Proposal for the Barrel Alignment Upgrade
description
Transcript of Proposal for the Barrel Alignment Upgrade
![Page 1: Proposal for the Barrel Alignment Upgrade](https://reader034.fdocuments.net/reader034/viewer/2022051517/56814be4550346895db8be06/html5/thumbnails/1.jpg)
Proposal for the Barrel Alignment Upgrade
Bencze György, Béni Noémi, Szillási Zoltán, Ujvári Balázs
(ATOMKI, RMKI )
This project is supported by Hungarian Research Fund (OTKA) NK 81447 .
the Hardware Barrel Alignment Group
![Page 2: Proposal for the Barrel Alignment Upgrade](https://reader034.fdocuments.net/reader034/viewer/2022051517/56814be4550346895db8be06/html5/thumbnails/2.jpg)
Outline
Two bigger topics:
• Reinforcement of measurements in Sector 13 & 14
• Measurement of inter-wheel distances within Barrel
Two minor items:
• Additional PG targets/redesign PG targets on MABs
• Programming extension to BoardPCs
Barrel Alignment – Upgrade proposal 22011. 03. 29.
And a wish…
• Incorporate DT temperatures into the Ali reco
![Page 3: Proposal for the Barrel Alignment Upgrade](https://reader034.fdocuments.net/reader034/viewer/2022051517/56814be4550346895db8be06/html5/thumbnails/3.jpg)
Reinforcement of alignment measurements in Sector 13 &
14
Barrel Alignment – Upgrade proposal 32011. 03. 29.
![Page 4: Proposal for the Barrel Alignment Upgrade](https://reader034.fdocuments.net/reader034/viewer/2022051517/56814be4550346895db8be06/html5/thumbnails/4.jpg)
Schematic view of the Barrel Alignment
- Rigid structures (MABs, z-bars)- Video-camera boxes (on the MABs)- LED holders (called forks, on the chambers)- Diagonal and Z-LED holders
(on the MABs and Z-bars)- Board computers (one for each MAB)
muon chambers
light sources (LED)
CCD’s
MABPassive plane (6)
Active plane (6)
Muon chamberoptical line(8 lines)
Link line
MAB (36 pieces)
Z bar
Diagonal connection
Barrel Alignment – Upgrade proposal 42011. 03. 29.
![Page 5: Proposal for the Barrel Alignment Upgrade](https://reader034.fdocuments.net/reader034/viewer/2022051517/56814be4550346895db8be06/html5/thumbnails/5.jpg)
Sectors 13-14 for MB4 chambers
Sector 13
Sector 14
Sector 4
Sector 10
Sectors 4 and 10 are measured at the –phi side only (by 4 MABs)
Chambers in sectors 13 and 14 are measured at the +phi side only (by 2 MABs)
X
Barrel Alignment – Upgrade proposal 52011. 03. 29.
![Page 6: Proposal for the Barrel Alignment Upgrade](https://reader034.fdocuments.net/reader034/viewer/2022051517/56814be4550346895db8be06/html5/thumbnails/6.jpg)
Results – what is expected
What is measured (sect 13,14):
MAB
DT
Transversal view Longitudinal view
Measurement point
MAB
x
y
zYB+2 YB-2
Fair results in X and Z at MB+/-1,2, weak in rot_Z, therefore also in Y (depending on the chamber orientation), very weak in general for YB0.
What is expected:
MAB
Barrel Alignment – Upgrade proposal 62011. 03. 29.
![Page 7: Proposal for the Barrel Alignment Upgrade](https://reader034.fdocuments.net/reader034/viewer/2022051517/56814be4550346895db8be06/html5/thumbnails/7.jpg)
Results – COCOA-error study
Mean and Max errors (COCOA-errors only but real measurement data):
Mean Max
In X (all chambers, micrometer) 26 61
In Z (YB0 excluded, micrometer) 23 34
In rot_Z (YB0 excluded, mrad) 1.9 2.0
Other rotations (all chambers): <0.3 mrad
For YB0:
In X: 61 micrometer; In Z: 2770 micrometer(!) In rot_Z: 13 mrad (!)
As expected but here we have the numbers
Barrel Alignment – Upgrade proposal 72011. 03. 29.
![Page 8: Proposal for the Barrel Alignment Upgrade](https://reader034.fdocuments.net/reader034/viewer/2022051517/56814be4550346895db8be06/html5/thumbnails/8.jpg)
The proposal
Put a MiniMAB with 2 cameras at the joint region looking inside the wheel.The cameras can observe the LEDs (already installed but not used so far).The MiniMABs can fix the DTs wrt. each other.
YB+2 YB+1 YB0 YB-1 YB-2
Sector 4Proposed MiniMABarrangement:
MAB
MiniMAB
Sector 13
Sector 10
Sector 14
Barrel Alignment – Upgrade proposal 82011. 03. 29.
![Page 9: Proposal for the Barrel Alignment Upgrade](https://reader034.fdocuments.net/reader034/viewer/2022051517/56814be4550346895db8be06/html5/thumbnails/9.jpg)
MiniMABs
Cameras identical to those used for chimney-chamber regions
d
Camera distance „d”:Sector 13 Sector 14 (top) (bottom)
368 mm 457.4 mm
Two types:
top and bottom
Carbon-fiber plate (5mm thickness)
Barrel Alignment – Upgrade proposal 92011. 03. 29.
![Page 10: Proposal for the Barrel Alignment Upgrade](https://reader034.fdocuments.net/reader034/viewer/2022051517/56814be4550346895db8be06/html5/thumbnails/10.jpg)
Results of simulations, sectors 4 and 13
Position error for YB0_sect13:
w/out MM with MMsmicrometer micrometer
phi 27.4 20.4R 1423.8 166.2Z 1511.2 90.1
rot_Z error:
Sect 13 Sect 13 Sect 4 Sect 4Wheel w/out MM with MMs w/out MM with MMs
mrad mrad mrad mrad2 0.13 0.046 0.11 0.0461 0.11 0.058 0.14 0.0580 0.48 0.056 0.48 0.055-1 0.11 0.046 0.14 0.046-2 0.13 0.046 0.11 0.046
Worstcase
Barrel Alignment – Upgrade proposal 102011. 03. 29.
![Page 11: Proposal for the Barrel Alignment Upgrade](https://reader034.fdocuments.net/reader034/viewer/2022051517/56814be4550346895db8be06/html5/thumbnails/11.jpg)
Results of simulations, sectors 10 and 14
Position error for YB0_sect14:
w/out MM with MMsmicrometer micrometer
phi 27.4 7.5R 1423.8 135.2Z 1511.2 70.1
rot_Z error:
Sect 14 Sect 14 Sect 10 Sect 10Wheel w/out MM with MMs w/out MM with MMs
mrad mrad mrad mrad2 0.13 0.046 0.11 0.0461 0.11 0.046 0.14 0.0460 0.48 0.045 0.48 0.045-1 0.11 0.046 0.14 0.046-2 0.13 0.046 0.11 0.046
Worstcase
Barrel Alignment – Upgrade proposal 112011. 03. 29.
![Page 12: Proposal for the Barrel Alignment Upgrade](https://reader034.fdocuments.net/reader034/viewer/2022051517/56814be4550346895db8be06/html5/thumbnails/12.jpg)
What is needed18 carbon-fiber plates to be bought (cheap)36 video-sensors available from spares36 lenses from spares (f=20mm)36 camera-houses to be fabricated 4 board-PCs from spares* 2 CAEN A3006 LV modules to be bought (~12kCHF) 2 power distrib.+eth.switch parts (switch, connectors, box) to be bought, assembly needed
In addition:Camera-box assembly, calibrationMiniMAB calibrationCabling, installation
Installation is possible during the next long shut-down when the barrel is opened.Free spaces for LV modules and 1U distrib. modules are OK
Barrel Alignment – Upgrade proposal 122011. 03. 29.
* New BPC are to be installed only on YB±1. Otherwise use free ports of existing ones.
![Page 13: Proposal for the Barrel Alignment Upgrade](https://reader034.fdocuments.net/reader034/viewer/2022051517/56814be4550346895db8be06/html5/thumbnails/13.jpg)
Measurement of inter-wheel distances within Barrel
Barrel Alignment – Upgrade proposal 132011. 03. 29.
![Page 14: Proposal for the Barrel Alignment Upgrade](https://reader034.fdocuments.net/reader034/viewer/2022051517/56814be4550346895db8be06/html5/thumbnails/14.jpg)
Motivation
• measurement of the distance between the barrel wheels is desireable during closure and magnet ramp
• more sensor could also show wheel deformation (some hints from Barel Ali)
Easiest solution is to put distance meters on the wheels and read them out through the BoardPC. (since it would require the least cabling work)
Barrel Alignment – Upgrade proposal 142011. 03. 29.
![Page 15: Proposal for the Barrel Alignment Upgrade](https://reader034.fdocuments.net/reader034/viewer/2022051517/56814be4550346895db8be06/html5/thumbnails/15.jpg)
Possible solutions
Potentiometer:
Sticks out -- vulnerable
Laser displacement sensor:
• quite expensive
• needs digital
• Voltage should be compatible with MAB, BPC
Barrel Alignment – Upgrade proposal 152011. 03. 29.
![Page 16: Proposal for the Barrel Alignment Upgrade](https://reader034.fdocuments.net/reader034/viewer/2022051517/56814be4550346895db8be06/html5/thumbnails/16.jpg)
Possible solutions
• device used by EndCap Ali is an analog one (and no more produced)
• digital one needed (from different firm)(possible some serial comm, since PBC still has one free RS232 port)
• candidate: Micro Epsilon (RS422)
• firm has been contacted for technical & pricing details --- had an on-site meeting
Barrel Alignment – Upgrade proposal 162011. 03. 29.
≥ 1300 CHF/pc !!!
![Page 17: Proposal for the Barrel Alignment Upgrade](https://reader034.fdocuments.net/reader034/viewer/2022051517/56814be4550346895db8be06/html5/thumbnails/17.jpg)
Where to install MAB volume (or close to it) is a good candidate
• only local cabling needed
• wheel ref holes are close and could be used
• Ref holes have very good surface and• used by Survey to define wheel possibility to follow wheel movements in survey approach
Barrel Alignment – Upgrade proposal 172011. 03. 29.
![Page 18: Proposal for the Barrel Alignment Upgrade](https://reader034.fdocuments.net/reader034/viewer/2022051517/56814be4550346895db8be06/html5/thumbnails/18.jpg)
Conclusion
Barrel Alignment – Upgrade proposal 182011. 03. 29.
• enormous number of devices would be needed for accurate wheel position/deformation measurements
Min 50kCHF (or rather above)
• since Ali doesn’t have wheels (DTs only), these measurements would not improve
• these devices are not good for closing either…
We propose to abandon this project
To tell the truth, we plan to be involved in a similar closing sensor, but:
• less precise (~1-2 mm)• much less number• not radhard, not B tolerant• cheaper (HOPE!!!)
![Page 19: Proposal for the Barrel Alignment Upgrade](https://reader034.fdocuments.net/reader034/viewer/2022051517/56814be4550346895db8be06/html5/thumbnails/19.jpg)
Additional PG targets/redesign PG targets on MABs
Barrel Alignment – Upgrade proposal 192011. 03. 29.
![Page 20: Proposal for the Barrel Alignment Upgrade](https://reader034.fdocuments.net/reader034/viewer/2022051517/56814be4550346895db8be06/html5/thumbnails/20.jpg)
Motivation
• there is a discrepancy between the track and the hw alignments both in Z (2mm, scaling?) and phi-like torsion (3mm)
• so far we have only indirect ways to test where it comes from
• previous item wouldn’t solve this enigma, since Barrel Ali doesn’t have wheels.
• torsion has gone, but was not solved by us! We need a direct external measurement possibility.
This is a minor item, but having large impact…
Barrel Alignment – Upgrade proposal 202011. 03. 29.
![Page 21: Proposal for the Barrel Alignment Upgrade](https://reader034.fdocuments.net/reader034/viewer/2022051517/56814be4550346895db8be06/html5/thumbnails/21.jpg)
What to do?It would be nice to measure all 6 dof of a MAB, but it is impossible measure at least one point of it:
These points are surely seen from outside
?
Barrel Alignment – Upgrade proposal 212011. 03. 29.
![Page 22: Proposal for the Barrel Alignment Upgrade](https://reader034.fdocuments.net/reader034/viewer/2022051517/56814be4550346895db8be06/html5/thumbnails/22.jpg)
What to do with them? How?
• Survey group could measure Z coordinates of them (or at least Z distance)
• Antje says precision is around 70 microns (discrepancy, we have ~ 2mm!)
• Maybe they can measure phi position as well answer for torsion…
• If Z scaling found, its value can be used as a correction later.
• Solution is cheap
• Mimmo can design (probably the worn MAB definition targets are also to be changed at the same time)
• New targets are needed to be located inside the MABs frame needs access to them and probably to be done in ISR.
Barrel Alignment – Upgrade proposal 222011. 03. 29.
![Page 23: Proposal for the Barrel Alignment Upgrade](https://reader034.fdocuments.net/reader034/viewer/2022051517/56814be4550346895db8be06/html5/thumbnails/23.jpg)
Programming extension to BoardPCs
Barrel Alignment – Upgrade proposal 232011. 03. 29.
![Page 24: Proposal for the Barrel Alignment Upgrade](https://reader034.fdocuments.net/reader034/viewer/2022051517/56814be4550346895db8be06/html5/thumbnails/24.jpg)
Motivation and the solution
• In last May we lost a Custom Board since its software got frozen• Problem is known, it is due to a bootloader that is designed to be able to upload new firmware if needed• Now, on 30 (out of 36) Custom Boards, bootloader is disabled (May problem happened on one of the remaining 6)• This prevents us from uploading new firmware…
We would like to design and install a small device on BPC to solve it
Solution:
This item is very small, but also requires access to MABs…
Barrel Alignment – Upgrade proposal 242011. 03. 29.
![Page 25: Proposal for the Barrel Alignment Upgrade](https://reader034.fdocuments.net/reader034/viewer/2022051517/56814be4550346895db8be06/html5/thumbnails/25.jpg)
And finally a wish…
Barrel Alignment – Upgrade proposal 252011. 03. 29.
![Page 26: Proposal for the Barrel Alignment Upgrade](https://reader034.fdocuments.net/reader034/viewer/2022051517/56814be4550346895db8be06/html5/thumbnails/26.jpg)
Use TDT in Ali reco
Barrel Alignment – Upgrade proposal 262011. 03. 29.
DT Calibration in ISR…
• DT temperature varied between 19 and 24 degC
• We have this data for all DTs
![Page 27: Proposal for the Barrel Alignment Upgrade](https://reader034.fdocuments.net/reader034/viewer/2022051517/56814be4550346895db8be06/html5/thumbnails/27.jpg)
Use TDT in Ali reco
Barrel Alignment – Upgrade proposal 272011. 03. 29.
Alignment measurements in UXC…
• Temperature on MABs varies between 19 and 26 degC
• This is the T of air and not DT
(αAl = 23.1 μm/K …might be 100 μm/K on MB4!!)
Tmeas ≠ Tcalib distance of alignment passages change APE gets worse
![Page 28: Proposal for the Barrel Alignment Upgrade](https://reader034.fdocuments.net/reader034/viewer/2022051517/56814be4550346895db8be06/html5/thumbnails/28.jpg)
Use TDT in Ali reco
Barrel Alignment – Upgrade proposal 282011. 03. 29.
Latest APE calculations σXlocal ~ 500μm (wrt. PG)
We belive that APE could be reduced if actual chamber temperature could be used.
• This would require to measure rather the real DT temperature than the air (MAB).
• Measure the gas temperature? At the manifold on the chamber exit?
• Aachen has a proposal for that.
(αAl = 23.1 μm/K …might be 100 μm/K on MB4)
![Page 29: Proposal for the Barrel Alignment Upgrade](https://reader034.fdocuments.net/reader034/viewer/2022051517/56814be4550346895db8be06/html5/thumbnails/29.jpg)
Summary
Barrel Alignment – Upgrade proposal 292011. 03. 29.
We have four items and would like to get the consent of the DT:
Institutes could be involved: • ATOMKI• Budapest• Univ of Debrecen• CERN ?• Torino (Mimmo)• Aachen (TDT)
Probably all of these modifications could be made in 2013.