Project Title : BATANGAS TO MANILA NATURAL GAS PIPELINE PROJECT (BATMAN1) Project Location : Batangas City, Batangas to Navotas City Nature of Project : Natural Gas Transmission and Distribution Pipeline Implementing Agency : PNOC Mother JV Partners and Percent Equity : Not applicable Project Description: The BATMAN 1 Project is among the government’s priority projects geared towards the development of the natural gas industry. The Department of Energy (DOE) will spearhead the project through its attached corporation, the PNOC. This project will involve the construction of about 121 kilometers of transmission and distribution pipeline facilities from Batangas to Navotas City to transport and supply natural gas to consumers, located in the high-growth areas of Batangas, Cavite, Laguna and the National Capital Region (NCR). The project is expected to bring substantial economic and environmental benefits to the country as it will provide access to natural gas. Considered to be a more cost-effective and more environment-friendly fuel than traditional liquid fossil fuels, the natural gas will supply the requirements of the power, industrial, commercial, transport and residential sectors. Project Status as of December 2016: The Project is awaiting NEDA approval. PNOC is currently undertaking activities in relation to the acquisition of right-of-way such as coordinating with the Toll Regulatory Board, as well as Toll Operators, securing as-built plans of all road networks that will be traversed by the planned route, and securing project endorsement from various LGUs that will be affected.

Transcript of Project Title : BATANGAS TO MANILA NATURAL GAS ... Updates.pdfProject Title : BATANGAS TO MANILA...

Page 1: Project Title : BATANGAS TO MANILA NATURAL GAS ... Updates.pdfProject Title : BATANGAS TO MANILA NATURAL GAS PIPELINE PROJECT (BATMAN1) Project Location : Batangas City, Batangas to

Project Title : BATANGAS TO MANILA NATURAL GAS PIPELINE PROJECT (BATMAN1) Project Location : Batangas City, Batangas to Navotas City Nature of Project : Natural Gas Transmission and Distribution Pipeline Implementing Agency : PNOC Mother JV Partners and Percent Equity : Not applicable

Project Description: The BATMAN 1 Project is among the government’s priority projects geared towards the development of the natural gas industry. The Department of Energy (DOE) will spearhead the project through its attached corporation, the PNOC. This project will involve the construction of about 121 kilometers of transmission and distribution pipeline facilities from Batangas to Navotas City to transport and supply natural gas to consumers, located in the high-growth areas of Batangas, Cavite, Laguna and the National Capital Region (NCR). The project is expected to bring substantial economic and environmental benefits to the country as it will provide access to natural gas. Considered to be a more cost-effective and more environment-friendly fuel than traditional liquid fossil fuels, the natural gas will supply the requirements of the power, industrial, commercial, transport and residential sectors. Project Status as of December 2016: The Project is awaiting NEDA approval. PNOC is currently undertaking activities in relation to the acquisition of right-of-way such as coordinating with the Toll Regulatory Board, as well as Toll Operators, securing as-built plans of all road networks that will be traversed by the planned route, and securing project endorsement from various LGUs that will be affected.

Page 2: Project Title : BATANGAS TO MANILA NATURAL GAS ... Updates.pdfProject Title : BATANGAS TO MANILA NATURAL GAS PIPELINE PROJECT (BATMAN1) Project Location : Batangas City, Batangas to

Project Title : SWEET SORGHUM FOR BIODIESEL PROJECT

Project Location : Batangas

Nature of Project : Biodiesel Project

Implementing Agency : PNOC Mother

JV Partners and Percent Equity : Not applicable

Project Description:

The General Appropriation Act (GAA) of 2014 or Republic Act (RA) 10633 provides Feasibility

Study (F/S) Fund to be administered by NEDA. The fund is intended to be used exclusively for the

conduct of F/S for non-Public Private Partnership (PPP) infrastructure projects.

Pursuant to this, the National Economic Development Authority (NEDA) sent a letter of invitation

to PNOC and its subsidiaries, to submit Feasibility Study proposals that require funding.

PAFC responded to the call and submitted a proposal to study the potential of extracting

bioethanol from Sweet Sorghum plant. Specifically, the study deals with the establishment of a

commercial sweet sorghum plantation and a sweet sorghum syrup processing plant in the

Philippines.

PAFC’s basis for such study was the Bio-fuels Act of 2006 (RA 9367) which created a market for

bio-ethanol because of the mandate for all oil companies to blend 5% bio-ethanol by volume in

2009, increasing to 10% in 2015 and 20% by 2030 on all gasoline fuel products distributed and

sold in the Philippines, based on the Philippine Energy Plan (PEP) for 2012-2030.

Likewise, under the DOE Department Circular 2011-12-0013 on the “Utilization of Locally

Produced Bio-ethanol in the Production of e-Gasoline Consistent with the Bio-fuels Act of 2006”

primarily mandates the purchase of locally produced ethanol before a company could import the

same.

In the bidding conducted by NEDA, the University of the Philippines at Los Baños Foundation, Inc.

(UPLBFI) won as the consultant to do the detailed feasibility study which was entitled “Feasibility

Study on the Establishment of a Commercial Sweet Sorghum Plantation and a Sweet Sorghum

Syrup Processing Plant in the Philippines.”

Page 3: Project Title : BATANGAS TO MANILA NATURAL GAS ... Updates.pdfProject Title : BATANGAS TO MANILA NATURAL GAS PIPELINE PROJECT (BATMAN1) Project Location : Batangas City, Batangas to

Although the F/S fund came from NEDA, the owner of the final output of the study (Feasibility

Study) will be the proponent or PAFC. Should the project proved to become feasible, PAFC is

designed to implement it.

In the last quarter of 2014, however, the Office of the President of the Philippines thru the

recommendation of Governance Commission for GOCCs (GCG) ordered the abolition of PAFC. In

view of this, a transition plan has been formulated for the eventual transfer of PAFC’s projects

and operations to PNOC and this includes the proposed Sweet Sorghum Project.

Project Status as of December 2016:

The PNOC Investment Appraisal Committee (IAC) TWG completed the evaluation of the proposed

Sweet Sorghum Project. Results of the evaluation has already been endorsed to the Senior

Management Committee (SEMCOM) requesting decision and guidance from PNOC Management

whether to pursue or not the project.

Page 4: Project Title : BATANGAS TO MANILA NATURAL GAS ... Updates.pdfProject Title : BATANGAS TO MANILA NATURAL GAS PIPELINE PROJECT (BATMAN1) Project Location : Batangas City, Batangas to

Project Title : Service Contract 37 - Cagayan Project Location : Cagayan Basin Nature of Project : Petroleum Exploration Implementing Subsidiary : PNOC Exploration Corporation (PNOC EC) JV Partners and Percent Equity : PNOC Exploration Corporation 100% Project Description: Service Contract 37 originally covers an area of 2,200 sq.km. in the onshore Cagayan Basin in the provinces of Isabela and Quirino and the City of Santiago. It was awarded by the Department of Energy on July 18, 1990. It entered the 25-year production period in July 1997 when the San Antonio gas field was declared commercial by the DOE. The 3MW San Antonio Gas Power Plant was in operation until 2008. At present, SC 37 covers only 360 sq. km. to include the production and retention areas.

Project Status as of December 2016: PNOC EC continued its monitoring of the pressure build-up of the Mangosteen-1 well and conducted sampling activities for gas and fluid. PNOC EC also submitted to the DOE the Mangosteen-1 Completion Report. Currently, PNOC EC is finalizing the basin analysis report before submission to the DOE.

Page 5: Project Title : BATANGAS TO MANILA NATURAL GAS ... Updates.pdfProject Title : BATANGAS TO MANILA NATURAL GAS PIPELINE PROJECT (BATMAN1) Project Location : Batangas City, Batangas to

Project Title : Service Contract 47 – Offshore Mindoro Project Location : Offshore Mindoro Nature of Project : Petroleum Exploration Implementing Subsidiary : PNOC Exploration Corporation (PNOC EC) JV Partners and Percent Equity : PNOC EC (Operator) 97% PetroEnergy Resource Corporation 2% Basic Energy Corporation 1% Project Description: SC 47 was awarded on January 10, 2005 by the Department of Energy (DOE) to PNOC EC and Petronas Carigali with the latter as operator. It originally covers an area of 14,667 sq. km. in Offshore Mindoro area but reduced to 10,480 sq.km. after satisfying the required relinquishment in 2009. The SC has a work commitment of four (4) exploration wells and minimum of 500 km 2D seismic data acquisition over three sub-phases for seven (7) years. On January 10, 2008, PNOC EC assumed operatorship of the block after Petronas relinquished its interest in the block due to unfavorable results of the Kamia 1 well drilled in 2007. PNOC EC now holds 97% interest, with partners Petro Energy Resources Corporation and Basic Energy Corporation holding 2% and 1% participating interests, respectively. Project Status as of December 2016: On March 10, 2016, the DOE approved the relinquishment of SC 47 with effective on

January 10, 2012.

Page 6: Project Title : BATANGAS TO MANILA NATURAL GAS ... Updates.pdfProject Title : BATANGAS TO MANILA NATURAL GAS PIPELINE PROJECT (BATMAN1) Project Location : Batangas City, Batangas to

Project Title : Service Contract 57- Calamian Project Location : Offshore Northwest Palawan Nature of Project : Petroleum Exploration Implementing Subsidiary : PNOC Exploration Corporation (PNOC EC) JV Partners and Percent Equity : China National Offshore Oil Company

International Limited (CNOOC) - Operator 51% PNOC EC 28% Mitra Energy Limited (MITRA) 21%

(pending approval of the transfer of participating Interests to CNOOC & Mitra Energy Limited) Project Description: SC 57 is located in offshore northwest Palawan, west of Calamian islands covering an area of 7,120 square kilometers in offshore northwest Palawan and is situated around 50 kms northwest from the north-westernmost tip of Busuanga Island. It was awarded on September 15, 2005 by the DOE to PNOC EC. It later farmed out portions of its interest to China National Offshore Oil Company (CNOOC) and Mitra Energy Limited (MEL). Currently, the company holds 28% interest with CNOOC and MEL holding 51% and 21%, respectively. The SC has a work commitment of three (3) exploration wells, 1,000 line km 2D data, reprocessing of 1,000 km vintage 2D data, and an option to either acquire seismic or drill one (1) well over seven (7) sub-phases in seven (7) years. Project Status as of December 2016: PNOC EC continues discussions with the DOE and Office of the President (OP) to resolve issues on PNOC EC’s request for the approval of the transfer of its participating interests to CNOOC and Mitra Energy.

Page 7: Project Title : BATANGAS TO MANILA NATURAL GAS ... Updates.pdfProject Title : BATANGAS TO MANILA NATURAL GAS PIPELINE PROJECT (BATMAN1) Project Location : Batangas City, Batangas to

Project Title : Service Contract 59 – West Balabac Project Location : Offshore SW Palawan Nature of Project : Petroleum Exploration Implementing Subsidiary : PNOC Exploration Corporation (PNOC EC) JV Partners and Percent Equity : PNOC Exploration Corporation 100% Project Description: Service Contract 59 covers 14,760 sq. km. in offshore Southwest Palawan. It was awarded to PNOC EC by the Department of Energy (DOE) on January 13, 2006. SC-59 is located north of recent deep-water petroleum discoveries in offshore Malaysia and may share a common petroleum system with them.

PNOC EC acquired 2,056.475 km new 2D seismic data in November 2006 using CGG Veritas’ M/V Veritas Voyager and has satisfied its obligations with the DOE for the first two sub-phases of the SC-59 work program. Follow-up seismic program involving 363.40 km of 2D data has been completed by PGS’ M/V Orient Explorer from November 29, 2009 to December 04, 2009. A large 3D seismic survey has recently been completed with a total coverage of 3,075.85 sq km.

In 2013, BHP Billiton Petroleum Philippines withdrew its participation in SC 59. Project Status as of December 2016 PNOC EC continues the interpretation of the SC 59 multi-client brute stack seismic data

and awaits DOE’s approval on the request for amendment of Sub-Phase 3 and Sub-

Phase 4.

Page 8: Project Title : BATANGAS TO MANILA NATURAL GAS ... Updates.pdfProject Title : BATANGAS TO MANILA NATURAL GAS PIPELINE PROJECT (BATMAN1) Project Location : Batangas City, Batangas to

Project Title : Service Contract 63 – East Sabina Project Location : Offshore Southwest Palawan Nature of Project : Petroleum Exploration Implementing Subsidiary : PNOC Exploration Corporation (PNOC EC) JV Partners and Percent Equity : PNOC EC (Operator) 40%

Dragon Oil 40% Nido Petroleum 20%

Project Description: The SC 63 East Sabina was awarded on November 24, 2006. It has an area of around 10,560 sq.km. located offshore southwest of Palawan. It was formerly the Area-1, one of the four blocks offered by the DOE under the Philippine Energy Contracting Round (PECR) in 2005 which was jointly applied for by the PNOC EC and Nido Petroleum. The Service Contract is under a 7-year work program divided into 5 sub-phases. It is now on its 2nd sub-phase which is an integration of the original sub-phase 2 and sub-phase 3. Project Status as of December 2016: On Mach 10, 2016, the DOE granted a 3-three technical moratorium from November 2015 to November 2018 to allow the partners to farm-out the block. On July 15, 2016, PNOC EC submitted to the DOE the petrophysical study report of Baragatan-1A well which was validated on July 21, 2016. On November 4, 2016, PNOC EC received the signed copy of the Deed of Assignment on the redistribution of the participating interest in SC 63 from Dragon Oil (Philippines) Limited. Currently, PNOC EC is awaiting the approval by the DOE of both the Deed of Assignment and the request to transfer SC 63 operatorship from PNOC EC to Nido Petroleum.

Page 9: Project Title : BATANGAS TO MANILA NATURAL GAS ... Updates.pdfProject Title : BATANGAS TO MANILA NATURAL GAS PIPELINE PROJECT (BATMAN1) Project Location : Batangas City, Batangas to

Project Title: SC 74 – Linapacan Project Location: Northwest Palawan Basin Nature of Project: Petroleum Exploration Implementing Subsidiary: PNOC Exploration Corporation (PNOC EC) JV Partners and Percent Equity: PXP Energy Corporation (Operator) – 70% (formerly Philex Petroleum) Philodrill Corporation – 25% PNOC EC – 5% Project Description: SC 74 was awarded by the DOE to joint bidders Pitkin Petroleum Limited (Pitkin) and Philodrill Corporation on 13 August 2013 during the PECR 4. The Service Contract covers an area of 429,184 hectares in the offshore Northwest Palawan Basin with water depths ranging from less than 10 meters to about 200 meters and about 278 kilometers southwest of Manila and approximately 150 km. northwest of Puerto Princesa, Palawan. Project Status as of December 2016: On April 25, 2016, the DOE approved Pitkin Petroleum’s transfer of its 70% interest and operatorship to PXP Energy Corporation (formerly Philex Petroleum). The processing of the 1,718 km. gravity and 1,624 km. magnetic data was completed in September 2016, while the processing of the recently acquired 2D seismic data was completed in December 2016.

Page 10: Project Title : BATANGAS TO MANILA NATURAL GAS ... Updates.pdfProject Title : BATANGAS TO MANILA NATURAL GAS PIPELINE PROJECT (BATMAN1) Project Location : Batangas City, Batangas to

Project Title : Service Contract 75 – Northwest Palawan Project Location : Offshore NW Palawan Nature of Project : Petroleum Exploration Implementing Subsidiary : PNOC Exploration Corporation (PNOC EC) JV Partners and Percent Equity : Philex Petroleum Corporation 50%

PNOC Exploration Corporation 35% PetroEnergy Resources Corporation 15%

Project Description: SC 75 was awarded by the DOE to PNOC EC on 27 December 2013. It covers an area of 6,160 sq km (616,000 hectares) in the offshore Northwest Palawan Basin with water depths at 1,000 to 2,600 m. It is located west of SC 58 and north of SC 63. The exploration period in SC 75 is for seven years divided into five sub-phases. The work program for the Sub-phase 1 (SP1) includes the acquisition of a 2,237 line-km 2D seismic data within the first half of 2014. Processing and interpretation of the acquired data will follow until the end of SP1 on December 27, 2015. Project Status as of December 2016:

On September 9, 2015, the DOE granted PXP Energy Corporation its request for Force Majeure to SC 75 work Commitments for Sub-Phase 2 effective upon the end of Sub-Phase 1 on December 27, 2015 due to the current situation between China and the Philippines in the West Philippine Sea.

Page 11: Project Title : BATANGAS TO MANILA NATURAL GAS ... Updates.pdfProject Title : BATANGAS TO MANILA NATURAL GAS PIPELINE PROJECT (BATMAN1) Project Location : Batangas City, Batangas to

Project Title : COC 41 - ZAMBOANGA SIBUGAY Project Location : COC 41, ZamboangaSibugay

(Barangay Little Baguio, Municipality of Imelda and Barangay Poblacion, Municipality of Diplahan, Province of Zamboanga del Sur)

Nature of Project : Coal Mining (Development and Production) Implementing Subsidiary : PNOC Exploration Corporation (PNOC EC) Project Description: PNOC EC took over the operations of the Integrated Little Baguio (ILB) Coal Mine from its then Joint Venture partner, the Taiwan Overseas Mining Co. (Phils) Inc. (TOMC) starting March 2009. The coal mine is located at Brgy Little Baguio, Municipality of Imelda and Brgy. Poblacion, Municipality of Diplahan. However, due to unfavorable coal prices, all development and production activities were suspended. PNOC EC is also supervising small-scale coal mining operations within COC 41. Further, PNOC EC is also exploring areas in Sta. Barbara, Malongon, Lower Butong, and Gotas North Limb which are also part of the COC 41. Project Status as of December 2016 PNOC EC continues exploration activities in areas such as Malongon/Sta. Barbara/ Gotas North Limb, Lumbog, and Lower Botong which are also part of the COC. As of end December 2016, eight (8) drill holes have been spudded and two (2) drill holes were competed, with total drilling meterage of 2,021 meters.

Page 12: Project Title : BATANGAS TO MANILA NATURAL GAS ... Updates.pdfProject Title : BATANGAS TO MANILA NATURAL GAS PIPELINE PROJECT (BATMAN1) Project Location : Batangas City, Batangas to

Project Title : Isabela Coal Mine Development Project Coal Operating Contract (COC) No. 122 Project Location : City of Cauayan and Municipalities of Benito Soliven

and Naguillan, Province of Isabela Nature of Project : Coal Mine Development Implementing Subsidiary : PNOC Exploration Corporation (PNOC EC) 100% Project Description: COC 122 is located some 300 kilometers north of Manila and includes portions of the City of Cauayan and the municipalities of Naguilian and Benito Soliven, all within the province of Isabela, in the Cagayan Valley region. The Isabela province is located at the northeastern part of Luzon Island. The project is a pioneering undertaking being developed by PNOC EC. It seeks to utilize low rank indigenous coal to fuel an electric power plant employing “progressive mining and rehabilitation method” and “clean coal” technology for the mine and power plant, respectively. It aims to promote the use of indigenous coal resources and augment the energy demand requirement of Isabela and the country as a whole. This project is being undertaken by virtue of COC 122 awarded by the Department of Energy on 23 December 1997, giving PNOC EC exclusive exploration rights over nine (9) coal blocks, totaling 9,000 hectares. Project Status as of December 2016:

In June 2016, PNOC EC was able to secure a favorable DOJ opinion that it can enter into power generation business. In October 2016, PNOC EC submitted to the National Economic and Development Authority (NEDA) a position paper on the exemption from certain provisions of the Revised JV Guidelines. Consequently, PNOC EC met with the NEDA infrastructure staff to discuss said position paper in November 2016.

Page 13: Project Title : BATANGAS TO MANILA NATURAL GAS ... Updates.pdfProject Title : BATANGAS TO MANILA NATURAL GAS PIPELINE PROJECT (BATMAN1) Project Location : Batangas City, Batangas to

Project Title : Isabela Coal Exploration Project Coal Operating Contract (COC) No. 141 Project Location : Municipality of Benito Soliven, Province of Isabela Nature of Project : Coal Exploration Implementing Subsidiary : PNOC Exploration Corporation (PNOC EC) Project Description: COC 141 which covers 3 blocks, equivalent to a project area of 3,000 hectares was awarded by the DOE to PNOC EC on July 5, 2005. The contract area is adjacent and located north of PNOC EC’s COC 122. It is believed that the northern extension of the coal deposit in COC 122 is located at the COC 141 project area. COC 141 is projected to augment the production of COC 122 in the long term. It was awarded by the DOE to PNOC EC on July 5, 2005. Project Status as of December 2016: PNOC EC received a letter on November 5, 2015 from the DOE cancelling the Coal

Operating Contract (COC).

Page 14: Project Title : BATANGAS TO MANILA NATURAL GAS ... Updates.pdfProject Title : BATANGAS TO MANILA NATURAL GAS PIPELINE PROJECT (BATMAN1) Project Location : Batangas City, Batangas to

Project Title : Trento, ADS – Lingig, SDS Coal Project Coal Operating Contract (COC) No. 184 Project Location : Agusan del Sur – Surigao del Sur Nature of Project : Coal Exploration Implementing Subsidiary : PNOC Exploration Corporation (PNOC EC) 100% JV Partners and Percent Equity : None Project Description: The coal exploration site is located in the municipality of Trento in Agusan del Sur, and at the municipality of Lingig in Surigao del Sur. The COC covers an area of 3,000 hectares spread over 3 coal blocks (CBS- 40-L-332, 333, & 334). Two blocks (332 & 334) are former blocks of PNOC Coal Corp. which were relinquished in the mid-1980’s. No exploration holes have been drilled in the area. Project Status as of December 2016: PNOC EC is still awaiting response of the DOE on the request for the relinquishment of the Coal Operating Contract (COC).

Page 15: Project Title : BATANGAS TO MANILA NATURAL GAS ... Updates.pdfProject Title : BATANGAS TO MANILA NATURAL GAS PIPELINE PROJECT (BATMAN1) Project Location : Batangas City, Batangas to

Project Title : Zamboanga Sibugay Coal Exploration Coal Operating Contract (COC) No. 185 Project Location : Buug-Malangas, Zamboanga Sibugay Nature of Project : Coal Exploration Implementing Subsidiary : PNOC Exploration Corporation (PNOC EC) 100% JV Partners and Percent Equity : None Project Description: PNOC EC intends to conduct exploration activities in COC 185 including block boundary survey and drilling of about twenty-two (22) drill holes to determine the extent, volume, behavior and quality of coal seams. This will be done for possible coal mining operations in line with the DOE’s directive to explore and develop indigenous energy resources of the country. Boundary survey will be conducted in the area and drilling of about 22 holes which are scheduled for implementation upon obtaining the Certificate Pre-Condition. Project Status as of December 2016: PNOC EC continues the conduct of Field Base Investigation (FBI) and the Pre-Free and Prior Informed Consent (Pre-FPIC) for the affected barangays. On December 15, 2016, PNOC EC obtained the FPIC of the concerned Indigenous Cultural Communities/Indigenous Peoples upon the signing of the MOA between PNOC EC, NCIP, and leaders of the indigenous peoples living in the three (3) municipalities covered in the project areas.

Page 16: Project Title : BATANGAS TO MANILA NATURAL GAS ... Updates.pdfProject Title : BATANGAS TO MANILA NATURAL GAS PIPELINE PROJECT (BATMAN1) Project Location : Batangas City, Batangas to

Project Title : Zamboanga Sibugay Coal Exploration Coal Operating Contract (COC) No. 186 Project Location : Imelda-Malangas, Zamboanga Sibugay Nature of Project : Coal Exploration Implementing Subsidiary : PNOC Exploration Corporation (PNOC EC) 100% JV Partners and Percent Equity : None Project Description: COC 186 is composed of five coal blocks with a total area of slightly more than 5,000 hectares. It is situated directly south of Coal Operating Contract 41. It encompasses 24 barangays across the municipalities of Imelda and Malangas. The 15 barangays under Imelda includes (from northernmost) Gandiangan, Canaan, Pulawan (Mt. View), Israel (Balian Israel), Mali Little Baguio, La Victoria, San Jose, Poblacion (Santa Fe), Sta. Barbara, Upper Baluran, Lower Baluran, Balungisan Dumpoc, and Baluyan. Malangas has 9 barangays which are included in the coal blocks, namely, (from westernmost) Bontong, Mulom. Rebocon, Overland, Camanga, Basak-Bawang, Candiis, Lipacan and Tackling. Small portions of the southwestern part of Block 78 are within the boundaries of Payao and Alicia. PNOC EC intends to conduct exploration activities in COC 186 including block boundary survey and drilling of at least forty-two (42) drill holes to determine the extent, volume, behavior and quality of coal seams for possible coal mining operations in line with the DOE’s directive to explore and develop indigenous energy resources of the country. Boundary survey for five coal blocks and drilling of about 42 holes are scheduled for implementation upon obtaining the Certificate Pre-Condition. Project Status as of December 2016: PNOC EC continues the conduct of Field Base Investigation (FBI) and the Pre-Free and Prior Informed Consent (Pre-FPIC) for the affected barangays. On December 15, 2016, PNOC EC obtained the FPIC of the concerned Indigenous Cultural Communities/Indigenous Peoples upon the signing of the MOA between PNOC EC, NCIP, and leaders of the indigenous peoples living in the three (3) municipalities covered in the project areas.

Page 17: Project Title : BATANGAS TO MANILA NATURAL GAS ... Updates.pdfProject Title : BATANGAS TO MANILA NATURAL GAS PIPELINE PROJECT (BATMAN1) Project Location : Batangas City, Batangas to
Page 18: Project Title : BATANGAS TO MANILA NATURAL GAS ... Updates.pdfProject Title : BATANGAS TO MANILA NATURAL GAS PIPELINE PROJECT (BATMAN1) Project Location : Batangas City, Batangas to

Project Title : Modular CNG Daughter Stations Project Location : Barangay Bolbok, City of Batangas, Province

Of Batangas and Barangay Tubigan, City of Biñan, Province of Laguna

Nature of Project : Refilling Station Implementing Subsidiary : PNOC Exploration Corporation (PNOC EC) JV Partners and Percent Equity : Not applicable

Project Description: PNOC EC has been mandated by the DOE to take over the role and obligations of the Pilipinas Shell Petroleum Corporation (PSPC) under the Natural Gas Vehicle Program for Public Transport’s (NGVPPT) “Pilot Phase”. The company intends to develop, operate and maintain two daughter stations, modular in design and can be decommissioned and can be easily transferred to different locations. Project Status as of December 2016: PNOC EC continues coordination with the DOE-Energy Utilization Management Bureau (DOE-EUMB) and Natural Gas Office on the way forward for the project considering the current market condition.

Page 19: Project Title : BATANGAS TO MANILA NATURAL GAS ... Updates.pdfProject Title : BATANGAS TO MANILA NATURAL GAS PIPELINE PROJECT (BATMAN1) Project Location : Batangas City, Batangas to

Project Title : COAL PRODUCTION AND SALES Project Location/s : Naga, Cebu Malangas, Zamboanga Sibugay Nature of Project : Coal trading Implementing Subsidiary : PNOC Exploration Corporation (PNOC EC) JV Partners & Percent Equity : PNOC EC 100% Project Description: PNOC EC, aside from selling the coal produced from its mine/s, also trades coal supplied by other producers both from domestic and foreign sources. To support its trading activities, PNOC EC operates terminal in Naga (Cebu). This terminal serves as receiving port for stockpiling, blending and screening of coal for clients availing of the services. It caters to customers from different cement, industrial plants/small boiler users and paper mills/manufacturing sectors. The coal terminal has operations centered basically on coal trading, blending and other related activities. Project Status as of December 2016: PNOC EC continues to market coal produced from various small-scale coal miners in COC 41 (Zamboanga Sibugay) and from other coal producers.

Page 20: Project Title : BATANGAS TO MANILA NATURAL GAS ... Updates.pdfProject Title : BATANGAS TO MANILA NATURAL GAS PIPELINE PROJECT (BATMAN1) Project Location : Batangas City, Batangas to

Project Title : Energy Supply Base Project Location : Mabini, Batangas Nature of Business : Private and public warehousing, pier servicing and all

businesses related to or in support of logistic facilities for onshore and offshore exploration activities in petroleum and other energy related fields.

Implementing Subsidiary : PNOC Exploration Corporation Project Description: PNOC EC Energy Supply Base (ESB) is located in the municipality of Mabini, Batangas covering a total area of 19 hectares. ESB is presently carrying out business activities such as private and public warehousing, pier servicing and all businesses related to or in support of logistic facilities for onshore and offshore exploration activities in petroleum and other energy related fields. Currently, ESB generates income from the following services and/or activities: pier servicing, warehousing/space rentals, bunkering, cargo handling, equipment rental, royalty, water supply and manpower services. Project Status as of December 2016: PNOC EC Energy Supply Base continues to provide berthing, cargo handling, storage and warehousing facilities to its energy and commercial clients.

Page 21: Project Title : BATANGAS TO MANILA NATURAL GAS ... Updates.pdfProject Title : BATANGAS TO MANILA NATURAL GAS PIPELINE PROJECT (BATMAN1) Project Location : Batangas City, Batangas to

Project Title JOBIN SQM SOLAR POWER PROJECT (BATAAN)

Project Location Sta. Rita, Subic Bay Freeport Zone (SBFZ)

Nature of Project Wind Power Project

Implementing Subsidiary PNOC Renewables Corporation

JV Partners and Percent Equity None

Project Description The Jobin Sqm Subic Solar Power Project is a 100MW

photovoltaic solar (PV) farm in Sta. Rita, Subic Bay

Freeport Zone (SBFZ) together with the assistance of

Hydrochina International.

Jobin Sqm, Inc. (JSI) is the proponent of the project.

PNOC RC is assisting Jobin Sqm, Inc. (JSI) in its service

contract application with the Department of Energy

(DOE).

Project Status As of November 2016

Jobin Sqm Inc. was recently acquired by Emerging Power Inc (EPI). As of March 2016, only 7.1MW installed.

Page 22: Project Title : BATANGAS TO MANILA NATURAL GAS ... Updates.pdfProject Title : BATANGAS TO MANILA NATURAL GAS PIPELINE PROJECT (BATMAN1) Project Location : Batangas City, Batangas to

Project Title JOBIN SQM WIND POWER PROJECT (BATAAN)

Project Location Sta. Rita, Subic Bay Freeport Zone (SBFZ)

Nature of Project Solar Power Project

Implementing Subsidiary PNOC Renewables Corporation

JV Partners and Percent Equity None

Project Description The Jobin Sqm Subic Wind Power Project is a 50MW

wind power farm in Sta. Rita, Subic Bay Freeport

Zone (SBFZ) together with the assistance of

Hydrochina International.

Jobin Sqm, Inc. (JSI) is the proponent of the project.

PNOC RC is assisting Jobin Sqm, Inc. (JSI) in its service

contract application with the Department of Energy

(DOE).

Project Status As of November 2016

Jobin Sqm Inc. was recently acquired by Emerging Power Inc (EPI). As of March 2016, only 7.1MW installed.

Page 23: Project Title : BATANGAS TO MANILA NATURAL GAS ... Updates.pdfProject Title : BATANGAS TO MANILA NATURAL GAS PIPELINE PROJECT (BATMAN1) Project Location : Batangas City, Batangas to

Project Title ENERGY EFFICIENT LIGHTING (EEL) – PHILIPPINE PUBLIC SAFETY COLLEGE

Project Location Philippine National Police Academy and National Police College, Camp Castañeda, Silang, Cavite

Nature of Project Energy Efficient Lighting (EEL) Project

Implementing Subsidiary PNOC Renewables Corporation

JV Partners and Percent Equity None

Project Description This Energy Efficient Lighting Project is a PNOC RC funded project promoting energy efficiency and conservation through the use of Light Emitting Diode (LED) bulbs in building which aims to lower the electricity consumption by 50% while at the same time maintaining the illumination level. This energy lighting efficiency strategies will help reduce fossil fuel consumption, reduce greenhouse gas emissions and help attain the country’s goal towards energy independence and security. In March 2016, PNOC RC and Philippine Public Safety College signed a Memorandum of Agreement regarding the lease of Energy Efficient Lighting System to be installed by PNOC RC at the premises of Philippine National Police Academy and the National Police College located in Silang, Cavite.

Project Status As of November 2016

On March 21, 2016 PNOC RC conducted a public bidding and engaged the services of Innovative Electrical Enterprises to supply, deliver and install LED bulbs. The Phase 1 of the project was completed on July 1, 2016 and the installation of Phase 2 was completed on September 16, 2016. To date the disposal of old lighting units is on-going.

Page 24: Project Title : BATANGAS TO MANILA NATURAL GAS ... Updates.pdfProject Title : BATANGAS TO MANILA NATURAL GAS PIPELINE PROJECT (BATMAN1) Project Location : Batangas City, Batangas to

Project Title

8.4 MW DULANGAN HYDROPOWER PROJECT

Project Location Baco and Naujan, Oriental Mindoro

Nature of Project Hydroelectric power plant development

Implementing Subsidiary PNOC Renewables Corp.

JV Partners and Percent Equity To be determined

Project Description This project is a run-of-river project to be located along

Dulangan river situated in Baco, Oriental Mindoro. Its

estimated potential hydropower energy is 8.40 MW

based on the feasibility study completed in November

2014. Power generated will be sold to the local electric

cooperative, as the project is located in the Island of

Mindoro, a SPUG area.

Project Status As of November 30, 2016

At present, PNOC RC continues to look for investor/developer who will develop the project under a joint venture partnership.

Page 25: Project Title : BATANGAS TO MANILA NATURAL GAS ... Updates.pdfProject Title : BATANGAS TO MANILA NATURAL GAS PIPELINE PROJECT (BATMAN1) Project Location : Batangas City, Batangas to

Project Title 630KW SDC MUÑOZ HYDROPOWER PROJECT

Project Location Upper Pampanga River Integrated Irrigation Systems (UPRIIS) Super Diversion Canal (SDC) Lateral C Brgy. Rizal, Science City of Muñoz, Nueva Ecija

Nature of Project Hydropower development

Implementing Subsidiary PNOC Renewables Corporation

JV Partners and Percent Equity To be determined

Project Description Development of 630 kW mini-hydropower project along NIA’s irrigation canal.

Project Status As of November 2016

To date, the revision of the feasibility is on-going.

Page 26: Project Title : BATANGAS TO MANILA NATURAL GAS ... Updates.pdfProject Title : BATANGAS TO MANILA NATURAL GAS PIPELINE PROJECT (BATMAN1) Project Location : Batangas City, Batangas to

Project Title 44 MW KABAYAN 2 HYDROPOWER PROJECT (formerly NALATANG B HYDROPOWER PROJECT)

Project Location Kabayan, Benguet

Nature of Project Hydropower electric plant development

Implementing Subsidiary PNOC Renewables Corp.

JV Partners and Percent Equity To be determined

Project Description Project Status as of November 30, 2016

This project is a run-of-river project located along

Nalatang River in Kabayan, Benguet situated

upstream of Agno River. The area is a mountainous

region with no major road infrastructure. Its

surrounding area is home to indigenous peoples.

In June 2016, the DOE signed the amended service

contract covering the increase in capacity to 52 MW

and the change in name to Kabayan 2 HEP.

Page 27: Project Title : BATANGAS TO MANILA NATURAL GAS ... Updates.pdfProject Title : BATANGAS TO MANILA NATURAL GAS PIPELINE PROJECT (BATMAN1) Project Location : Batangas City, Batangas to

Project Title 13.8MW PACUAN-GUINOBAAN HYDROPOWER PROJECT

Project Location La Libertad (Pacuan) and Guihulngan (Guinobaan), Negros Oriental

Nature of Project Hydropower electric plant development

Implementing Subsidiary PNOC Renewables Corp.

JV Partners and Percent Equity To be determined through JV process (NEDA Joint Venture Guidelines)

Project Description The project is a run-of-river project with two (2) major

tributary resources; one from Pacuan River, Pacuan,

La Libertad with a potential hydropower energy of 6.8

MW and another from Guinobaan River, Guinobaan,

La Libertad with a potential hydropower energy of 7

MW. The tributary rivers will merge into the La

Libertad River with a combined potential capacity of

13.8 MW.

Project Status As of November 2016

Presently, PNOC RC is looking for an investor/developer that will develop the project under a joint venture partnership.

Page 28: Project Title : BATANGAS TO MANILA NATURAL GAS ... Updates.pdfProject Title : BATANGAS TO MANILA NATURAL GAS PIPELINE PROJECT (BATMAN1) Project Location : Batangas City, Batangas to

Project Title 1,000kW PRISMC RIZAL HYDROPOWER PROJECT

Project Location Pampanga River Irrigation System (PRIS) Main Canal

Brgy. Poblacion West, Rizal, Nueva Ecija

Nature of Project Hydropower development

Implementing Subsidiary PNOC Renewables Corporation

JV Partners and Percent Equity PNOC RC – 50%

National Development Corp. (NDC) – 50%

Project Description Development of a 1000 kW mini-hydropower project

along NIA’s irrigation canal.

Project Status

As of November 2016

The commissioning of the project was completed last

June 30, 2016 and commercial operation started on

July 1, 2016.

Page 29: Project Title : BATANGAS TO MANILA NATURAL GAS ... Updates.pdfProject Title : BATANGAS TO MANILA NATURAL GAS PIPELINE PROJECT (BATMAN1) Project Location : Batangas City, Batangas to

Project Title SALTAN B HYDROPOWER PROJECT

Project Location Balbalan, Kalinga

Nature of Project Hydropower electric plant development

Implementing Subsidiary PNOC Renewables Corp.

JV Partners and Percent Equity To be determined through JV process (NEDA Joint

Venture Guidelines)

Project Description The project is a run-of-river hydropower project to be

located along the Saltan B River in the municipality of

Balbalan, Kalinga. Its estimated potential hydropower

energy is 24 Mwe based on the feasibility study

completed last December 16, 2015.

Project Status As of November 2016

In April 2016, the service contract for the Saltan B Hydropower Project was surrendered to DOE

Page 30: Project Title : BATANGAS TO MANILA NATURAL GAS ... Updates.pdfProject Title : BATANGAS TO MANILA NATURAL GAS PIPELINE PROJECT (BATMAN1) Project Location : Batangas City, Batangas to

Project Title MAIBARARA GEOTHERMAL POWER PROJECT

Project Location Sto. Tomas, Batangas

Nature of Project Geothermal

Implementing Subsidiary PNOC Renewables Corporation

JV Partners and Percent Equity

PetroGreen Energy Corporation (PGEC) – 65%, Trans-Asia – 25%, and PNOC-RC – 10%

Project Description Maibarara Geothermal, Inc. (MGI) operates the Maibarara Geothermal Power Project (MGPP) under a joint venture agreement with Trans-Asia Oil and Energy Development Corporation (Trans-Asia) and PNOC Renewables Corporation (PNOC RC). The Maibarara service contract was awarded by the Department of Energy (DOE) in February 2010 following an open and competitive selection process last October 2009. The Maibarara geothermal field is the second resource discovered in the Makiling-Banahaw (Mak-Ban) contract area situated in Laguna and Batangas, Philippines. Maibarara is located at the western foot of Mt. Makiling, a stratovolcano about 3 kilometers northwest of Bulalo geothermal field.

Project Status As of November 2016

The project was commissioned in February 2014 and has generated 139,538.55MWh of energy as of November 2016.

Page 31: Project Title : BATANGAS TO MANILA NATURAL GAS ... Updates.pdfProject Title : BATANGAS TO MANILA NATURAL GAS PIPELINE PROJECT (BATMAN1) Project Location : Batangas City, Batangas to

Project Title MAIBARARA GEOTHERMAL POWER PROJECT

Project Location Sto. Tomas, Batangas

Nature of Project Geothermal

Implementing Subsidiary PNOC Renewables Corporation

JV Partners and Percent Equity

PetroGreen Energy Corporation (PGEC) – 65%, Trans-Asia – 25%, and PNOC-RC – 10%

Project Description Maibarara Geothermal, Inc. (MGI) operates the Maibarara Geothermal Power Project (MGPP) under a joint venture agreement with Trans-Asia Oil and Energy Development Corporation (Trans-Asia) and PNOC Renewables Corporation (PNOC RC). The Maibarara service contract was awarded by the Department of Energy (DOE) in February 2010 following an open and competitive selection process last October 2009. The Maibarara geothermal field is the second resource discovered in the Makiling-Banahaw (Mak-Ban) contract area situated in Laguna and Batangas, Philippines. Maibarara is located at the western foot of Mt. Makiling, a stratovolcano about 3 kilometers northwest of Bulalo geothermal field.

Project Status As of November 2016

The project was commissioned in February 2014 and has generated 139,538.55MWh of energy as of November 2016.

Page 32: Project Title : BATANGAS TO MANILA NATURAL GAS ... Updates.pdfProject Title : BATANGAS TO MANILA NATURAL GAS PIPELINE PROJECT (BATMAN1) Project Location : Batangas City, Batangas to

Project Title 200KW SOLAR PV ROOFTOP PROJECT AT THE COMMISSION OF AUDIT (COA)

Project Location Commonwealth Ave., Quezon City

Nature of Project Solar PV Rooftop Project

Implementing Subsidiary PNOC Renewables Corporation

JV Partners and Percent Equity None

Project Description Installation of 200kW Solar Rooftop Facility under a lease-purchase agreement. PNOC RC and Commission on Audit (COA) signed a Memorandum of Agreement wherein the former will install a Solar PV System on one of the buildings of PHC and the latter will pay the system through the fix lease agreement for fifteen (15) years. After the lease agreement the ownership of the PV Solar System will be transferred to PHC.

Project Status As of November 2016

On August 2, 2016 PNOC RC Board of Directors approved the award of the design and build contract for the installation of a 200KW grid tied Solar PV System at COAS building to Techline Machine Tools, Inc. and started the project last August 15, 2016. To date the construction of the project is on-going.

Page 33: Project Title : BATANGAS TO MANILA NATURAL GAS ... Updates.pdfProject Title : BATANGAS TO MANILA NATURAL GAS PIPELINE PROJECT (BATMAN1) Project Location : Batangas City, Batangas to

Project Title 100KW SOLAR PV ROOFTOP PROJECT AT THE DENR – EMB

Project Location DENR Compound Visayas Ave., Quezon City

Nature of Project Solar PV Rooftop Project

Implementing Subsidiary PNOC Renewables Corporation

JV Partners and Percent Equity None

Project Description Installation of a 100kW Solar Rooftop Facility under a lease-purchase agreement. PNOC RC and Department of Environment and Natural Resources – Environmental Management Bureau (DENR-EMB) signed a Memorandum of Agreement wherein the former will install a Solar PV System on one of the buildings of PHC and the latter will pay the system through the fix lease agreement for fifteen (15) years. After the lease agreement the ownership of the PV Solar System will be transferred to PHC.

Project Status As of November 2016

On January 2016 PNOC RC awarded the design and build contract for the installation of a 100KW grid tied Solar PV System at DENR-ERSLD building to Solewind Builders and started the project in March 2016. The project was commissioned in September 2016 and started the commercial operation on the same month.

Page 34: Project Title : BATANGAS TO MANILA NATURAL GAS ... Updates.pdfProject Title : BATANGAS TO MANILA NATURAL GAS PIPELINE PROJECT (BATMAN1) Project Location : Batangas City, Batangas to

Project Title 100KW SOLAR PV ROOFTOP PROJECT AT THE DEPARTMENT OF SCIENCE AND TECHNOLOGY

Project Location Gen. Santos Ave., Bicutan, Taguig City

Nature of Project Solar PV Rooftop Project

Implementing Subsidiary PNOC Renewables Corporation

JV Partners and Percent Equity None

Project Description Installation of a 100kW Solar Rooftop Facility under a lease-purchase agreement. PNOC RC and Department of Science and Technology (DOST) signed a Memorandum of Agreement wherein the former will install a Solar PV System on one of the buildings of PHC and the latter will pay the system through the fix lease agreement for fifteen (15) years. After the lease agreement the ownership of the PV Solar System will be transferred to PHC.

Project Status As of November 2016

The Engineering, Procurement, Construction, and Commissioning (EPCC) of the project started last September 3, 2015. The EPCC of the project was completed in March 2016 and started the commercial operation on the same month.

Page 35: Project Title : BATANGAS TO MANILA NATURAL GAS ... Updates.pdfProject Title : BATANGAS TO MANILA NATURAL GAS PIPELINE PROJECT (BATMAN1) Project Location : Batangas City, Batangas to

Project Title 80KW SOLAR PV ROOFTOP PROJECT AT THE PHILIPPINE COCONUT AUTHORITY

Project Location Diliman, Quezon City

Nature of Project Solar PV Rooftop Project

Implementing Subsidiary PNOC Renewables Corporation

JV Partners and Percent Equity None

Project Description Installation of 80kW Solar Rooftop Facility under a lease-purchase agreement. PNOC RC and Philippine Coconut Authority (PCA) signed a Memorandum of Agreement wherein the former will install a Solar PV System on one of the buildings of PHC and the latter will pay the system through the fix lease agreement for fifteen (15) years. After the lease agreement the ownership of the PV Solar System will be transferred to PHC.

Project Status As of November 2016

On May 31, 2016 PNOC RC Board of Directors approved the award of the design and build contract for the installation of a 80KW grid tied Solar PV System at PCA building to Applied Systems Manufacturing Corporation and started the project last July 1, 2016. To date the performance testing of the project is on-going.

Page 36: Project Title : BATANGAS TO MANILA NATURAL GAS ... Updates.pdfProject Title : BATANGAS TO MANILA NATURAL GAS PIPELINE PROJECT (BATMAN1) Project Location : Batangas City, Batangas to

Project Title 100KW SOLAR PV ROOFTOP PROJECT AT THE PHILIPPINE HEART CENTER

Project Location Philippine Heart Center, East Ave. Quezon City

Nature of Project Solar PV Rooftop Project

Implementing Subsidiary PNOC Renewables Corporation

JV Partners and Percent Equity None

Project Description Installation of a 100kW Solar Rooftop Facility under a lease-purchase agreement. PNOC RC and Philippine Heart Center (PHC) signed a Memorandum of Agreement wherein the former will install a Solar PV System on one of the buildings of PHC and the latter will pay the system through the fix lease agreement for fifteen (15) years. After the lease agreement the ownership of the PV Solar System will be transferred to PHC.

Project Status As of November 2016

The project was inaugurated last November 3, 2015 and operation of the Solar PV system started last December 1, 2015. The commercial operation of the project is on going.

Page 37: Project Title : BATANGAS TO MANILA NATURAL GAS ... Updates.pdfProject Title : BATANGAS TO MANILA NATURAL GAS PIPELINE PROJECT (BATMAN1) Project Location : Batangas City, Batangas to

Project Title 240KW SOLAR PV ROOFTOP PROJECT AT THE UNIVERSITY OF THE PHILIPPINES - DILIMAN

Project Location UP Diliman, Quezon City

Nature of Project Solar PV Rooftop Project

Implementing Subsidiary PNOC Renewables Corporation

JV Partners and Percent Equity None

Project Description Installation of a 240kW Solar Rooftop Facility under a lease-purchase agreement. PNOC RC and University of the Philippines –Diliman signed a Memorandum of Agreement wherein the former will install a Solar PV System on one of the buildings of PHC and the latter will pay the system through the fix lease agreement for fifteen (15) years. After the lease agreement the ownership of the PV Solar System will be transferred to PHC.

Project Status As of November 2016

On May 31, 2016 PNOC RC Board of Directors approved the award of the design and build contract for the installation of a 240KW grid tied Solar PV System at UP-Diliman building to Applied Systems Manufacturing Corporation and started the project last August 15, 2016. To date the construction of the project is on-going.