PROJECT PROJECT MANAGEMENT PROJECT TEAM PROJECT PLANNING GANTT CHART CPM PERT.
Project Name: Onkei (Japanese for “Grace” and “Blessing...
Transcript of Project Name: Onkei (Japanese for “Grace” and “Blessing...
FINAL PROJECT- DOWTOWN 21 SHARMA, MILLER & PARKER (SMP) Page 1
Project Name: Onkei (Japanese for “Grace” and “Blessing”) Lot # 21
Architectural Studio 5 Final Project
Client Name: City of Mississauga Team Name: Sharma, Miller & Parker Inc. (SMP)
Date: April 19, 2012
FINAL PROJECT- DOWTOWN 21 SHARMA, MILLER & PARKER (SMP) Page 2
TABLE OF CONTENTS
1.0 Documentation
1.1 Introduction, Objectives and Intentions PAGE 4 - Introduction - Objectives - Community Housing Type - Analysis and Problem Definition - Intentions (Physical, Social, Symbolic) - Design Principles and Concept - Materials - Formal Organization
1.2 Statistics PAGE 9 - Program - Schedule of Areas - Occupant Load Chart - Washroom Calculation Charts
1.3 O.B.C. Requirements PAGE 12 - O.B.C Matrix - Interconnected Floor Spaces - Exposed Building Face
2.0 Sustainable Design Research & Sustainable Design Application Details
2.1 Energy PAGE 14 - Conversion and Renewable Strategies - Energy Conversion and Solar Collection Application
2.2 Water PAGE 17 - Waste and Rain Water Management Strategies - Grey Waste and Rain Water Collection Application to Design
2.3 Materials PAGE 26 - Sustainable Choices of Roof and Wall Assemblies and Structural System - Detail Indication Material Selection Application
3.0 Plans
3.1 Retail and Site (DWGS: A1 & A2) 3.2 Typical Office (DWG: A2)
FINAL PROJECT- DOWTOWN 21 SHARMA, MILLER & PARKER (SMP) Page 3
3.3 Typical Residential (DWG: A3,A4,A5,A6)
4.0 Materials and Synthesis
4.1 Wall Section “A” (DWG: B1) 4.2 Wall Section “B” (DWG: B2) 4.3 Wall Section “C” (DWG: B3)
5.0 3-D Models
5.1 Structural Design PAGE 30 5.2 Interior Design PAGE 31, 32 5.3 Exterior Design PAGE 33
FINAL PROJECT- DOWTOWN 21 SHARMA, MILLER & PARKER (SMP) Page 4
1.1 Introduction, Objectives and Intentions
Introduction The structure, named Onkei, is located at Square One road and Hammerson road. Across
Square one road, on the south-east side of the building, is Square One Mall. From this lot you can
view the Sears, Wal-Mart and Zellers. The design is to portray a welcoming environment and to
invite in the diverse community. The overall building design is intended to cause one to draw their
attention up to the top of the building, where one can catch a glimpse of the sky. The use of warm
colours invites a sense of homeliness and invite in the community. The extensive use of glass
allows the sunlight to pierce through the building envelope and brighten the area up. Natural
materials soften the building face and are juxtaposed by the dark stucco colours. The front
entrance is highlighted in red and juts out against the light stone on the first two floors. The
residential floors use a mixture of dark red and green on a background of white. The objective was
to have random pops of colour to help accentuate the rhythmic façade on the residential floors.
Standing on the sidewalk you would be faced by a light stone and as you glanced above, you
would see the wooden beams spanning vertically up to the top of the structure. The motive behind
the use of materials was to differentiate between the residential and commercial areas of the
building. To create some privacy along the two A-Streets, a decorative wall has been set up to
block some of the direct view to the fourth and fifth floors from the street. The back garden also
has a decorative wall to create some privacy from the B-Street and surrounding buildings.
Objectives
The Social Objectives of this multi-use building is to accommodate for the inhabitants living
in the residential floors above. It is important to ensure a vivacious, healthy and safe environment
for the elderly tenants and to attract a large diversity of seniors of all cultures and back grounds.
Activities, care and close convenience to specific goods should be accommodated for in an
efficient and accessible way. The space needs to engage, invite and create an aesthetically-
pleasing atmosphere for the residences, family members and friends and create a lively social
area. A large part of the design and structure is to promote education of sustainability through the
design of the building. Through efficiency and economic construction, the building can help reduce
poverty by creating an affordable and sustainable living space and life style for the
residence, but also creating an opportunity for small businesses and job opportunities. This will
support a high quality of life in a diverse society by promoting culture, arts and education.
The Environmental Objectives define a large majority of the building design. It is important
to ensure a sustainable lifestyle for those living, working and visiting within the multi-use building.
The environmental footprint will be reduced through the use of many sustainable initiatives. A
small variety of these initiatives are green walls, solar panels, window shading, grey water use,
sun/wind/elements orientation of building, and enforcing a intense waste and recycling
management. There would be a focus on education for others to learn about the importance of
sustainability and what this multi-use building is doing to help lower its environmental footprint.
This would help promote continued advancement toward a compact and sustainable lifestyle for
not only the residences, but also for others visiting or working within the building. The
implementation of sustainable, efficient and economic construction would help to create affordable
living. Over the whole life cycle of the multi-use building, it is important to produce some economic
return with the money spent.
The Civic Objectives can be attained through a welcoming and community based design.
The commercial retail and office units accommodate for the residences needs, creating a
community within multi-use building. Civic uses can be attained through educational services,
recreational services, cultural services and medical services. The design is to help promote a
diverse and sustainable environment. The commercial units on the first two floors will provide
these services for not only the residences to utilize but for the general public as well. These
services offer an opportunity for employment, education, cultural diversity and accommodate for a
substantial group of residences within the area.
FINAL PROJECT- DOWTOWN 21 SHARMA, MILLER & PARKER (SMP) Page 5
Community Housing Type
Old Age Housing
Program First Floor – Commercial Retail Units
Area = 2980 sqm
# of Units = 10
Uses = Grocer/ Delicatessen, Hair Salon, Hobby/ Game Shop, Coffee Shop, Craft Store, Yoga/ Dance Studio
The approximated area for the first floor commercial retail units is 3000 sqm. In this space there could be ten stores all related to the needs of the Seniors Housing above. The proposed uses of a few of these stores are as follows, Grocer/ Delicatessen, Hair Salon, Hobby/ Game Shop, Coffee Shop, Craft Store, Yoga/ Dance Studio.
Second Floor – Commercial Office Units
Area = 3227 sqm
# of Office Units = 14
Uses = Real estate Agent, Travel Agent, Insurance Broker, Doctors Office, General Office Use
The commercial office area on the second floor has an approximate area of 3300 sqm. This space could accommodate 14 offices also related to the needs of the elderly living in the upper floors. These proposed units could offer such businesses as, Real Estate Agent, Travel Agent, Insurance Broker, general office use and a Doctor’s Office.
Third to Sixth Floor – Residential Units
Third Floor Area = 2620 sqm
Fourth Floor Area = 2112 sqm
Fifth Floor Area = 1936 sqm
Sixth Floor Area = 1943 sqm
Total Area = 8611 sqm
Bachelor = 50 – 70 sqm = 6 units
1 Bedroom = 70 – 90 sqm = 43 units
2 Bedroom = 90 – 110 sqm = 29 units
Total Rooms = 78 units
Seniors (65+) 3 – 7 year waiting list This building has been selected to be a Seniors Home (65+) and will have a 3 – 7 year waiting list The overall Approximated area for all four floors of Residential Public Housing is 8600 sqm. This could accommodate 78 housing units in total. Of the Bachelor units ranging in size from 50 – 70 sqm there could be 6 units and of the 1 Bedroom units, 70 – 90 sqm, there could be 43 units each. The 2 Bedroom units have an approximate size of 90 – 110 sqm and 29 units can be accommodated for.
Analysis and Problem Definition The design of my building creates a variation of room sizes and shapes on every level. This
can be a problem when creating a grid and main supporting walls. Although it seems nice to have
a unique apartment, it is time consuming from both the design and construction aspect. It also
creates an issue when determining a rental price for the unit. In an attempt to fix this problem,
every residential floor has a similar layout and the majority of the rooms are in the same position
on every floor, even though the wall indents may not align on every floor.
Another issue was the “U” shaped halls on the residential floors. These create dead ends
which are undesirable. Therefore, the stairs are now located close to the end of each of the three
“dead ends.” This helps to create a simple beginning and an ending; and causes less confusion
for the residences. Lastly, with the shape of the building having almost a “tunnel” towards the
west, there is concern of high winds intensifying within the courtyard area and causing problems
on the rooftop gardens. This has been addressed by placing a decorative wall in the back garden,
which serves multiple design purposes. The wall both diverts the wind around the building and
provides privacy and a backdrop for the garden. With four buildings right next to each other it is
important to create some privacy for the residences. This wall also creates a more appealing
backdrop to the garden then the neighboring buildings.
Some of the forces around the building are environmental and physical. Wind, sun and
other forms of weather need to be taken into account in the design of the building. There are
adjacent buildings all around, some more appealing than others. Therefore, taking into account
these views, specific design ideas need to be implemented. Following the rules of the Downtown
21 document and creating an aesthetically appealing building are also important goals in this
project. Environmental forces are important to take into account when designing a building.
Strong, cold winds come from the North–West, which is along the back of the building (along the
B-Street side of the building). This means the building should be more protected along this side,
by either having fewer windows to stop cold air from coming in, or install windows with a strong R
rating. Because there are quite a few residential apartments along this side of the building the
FINAL PROJECT- DOWTOWN 21 SHARMA, MILLER & PARKER (SMP) Page 6
second option seems more practical although more expensive. The sun rises from the east and
falls in the west. Hence, the building has been designed to get the most out of both morning and
evening sun. The main entrance of the building faces east and the majority of the rooms are along
the South-East and North-East walls. Because of the layered design of rooftop gardens they all
receive sun during the hottest time of the day when the sun it directly above and into the evening.
The only time they will not receive any light is in the morning.
Intentions
Beauty and sustainability need to be entwined to create an effective and grand
environment. Sustainability plays a large role in the overall construction and shape of the building.
The direction of the sun in relation to the site determines many large features of the building. The
main entrance faces east and the majorty of the rooms are oriented to get morning light.
Photovoltaics are to be added to the roof are to be mounted along the rear roof top. The
environmental footprint will be reduced through the use of these sustainable initiatives.
Furthermore, the design embraces the use of indoor green walls on the ground floor, along the
main hallway. Green walls produce a calming effect with rich ambience and help in purifying the
indoor air. Lastly, other variety of initiatives such as green roofs, window shading, grey water
system and waste recycling management are also placed in the design to accumulate maximum
LEED points. The implementation of sustainable, efficient and economic construction would help
to create affordable living. Over the whole life cycle of the multi-use building, it is important to
produce some economic return with the money spent. It is important to ensure a sustainable
lifestyle for those living, working and visiting within the multi-use building. . Through efficiency and
economic construction, the building can help reduce poverty by creating an affordable and
sustainable living space and life style for the residence, but also creating an opportunity for small
businesses and job opportunities.
It is important to ensure a vivacious, healthy and safe environment for the elderly tenants
and to attract a large diversity of seniors of all cultures and back grounds. The proposed multi-use
building is to accommodate for the inhabitants living in the residential floors above. Activities, care
and close convenience to specific goods are to be provided in an efficient and accessible way, so
the tenants and the community can benefit. The space needs to engage, invite and create
anaesthetically-pleasing atmosphere for the community, thus creating a lively social area. The
open feature of the building from the west side creates the sense of community as many of the
residential units will share a common balcony and view. Moreover, the community rooms located
at the center of third and fourth floor, provide space for the tenants to connect with the community
through various social activities. Finally, it is also important to be able to involve others to create a
diverse community within the building parameters. This can be attained through creating a
welcoming, enticing and educational environment through an aesthetically appealing design.
FINAL PROJECT- DOWTOWN 21 SHARMA, MILLER & PARKER (SMP) Page 7
Symbolic Intention
The idea of nature and technology coincides, the one so effortless and the other so complex, yet complement each other and create a message of unity.
FINAL PROJECT- DOWTOWN 21 SHARMA, MILLER & PARKER (SMP) Page 8
Design Principles
The main design principles used to create this building help to make a harmonious space
for the elderly. The use of a grid pattern creates organization in an otherwise random façade. This
will also help to set up a structural grid within the framework of the building. The random
placement of indents along the front façade creates a rhythm like waves flowing across the
surface of the building. This busy surface is broken and juxtaposed by the smooth “cover” that
stretches symmetrically along the two front facades of the building. This “cover” provides both
shade and privacy for the upper residential floors.
The floor plans also follow some design principles to create an engaging interior. Each floor’s focal
point is of a clear panoramic view of both the back garden and roof-top gardens. This helps to
bring the outdoors in.
Formal Organization
The rooms within the building radiate around the central hall. There are three stairs and a
total of three elevators on either side of a “Y” shaped hall. When entering the first floor from the
mall entrance off the corner of Square one Dr. and Hammerson, you step into a small vestibule
with a hall leading off of it. The transition from the front to the rear end of the building is uplifting
and vibrant; as the green walls in the hallways direct towards the lush rear garden. The green
walls provide both a focal point of the building and a source of fresh air within the midst of a busy
area. The outdoor garden in the rear is partly surrounded by a glass wall on two sides creating a
courtyard. All around the glass courtyard is an area for the residents to sit and mingle while
soaking in the view of the garden under the protection of the building. The commercial are lined
around the edge of the building to provide natural light and allow people to enter from the street.
Once in the building they can get to any of the other stores without having to leave from the
protection of the building.
The second floor is commercial office use and can accommodate 14 main offices. These
offices are accessed by the use of either the stairs or the elevators. At the back of the building,
facing towards the garden there is a sitting area with a view to the garden. The exterior wall is
glazed curtain wall that reaches up to the second floor providing exceptional view to the garden
below.
The third to sixth floors are all residential and are adapted to suit an elderly community. The
first three floors have their own roof garden and a grand panoramic view from the interior to the
back garden. The first two floors have a centralized community room. These rooms are large
enough for a common dining area and an activity/ socializing room. All of the floors have a
widened hallways to allow for easy mobility. All the rooms are along the exterior walls and a “Y”
shaped hall attaches them all. The minimizing of dead-end corridors creates less confusion and
takes advantage of the shape of the upper floors and minimizing wasted space. Because of the
orientation of the building, the rooms facing Square One Dr. and Hammerson will get the morning
sun, and the rooms facing lot 19 and 22 will get the evening sun. All corner rooms are larger and
have two walls with views.
FINAL PROJECT- DOWTOWN 21 SHARMA, MILLER & PARKER (SMP) Page 9
1.2 Statistics
Schedule of areas in chart form
No. Area Room Name No. Area Room Name No. Area Room Name No. Area Room Name No. Area Room Name No. Area Room Name602 58 1-BED APT. 502 58 1-BED APT. 402 58 1-BED APT. 302 21 RECEPTION 202 104 OFFICE 1 102 32 VESTIBULE
603 13.5 JTR ROOM 503 13.5 JANITOR ROOM 403 13.5 JANITOR ROOM 303 71 1-BED APT. 203 28 FEMALE WASHROOM 103 13 MAIL ROOM
604 50.1 BCHL. APT. 504 50.1 BCHL. APT. 404 50.1 BCHL. APT. 304 71 1-BED APT. 204 28 MALE WASHROOM 104 67 SECURITY
605 10.2 UNISEX ACCESSIBLE WASHROOM 505 10.2 UNISEX ACCESSIBLE WASHROOM 405 10.2 UNISEX ACCESSIBLE WASHROOM 305 JANITOR'S ROOM 205 212 OFFICE 2 105 43 RETAIL 1
606 85 1-BED APT. 506 85 1-BED APT. 406 85 1-BED APT. 306 70 1-BED APT. 206 231 OFFICE 3 106 15 INFORMATION CENTRE
607 31 SUN ROOM 507 31 SUN ROOM 407 62 NURSES STATION 307 16 UNISEX ACCESSIBLE WASHROOM 207 333 OFFICE 4 107 244 RETAIL 2
608 50 BCHL. APT. 508 50 BCHL. APT. 408 50 BCHL. APT. 308 121 2-BED APT. 208 21 FEMALE WASHROOM 108 219 RETAIL 3
609 96.1 2-BED APT. 509 96.1 2-BED APT 409 57 1-BED APT. 309 104 DINING AREA 209 23 MALE WASHROOM 109 408 RETAIL 4
610 85.5 1-BED APT. 510 85.5 1-BED APT. 410 85.5 1-BED APT. 310 70 1-BED APT. 210 21 JANITOR ROOM 110 29 MAINTENANCE ROOM
611 126.1 2-BED APT. 511 126.1 2-BED APT 411 96 2-BED APT. 311 94 1-BED APT. 211 146 OFFICE 5 111 53 RETAIL 5
612 48.6 1-BED APT. 512 48.6 1-BED APT. 412 126 2-BED APT. 312 121 2-BED APT. 212 98 OFFICE 6 112 32 MALE BATHROOM
613 12.7 UNISEX ACCESSIBLE WASHROOM 513 12.7 UNISEX ACCESSIBLE WASHROOM 413 49 1-BED APT. 313 124 2-BED APT. 213 253 OFFICE 7 113 32 FEMALE BATHROOM
614 70 1-BED APT. 514 70 1-BED APT. 414 12.7 UNISEX ACCESSIBLE WASHROOM 314 178 2-BED APT. 214 117 OFFICE 8 114 154 RETAIL 6
615 55.68 1-BED APT. 515 55.68 1-BED APT. 415 70 1-BED APT. 315 49 1-BED APT. 215 13 MALE WASHROOM 115 59 RETAIL 7
616 75.5 1-BED APT. 516 75.5 1-BED APT. 416 56 1-BED APT. 316 12.7 UNISEX ACCESSIBLE WASHROOM 216 13 FEMALE WASHROOM 116 229 RETAIL 8
617 83 1-BED APT. 517 83 1-BED APT. 417 76 1-BED APT. 317 70 1-BED APT. 217 226 OFFICE 9 117 162 RETAIL 9
618 44.5 NURSES STATION 518 44.5 NURSES STATION 418 83 1-BED APT. 318 56 1-BED APT. 218 207 OFFICE 10 118 163 RETAIL 10
619 100 2-BED APT. 519 100 2-BED APT 419 117 2-BED APT. 319 76 1-BED APT. 219 191 OFICE 11 119 28 HALL
620 141 2-BED APT. 520 141 2-BED APT 420 100 2-BED APT. 320 104 1-BED APT. 220 100 OFFICE 12 120 99 BIKE STORAGE
621 86.8 1-BED APT. 521 86.8 1-BED APT. 421 141 2-BED APT. 321 69 KITCHEN 221 130 OFFICE 13 121 121 LOADING AND STORAGE AREA
622 115.73 2-BED APT. 522 115.73 2-BED APT 422 87 1-BED APT. 322 129 2-BED APT. 222 74 OFFICE 14 122 20 MALE BATHROOM
623 10.2 UNISEX ACCESSIBLE WASHROOM 523 10.2 UNISEX ACCESSIBLE WASHROOM 423 116 2-BED APT. 323 187 2-BED APT. 2a 16.5 EXIT STAIR 123 25 FEMALE BATHROOM
624 16.1 GARBAGE ROOM 524 16.1 GARBAGE ROOM 424 10.2 UNISEX ACCESSIBLE WASHROOM 324 117 1-BED APT. 2b 16.5 EXIT STAIR 124 19 JANITOR ROOM
625 78.2 1-BED APT. 525 78.2 1-BED APT. 425 16.1 GARBAGE 325 151 2-BED APT. 2c 16.5 EXIT STAIR 125 33 GARBAGE
6a 16.5 EXIT STAIR 5a 16.5 EXIT STIAR 426 78.2 1-BED APT. 326 10.2 UNISEX ACCESSIBLE WASHROOM 1a 16.5 EXIT STAIR
6b 16.5 EXIT STAIR 5b 16.5 EXIT STIAR 4a 16.5 EXIT STAIR 327 16.1 GARBAGE 1b 16.5 EXIT STAIR
6c 16.5 EXIT STAIR 5c 16.5 EXIT STIAR 4b 16.5 EXIT STAIR 328 78 1-BED APT. 1c 16.5 EXIT STAIR
4c 16.5 EXIT STAIR 3a 16.5 EXIT STAIR
3b 16.5 EXIT STAIR
3c 16.5 EXIT STAIR
1st Floor Total Area: 2980 sqm
Gross Floor Area: 14,818 sqm
6th Floor Total Area: 1943 sqm 5th Floor Total Area: 1936 sqm 4th Floor Total Area: 2112 3rd Floor Total Area: 2620 sqm 2nd Floor Total Area: 3227 sqm
RESIDENTIAL FLOORS OFFICES RETAIL
6th Floor Residential 5th Floor Residential 4th Floor Residential 3rd Floor Residential 2nd Floor Offices 1st Floor Retail
FINAL PROJECT- DOWTOWN 21 SHARMA, MILLER & PARKER (SMP) Page 10
Occupant load chart
Floor #
Floor Type
Occupancy Classification
(Using Table 3.7.4.8.)
Occupant Load Factor
Occupant Load
Reference
1. Retail (Commercial) E 3.70 2980 sqm. / 3.70 = 806 (Rounded to zero decimals)
OBC Table 3.1.17.1
2. Offices (Services) D 9.30 3227 sqm. / 9.80 = 330 (Rounded to zero decimals)
OBC Table 3.1.17.1
3. Residential (Old Age Housing) B3 - 31 (*According to Room Types & Services on the floor)
-
4. Residential (Old Age Housing) B3 - 28 (*According to Room Types & Services on the floor)
-
5.. Residential (Old Age Housing) B3 - 25 (*According to Room Types & Services on the floor)
-
6.. Residential (Old Age Housing) B3 - 25 (*According to Room Types & Services on the floor)
-
FINAL PROJECT- DOWTOWN 21 SHARMA, MILLER & PARKER (SMP) Page 11
Washroom Calculation charts
First Floor (Retail) Area / Occupant Load: 2980sqm./ 3.70 =806 no. of persons No. of persons / 2: 806/2 = 403 (number per sex) Occupancy type First Floor(retail): E Using Table 3.7.4.8. Male: 17 W.C and 9 sinks Female: 17 and 9 sinks Second Floor (Service) 3227sqm./ 9.30 = 347 no. of persons 347/2 = 174 (number per sex) Occupancy type First Floor(retail): D Using Table 3.7.4.7. Male: 9 W.C and 5 sinks Female: 9 W.C and 5 sinks Third Floor (Residential) # of persons: 31 (*According to Room Types & Services on the floor) 31/2 = 16 (number per sex) Occupancy type First Floor(retail): B3 Using Table 3.7.4.4. Male: 2 W.C and 1 sinks Female: 2 W.C and 1 sinks
Fourth Floor (Residential) # of persons: 28 (*According to Room Types & Services on the floor) 28/2 = 14 (number per sex) Occupancy type First Floor(retail): B3 Using Table 3.7.4.4. Male: 2 W.C and 1 sinks Female: 2 W.C and 1 sinks Fifth Floor (Residential) # of persons: 25 (*According to Room Types & Services on the floor) 25/2 = 13 (number per sex) Occupancy type First Floor(retail): B3 Using Table 3.7.4.4. Male: 1 W.C and 1 sinks Female: 1 W.C and 1 sinks Sixth Floor (Residential) # of persons: 25 (*According to Room Types & Services on the floor) 25/2 = 13 (number per sex) Occupancy type First Floor(retail): B3 Using Table 3.7.4.4. Male: 1 W.C and 1 sinks Female: 1 W.C and 1 sinks
FINAL PROJECT- DOWTOWN 21 SHARMA, MILLER & PARKER (SMP) Page 12
1.3 O.B.C Requirements
Team Name: Sharma, Millar and Parker Inc.
Team Members: Ankit Sharma, Ann Parker, Kristina Millar
Location: Mississauga, Ontario
Location: Site 21 street name: Square One Dr
PART 1: GENERAL BUILDING DESCRIPTION – Ann Parker
ITEM DETAILS OBC REF’S
1.1 Project Description NEW
P3 P9
1.2 Major Occupancy(ies) (F1-3, B-3, D, E)
Multiple Occupancy YES 3.1.2.1.(1)
1.3 Building Area (s.m.) Existing (S.M.) New 3350 (S.M.) total 1.1.3.2.
1.4 Gross Floor Area Existing (S.M.) (not applicable in this project)
New (S.M.) 1. 3092 2. 3312 3. 2687 4. 2172 5. 2007 6. 2007
Over All Total 15277
1.1.3.2.
1.5 # Storeys above grade - 6 below grade - 3 3.2.1.1;1.1.3.2.
1.6 Building Height (m) 27 meters (including penthouse) 2.1.1.3.
1.7 High Building Yes
3.2.6.1(d)
1.8 # Streets 3 – A-Streets: Square One Dr, Hammerson & 1 - B-Street 3.2.2.10 & 3.2.5.5.
1.9 Classification description: stories area = Group B, Division 3, any height, any area, sprinklered # streets = 3 (teacher note: most strict applies) 3.2.2.38
1.10 Barrier Free Design
# of Entrances Required @ grade = n/a
# of Entrances Provided @ grade = 11
# elev’s provided = 6
3.8.1.1. 3.8.1.2(1)
Barrier free Path Req’ts -Every barrier-free path of travel less than 1 600 mm in width shall be provided with an unobstructed space not less than 1 600 mm in width and 1 600 mm in length located not more than 30 m apart.
# Parking to be provided N/A Accesible: 1% of total spaces
3.8.1.3.(4)
1.11 Occupant Load Summary
1st Group E – 3.70 # persons: 836 3.1.17.1
2nd
- Group D – 9.30 # persons: 356
3rd Group B, Division 3 – 10.00
# persons: 269
4th
Group B, Division 3 – 10.00 # persons: 217
5th
Group B, Division 3 – 10.00 # persons: 201
6th
Group B, Division 3 – 10.00 # persons: 201
Parking Group F, Division 3 # persons:
PART 2: FIRE PROTECTION – Kristina Millar
ITEM DETAILS OBC REF’S
2.1 Construction Combustible non-combustible Either in combinat’n 3.2.2.38(2)
2.2 Sprinklers bsmt only entire building in lieu of roof rating
3.2.2.38(2)(a) 3.2.2.43.B 3.2.2.51 3.2.2.57
2.3 Standpipe required
Standpipe is required a. Is more than 3
storeys high b. Is more than
14m high
Location a. exit stair shaft b. service space
3.2.9.1 (1)
3.2.9.2
2.4 Fire Alarm N.Req'd?
Provided – a single system shall be provided for all occupancies
Location – shall be provided throughout the building
3.2.4.1 (2)
3.2.4.2 (2) (3)
2.5 Required Ratings (hrs)
Exits = 45 mins Access to exits = 45 mins Exit discharges = 45 mins
Roof = 1 hr Mezzanine = 1 hr 3.2.2.43 2(b)(c) 3.2.2.50 3.2.2.38(2)(c)
As “E” occ’y Supports 1 hr Corridors 45 m
Floor 2hr 3.2.2.57 3.3.1.4 (2)
As “D” occ’y Supports 1 hr Corridors 45 m
Floor 2hr 3.2.2.50 3.3.1.4 (2)
As “B3” occ’y Supports 1 hr Corridors 30m
Floor 2hr 3.2.2.38 (2) (b) 3.3.1.4 (2)
2.6 Spatial Separation Between Occupancies
lower upper Rating (Hrs.) 3.1.3.1
Parking (F 2&3) Retail (E) --- Retail (E) Office (D) --- Office (D) Residential (B3) 2hr Residential (B3) Residential (B3) ---
Residential (B3) Residential (B3) ---
Residential (B3) Residential (B3) ---
Residential (B3) Penthouse (F3) 2hr
2.7 Mezzanines and Openings thru floors
Interconnected No
exceptions a) the
interconnected floor space consists of the first storey and the
exceptions b) the
interconnected floor space is sprinklered
exceptions c) the
interconnected floor space contains only Group A, Division 1,
3.2.8.2.(6)
FINAL PROJECT- DOWTOWN 21 SHARMA, MILLER & PARKER (SMP) Page 13
storey next above
or below it, but not both
2 or 3, Group D,
Group E, or Group F, Division 2 or 3 occupancies.
configuration a) circle dia 9m b) ellipse 7m wide and min 65m^2 area 3.2.8.3.(2)
2.8 Unprotected openings in an Exposed Building Face
(Front) A Street Length? 69m Height? 22m Area? 1518m^2 Limiting Distance = 0
Percentage allowed 90% = 1366m^2 Actual percentage
3.2.8.3.(2) 3.2.3.1.A
(Rear) B-Street Length? 69m Height? 22m Area? 1518m^2 Limiting Distance = 0
Percentage allowed 70% = 1063m^2 Actual percentage
3.2.8.3.(2) 3.2.3.1.A
(Sides) A-Street Length? 53m Height? 22m Area? 1166m^2 Limiting Distance = 0
Percentage allowed 90% = 1049m^2 Actual percentage
3.2.8.3.(2) 3.2.3.1.A
(Sides) B-Street Length? 53m Height? 22m Area? 1166m^2 Limiting Distance = 0
Percentage allowed 70% = 816m^2 Actual percentage
3.2.8.3.(2) 3.2.3.1.A
PART 3: EXIT REQUIREMENTS – Ankit Sharma
ITEM DETAILS OBC REF’S
3.1 Travel distances
maximum distance to an exit = 45m commercial = 40m residential = 45m Retail = 45m
3.4.2.4 (3) 3.4.2.5 (b)(c)
minimum distance between exits 86m/2 = 43m not more then 9m for a floor area having a public corridor 3.4.2.3(1)(a)
3.2 Dead end corridors
Permitted Residential = no Commercial = no Retail = no No No
3.3.1.9.(9) 3.3.1.9.(11) 3.3.1.9.(12)
Provided Residential = n/a Commercial = n/a Retail = n/a length (m) occ. Load?
3.3.1.9.(9) 3.3.1.9.(11) 3.3.1.9.(12)
3.3 Corridor width (Minimum aggregate required)
Retail = 9.2mm per person
Commercial = 9.2 mm per person
Residential = 18.4 mm per person
3.4.3.2.(1)(a)
3.4 Exit Capacity (based on occupant loads)
3.4.1 Corridor Width
Retail = Min. of 1100mm (Not barrier free)
Commercial = Min. of 1100mm (Not barrier free)
Residential = Min. of 1100mm (Not barrier free)
3.3.1.9(2)(a) and (c)
3.4.2 Stair width Retail = 1100mm Commercial = 1100mm Residential = 1650mm 3.10.2.5(2) 3.4.2.2.(6)(c),(e)
3.4.3. # 900mm doors from each floor based on occ. load
Retail 9.2mm x 836 = 7691.2 7691.2 / 3 = 2563.73 2563.73 / 915 = 2.8 # of doors = 3
Commercial 9.2mm x 356 = 3275.2 3275.2 / 3 = 1091.73 1091.73 / 915 = 1.19 # of doors = 2
Residential 18.4mm x 356 = 6550.4 6550.4 / 3 = 2183.46 2183.46 / 915 = 2.38 # of doors = 3
FINAL PROJECT- DOWTOWN 21 SHARMA, MILLER & PARKER (SMP) Page 14
2.0 Sustainable Design Research & Sustainable Design Application Details
2.1 Energy
According, to National Resource Canada (NRC) energy usage charts:
Commercial/Institutional Secondary Energy Use by Energy Source, End-Use and Activity Type
1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008
Total Growth
1990–2008
Total Energy Use (PJ) a 867.0 888.9 901.2 933.1 927.6 960.9 981.5 998.5 944.1 979.2 1,072.8 1,060.9 1,131.5 1,166.5 1,172.8 1,162.2 1,090.0 1,158.4 1,205.9 39.1%
Energy Use by Energy Source (PJ) a
Electricity 390.1 398.0 397.6 408.0 409.5 421.2 426.9 436.6 431.3 436.8 453.0 445.2 476.8 474.4 483.4 485.9 474.0 517.0 561.0 43.8%
Natural Gas 387.1 403.4 416.6 433.1 420.2 427.6 451.2 452.7 418.5 443.8 503.2 488.4 517.2 525.1 514.1 504.9 467.6 479.6 491.0 26.8%
Light Fuel Oil and Kerosene 62.0 58.1 56.9 57.7 52.4 61.2 59.7 57.5 47.6 47.0 60.4 63.6 73.9 80.1 91.5 83.3 75.7 79.1 68.2 10.1%
Heavy Fuel Oil 11.4 11.0 11.5 11.2 11.9 8.6 9.0 11.8 16.8 17.0 19.8 26.8 27.4 53.5 48.8 55.6 42.5 47.0 47.3 316.7%
Steam 0.2 0.0 0.0 0.3 0.4 0.4 0.4 0.6 0.3 0.3 0.3 0.3 0.3 0.3 0.4 2.7 2.5 3.8 3.8 –
Other 1 16.3 18.4 18.6 22.8 33.3 41.8 34.3 39.3 29.5 34.3 36.1 36.6 35.9 32.9 34.5 29.7 27.7 31.8 34.6 112.8%
Energy Use by End-Use (PJ) b
Space Heating 471.8 473.0 496.2 513.4 502.5 524.4 550.4 541.0 472.7 495.0 578.7 547.9 594.4 615.9 614.6 593.9 534.5 564.1 576.9 22.3%
Water Heating 67.5 70.4 71.4 71.6 71.7 72.7 69.3 83.9 80.2 81.3 90.0 92.9 91.4 99.0 102.1 100.8 98.2 93.4 90.6 34.2%
Auxiliary Equipment 83.2 85.0 88.9 89.9 93.1 97.8 101.1 108.4 112.7 115.2 133.1 141.2 146.4 157.9 171.2 172.7 176.7 204.7 232.0 178.8%
Auxiliary Motors 91.1 94.0 95.7 96.4 96.3 97.1 97.4 94.7 95.3 95.6 95.9 94.1 95.1 94.9 96.7 88.0 88.8 95.6 108.5 19.0%
Lighting 114.2 118.0 120.1 121.2 121.0 121.8 122.5 119.0 119.2 119.7 120.2 117.8 119.5 119.1 121.4 109.0 108.4 116.5 133.1 16.5%
Space Cooling 30.2 39.7 20.4 32.2 35.0 39.3 33.2 44.1 56.6 64.9 47.2 59.2 76.9 71.7 58.9 89.4 75.0 75.3 55.7 84.1%
Street Lighting f 8.9 8.7 8.4 8.3 8.0 7.8 7.5 7.4 7.5 7.4 7.7 7.7 7.8 7.8 7.8 8.3 8.3 8.8 9.1 1.7%
Energy Use by Activity Type 2 (PJ) b
Wholesale Trade 61.8 62.5 62.5 64.3 63.3 65.0 66.0 66.3 62.0 63.9 69.8 68.3 72.0 73.6 73.8 71.3 66.5 70.8 73.3 18.6%
Retail Trade 142.5 145.1 145.9 151.1 149.6 154.1 156.9 159.5 151.5 158.0 173.3 171.6 182.7 188.9 193.2 191.7 180.9 194.2 203.6 42.9%
Transportation and Warehousing 51.4 51.5 51.4 52.7 51.2 52.6 53.5 52.1 47.5 48.2 52.5 50.1 52.2 52.8 51.8 48.6 44.4 46.6 47.2 -8.2%
Information and Cultural Industries 16.7 17.5 18.0 18.8 18.9 19.7 20.2 20.8 20.0 21.0 23.3 23.1 24.9 25.8 25.9 25.2 23.5 25.0 25.9 55.1%
Offices 3 272.5 283.1 289.4 302.0 301.4 313.4 320.9 328.6 313.1 327.5 361.5 359.1 385.0 398.1 398.2 406.1 381.1 405.4 422.4 55.0%
Educational Services 112.8 115.6 117.1 120.7 120.2 124.9 128.4 130.8 123.1 127.1 138.9 137.9 147.2 152.4 153.2 149.0 138.5 146.2 152.5 35.1%
Health Care and Social Assistance 97.2 98.8 100.6 103.4 103.5 107.5 109.7 112.4 105.9 109.5 118.6 117.8 125.9 128.5 129.2 126.4 118.9 125.9 131.1 34.9%
Arts, Entertainment and Recreation 19.6 20.4 21.1 22.2 22.5 24.2 25.1 25.5 24.0 24.8 27.2 26.9 28.6 29.5 29.4 29.0 27.3 29.2 30.8 56.9%
Accommodation and Food Services 64.0 66.0 66.6 69.1 68.8 70.9 72.2 73.6 69.6 71.4 77.9 76.6 82.4 85.6 87.1 84.6 80.3 85.0 88.2 37.9%
Other Services 19.6 19.9 20.1 20.5 20.3 20.8 21.1 21.4 19.9 20.4 22.2 21.7 22.9 23.4 23.3 22.2 20.4 21.3 21.9 11.3%
Activity
Total Floor Space (million m2) c 509.9 525.6 537.4 546.3 552.5 558.7 564.7 573.1 581.9 591.5 601.1 610.2 620.8 631.2 642.6 654.2 667.3 679.7 698.3 36.9%
Energy Intensity 2 (GJ/m2) a,c 1.68 1.67 1.66 1.69 1.66 1.71 1.72 1.73 1.61 1.64 1.77 1.73 1.81 1.84 1.81 1.76 1.62 1.69 1.71 1.8%
Heating Degree-Day Index b,d 0.92 0.93 0.99 1.01 0.98 0.98 1.04 0.98 0.84 0.88 0.96 0.88 0.93 0.96 0.95 0.92 0.85 0.93 0.95
Cooling Degree-Day Index b,e 1.05 1.36 0.54 1.00 0.99 1.18 0.94 0.93 1.31 1.54 0.91 1.43 1.73 1.32 0.95 1.79 1.38 1.45 1.08
1) “Other” includes coal and propane.
2) Excludes street lighting.
3) “Offices” includes activities related to finance and insurance; real estate and rental and leasing; professional, scientific and technical services; and public administration.
FINAL PROJECT- DOWTOWN 21 SHARMA, MILLER & PARKER (SMP) Page 15
Possible sources of errors of information acquired from the charts:
- Energy Intensity might have increased since 2008
- The information is an average rate and standardized
Residential Apartments Secondary Energy Use by Energy Source and End-Use
1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008
Total Growth
1990–2008
Total Apartments Energy Use (PJ) a,b 249.8 242.1 251.3 255.9 261.6 255.4 269.6 262.6 239.7 247.5 256.7 245.8 251.7 263.6 259.6 253.0 243.7 257.4 261.9 4.9%
Energy Use by Energy Source (PJ) a,b
Electricity 112.5 109.9 113.4 111.7 111.7 110.4 112.3 113.1 107.4 109.7 114.6 114.0 116.4 122.3 125.4 123.0 121.9 127.0 132.4 17.7%
Natural Gas 88.9 88.4 92.7 99.0 105.7 104.3 112.1 106.8 95.6 99.9 103.8 97.4 102.1 106.8 102.6 101.8 96.6 103.6 104.9 18.0%
Heating Oil 37.7 32.5 33.9 34.8 33.3 29.4 33.2 30.3 26.3 26.8 26.0 23.1 21.6 22.3 19.3 15.9 13.9 14.2 11.8 -68.6%
Other 1 3.7 3.9 3.3 2.1 2.2 2.5 2.3 2.2 2.0 1.7 1.7 1.7 1.6 1.6 1.6 1.8 1.8 2.0 2.1 -43.7%
Wood 7.0 7.5 8.1 8.3 8.7 8.9 9.7 10.1 8.6 9.4 10.5 9.6 10.0 10.5 10.7 10.5 9.5 10.6 10.7 53.7%
Energy Use by End-Use (PJ) b
Space Heating 130.1 125.1 134.1 138.1 139.7 135.2 147.7 140.6 117.3 124.0 133.3 120.8 126.9 136.4 133.0 126.7 117.1 129.7 131.9 1.4%
Water Heating 64.1 62.3 62.7 64.2 67.6 66.0 67.5 67.2 66.6 67.2 66.5 66.1 65.8 67.2 65.1 65.0 64.7 65.6 65.2 1.7%
Appliances 47.8 46.6 47.0 46.0 46.5 46.3 46.5 46.7 47.2 47.4 48.5 49.8 49.7 50.7 52.0 50.6 51.2 50.9 54.1 13.3%
Lighting 7.1 6.9 7.0 6.9 7.1 7.1 7.2 7.3 7.4 7.6 7.8 8.0 8.0 8.2 8.3 7.9 7.9 7.6 7.8 10.1%
Space Cooling 0.8 1.1 0.4 0.7 0.7 0.9 0.7 0.7 1.1 1.2 0.7 1.1 1.3 1.1 1.1 2.9 2.9 3.6 2.9 282.7%
Activity
Total Floor Space (million m2) b 285 293 298 303 307 312 316 319 318 318 318 319 322 325 330 336 342 347 355 24.3%
Total Households (thousands) b,c 3,206 3,295 3,341 3,392 3,434 3,485 3,530 3,556 3,590 3,629 3,676 3,726 3,772 3,819 3,870 3,928 3,971 4,031 4,076 27.1%
Energy Intensity (GJ/m2) a,b 0.88 0.83 0.84 0.85 0.85 0.82 0.85 0.82 0.75 0.78 0.81 0.77 0.78 0.81 0.79 0.75 0.71 0.74 0.74 -15.6%
Energy Intensity (GJ/household) a,b,c 77.9 73.5 75.2 75.4 76.2 73.3 76.4 73.9 66.8 68.2 69.8 66.0 66.7 69.0 67.1 64.4 61.4 63.9 64.3 -17.5%
Heating Degree-Day Index b,d 0.92 0.93 0.99 1.01 0.98 0.98 1.04 0.98 0.84 0.88 0.96 0.88 0.93 0.96 0.95 0.92 0.85 0.93 0.95
Cooling Degree-Day Index b,e 1.05 1.36 0.54 1.00 0.99 1.18 0.94 0.93 1.31 1.54 0.91 1.43 1.73 1.32 0.95 1.79 1.38 1.45 1.08
1) “Other” includes coal and propane.
16 | P a g e
LEED credit 2.2 On site renewable sources must produce 10% of overall energy req’d: 2 POINTS
In the commercial spreadsheet, for 2009, it indicates that the Energy Intensity was 1.7 GJ/m2 (or 1.7x10^9). One kw-h equals 3.6 MJ (or 3.6x10^6). Therefore: 1.7x10^9 GJ/m2 divided by 3.6x10^6 MJ = .472x10^3 kw-h/m2 (or 472 kw-h / m2) In the residential spreadsheet, for 2008, it indicates that the Energy Intensity was 0.74 GJ/m2 (or 7.4 x 10^8). One kw-h equals 3.6 MJ (or 3.6x10^6). Therefore: 7.4x10^8 GJ/m2 / 3.6x10^6 MJ = 2.05 x 10^2 kw-h/m2 (or 205 kw-h/m2)
Floor Areas of the building: So,
Floor # and Type Floor Area (m^2)
1st Floor- Commercial/ Retail 2980 m^2
2nd Floor- Services/ Offices 3227 m^2
3rd Floor- Residential/ Old Age Housing 2620 m^2
4th Floor- Residential/ Old Age Housing 2112 m^2
5th floor- Residential/ Old Age Housing 1936 m^2
6th floor- Residential/ Old Age Housing 1943 m^2
So, depending on the floorplan area of the building, we can calculate the average baseline energy consumption. First Floor Energy Consumption: 472 kw-h/m2 x 2980 m^2 = 1,406,560 kw-h Second Floor Energy Consumption: 472 kw-h/m2 x 3227 m^2 = 1,523,144 kw-h Third Floor Energy Consumption: 205 kw-h/m2 x 2620 m^2 = 537,100 kw-h Fourth Floor Energy Consumption: 205 kw-h/m2 x 2112 m^2 = 432,960 kw-h Fifth Floor Energy Consumption: 205 kw-h/m2 x 1936 m^2 = 396,880 kw-h Sixth Floor Energy Consumption: 205 kw-h/m2 x 1943 m^2 = 398,315 kw-h Total Building Energy Consumption: 4,694,959 kw-h Peak Output power= 320 watts Avg. Peak Sun Hours per day = 4.5 hours
Daily Production per cell = 320 x 4.5 = 1440 wh/ cell per day Area of Cell= 2m^2 % of roof being used by Solar panel = 80% Area of roof being used by Solar Panels = 1943 * 0.80 = 1554 sqm. # of cells = 1554 / 2 = 777 cells Daily Production of Total Cells = 777 x 1440 =1,118,880 wh Annual Total Production by roof solar panels = 1,118,880 x 365 / 1000 = 478391.2 % Total Saving from solar panels: 478391.2 kw-h / 4,694,959 kw-h * 100 = 10.18%
Solar Panels on a roof
References: http://oee.nrcan.gc.ca/corporate/statistics/neud/dpa/handbook_tables.cfm?attr=0 http://www.canadiansolar.com/en/products/newedge-modules/newedge-modules.html http://oee.nrcan.gc.ca/corporate/statistics/neud/dpa/tableshandbook2/com_00_1_e_4.cfm http://en.ca.sanyo.com/HIT-Power/HIT-Power-HIT-Photovoltaic-Module http://en.ca.sanyo.com/dynamic/LinkListingItems/Files/HIT%20Power%20225A%20web-1.pdf http://www.solar-estimate.org/?page=solar-calculations http://greenecon.net/understanding-the-cost-of-solar-energy/energy_economics.html http://www.eclipsall.com
17 | P a g e
2.2 Water A). Rainwater Harvesting Although 70% of the earth's surface is covered by water, less than 1% is appropriate for consumption. As the earth's population continues to increase, it is perilous that we get smarter about how we use our depleting source of clean water. Fresh water is vital to our existence, it lets us to harvest food, manufacture goods and sustain our health. The good news is that building can be designed and incorporated in such a way that it’s more sustainable. Rainwater is a renewable, sustainable and a high quality water source for the proposed building. It is soft, neutral in pH, free from disinfection by-products, salts, minerals, and other natural and man-made contaminants that cause staining, pipe corrosion or smell.
A rainwater harvesting system has four main functions:
catch rainwater from the roof transport the water through the downspouts and piping remove debris and clean the water store the water for its intended use
Solutions:
- A large grey cistern is to be installed on the top of the roof, hidden from the street level view, to collect rainwater
- Some of the water shall be diverted straight to the green roofs installed on the roof and porches on various floors.
- The remaining water collected from the roof shall be transported through plumbing pipes to the filtration system installed on the parking level II (P2)
- After the water has been filtered, it shall be transported to the grey water storage located on the parking level III (P3)
Proposed System: BRAC System for Rainwater Harvesting and Water Management
18 | P a g e
Brac Systems CGW-19800
The CGW-19800 is comprised of three 6600 main holding tanks connected in series and is specifically used in applications when a higher flow volume of greywater is required. The high output 15hp pump manufactured by Brac Systems Inc. is capable of delivering 50,000 Litres /hour (13,192 GPH) @ 71psi. This high output will assist in delivering the greywater at above minimum working pressures when used in taller buildings or for multiple flush valve applications. The CGW-19800 can be used in many different applications ranging from labour camps to vacation resort
The liquid capacity of the CGW-19800 is 17400 Litres (4590 USG), which could recycle enough greywater per day to fully service the toilet flush volume requirements in a 480 man labour camp or detention centre.
The BRAC CGW-19800 Commercial GRS is a complete all-in-one greywater recycling system which includes in-ground holding tanks, in-ground lift stationas, above-ground dual pressure filters, a water management processor with a dedicated pump, a variable frequency, 15hp constant pressure greywater pumping system, pressure filter alarms, and an integrated monitoring and controller processor with built-in BMS functionality (ModBus RTU/RS232).
Holding Tanks used to store rainwater (below grade)
Dual pressure filters used to check water quality
In-ground lift stationas for water management processing with dedicated pumps to move the water up
19 | P a g e
Missisauga Average Water Precipitation per month
Month Average Precipitation (in mm and Liters)
January 65mm
Feburary 61mm
March 87mm
April 80mm
May 92mm
June 95mm
July 97mm
August 81mm
September 75mm
October 60mm
November 72mm
December 74mm
Average Precipitation in Mississauga: (65mm + 61mm + 87mm + 80mm + 92mm + 95mm + 97mm + 81mm + 75mm + 60mm + 72mm + 74mm) / 12 = 78.25mm (0.07825 meters) Area of the roof used as drainage for rainwater: 1943 square meters Rainwater collection in a year: 1943 sq.m * 0.07825 meters = 152 square meters or 152000 Liters
Standard Water Fixtures
First Floor Retail
Fixture # of Units
Liter use per minute
Duration (flush/flow)
Min. Flush/Flow Usage
Occupant Load
Total Water (liters)
Water Closet
6.06 1 1 836 5066.16
Urinals 3.79 1 1 836 3168.44
Lavatories 9.46 12 1 836 94902.72
Janitor 1 9.46 12 1 1 113.52
Total: 103250.84
Second Floor Offices
Fixture # of Units
Liter use per minute
Duration (flush/flow)
Min. Flush/Flow Usage
Occupant Load
Total Water (liters)
Water Closet
6.06 1 1 356 2157.36
Urinals 3.79 1 1 356 1349.24
Lavatories 9.46 12 1 356 40413.12
Kitchen Sink
14 9.46 12 1 26 41321.28
Janitor 1 9.46 12 1 1 113.52
Total: 85354.52
Third Floor Residential
Fixture # of Units
Liter use per minute
Duration (flush/flow)
Min. Flush/Flow Usage
Occupants
Total Water (liters)
Water Closet
3 6.06 1 1 31
563.58
20 | P a g e
(Public)
Water Closet (Bachelor)
0 6.06 1 1 1
0
Water Closet (1-Bedroom)
12 6.06 1 1 1
72.72
Water Closet (2- Bedroom)
7 6.06 1 1 2
84.84
Urinals 0 3.79 1 1 31 0
Lavatories (Public)
3 9.46 12 1 31
10557.36
Lavatories (Bachelor)
0 9.46 12 1 1
0
Lavatories (1-Bedroom)
12 9.46 12 1 1
1362.24
Lavatories (2-Bedroom)
7 9.46 12 1 2
1589.28
Kitchen Sink
2 9.46 12 1 31
7038.24
Showers (Bachelor)
0 9.46 720 1 1
0
Showers (1-Bed)
12 9.46 720 1 1
81734.4
Showers (2-Bed)
7 9.46 720 2 2
190713.6
Showers (Public)
3 9.46 720 2 31 1266883.
2
Janitor 1 9.46 12 1 1 113.52
Total: 1560712.98
Fourth Floor Residential
Fixture # of Units
Liter use per minute
Duration (flush/flow)
Min. Flush/Flow Usage
Occupants
Total Water (liters)
Water Closet (Public)
3 6.06 1 1 28
509.04
Water Closet (Bachelor)
2 6.06 1 1 1
12.12
Water Closet (1-Bedroom)
11 6.06 1 1 1
66.66
Water Closet (2- Bedroom)
7 6.06 1 1 2
84.84
Urinals 0 3.79 1 1 28
0
Lavatories (Public)
3 9.46 12 1 28
9535.68
Lavatories (Bachelor)
2 9.46 12 1 1
227.04
Lavatories (1-Bedroom)
11 9.46 12 1 1
1248.72
Lavatories (2-Bedroom)
7 9.46 12 1 28
22249.92
Nursing Station
2 9.46 12 1 28
6357.12
Showers (Bachelor)
2 9.46 720 1 1
13622.4
Showers (1-Bed)
11 9.46 720 1 1
74923.2
Showers (2-Bed)
7 9.46 720 2 2
190713.6
Showers (Public)
3 9.46 720 2 28 1144281.
6
Janitor 1 9.46 12 1 1 113.52
Total: 1463945.46
21 | P a g e
Fifth Floor Residential
Fixture # of Units
Liter use per minute
Duration (flush/flow)
Min. Flush/Flow Usage
Occupants
Total Water (liters)
Water Closet (Public)
3 6.06 1 1 23
418.14
Water Closet (Bachelor)
2 6.06 1 1 1
12.12
Water Closet (1-Bedroom)
10 6.06 1 1 1
60.6
Water Closet (2- Bedroom)
5 6.06 1 1 2
60.6
Urinals 0 3.79 1 1 23 0
Lavatories (Public)
3 9.46 12 1 23
7832.88
Lavatories (Bachelor)
2 9.46 12 1 1
227.04
Lavatories (1-Bedroom)
10 9.46 12 1 1
1135.2
Lavatories (2-Bedroom)
5 9.46 12 1 2
1135.2
Nursing Station
2 9.46 12 1 23
5221.92
Showers (Bachelor)
2 9.46 720 1 1
13622.4
Showers (1-Bed)
10 9.46 720 1 1
68112
Showers (2-Bed)
5 9.46 720 2 2
136224
Showers (Public)
3 9.46 720 2 23
939945.6
Janitor 1 9.46 12 1 1 113.52
Total: 1174121.22
Sixth Floor Residential
Fixture # of Units
Liter use per minute
Duration (flush/flow)
Min. Flush/Flow Usage
Occupants
Total Water (liters)
Water Closet (Public)
3 6.06 1 1 25
454.5
Water Closet (Bachelor)
2 6.06 1 1 1
12.12
Water Closet (1-Bedroom)
10 6.06 1 1 1
60.6
Water Closet (2- Bedroom)
6 6.06 1 1 2
72.72
Urinals 0 3.79 1 1 25 0
Lavatories (Public)
3 9.46 12 1 25
8514
Lavatories (Bachelor)
2 9.46 12 1 1
227.04
Lavatories (1-Bedroom)
10 9.46 12 1 1
1135.2
Lavatories (2-Bedroom)
6 9.46 12 1 2
1362.24
Nursing Station
2 9.46 12 1 25
5676
22 | P a g e
Showers (Bachelor)
2 9.46 720 1 1
13622.4
Showers (1-Bed)
10 9.46 720 1 1
68112
Showers (2-Bed)
6 9.46 720 2 2
163468.8
Showers (Public)
3 9.46 720 2 25
1021680
Janitor 1 9.46 12 1 1 113.52
Total: 1284511.14
Low Flush Flow Fixtures
First Floor Retail
Fixture # of Units
Liter use per minute
Duration (flush/flow)
Min. Flush/Flow Usage
Occupant Load
Total Water (liters)
Water Closet
3.03 1 1 836 2533.08
Urinals 1.89 1 1 836 1580.04
Lavatories 1.89 12 1 836 18960.48
Janitor 1 1.89 12 1 1 22.68
Total: 23096.28
Second Floor Offices
Fixture # of Units
Liter use per minute
Duration (flush/flow)
Min. Flush/Flow Usage
Occupant Load
Total Water (liters)
Water Closet
3.03 1 1 356 1078.68
Urinals 1.89 1 1 356 672.84
Lavatories 1.89 12 1 356 8074.08
Kitchen Sink
14 1.89 12 1 26 8255.52
Janitor 1 1.89 12 1 1 22.68
Total: 18103.8
Third Floor Residential
Fixture # of Units
Liter use per minute
Duration (flush/flow)
Min. Flush/Flow Usage
Occupants
Total Water (liters)
Water Closet (Public)
3 3.03 1 1 31
281.79
Water Closet (Bachelor)
0 3.03 1 1 1
0
Water Closet (1-Bedroom)
12 3.03 1 1 1
36.36
Water Closet (2- Bedroom)
7 3.03 1 1 2
42.42
Urinals 0 1.89 1 1 31 0
Lavatories (Public)
3 1.89 12 1 31
2109.24
Lavatories (Bachelor)
0 1.89 12 1 1
0
Lavatories (1-Bedroom)
12 1.89 12 1 1
272.16
Lavatories (2-Bedroom)
7 1.89 12 1 2
317.52
Kitchen Sink
2 1.89 12 1 31
1406.16
Showers (Bachelor)
0 6.81 720 1 1
0
Showers (1-Bed)
12 6.81 720 1 1
58838.4
Showers (2-Bed)
7 6.81 720 2 2
137289.6
Showers (Public)
3 6.81 720 2 31
911995.2
23 | P a g e
Janitor 1 1.89 12 1 1 22.68
Total: 1112611.53
Fourth Floor Residential
Fixture # of Units
Liter use per minute
Duration (flush/flow)
Min. Flush/Flow Usage
Occupants
Total Water (liters)
Water Closet (Public)
3 6.06 1 1 28
509.04
Water Closet (Bachelor)
2 6.06 1 1 1
12.12
Water Closet (1-Bedroom)
11 6.06 1 1 1
66.66
Water Closet (2- Bedroom)
7 6.06 1 1 2
84.84
Urinals 0 3.79 1 1 28 0
Lavatories (Public)
3 9.46 12 1 28
9535.68
Lavatories (Bachelor)
2 9.46 12 1 1
227.04
Lavatories (1-Bedroom)
11 9.46 12 1 1
1248.72
Lavatories (2-Bedroom)
7 9.46 12 1 28
22249.92
Nursing Station
2 9.46 12 1 28
6357.12
Showers (Bachelor)
2 9.46 720 1 1
13622.4
Showers (1-Bed)
11 9.46 720 1 1
74923.2
Showers (2-Bed)
7 9.46 720 2 2
190713.6
Showers (Public)
3 9.46 720 2 28 1144281.
6
Janitor 1 9.46 12 1 1 113.52
Total: 1463945.46
Fifth Floor Residential
Fixture # of Units
Liter use per minute
Duration (flush/flow)
Min. Flush/Flow Usage
Occupants
Total Water (liters)
Water Closet (Public)
3 3.03 1 1 23
209.07
Water Closet (Bachelor)
2 3.03 1 1 1
6.06
Water Closet (1-Bedroom)
10 3.03 1 1 1
30.3
Water Closet (2- Bedroom)
5 3.03 1 1 2
30.3
Urinals 0 1.89 1 1 23 0
Lavatories (Public)
3 1.89 12 1 23
1564.92
Lavatories (Bachelor)
2 1.89 12 1 1
45.36
Lavatories (1-Bedroom)
10 1.89 12 1 1
226.8
Lavatories (2-Bedroom)
5 1.89 12 1 2
226.8
Nursing Station
2 1.89 12 1 23
1043.28
Showers (Bachelor)
2 6.81 720 1 1
9806.4
Showers (1-Bed)
10 6.81 720 1 1
49032
24 | P a g e
Showers (2-Bed)
5 6.81 720 2 2
98064
Showers (Public)
3 6.81 720 2 23
676641.6
Janitor 1 1.89 12 1 1 22.68
Total: 836949.57
Sixth Floor Residential
Fixture # of Units
Liter use per minute
Duration (flush/flow)
Min. Flush/Flow Usage
Occupants
Total Water (liters)
Water Closet (Public)
3 3.03 1 1 25
227.25
Water Closet (Bachelor)
2 3.03 1 1 1
6.06
Water Closet (1-Bedroom)
10 3.03 1 1 1
30.3
Water Closet (2- Bedroom)
6 3.03 1 1 2
36.36
Urinals 0 1.89 1 1 25 0
Lavatories (Public)
3 1.89 12 1 25
1701
Lavatories (Bachelor)
2 1.89 12 1 1
45.36
Lavatories (1-Bedroom)
10 1.89 12 1 1
226.8
Lavatories (2-Bedroom)
6 1.89 12 1 2
272.16
Nursing Station
2 1.89 12 1 25
1134
Showers (Bachelor)
2 6.81 720 1 1
9806.4
Showers (1-Bed)
10 6.81 720 1 1
49032
Showers (2-Bed)
6 6.81 720 2 2
117676.8
Showers (Public)
3 6.81 720 2 25
735480
Janitor 1 1.89 12 1 1 22.68
Total: 915697.17
1st Floor
2nd Floor 3rd Floor 4th Floor 5th Floor 6th Floor
Total Water (Liters) used by Standard Water Fixtures
103250.84 85354.52
1560713 1463945.5 1174121.2
1284511.14
Days Used in a Year 260 260 365 365 365 365
Total Water (Liters) used in a Year 26845218 22192175 569660238 534340093 428554245 468846566
1st Floor
2nd Floor 3rd Floor 4th Floor 5th Floor 6th Floor
Total Water (Liters) used by Low Flush/Flow Fixtures 23096.28 18103.8 1112611.5
1033134 836949.57
915697.17
25 | P a g e
Days Used in a Year 260 260 365 365 365 365
Total Water (Liters) used in a Year 6005032.8 4706988 406103208 377093899 305486593 334229467
1st Floor
2nd Floor 3rd Floor 4th Floor 5th Floor 6th Floor
Total Water (Liters) used in a Year by Standard Water Fixtures 26845218 22192175 569660238
534340093 428554245
468846566
Total Water (Liters) used in a Year by Flush/ Flow Fixtures 6005032.8 4706988 406103208 377093899 305486593 334229467
Total Water (Liters) saved in a Year 20840186 17485187 163557029 157246194 123067652 134617099
Total Water (Liters) saved in a Year using Flush/ Flow Fixtures) 616813347.2
Total Water (Liters) saved in a Year using Rainwater Collection System) 152000
Total Water (Liters) saved in a Year using Flush/ Flow Fixtures) 616813347.2
Total Water (Liters) saved in a Year using Rainwater Collection System) 152000
Total Water (Liters) saved in a Year using Rainwater Collection System) & Flush/ Flow Fixtures 616965347 Liters
Total Percent (%) Water (Liters) saved in a Year using Rainwater Collection System) & Flush/ Flow Fixtures
2050438536/ 616965347 x 100 = 30%
Leed Points Achieved: WATER EFFICIENT LANDSCAPING: NO POTABLE WATER USE OR IRRIGATION (4 points) WATER USE REDUCTION: 30% (2 points) Bibliography: "Kohler Kitchen and Bath Fixtures and Faucets." Kohler Kitchen and Bath Fixtures and Faucets. Kohler. Web. 15 Apr. 2012. <http://www.kohler.ca>. "The Rainwater Connection - About Rainwater Collection." Rainwater Connection. Web. 15 Apr. 2012. <http://www.rainwaterconnection.com/rainwater_harvesting/about_rainwater_collection.htm>.
"World Weather and Climate Information." Weather and Climate: Average Monthly Rainfall, Sunshine, Temperatures. Web. 15 Apr. 2012. <http://www.weather-and-climate.com/>. "Brac Systems - Grey Water Recycling." Brac Systems. Web. 15 Apr. 2012. <http://www.bracsystems.com>.
26 | P a g e
2.3 Materials
HD Synthetic Resin Panel (Prodema) LEED credits 6 & 7
Prodema products are manufactured with strictest environmental requirements. The high density core is made up of heat-hardened synthetic-resin-bonded fibre with a natural wood protected surface. The main features of these resin panels is the aesthetic qualities; high mechanical resistance; resistance to changes in temperature (which is beneficial with Mississauga’s climate); and fire proofing format. The wood veneers come in a variety of different colours from dark brown to an off white. The Prodema panels are located throughout the building but are focused on residential floors three to six.
Advantages of mounting the Prodema panel is it provides waterproofing against rains; creates a constant air ventilation and prevents moisture from getting trapped and dampening insulation; it reduces heat bridges; and is a great energy saver.
Product Supplier:
http://www.soundsolutions.ca/
Sound Solutions Inc. 389 Deerhust Drive Brampton, Ontario L6T 5K3
SUPPORTS ARE FIXED TO FAÇADE WITH SCREWS AND PLUGS MADE OF STEEL OR NYLON
STRIP FIXED TO SUPPORTS USING STAINLESS STEEL SCREWS
WALL THERMAL
INSULATION
VERTICAL STRIP
AIR GAP
PANEL WITH CONCEALED FIXING ALUMINUM
GUIDE STRIP
ALUMINUM HANGING HOOK
27 | P a g e
White Roof- Heat Island Effect: Roof LEED Credit 7.2 point 1
White roofs are an excellent sustainable choice as it reduces energy consumption by becoming a ‘cool roof’. Reflecting the sunrays off the building reduces the temperature inside the building, this will reduce energy costs. ‘Duro- Last Cool Zone reflective roof is installed by Gemsor roofing Inc. This company is located in the GTA and serves Brampton, Mississauga, Oakville, Toronto etc. The benefit of using this product is it reduces heat consumption up to 40%; reduces winter heat loss and summer heat gain. Also it shall decrease urban heat island; which will gain 5.1 LEED points for regional materials.
LEED states that to receive one point, the building should use a roof with a Solar Reflective Index (SRI) of 78 over at least 75 percent of the roof’s surface for roofs with slopes less than 2:12
Using Option 1:
Projected area of SRI roof x SRI of installed roof > 75% Total Projected Roof area Required SRI
(1521.75m2 / 2029 m2) x (78/ 78) > 75%
Product Supplier:
Gemsor roofing Inc.
4 Victoria Street Caledon, ON Canada
28 | P a g e
Green roof- Heat Island Effect: Roof LEED Credit 7.2
Green roofs will be included outside the residential units. The benefits of using a green roof, will not only increase LEED points, but will reduce energy consumption and carbon footprint. Growing small plants reduces the summer air conditioning and offers a layer of insulation during the winter months.
LEED states that to receive one point, the non-roof heat island effect shall have 50% of the outdoor area to be plantation.
Using Option 1: 100% of the outdoor space located from floors 3-6 shall be green roof.
Product Supplier:
Green Space Roofing 797 Dundas St. W Suite 201 Toronto, ON, M6J 1V2
29 | P a g e
Stone Cladding
Stone is a natural resource and therefore is sustainable. The location of the stone cladding shall be located on the first and second floors. Natural limestone is the stone choice, natural stone is a better choice because as it ages it maintains it natural aesthetic look whereas man-made stone does not age as aesthetically and needs replacing after so many years.
Product suppliers
http://www.ciot.com/ontario/en/index.sn
1020 Lawrence Avenue, West
Toronto, Ontario
Structural Systems:
The structural system that is designed to withstand the heavy loads of or building is structural steel tube columns. The maximum tributary load area is 220 m2; therefore the columns are going to be 200mm x 200mm W8. The beams structurally chosen for this building are steel "I" beams. The maximum span is 18m so the height of the beam shall be 800mm or 0.8m. Open Web Steel Joists (OWSJ) are to be used as floor joists the maximum span is 18m therefore the height of the OWSJ will be 800mm or 0.8m. Joist spacing is going to be 2.7m. And lastly slabs are to be steel decking and then poured concrete slab, the depth of the decking is 51mm and the slab has a depth of 100mm.
30 | P a g e
5.0 3D MODELS
5.1 STRUCTURAL MODEL
31 | P a g e
5.1 INTERIOR MODEL
32 | P a g e
33 | P a g e
5.3 EXTERIOR MODEL
34 | P a g e