
Control of Water logging & Salinity in Dehs Barachari, Maldasi, Shahdadpur and Tando Adam Taluka Shahdadpur & Tandojam, District Sanghar.
Sanghar 2012-13 56.204 40.000
2 154
Surface Drainage Scheme in Deh 11 Rahib Shah, 03 Samo Raho, Tail Bhoura Bio & 22 Dino Shah, Taluka Sakrand.
Benazirabad 2012-13 163.302 149.317
3 161Surface Drainage scheme in Deh Jhol/ Ararro, Kandiyari & Jarioon.
T.A.Yar 2012-13 105.210 73.275
OPEN CANALS
4 209
Assuring Water Supply for Karachi upgrading Kinjhar Lake System (under Urban Water Supply).
Thatta 2014-15 3422.782 2235.000
5 211
Construction of Pumping Scheme at Dadu Canal Mile 132 Dadu Tail (Revised).
Jamshoro 2012-13 184.236 173.236
6 214
Constructing stone pitching along RMC RD-737 to 750 both sides & RD-790 to 800 NIP Sides.
Matiari 2012-13 139.468 115.000
11
7 216
Constructing of Retaining Wall along Rice Canal at RD 358 Both Sides, Badeh City.
Larkana 2012-13 84.867 54.993
8 217Rehabilitation X-Regulators of Rohri Main Canal.
Khairpur/ N.F/N.Shah
2012-13 203.000 200.000
9 223Rehabilitation / Renovation of Left Bank Barrage Colony Hyderabad
Hyderabad 2012-13 90.152 58.062
Total 4449.221
12
Sr #ADP
#Name of Scheme
Location of scheme/ District
Target Date for
Completion
Estimated Cost
Estimated Exp Up to June 2012
Scope of Physical WorkPhysical
Achievements
1 2 3 4 6 7 8 9 10
4- SPECIAL PACKAGES
Hyderabad Development Package
1 2288Phase -I Drainage system components of 25 years Master Plan for Qasimabad Hyderabad
Hyderabad 30-06-2013 386.73 386.73
2 2290Construction of Underpass at Naseem Nagar Chowk, Qasimabad, (Part of Free Corridor)
Hyderabad 30-06-2013 198.314 148.68
Shaheed Benazirabad Package
3 2296
Construction / Missing facilities of Education Building, Estabishment of Shaheed Zulfiqar Ali Bhutto Memorial Library and Revenue Component of Sports complex Nawabshah.
S.B.A. 30-06-2013 265.477 115.477
Larkana Development Package
4 2307
Construction of Bus Terminal and Taxi stand Retodero and Naudero Cities of Taluka Retodero ( 02 Nos)
Larkana 30-06-2013 153.896 153.896
Lyari Development Package
5 2318
Renovation & Improvement of existing Playgrounds (03 Nos) Lyari Town Karachi ( Phase-II)
Karachi 30-06-2013 81.103 71.000
13
6 2319Rehabilitation / Improvement of Roads and Internal Street of Lyari Town (Phase-II)
Karachi 30-06-2013 513.73 350.000
7 2321
Repair, Renovatio & Rehabilitation of existing Primary / Secondary Schools of Lyari (Phase-II) (41 Units)
Karachi 30-06-2013 314.949 100.000
Karachi Metropolitan Corporation Package
8 23262-Lane, 2Way Flyover of water Pump Shahrah-e-Pakistan
Karachi30-06-2014 493.95 75
9 23272-Lane, 2Way Flyover at Aisha Manzil Shahrah-e-Pakistan
Karachi30-06-2014 493.95 100
10 23282-Lane, 2 Way Flyover at Dak Khana S.M Tayfiq Road
Karachi30-06-2014 472.25 64.757
Total 3374.349
14
Sr #
ADP #
Name of SchemeLocation of
scheme/ District
Target Date for
Completion
Estimated Cost
Estimated Exp Up to June 2012
Scope of Physical WorkPhysical
Achievements
1 2 3 4 6 7 8 9 10
5- EDUCATION DEPARTMENT
1 1732 Promotion of Private Schools in Rural areas / Urban Slums (Revised)
Sindh 30-06-2013 2963.756 1799.614
2 1733Setting up Rural Community Based Schools through Public Private Partnership (Revised)
Sindh 30-06-2013 461.755 423.133
3 1734 Integrated Education Learning Program (ILP) (Revised)
Sindh 30.06.2013 2085.109 1500.00
4 1741
Establishment of Public Schools in Sindh (05 units) at Sanghar, Tando Muhammad Khan, Tando Allahyar, Ghotki & Matiari
Sanghar, T.M. Khan,
T.Allahyar, Ghotki & Matiari
30.06.2013 1333.77 364.197
5 1747Rehabilitation of Existing High / Higher Secondary Schools in Sindh (2008-09 Prog)
Sindh 30.06.2014 1890.737 906.860
6 1748Establishment of Single Section High Schools in Sindh (53 units) (2008-09 Prog)
Sindh 30.06.2014 1293.132 322.918
7 1775
Introduction of Post-Graduate Courses in 12 Existing Degree Colleges (2005-06 Program) at Karachi 05, Matiari 01, Tharparkar 01, Sanghar 01, Kamber 01, Larkana 01 N.Feroze 01, Sukkur 01(Revised)
Karachi, Matiari,
Tharparkar Sanghar, Kamber, Larkana
N.Feroze,
30.06.2013 684.85 531.065
15
8 1777 Establishment of Cadet College Gadap Town Karachi Revised
Karachi 30.6.2014 714.102 375.000
9 1779 Establishment of Cadet College for Girls @ Benazir Abad (Revised)
Benazirabad 30.06.2013 885.137 390.000
10 1781Establishment of Benazir Bhutto Shaheed Institute of Management Science Dadu
Dadu 30.6.2013 989.581 260.000
11 1799Establishment of Boys / Girls Degree College in Sindh (23 units) 2010-11 Programme.
Sindh 30.06.2014 2424.903 350.000
12 1826
Development of New Infrastructure and other essential facilities for Establishment of Mehran University College of Engineering and Technology at Kharipur Mirs
Khairpur 30.06.2013 998.29 675.000
13 1829
Establishment of Quaid-e-Awam University of Engineering Science & Technology, Constituent College / Campus at Larkana
Larkana 30.06.2014 2636.908 458.173
14 1834
Essential facilities to be developed for Mehran University college of Engineering & Technology at Khairpur Mirs
Khairpur Mirs 30.06.2014 847.728 500.00
TOTAL 20209.758
16
Sr #
ADP #
Name of SchemeLocation of
scheme/ District
Target Date for
Completion
Estimated Cost
Estimated Exp Up to June 2012
Scope of Physical WorkPhysical
Achievements
1 2 3 4 6 7 8 9 10
6- FISHERIES DEPARTMENT
1 61
Model Village for Fisherman at Hawksbay Zero point Badin Manchar Lake and Keenjhar Lake, Thatta
i) Zero Point, Badin Unit.(Jati)ii) Keenjhar Lake Thatta Unit a) Ramzan
Mirbahar Chilyaiii) Manchar lake Jamshoroiv) Hawksbay shifted to Dabla Para Rehri
Goth Bin Qasim Karachi
JatiThattaJamshoroKarachi
30-06-2011 481.825 368.128
74 % cumulative physical progress
2 62 Introduction of Culture of High value Brackish Water fish in Sindh
Badin & Thatta 30-06-2013 48.096 24.999
3 63
Rehabilitation of Pilot ShrimpFarm Garho as Training andResearch Centre Thatta 30-06-2013 261.792 122.752
Office Block-cum-Conference Hall
PondsConstn.of LaboratoriesHostel for 40 StudentsTraining & Res.Centre
Catg.III BungalowType Ivth Qtrs / Vth Qtrs(2
Nos)Ext.Drainage & Septic tank
Dismantling in progress50% work completed
Work in progressWork in progressWork in progress
Roof laidWork in progressWork in progress
Roof laid
4 64 Revival of Fishing Industry in the Coastal Belt of District Thatta
Thatta 30-06-2016 868.601 706.472
5 65 Strengthening and Improvement of Fish and Shrimp Hatcharies in Sindh
Sindh 30.06.2012 784.013 465.823
TOTAL 2444.327
17
Sr #
ADP #
Name of SchemeLocation of
scheme/ District
Target Date for
Completion
Estimated Cost
Estimated Exp Up to June 2012
Scope of Physical Work Physical Achievements
1 2 3 4 6 7 8 9 10
7- HEALTH DEPARTMENT
1 2016 Strengthening of Safe Blood transfusion Reforms in Sindh.
Sindj 30.06.2012 78.781 58.827
2 2022 Provincial Tuberculosis Control Programme in Sindh.
Sindh 30.06.2012 674.4 500.425
3 2023Extension of Malaria Control Programme for Roll Back Malaria initiative in Sindh.
Sindh 30.06.2012 441.739 408.271
4 2025 Prevention & Control of Blindness Program in Sindh
Sindh 30.06.2014 329.304 185.615
5 2026 Prevention & Control of Hepatitis in Sindh Chief Minister Initiatives.
Sindh 14.06. 3412.115 1,000
6 2031 Enhanced HIV/AIDS Control Programme in Sindh
Sindh 30.06.2014 637.167 160.145
TOTAL 5573.506
18
Sr #
ADP #
Name of SchemeLocation of
scheme/ District
Target Date for
Completion
Estimated Cost
Estimated Exp Up to June 2012
Scope of Physical WorkPhysical
Achievements
1 2 3 4 6 7 8 9 10
8- LIVESTOCK DEPARTMENT
1 52
Expansion of Poultry Hatcharies & Backyard Farming in Sindh including Poultry Controlled Atmosphere ShedsGhotaki, Kashmore & nausheroferoz
Sindh30.06.12
to be extended
247.376 181.834 25 % physical progress
2 43
Strengthening of Existing Facilities at Vaccine Production Unit for Preparation of Hamorrhagic Septicemia and Enterotoxemia (ET) Vaccine Tando jam
Hyderabad 30.06.2013 59.961 55.601
3 44 Improvement of Existing Livestock Farms in Sindh
Sindh 30.06.2011 140.447 120.447
4 46Strengthening of Research & Training Institute for Livestock Dev. @ Tando Muhammad Khan
T.M. Khan 30.06.2013 59.189 37.045
5 48Genetic Improvement through Embryo transfer Technology, Implementation through Joint venture.
Karachi 30.06.2013 91.999 80.007
6 49
Pilot Project on Surveillance of Bovine Tuberculosis, Brucellosis and other Zoonotic Diseases in Sindh (08 Districts).
Sindh 30.06.2014 59.926 36.438
19
7 50
Strengthening of Viral and Protozoan Disease Diagnostic Facilities at Central Veterinary Diagnostic laboratory (CVDL), Tando Jam .
Hyderabad 30.06.2014 205.163 90.058
8 51 Strengthening of Sindh Poultry Vaccine Centre Korangi, Karachi
Karachi 30.06.2013 202.523 146.688
9 53 Establishment of Disease Control Zone of Livestock in Sindh
Sindh 30.06.2013 169.627 39.486
TOTAL 1236.211
20
Sr #
ADP #
Name of SchemeLocation of
scheme/ District
Target Date for
Completion
Estimated Cost
Estimated Exp Up to June 2012
Scope of Physical WorkPhysical
Achievements
1 2 3 4 6 7 8 9 10
9- AGRICULTURE DEPARTMENT
1 18 Strengthening of Agriculture Training Institute (ATI), Jacobabad
Jacobabad 30-06-2013 128.572 15.154
1. Academic Block
2. Former Training center and canteen
3. Type IInd Bungalow
4. type IIIrd Bungalow
5. Type VITh Qrts: 10 Nos
6. Boundry Wall:
7. Road Work
Tile Floor work and repair of roof in progress.Foundation work in progress
Flooring work in process
Flooring Work in process.
6 Nos Qtrs roof laid & 4 Nos Qtr up to roof levelEast West South site upto plinth beam levelEarth work completed.
2 20Repair of Directorate General, Agriculture Extension and Directorate Training Building Hyderabad.
Hyderabad 30-06-2013 46.3331.108
At Shahbaz BuildingConstnof Addl. BlockReno. Of existingExt. Devl.
At Doomre GhothReno. / Rehabilitation of Existing Agriculture Training Centre
Foundation in progress.
GF:Renovation completed
21
3 25
Construction of MirchMandi at Kunri (DistrictUmerkot) Umerkot 30-06-2013 195.878
50.000
Shops 84 NosRemaining scope
Mosque 1 No. / Marketing office 1 No.
Dispensary 1 No./Godowns (Small) 49 Nos
Godowns (Medium) 1 No./ Godowns (large)1 No.
Parking 1 No./ Hotel 3 NosRestourant 1 No./Police post 2
Nos.G.Lav.2 Nos./Chowkidar Room 2
NosAction space / Lawn / Verandah
Shops (Small)50 Nos Shops (Small)5 Nos II type
U.G.Tank / C.Wall i/c gates 3 Nos.
Super Structure in progress.
RCC pillar work in progress.
4 26Modernization of Training & Research Facilities in Agriculture Engineering Workshop, Nareja.
Hyderabad 30-06-2013 383.885 231.059
Office Block (GF)Office Block (FF)Hostel Block(GF)Hostel Block(FF)P.Form.Main Building.Generator roomGuard RoomCar porchMosque / Machinery HallC/Wall I/c Steel Gate.Ext: Dev:
Finishing in progress.Finishing in progressFinishing in progressFinishing in progress
Upto Roof level / Upto plinth level
Work in progressInternal road completed.
5 19
Dissemination of Agricultural Information among Farming Community through Electronic & Print Media
Hyderabad 30.06.2013 59.995 29.899
22
6 27
Up Gradation of Agriculture Engineering Workshop and Establishment of Fleet Management System for Agriculture Machinery
Sindh 30.06.2013 400.00 145.403
TOTAL 1214.66
23
Sr #ADP
#Name of Scheme
Location of scheme/ District
Target Date for
Completion
Estimated Cost
Estimated Exp Up to June 2012
Scope of Physical WorkPhysical
Achievements
1 2 3 4 6 7 8 9 10
10- WILDLIFE & FORESTRYCOASTAL DEVELOPMENT AUTHORITY (CDA)
1 71Oil Palm Plantation on 500 Acres in Coastal Zone of Thatta District
Thatta30-06-2013 48.610 34.250
272 Sindh Coastal Community
Development Project (SCCDP)Thatta &
Badin30-06-2013 266.883 156.883
FORESTRY
3 76
Canal Side Plantation Over K.B. Feeder, Phuleli and Pinyari canals of Kotri barage irrigation System
Thatta, Hyderabad, TM Khan &
Badin
30-06-2013 111.850 99.250
4 77Plantation on Vacated Enchroached Forrest Lands in Sindh
Sindh 30-06-2013 218.000 135.300
5 78 Afforestation of Gorakh Hill Dadu 30-06-2013 101.414 65.872
6 81Tree Plantation in Badin District (under revision)
Badin 6/30/2013 55.520 55.325
7 84
Habitat Restoration and Promotion of Eco-Tourism through Development of Wildlife Safari in Booharki Forest.
Badin 30-06-2013 255.000 124.755
WILDLIFE
8 92Development of Khirthar Protected Area Complex (KPAC)
Karachi & Jamshoro
6/30/2013 299.290 267.520
Total 1356.277
24
Sr #ADP
#Name of Scheme
Location of scheme/ District
Target Date for
Completion
Estimated Cost
Estimated Exp Up to June 2012
Scope of Physical WorkPhysical
Achievements
1 2 3 4 6 7 8 9 10
11- OTHER DEPARTMENTSWOMEN DEVELOPMENT DEPARTMENT
1 2255Establishment of Sales & Display Resource Centre at Karachi.
Karachi 2014 35.541 17.826
2 2256Establishment of Day Care Centre at Karachi.
Karachi 2012-13 37.754 24.989
3 2257Establishment of Women Complaint Cells in Sindh for Aid to Women in Distress.
KarachiHyd, Sukkur
LarkanaBenazirabad
2012-13 69.529 27.257
4 2258Establishment of Media Cell in the Directorate of Women Development, Karachi.
Karachi 2014 59.302 34.921
ENVIROMENT
5 2275Establishment of Environment Management unit (EMU) in SIDA
Sindh 30.06.2012 94 11.031
AUQAF
6 2175
Re-Development of Dhamal Court at Dargah Lal Shahbaz Qalandar Jamshoro Phase II (Under Revision) District Jamshoro
Jamshoro 30-06-12 72.519 66.917
7 2171
Renconstruction, Construction General Repairs & Additions Structure at Dargah Shah Abdul Latif Bhitai at Bhitshah District Matiari ( Re-Revised)
Matiari 30-06-2013 51.628 45.939
SCIENCE & TECHNOLOGY
25
8 2248
Preservation of Record in the Directorate of Settlement, Survey and Land Record by Scanning, Filming, Cataloging and Digitalization of Maps (R&S) System
Hyderabad 30-06-2013 363.709 57.487
EXCISE & TAXATION DEPARTMENT
9 2243Strengthening of Excise & Taxation Department
Karachi 30-06-2013 338.000 39.838
BOARD OF REVENUE
10 2247
Computerization and Establishment of Land Administration and Revenue Management Information System (LARMIS)
Sindh (23 districts)
30-06-13 4305.76 1081.703
INVESTMENT DEVELOPMENT
11 127 Marble City (Revised) Sindh 30-06-2013 200.00 50.00
MINES & MINERALS
12 137Establishment of Rescue Station & Occupational Disease & Detection Centre at Lakhra/Jamshoro
Jamshoro 2012 207.932 144.637
TOURISM
13 2135Establishment of Motel at Nagarparkar District Tharparkar (Revised)
Tharparkar 2014 57.03 41.032
ANTIQUITIES
14 2358Conservation & Rehabilitation of Shahjhan Mosque Thatta
Thatta June 12 67.704 21.163
POPLUATION WELFARE
15 2387Establishment of Safe Mother Homes (SMH) at Larkana
Larkana June 13 34.604 22.382
Total 5995.012