CITY OF PORTLAND
BUREAU OF ENVIRONMENTAL SERVICES
PROJECT SPECIFICATIONS
FOR
ANKENY PUMP STATION UPGRADE BES project number E07833
STANDARD REQUIREMENTS (DIVISION 0) GENERAL REQUIREMENTS (DIVISION 1)
CONSOLIDATED PROJECT SPECIFICATIONS
The preparer of the consolidated project specifications for this Project:
Date: f r-2/j-l(
Signature Sheet 1
CITY OF PORTLAND
EXPIRES: 12/31/2012
BUREAU OF ENVIRONMENTAL SERVICES
PROJECT SPECIFICATIONS
FOR
ANKENY PUMP STATION UPGRADE BES project number E07833
ENGINEER OF RECORD CERTIFICATION(s):
Signing as the Engineer of Record for the sections listed below:
Section 007200 Division 01
Signing as the Engineer of Record for the sections listed below:
Division 02 Division 14 Sections: 09900, 10441, 11000, 11002, 11005, 11010, 11015, 11020,11021, 11050, 11305, 11328, 11347, 15050, 15061, 15062, 15064, 15066, 15067, 15075, 15085, 15090, 15095, 15096,15097,15101,15110,15118,15124,15131,15136, 15147, 15150, 15151, 15153, 15179, 15180, 15184, 15185, 15200, 15250, 15400, 15401, 15440, 15461, 15473
Signature Sheet 2
Signing as the Engineer of Record for the sections listed below:
Division 03 Division 04 Division 05
,"--..",.?-__ ~ Division 07 Sections: 08305
Signing as the neer of Record for the sections listed below:
Division 08 Sections: 09110; 09250; 09300; 10200; 10520; 10810
•
Signature . Sheet 3
EXPIRES: 06-30-13
Signing as the Engineer of Record for the sections listed below:
Sections: 15632, 15784, 15858, 15859, 15863, 15873, 15891, 15903, 15952, 15990
Signature Sheet 4
EXPIRES: 12131/2012
Signing as the Engineer of Record for the sections listed below:
Sections: 11060, 16176, 16440 Division 17
Signature Sheet 5
Signing as the Engineer of Record for the sections listed below:
Sections: 16000, 16030, 16110, 16120, 16125, 16140, 16175, 16310, 16311, 16322, 16421, 16445, 16450, 16460, 16470, 16500, 16702, 16710, 16920, 16921
Signature Sheet 6
PROJECT SPECIFICATIONS TABLE OF CONTENTS
ANKENY PUMP STATION UPGRADE PROJECT NO. E07833
Work to Be Done VOLUME 1 OF3
PROJECT SPECIFICATIONS
007200
DIVISION 1
01001 01010 01014 01025 01062 01063 01064 01200 01300 01310 01400 01410 01420 01430 01500 01505 01545 01560 01600 01700 01710 01720 01800 01900 01999
DIVISION 2
02050 02055 02080 02100
E07833 September 2011
Standard Requirements (see detailed table of contents in 007200)
GENERAL REQUIREMENTS
General Specifications Summary of Work Temporary Work and Suggested Work Sequence Measurement and Payment Permits Safety and Health Insurance Project Meetings Shop Drawings and Other Submittals Construction Schedules - Type X Contractor Quality Control Acceptance Inspection and Testing Facility Startup Operations and Maintenance (O&M) Data Contractor Facilities, Temporary Control, and Staged Construction Construction Waste Management Protection and Maintenance of Work and Property Environmental Controls Product Delivery, Storage, and Handling Contract Closeout Cleaning Project Record Documents Environmental Conditions Seismic Anchorage and Bracing Requirements Standard Forms
SITE WORK
Demolition Special Procedures Lead Paint Asbestos Abatement Site Preparation
Ankeny Pump Station Upgrade
DIVISION 2
02200 02350 02500 02527
DIVISION 3
03100 03200 03300 03400 03600
DIVISION 4
04200
DIVISION 5
05100 05501 05505 05511 05520 05530 05910 05911
DIVISION 6
DIVISION 7
07900
DIVISION 8
08110 08305 08710 08800
DIVISION 9
09110 09250 09300 09900
E07833 September 2011
SITE WORK (continued)
Earthwork Sheeting, Shoring, and Bracing Asphalt Pavement Concrete Curbs, Gutters, and Walks
CONCRETE
Formwork Concrete Reinforcement Cast-in-Place Concrete Precast Concrete Grout
MASONRY
Unit Masonry
METALS
Structural Metals Anchor Bolts Miscellaneous Metalwork Metal Stairs Handrailing Grating, Steel Stairs, Floor Plates, Safety Stair Treads, and Cover Plates Hot-Dip Zinc Coating Mechanical Zinc Coating
NOT USED
THERMAL AND MOISTURE PROTECTION
Sealants
DOORS AND WINDOWS
Steel Doors and Frames Access Hatches Finish Hardware Glass and Glazing
FINISHES
Steel Studs Gypsum Wallboard Tilework Coating Systems
Ankeny Pump Station Upgrade
DIVISION 10
10200 10441 10520 10810
SPECIALTIES
Louvers Warning Signs Fire Extinguishers and Cabinets Toilet Accessories
VOLUME 2 OF 3
DIVISION 11
11000 11002 11005 11010 11015 11020 11021 11050
11060 11305
11328 11347
EQUIPMENT
General Requirements for Equipment Rigid Equipment Mounts Machine Alignment Equipment Controls Noise Requirements and Control Vibration and Critical Speed Limitations Vibration Isolation Systems General Requirements for Centrifugal and Axial Flow Pumping Equipment Electric Motors Custom Engineered Vertical Constant-Speed Non-Clog and Non-Clog Mixed-Flow Centrifugal Pumps with Inlet Nozzle Diameters 16 Inches and Greater Supplied with Independent Motor Support Regenerative Turbine Pumps Submersible Wastewater Pumps for Sump Pumping Applications
DIVISION 12 NOT USED
DIVISION 13 NOT USED
DIVISION 14 CONVEYING SYSTEMS
14420 14611 14630
DIVISION 15
15050 15061 15062 15064 15066 15067 15075 15085 15090
E07833 September 2011
Jib Cranes Monorail and Hoist Bridge Cranes and Hoists
MECHANICAL
Piping Systems Steel Pipe Ductile Iron Pipe Plastic Pipe Copper Piping Stainless Steel Piping Joint Gaskets, Piping Connections Expansion Joints and Flexible Metal Hose
Ankeny Pump Station Upgrade
DIVISION 15
15095 15096 15097 15101 15110 15118 15124 15131 15136 15147 15150 15151 15153 15179 15180 15184 15185 15200 15250 15400 15401 15440 15461 15473 15632 15784 15858 15859 15863 15873 15891 15903 15952 15990
MECHANICAL (continued)
Piping Appurtenances Pipe Hangers and Supports Seismic Restraints for Piping Gate Valves Eccentric. Plug Valves Spring-Loaded Swing Check Valves Reduced Pressure Principle Backflow Preventers Large Diameter Ball Valves Knife Gate Valves Solenoid Valves Specialty Valves Wastewater Air Release and Vacuum Valves Pressure Regulating Valves Control Unit Schedule Electric Power Actuated Valve and Gate Schedules Manual Valve and Gate Operators and Operator Appurtenances Powered Valve and Gate Actuators and Appurtenances Hoses and Nozzles Insulation for Exposed Piping and Equipment Plumbing Process Drainage Plumbing Fixtures Air Gap Tank Electric Water Heaters Electric Unit Heaters Split System Heat Pump Unit Centrifugal Roof Supply Fans In-Line Centrifugal Fans Propeller Wall Fans Centrifugal Roof Exhaust Fans Sheet Metal Ductwork Diffhsers, Grilles, and Registers Ventilation System Control Devices Heating, Ventilating, and Air Conditioning Systems Testing, Adjusting, and Balancing
DIVISION 16 ELECTRICAL
16000 16030 16110 16120 16125 16140 16175
E07833 September 2011
General Requirements for Electrical Work Electrical Acceptance Testing Raceways, Boxes, and Supports 600 Volt Conductors, Wire and Cable Medium Voltage Conductors and Cable Wiring Devices Miscellaneous Electrical Devices
Ankeny Pump Station Upgrade
DIVISION 16 ELECTRICAL (continued)
16176 16310 16311 16322 16421 16440 16445 16450 16460 16470 16500 16613 16617 16702 16710 16920 16921
Local Control Panels Low Voltage Switchgear Low Voltage Switchboards Pad-Mounted Distribution Transformers S urge Arresters Instrument Transformers, Meters, Switches and Accessories Surge Protective Devices Grounding System Dry-Type Transformers (600 Volts and Less) Lighting and Power Panelboards Luminaires Liquid Level Controls Telemetry Systems Neutral Grounding Resistors Medium Voltage Pad-Mounted Switchgear 600 Volt Motor Control Centers 600 Volt Reduced-Voltage Solid-State Motor Starters
DIVISION 17 INSTRUMENTATION
17000 17030 17110 17120 17140 17200 17211 17212 17216 17274 17777 17900
E07833 September 2011
General Requirements for Instrumentation and Control Process Instrumentation and Control System Testing Instrument and PLC Control Panels Annunciator Systems Instrument Air Transmission Systems Instrument Index Process Taps and Primary Elements Transmitters Process Switches Miniature Case Electronic Panel Instruments Machinery Vibration Monitoring and Protection Systems Control Strategies
Ankeny Pump Station Upgrade
See Appendix
E07833 September 2011
SUPPLEMENTAL INFORMATION
Volume 3 of 3 DRAWINGS
Ankeny Pump Station Upgrade
WORK TO BE DONE
1. WORK TO BE DONE
A. Contract is for the constructions of the Ankeny Pump Station Upgrade. Work under this contract includes, but is not limited to:
1. Demolishing existing sewage pumps, piping systems, electrical building, electrical distribution equipment, control equipment, seal water system, hydraulic system, restroom plumbing fixtures, and HV AC equipment.
2. Removal and disposal of asbestos containing material (ACM) and lead based paint (LBP). See hazardous building assessment report in index.
3. Providing temporary electrical power system for the maintenance of pump station operations.
4. Constructing structural frames, walls and beams.
5. Constructing new stairways, ladders, platforms, catwalks, and access hatch.
6. Installing new electrical power distribution equipment and lighting systems.
7. Installing new electrical instrumentation and control equipment.
8. Constructing a new restroom facility with new restroom fixtures and appurtenances.
9. Modifying the existing wet well wall.
10. Installing four sewage pumps.
11. Installing all required piping, isolation valves, fittings, pipeline pigging, and flow meter equipment.
12. Modifying the existing storm pump valves and piping to add a recirculation line to the wet well to exercise the storm protection pumps.
13. Constructing a new seal water system.
14. Installing new HV AC equipment including louvers.
15. Upgrading the potable and non-potable water system, including reduced pressure backflow assemblies (RPBA's) and water heater.
16. Painting interior walls, equipment and existing roof
2. APPLICABLE SPECIFICATIONS
Bidder shall incorporate all applicable provisions of the Standard and General Requirements contained within this document.
Project No. E07833 September 2011
Ankeny Pump Station Upgrade WORK TO BE DONE
The City of Portland 2010 Standard Construction Specifications (as revised) are incorporated by reference into these specifications.
3. OWNER'S REPRESENTATIVE/ENGINEER
Owner's Representative:
Engineer of Record:
BES Design PM
Dan Bush 1120 SW 5th Avenue, Room 1100 Portland, Oregon 97204 503-823-2669
Brown and Caldwell 6500 SW Macadam Ave Suite 200 Portland, Oregon 97238 503-244-7005
Jeff Hanks 5001 N. Columbia Boulevard Portland, Oregon 97203-2098 503-823-2623
4. TIME FOR COMPLETION
The work shall be completed within 810calendar days after receipt of the written Notice to Proceed.
Project No. E07833 September 2011
** END OF SECTION **
Ankeny Pump Station Upgrade WORK TO BE DONE