Chiho Wang Duke University 1 TRT Barrel integration Status / Schedule Chiho Wang.
Barrel Support Structure and Barrel Integration Preparations
description
Transcript of Barrel Support Structure and Barrel Integration Preparations
Barrel Support Structure and Barrel Integration Preparations
Doug Benjamin
Duke University HEP
Barrel Support Structure (BSS) Fabricated in Russia Components – A side
and C side end Frames Inner cylinder Outer cylinder (in two
halves)
Duke’s Role in BSS assembly Integral part of small team
(6 people – Jack Fowler and DB) Jack Fowler – one of two
engineers DB – physicist responsible
Verify the BSS assembly Frame
Develop and verify BSS assembly JF designed inner cylinder
flange.
Duke’s Role in BSS assembly (Cont.) Measure individual
BSS components Analyze the
measurement results
Frame 1 "A Inside" Mounting Hole Deviation from Nominal
0
5
10
15
20
25
un
de
rflo
ws
0.0
2
0.0
4
0.0
6
0.0
8
0.1
0
0.1
2
0.1
4
0.1
6
0.1
8
0.2
0
0.2
2
0.2
4
0.2
6
0.2
8
0.3
0
0.3
2
0.3
4
0.3
6
0.3
8
0.4
0
Deviation from nominal in module mounting holes by type (in mm)
ho
les
pe
r 0
.10
mm
T1 inner T1 outer T2 inner T2 outer T3 inner T3 outer
Fail cut
Frame 1 "A Outside" Mounting Hole Deviation from Nominal
0
5
10
15
20
25
0.00
0.01
0.02
0.03
0.04
0.05
0.06
0.07
0.08
0.09
0.10
0.11
0.12
0.13
0.14
0.15
0.16
0.17
0.18
0.19
0.20
0.21
0.22
0.23
0.24
0.25
0.26
0.27
0.28
0.29
0.30
0.31
0.32
0.33
0.34
0.35
0.36
0.37
0.38
0.39
0.40
More
Devation from nominal in module mounting holes by type (in mm)
ho
les
per
0.1
0 m
m
T1 inner T1 outer T2 inner T2 outer T3 inner T3 outer
Duke’s Role in BSS assembly (Cont.) Shield the BSS
components Assemble the BSS Verify the BSS
alignment results
Preparations for integration DB was physicist
reponsible for integration Developed the procedures
to be used during integration
Verified the procedures DB and JF produced a
lengthy list of items to be finished before integration. This list was adopted by an
internal review committee on barrel integration readiness
Preparations for integration (cont.) Prepared the infrastructure
require for integration (scolding, gas lines, HV lines, HV software, module protection)
Prepared the modules for integration (Capacitor insertion)
First module permanently installed June 2004
DB passes responsibility for Barrel integration to Chiho Wang during June 2004DB could not travel as much (~
60% of time at CERN) for family reasons.
Conclusions Duke played a vital role in the BSS assembly Without efforts of JF and DB BSS assembly and
verification would have not happened in a timely manner.
DB and JF made crucial and significant contributions to preparations for the start of integration. This required that both spend large amounts of time at CERN for the past year (> 6 months each).
Excellent preparation for integration has meant that integration has gone smoothly (see Chiho’s talk).