Project: MISSION SURE ! "#$%& ’ &&(" )%&& End User Training Manual for SAP PP – Production Planning & Control Process Name: Material Requirement Planning (MRP) (Prerequisites: for running MRP in BMHS) Process No: TRF/O2C/4.0 Control Copy No: TRF/O2C/4.0/ #*+ # Doc Version Description Prepared by Date Reviewed by Approved by 00 Original Palani Dorai 24.12.2009 AK Anal, Sachin Kumar Rajak, Minu Singh

Transcript of Project: MISSION SURE - TRF Limitedintranet.trf.co.in/pdf/SAP End User Trg Manual/05 O2C - PP...

Page 1: Project: MISSION SURE - TRF Limitedintranet.trf.co.in/pdf/SAP End User Trg Manual/05 O2C - PP PDF... · Project: MISSION SURE ˘ ˇ ˆ ... SAP Easy Access > SAP menu > Logistics >

Project: MISSION SURE

�������� ����� ���� ������������������� ���� ������ ���

����������������������

����� � �� ���������������� � ������� ! "# $%&�'&&(�"��)%&&�

End User Training Manual

for

SAP PP – Production Planning & Control

Process Name: Material Requirement Planning (MRP) (Prerequisites: for running MRP in BMHS)

Process No: TRF/O2C/4.0

Control Copy No: TRF/O2C/4.0/

����� � �#*� +�#� �����

Doc Version Description Prepared by Date Reviewed by Approved by 00 Original Palani Dorai 24.12.2009 AK Anal,

Sachin Kumar Rajak, Minu Singh

Page 2: Project: MISSION SURE - TRF Limitedintranet.trf.co.in/pdf/SAP End User Trg Manual/05 O2C - PP PDF... · Project: MISSION SURE ˘ ˇ ˆ ... SAP Easy Access > SAP menu > Logistics >

Project: MISSION SURE

�������������� � ����TRF/O2C/4.0�'&&(�"��)%&&

Page 2 of 31

Introduction

The Production Planning and Control functional area in TRF has the following business processes.

��%

� �% �������� � ���� ���,������������ �� �

�� ������������ �!�

�� �� ��

�� ��������"� !���#� ����$��� ���% �&#���$ ���

�� �� ��

'� ��������"��� ������( ��������$$ ����$���

�� �� ��

�� ��������"��� !���#� ���&#���$ ���

�� �� ��

"� ��������)��� !���#� ������#� ���

For each of the above processes, there are separate End User Training Manuals are available

This End user Training manual covers from sl. no. 1 of the above list, that is, the Prerequisite for Material Requirement Planning (MRP) of BMHS, processes and their sub-processes

a) Display of a WBS Element –Transaction code CJ20N b) Multilevel BOM Explosion – Transaction code CS12 c) Display of a Material’s Routing details – Transaction Code CA03 d) Converting an Engg BOM in to a Production BOM – Transaction Code CS01

Page 3: Project: MISSION SURE - TRF Limitedintranet.trf.co.in/pdf/SAP End User Trg Manual/05 O2C - PP PDF... · Project: MISSION SURE ˘ ˇ ˆ ... SAP Easy Access > SAP menu > Logistics >

Project: MISSION SURE

�������������� � ����TRF/O2C/4.0�'&&(�"��)%&&

Page 3 of 31

1. Display of a WBS Element – Transaction code – CJ20N

Procedural Steps

Menu Path

To access CJ20N – Display of a WBS Element, use the following menu path

SAP Easy Access > SAP menu > Logistics > Project System > Project > CJ20N – project Builder

Transaction Code CJ20N

Procedure Enter the Transaction code CJ20N in the command field (as shown in the below screen)

Or go as per the navigation shown below and click CJ20N – Project Builder

Page 4: Project: MISSION SURE - TRF Limitedintranet.trf.co.in/pdf/SAP End User Trg Manual/05 O2C - PP PDF... · Project: MISSION SURE ˘ ˇ ˆ ... SAP Easy Access > SAP menu > Logistics >

Project: MISSION SURE

�������������� � ����TRF/O2C/4.0�'&&(�"��)%&&

Page 4 of 31

Press <Enter> key or click on the check mark icon in the top left side corner of the

Screen, the following screen Project Builder screen appears.

Page 5: Project: MISSION SURE - TRF Limitedintranet.trf.co.in/pdf/SAP End User Trg Manual/05 O2C - PP PDF... · Project: MISSION SURE ˘ ˇ ˆ ... SAP Easy Access > SAP menu > Logistics >

Project: MISSION SURE

�������������� � ����TRF/O2C/4.0�'&&(�"��)%&&

Page 5 of 31

Click on the Project, a drop down menu appears

And select (click once on) the Open option. (Refer screen above), the following Open project pop up window appears

Page 6: Project: MISSION SURE - TRF Limitedintranet.trf.co.in/pdf/SAP End User Trg Manual/05 O2C - PP PDF... · Project: MISSION SURE ˘ ˇ ˆ ... SAP Easy Access > SAP menu > Logistics >

Project: MISSION SURE

�������������� � ����TRF/O2C/4.0�'&&(�"��)%&&

Page 6 of 31

Key-in the WBS element details (as shown below)

And click on the check mark button of the pop up window, the following screen appears.

An expanded view of the above screen is shown below

Page 7: Project: MISSION SURE - TRF Limitedintranet.trf.co.in/pdf/SAP End User Trg Manual/05 O2C - PP PDF... · Project: MISSION SURE ˘ ˇ ˆ ... SAP Easy Access > SAP menu > Logistics >

Project: MISSION SURE

�������������� � ����TRF/O2C/4.0�'&&(�"��)%&&

Page 7 of 31

Expand the node up to the last sub-node as shown in the screen below.

a) For the following “Double Roll Crusher (Identification Number 210.2007.5.1.1” node,

Exapand this node

Page 8: Project: MISSION SURE - TRF Limitedintranet.trf.co.in/pdf/SAP End User Trg Manual/05 O2C - PP PDF... · Project: MISSION SURE ˘ ˇ ˆ ... SAP Easy Access > SAP menu > Logistics >

Project: MISSION SURE

�������������� � ����TRF/O2C/4.0�'&&(�"��)%&&

Page 8 of 31

the following tab screens are available in the right hand side of the screen.

b) For the following “Double Roll Crusher (Identification Number 5000155)” node,

The following tab screens are available in the right hand side of the screen.

Page 9: Project: MISSION SURE - TRF Limitedintranet.trf.co.in/pdf/SAP End User Trg Manual/05 O2C - PP PDF... · Project: MISSION SURE ˘ ˇ ˆ ... SAP Easy Access > SAP menu > Logistics >

Project: MISSION SURE

�������������� � ����TRF/O2C/4.0�'&&(�"��)%&&

Page 9 of 31

c) For the following “Double Roll Crusher (Identification Number 5000155 0001)” node,

The following tab screens are available in the right hand side of the screen.

Page 10: Project: MISSION SURE - TRF Limitedintranet.trf.co.in/pdf/SAP End User Trg Manual/05 O2C - PP PDF... · Project: MISSION SURE ˘ ˇ ˆ ... SAP Easy Access > SAP menu > Logistics >

Project: MISSION SURE

�������������� � ����TRF/O2C/4.0�'&&(�"��)%&&

Page 10 of 31

d) For the following “Double Roll Crusher (Identification Number 0001 5000001686)” node,

The following tab screens are available in the right hand side of the screen.

Page 11: Project: MISSION SURE - TRF Limitedintranet.trf.co.in/pdf/SAP End User Trg Manual/05 O2C - PP PDF... · Project: MISSION SURE ˘ ˇ ˆ ... SAP Easy Access > SAP menu > Logistics >

Project: MISSION SURE

�������������� � ����TRF/O2C/4.0�'&&(�"��)%&&

Page 11 of 31

From the above screen, we can get the details on the delivery date and the Quantity to be supplied.

End of document on T-code CJ20N – Display of WBS Element

Delivery Date

Quantity

Page 12: Project: MISSION SURE - TRF Limitedintranet.trf.co.in/pdf/SAP End User Trg Manual/05 O2C - PP PDF... · Project: MISSION SURE ˘ ˇ ˆ ... SAP Easy Access > SAP menu > Logistics >

Project: MISSION SURE

�������������� � ����TRF/O2C/4.0�'&&(�"��)%&&

Page 12 of 31

2. Multilevel BOM explosion – Transaction code – CS12

Procedural Steps

Menu Path

To access CS12 – Multilevel BOM: Initial Screen, use the following menu path

SAP Easy Access > SAP menu > Logistics > Production > Master data > Bill of Material > Reporting > BOM Explosion > Material BOM > CS12 – Multilevel BOM

Transaction Code CS12

Procedure Enter the Transaction code CS12 in the command field (as shown in the below screen)

Or go as per the navigation shown below and click CS12 – Multilevel BOM

Page 13: Project: MISSION SURE - TRF Limitedintranet.trf.co.in/pdf/SAP End User Trg Manual/05 O2C - PP PDF... · Project: MISSION SURE ˘ ˇ ˆ ... SAP Easy Access > SAP menu > Logistics >

Project: MISSION SURE

�������������� � ����TRF/O2C/4.0�'&&(�"��)%&&

Page 13 of 31

Press <Enter> key or click on the check mark button in the top left corner of the screen, the following screen will appear

Page 14: Project: MISSION SURE - TRF Limitedintranet.trf.co.in/pdf/SAP End User Trg Manual/05 O2C - PP PDF... · Project: MISSION SURE ˘ ˇ ˆ ... SAP Easy Access > SAP menu > Logistics >

Project: MISSION SURE

�������������� � ����TRF/O2C/4.0�'&&(�"��)%&&

Page 14 of 31

a) Key in the Sale Order Line item noted down for explosion purpose while displaying and checking the Sale Order, using T-code VA03. Note: we have noted down the Material number 5000000708

b) Click once on the Plant field, a drop down icon appears at the end of the field, and

Click on this drop down icon a drop down list pop up window appears, and select (click once) on the required Plant. For our example we have selected plant 1000, which is for BMHE Refer screen below for the above details.

Page 15: Project: MISSION SURE - TRF Limitedintranet.trf.co.in/pdf/SAP End User Trg Manual/05 O2C - PP PDF... · Project: MISSION SURE ˘ ˇ ˆ ... SAP Easy Access > SAP menu > Logistics >

Project: MISSION SURE

�������������� � ����TRF/O2C/4.0�'&&(�"��)%&&

Page 15 of 31

Click on the check mark icon of the pop up window, to get the value populated on the plant field in the screen. (Refer screen below)

Page 16: Project: MISSION SURE - TRF Limitedintranet.trf.co.in/pdf/SAP End User Trg Manual/05 O2C - PP PDF... · Project: MISSION SURE ˘ ˇ ˆ ... SAP Easy Access > SAP menu > Logistics >

Project: MISSION SURE

�������������� � ����TRF/O2C/4.0�'&&(�"��)%&&

Page 16 of 31

c) Do not enter any value in the field

d) Click once on the BOM Application field, a drop down icon appears at the end of the field,

and click on this drop down icon a drop down list pop up window appears, and select (click once) on the required BOM Application. We have selected PP01 – Production - general. Refer screen below

Click on the check mark icon of the pop up window, to get the value populated on the plant field in the screen. (Refer screen below)

Page 17: Project: MISSION SURE - TRF Limitedintranet.trf.co.in/pdf/SAP End User Trg Manual/05 O2C - PP PDF... · Project: MISSION SURE ˘ ˇ ˆ ... SAP Easy Access > SAP menu > Logistics >

Project: MISSION SURE

�������������� � ����TRF/O2C/4.0�'&&(�"��)%&&

Page 17 of 31

e) Leave all other fields as it is.

Click on the execute button, the following screen appears.

Page 18: Project: MISSION SURE - TRF Limitedintranet.trf.co.in/pdf/SAP End User Trg Manual/05 O2C - PP PDF... · Project: MISSION SURE ˘ ˇ ˆ ... SAP Easy Access > SAP menu > Logistics >

Project: MISSION SURE

�������������� � ����TRF/O2C/4.0�'&&(�"��)%&&

Page 18 of 31

End of document on T-code CS12 – Multilevel BOM

Occurrence of the component in the level of explosion that is components at level 1 & 2 of the explosion

Page 19: Project: MISSION SURE - TRF Limitedintranet.trf.co.in/pdf/SAP End User Trg Manual/05 O2C - PP PDF... · Project: MISSION SURE ˘ ˇ ˆ ... SAP Easy Access > SAP menu > Logistics >

Project: MISSION SURE

�������������� � ����TRF/O2C/4.0�'&&(�"��)%&&

Page 19 of 31

3. Convert Engineering BOM to production BOM - Transaction code – CS01

Procedural Steps

Menu Path

To access CS01 – Create Material BOM: Initial screen, use the following menu path

SAP Easy Access > SAP menu > Logistics > Production > Master data > Bill of Material > Material BOM > CS01 – Create

Transaction Code CS01

Procedure

Enter the Transaction code CS01 in the command field (as shown in the below screen)

Or go as per the navigation shown below and click CS01 - Create

Page 20: Project: MISSION SURE - TRF Limitedintranet.trf.co.in/pdf/SAP End User Trg Manual/05 O2C - PP PDF... · Project: MISSION SURE ˘ ˇ ˆ ... SAP Easy Access > SAP menu > Logistics >

Project: MISSION SURE

�������������� � ����TRF/O2C/4.0�'&&(�"��)%&&

Page 20 of 31

Press <Enter> key or click on the check mark button key, the following screen will appear

Page 21: Project: MISSION SURE - TRF Limitedintranet.trf.co.in/pdf/SAP End User Trg Manual/05 O2C - PP PDF... · Project: MISSION SURE ˘ ˇ ˆ ... SAP Easy Access > SAP menu > Logistics >

Project: MISSION SURE

�������������� � ����TRF/O2C/4.0�'&&(�"��)%&&

Page 21 of 31

a) Key in the material Number in the material field. In our example we have used material number as 5000000708 Note: we can select the material number by drop down list for this field. b) Key-in the Plant number in the Plant field. In our example we have keyed-in 1000 as the Plant number. Note: we can select the Plant number by drop down list for this field. c) Key-in the BOM Usage data in to the BOM Usage field. In our example we have used the BOM Usage value as 2 (Engineering Note: we can select the BOM Usage value by drop down list for this field. Once the data are keyed-in for the above field, the screen will look as shown below

Click on the copy button, the following screen appears.

Page 22: Project: MISSION SURE - TRF Limitedintranet.trf.co.in/pdf/SAP End User Trg Manual/05 O2C - PP PDF... · Project: MISSION SURE ˘ ˇ ˆ ... SAP Easy Access > SAP menu > Logistics >

Project: MISSION SURE

�������������� � ����TRF/O2C/4.0�'&&(�"��)%&&

Page 22 of 31

Key-in the same Material Number as that entered above in the screen , in the pop up window Material field, We have keyed in the same number in the field. That is 5000000708 And change the value of BOM Usage number to 1 (Production BOM) The screen will look as shown below

Page 23: Project: MISSION SURE - TRF Limitedintranet.trf.co.in/pdf/SAP End User Trg Manual/05 O2C - PP PDF... · Project: MISSION SURE ˘ ˇ ˆ ... SAP Easy Access > SAP menu > Logistics >

Project: MISSION SURE

�������������� � ����TRF/O2C/4.0�'&&(�"��)%&&

Page 23 of 31

Click on the check mark button, the following screen appears.

Select all the item as shown below (Note: Items can be selected partially also)

Page 24: Project: MISSION SURE - TRF Limitedintranet.trf.co.in/pdf/SAP End User Trg Manual/05 O2C - PP PDF... · Project: MISSION SURE ˘ ˇ ˆ ... SAP Easy Access > SAP menu > Logistics >

Project: MISSION SURE

�������������� � ����TRF/O2C/4.0�'&&(�"��)%&&

Page 24 of 31

And click on the Copy icon, the following screen appears

An enlarged view of the above screen is shown below.

Click on the save button to save the data. The following screen appears.

Page 25: Project: MISSION SURE - TRF Limitedintranet.trf.co.in/pdf/SAP End User Trg Manual/05 O2C - PP PDF... · Project: MISSION SURE ˘ ˇ ˆ ... SAP Easy Access > SAP menu > Logistics >

Project: MISSION SURE

�������������� � ����TRF/O2C/4.0�'&&(�"��)%&&

Page 25 of 31

Also look for the following message in the status line.

End of document for transactions CS01

Page 26: Project: MISSION SURE - TRF Limitedintranet.trf.co.in/pdf/SAP End User Trg Manual/05 O2C - PP PDF... · Project: MISSION SURE ˘ ˇ ˆ ... SAP Easy Access > SAP menu > Logistics >

Project: MISSION SURE

�������������� � ����TRF/O2C/4.0�'&&(�"��)%&&

Page 26 of 31

4. Display of a Material’s Routing details - Transaction code – CA03

Procedural Steps

Menu Path

To access CA03 – Display of a Routing details for a material, use the following menu path

SAP Easy Access > SAP menu > Logistics > Production > Master data > Routings > Standard Routings > CA03 - Display

Transaction Code CA03

Procedure Enter the Transaction code CA03 in the command field (as shown in the below screen)

Or go as per the navigation shown below and click CA03 - Display

Page 27: Project: MISSION SURE - TRF Limitedintranet.trf.co.in/pdf/SAP End User Trg Manual/05 O2C - PP PDF... · Project: MISSION SURE ˘ ˇ ˆ ... SAP Easy Access > SAP menu > Logistics >

Project: MISSION SURE

�������������� � ����TRF/O2C/4.0�'&&(�"��)%&&

Page 27 of 31

Press <Enter> key or click on the check mark button,, the following screen will appear

Page 28: Project: MISSION SURE - TRF Limitedintranet.trf.co.in/pdf/SAP End User Trg Manual/05 O2C - PP PDF... · Project: MISSION SURE ˘ ˇ ˆ ... SAP Easy Access > SAP menu > Logistics >

Project: MISSION SURE

�������������� � ����TRF/O2C/4.0�'&&(�"��)%&&

Page 28 of 31

a) Key in a Material number, In our example we have keyed in material number as 7000002119. Note: Material Number can be selected using the drop down list b) Key in Plant Number, in our example we have keyed in Plant Number as 1000. Note: Material Number can be selected using the drop down list The screen will look as below after keying-in the above details.

Click on the push button, the following pop up window appears,

Page 29: Project: MISSION SURE - TRF Limitedintranet.trf.co.in/pdf/SAP End User Trg Manual/05 O2C - PP PDF... · Project: MISSION SURE ˘ ˇ ˆ ... SAP Easy Access > SAP menu > Logistics >

Project: MISSION SURE

�������������� � ����TRF/O2C/4.0�'&&(�"��)%&&

Page 29 of 31

The above pop up window shows that there are Two Routings are available for this material. Select (click once on the line) any one of the routing (refer screen below), and click on the check

mark button of the pop up window. The following screen appears.

An enlarged view of the above screen is shown below

Page 30: Project: MISSION SURE - TRF Limitedintranet.trf.co.in/pdf/SAP End User Trg Manual/05 O2C - PP PDF... · Project: MISSION SURE ˘ ˇ ˆ ... SAP Easy Access > SAP menu > Logistics >

Project: MISSION SURE

�������������� � ����TRF/O2C/4.0�'&&(�"��)%&&

Page 30 of 31

Note: Since the line is in Selected, the colour is shown as above, if unselected the line will look as below

a) Click on the push button, the following screen appears

An enlarged view of the above screen is shown below

Page 31: Project: MISSION SURE - TRF Limitedintranet.trf.co.in/pdf/SAP End User Trg Manual/05 O2C - PP PDF... · Project: MISSION SURE ˘ ˇ ˆ ... SAP Easy Access > SAP menu > Logistics >

Project: MISSION SURE

�������������� � ����TRF/O2C/4.0�'&&(�"��)%&&

Page 31 of 31

In the above screen, the meaning of the Control key parameters, ZP01, ZP02, ZP03 and QM01 is as shown below

End of document on T-code CA03 – Display of Routing

End of document on – Prerequisite: ‘Material requirement Planning (MRP) of BMHS - (TRF/O2C/4.0) – 001-2