Proposed 2016-2017 Conservation Compliance Target and 10 ... · • 2016-2017 potential is 1.66 aMW...
Transcript of Proposed 2016-2017 Conservation Compliance Target and 10 ... · • 2016-2017 potential is 1.66 aMW...
![Page 1: Proposed 2016-2017 Conservation Compliance Target and 10 ... · • 2016-2017 potential is 1.66 aMW • 20% reduction from 2014-2015 (2.08 aMW) • Key drivers – Lower avoided costs](https://reader036.fdocuments.net/reader036/viewer/2022071010/5fc7f843f3886b67ad641f1e/html5/thumbnails/1.jpg)
Proposed 2016-2017 Conservation Compliance Target and
10-Year Compliance Plan
Presentation to Chelan PUD Board of Commissioners November 16, 2015
![Page 2: Proposed 2016-2017 Conservation Compliance Target and 10 ... · • 2016-2017 potential is 1.66 aMW • 20% reduction from 2014-2015 (2.08 aMW) • Key drivers – Lower avoided costs](https://reader036.fdocuments.net/reader036/viewer/2022071010/5fc7f843f3886b67ad641f1e/html5/thumbnails/2.jpg)
Overview
• No action requested • Purpose of the Conservation Potential
Assessment (CPA) • Review results of the 2016-2017 CPA • Review proposed 2016-2017 target
and 10-year plan • Review proposed programs for 2016
and associated budget
![Page 3: Proposed 2016-2017 Conservation Compliance Target and 10 ... · • 2016-2017 potential is 1.66 aMW • 20% reduction from 2014-2015 (2.08 aMW) • Key drivers – Lower avoided costs](https://reader036.fdocuments.net/reader036/viewer/2022071010/5fc7f843f3886b67ad641f1e/html5/thumbnails/3.jpg)
Conservation Potential Assessment • To identify achievable cost-effective conservation potential
• RCW19.285.040 (1)(a) “…using methodologies consistent with the
Pacific Northwest electric power and conservation planning council in its most recently published power plan, each qualifying utility shall identify its achievable cost-effective conservation potential…”
• RCW19.285.040 (1)(b) “…each qualifying utility shall establish and
make publicly available a biennial acquisition target for cost-effective conservation consistent with its identification of achievable opportunities in (a) of this subsection, and meet that target in the subsequent two-year period….”
![Page 4: Proposed 2016-2017 Conservation Compliance Target and 10 ... · • 2016-2017 potential is 1.66 aMW • 20% reduction from 2014-2015 (2.08 aMW) • Key drivers – Lower avoided costs](https://reader036.fdocuments.net/reader036/viewer/2022071010/5fc7f843f3886b67ad641f1e/html5/thumbnails/4.jpg)
Chelan PUD’s CPA Meets the Standard
• WAC 194-37-070 (6)(a) Utility Specific Analysis/Conservation Potential Assessment: “The NWPCC's analytical methodology for establishing the conservation resource potential and conservation targets for the Northwest power system is outlined in procedures (a)(i) through (xv) of this subsection. A utility that chooses this option will document that it established a ten-year potential using an analytical methodology consistent with these NWPCC procedures (a)(i) through (xv) of this subsection:”
• The 2016-2017 CPA documents how these criteria are met.
![Page 5: Proposed 2016-2017 Conservation Compliance Target and 10 ... · • 2016-2017 potential is 1.66 aMW • 20% reduction from 2014-2015 (2.08 aMW) • Key drivers – Lower avoided costs](https://reader036.fdocuments.net/reader036/viewer/2022071010/5fc7f843f3886b67ad641f1e/html5/thumbnails/5.jpg)
CPA Results
• 2016-2017 potential is 1.66 aMW • 20% reduction from 2014-2015 (2.08 aMW) • Key drivers
– Lower avoided costs (energy market) – Code changes (e.g. no more incandescent bulbs) – Recent achievements – Deemed measure savings from the Regional
Technical Forum were revised – Updated customer characteristics data
![Page 6: Proposed 2016-2017 Conservation Compliance Target and 10 ... · • 2016-2017 potential is 1.66 aMW • 20% reduction from 2014-2015 (2.08 aMW) • Key drivers – Lower avoided costs](https://reader036.fdocuments.net/reader036/viewer/2022071010/5fc7f843f3886b67ad641f1e/html5/thumbnails/6.jpg)
Achievable 10-Year Savings Plan
0
0.2
0.4
0.6
0.8
1
1.2
2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
1.66 aMW
aMW
![Page 7: Proposed 2016-2017 Conservation Compliance Target and 10 ... · • 2016-2017 potential is 1.66 aMW • 20% reduction from 2014-2015 (2.08 aMW) • Key drivers – Lower avoided costs](https://reader036.fdocuments.net/reader036/viewer/2022071010/5fc7f843f3886b67ad641f1e/html5/thumbnails/7.jpg)
Comparison of I-937 Compliance Targets by Biennium
0
0.5
1
1.5
2
2.5
3
3.5
4
2010-11 2012-13 2014-15 2016-17
Compliance Target (aMW)
aMW
![Page 8: Proposed 2016-2017 Conservation Compliance Target and 10 ... · • 2016-2017 potential is 1.66 aMW • 20% reduction from 2014-2015 (2.08 aMW) • Key drivers – Lower avoided costs](https://reader036.fdocuments.net/reader036/viewer/2022071010/5fc7f843f3886b67ad641f1e/html5/thumbnails/8.jpg)
2016 Residential Programs Existing • Weatherization • Low-income weatherization • Appliances • Refrigerator/freezer recycling • Manufactured home duct sealing • Simple Steps/Smart Savings • Ductless heat pumps • Heat pump water heaters • Air Source HP conversion • NEEM manufactured homes Proposed • NW Energy Star new construction • Residential direct installations • Mail-in by-request showerheads, LED lamps • Smart powerstrips
![Page 9: Proposed 2016-2017 Conservation Compliance Target and 10 ... · • 2016-2017 potential is 1.66 aMW • 20% reduction from 2014-2015 (2.08 aMW) • Key drivers – Lower avoided costs](https://reader036.fdocuments.net/reader036/viewer/2022071010/5fc7f843f3886b67ad641f1e/html5/thumbnails/9.jpg)
2016 Commercial Programs
General • Lighting • Energy Smart Grocer • Energy Smart Business • Strategic Energy
Management • Custom measures/HVAC
Local Govt. Initiatives • Chelan County Justice Ctr • Town Toyota Center LEDs • City of Cashmere Offices • Wenatchee School
District • Cascade School District • City of Wenatchee • City of Entiat
![Page 10: Proposed 2016-2017 Conservation Compliance Target and 10 ... · • 2016-2017 potential is 1.66 aMW • 20% reduction from 2014-2015 (2.08 aMW) • Key drivers – Lower avoided costs](https://reader036.fdocuments.net/reader036/viewer/2022071010/5fc7f843f3886b67ad641f1e/html5/thumbnails/10.jpg)
2016 Industrial Programs
• Lighting • Custom measures
![Page 11: Proposed 2016-2017 Conservation Compliance Target and 10 ... · • 2016-2017 potential is 1.66 aMW • 20% reduction from 2014-2015 (2.08 aMW) • Key drivers – Lower avoided costs](https://reader036.fdocuments.net/reader036/viewer/2022071010/5fc7f843f3886b67ad641f1e/html5/thumbnails/11.jpg)
2016 Regional Program
Northwest Energy Efficiency Alliance
![Page 12: Proposed 2016-2017 Conservation Compliance Target and 10 ... · • 2016-2017 potential is 1.66 aMW • 20% reduction from 2014-2015 (2.08 aMW) • Key drivers – Lower avoided costs](https://reader036.fdocuments.net/reader036/viewer/2022071010/5fc7f843f3886b67ad641f1e/html5/thumbnails/12.jpg)
Schedule • Nov. 16 (today) – Commission study session to
review CPA, proposed 2-year target and 10-year plan
• Dec. 7 – Publicly advertised Commission business
session to request approval of proposed 2-year target and 10-year plan
• By Dec. 31 - Submit target and plan to Commerce
per WAC 194-37-070(1) and (2)
![Page 13: Proposed 2016-2017 Conservation Compliance Target and 10 ... · • 2016-2017 potential is 1.66 aMW • 20% reduction from 2014-2015 (2.08 aMW) • Key drivers – Lower avoided costs](https://reader036.fdocuments.net/reader036/viewer/2022071010/5fc7f843f3886b67ad641f1e/html5/thumbnails/13.jpg)
Questions?