Progress Report- Apr'2011

download Progress Report- Apr'2011

of 55

Transcript of Progress Report- Apr'2011

  • 8/6/2019 Progress Report- Apr'2011

    1/55

    A/T Status of Earth auditCircle SSA VendorS.N

    o.Site/ Location W.O. No.&

    date, ifapplicable

    Type ofExchanges( CDOT/ NT/CDMA BTS

    etc).

    Type of Earthingsystem

    Offeredfor A/T(Yes/No)

    A/Tcompleted (Yes/

    No)

    ExchangeEarth

    measuredvalue

    DaCo

    Spikeearth

    Plateearth

    Ringearth

    Total No. of ExchangesA/Ted(Positive Output)

  • 8/6/2019 Progress Report- Apr'2011

    2/55

    1). Nielsen Coverage report

    From 16/01/2009 to 29/01/2009 Reference letter no: BSNL Corporate office Lett

    2). Verification of BTS Outage & Alarm Extension status reported by Circle

    From 16/02/2009 to 18/02/2009 Reference letter no: BSNL Corporate office Lett

    Circle SSA Site/ Location Project/ Scheme

    May '2009

    1 UPW Etah Sakrauli TE GSM PH-V.1

    2 UPW Etah Pondri TE GSM PH-V.1

    3 UPW Etah Unchagaon TE GSM PH-V.1

    4 UPW Etah Bahanpur TE GSM PH-V.1

    5 UPW Etah Mohanpur TE GSM PH-V.16 UPW Etah Bilsad TE GSM PH-V.1

    7 UPW Etawah Muradganj TE GSM PH-V.1

    8 UPW Etawah Purwasujan TE GSM PH-V.1

    9 UPWEtah Mission Hospital Kasganj

    GSM PH-V.1

    10 UPWEtah Ismailpur Road Kasganj

    GSM PH-V.1

    11 UPW Agra Manas Nagar GSM PH-V.1

    June '2009

    1 UPW Etah Bilram Tel Exch GSM PH-V.1

    2 UPW Etah Ismailpur Road Kasganj GSM PH-V.1

    3 UPW Etah Mission Hospital Kasganj GSM PH-V.1

    4 UPW Agra Manas Nagar GSM PH-V.1

    March'2010

    1 UPW Agra Signals, Air Force Station

    2 UPW Agra Tropo, Air Force Station

    3 UPW Agra TAX Bhawan

    Aug'2010

    1 UPW Agra Arjun Nagar TE

    2 UPW Agra Idgah TE

    Sep'2010

    1 UPW Agra Jaipur House TE

    3 UPW Agra TAX Bhawan

    3 UPW Agra TAX Bhawan

    Oct'2010

    1 UPW Agra DayalBagh TE

    2 UPW Agra DayalBagh TE

    Mar'2011

    1 UPW Etawah Main TE- OCB TAX

    2 UPW Etawah Main TE- AXE DTAX

    S.No.

  • 8/6/2019 Progress Report- Apr'2011

    3/55

    3 UPW Etawah Friends Colony TE

    4 UPW Agra Tajnagri TE

    5 UPW Agra Saheed NagarTE

  • 8/6/2019 Progress Report- Apr'2011

    4/55

    er no. MOB-14/QOS- survey-2007-08/24 dated 24-12-2008.

    er no. MOB-35/ BTS-2009 dated 12-02-2009 from GM (WS- O&M)

    P.O. No.& date Vendor/ Technology Type of equipment etc

    Ericsson BTS Tower

    Ericsson BTS Tower

    Ericsson BTS Tower

    Ericsson BTS Tower

    Ericsson BTS Tower Ericsson BTS Tower

    Ericsson BTS Tower

    Ericsson BTS Tower

    Ericsson Power Plant

    Ericsson Power Plant

    Ericsson Power Plant

    Ericsson BTS Tower

    Ericsson BTS Tower

    Ericsson BTS Tower

    Ericsson BTS Tower

    Sainico Engineers Engine Alternator

    Sainico Engineers Engine Alternator

    PO. No:- IT/PO/013/2008-09 Dated 15-1-09 & 22-1-09 ZTE Battery of 1000AH (2 set)

    Microtex Battery of 1000AH (2 set)

    Microtex Battery of 1000AH (2 set)

    Microtex Battery of 1000AH (2 set)

    PO. No:- IT/PO/013/2008-09 Dated 15-1-09 & 22-1-09 ZTE INVERTER

    PO. No:- IT/PO/013/2008-09 Dated 15-1-09 & 22-1-09 ZTE INVERTER

    Microtex Battery of 1000AH (2 set)

    Exi Power Plant (3+1 module)

    Amar Raja Battery of 4000AH (1 set)

    Microtex Battery of 1000AH (1 set)

    (MSC/ BSC/ BTS/ Coverageetc.

  • 8/6/2019 Progress Report- Apr'2011

    5/55

    Microtex Battery of 1000AH (2 set)

    HBL Battery of 1000AH (1 set)

    Microtex Battery of 1000AH (1 set)

  • 8/6/2019 Progress Report- Apr'2011

    6/55

    Installed Capacity (K lines) Date or Month of Offering

    GSM 40M GBT Yes 15-Nov-2008 Yes

    GSM 40M GBT Yes 19-Sep-2008 Yes

    GSM 40M GBT Yes 30-Aug-2008 Yes

    GSM 40M GBT Yes 19-Sep-2008 Yes

    GSM 40M GBT Yes 18-Oct-2008 Yes

    GSM 40M GBT Yes 19-Sep-2008 Yes

    GSM 40M GBT Yes 21-Jul-2008 Yes

    GSM 40M GBT Yes 21-Jul-2008 Yes

    GSMYes

    19-Sep-2008Yes

    GSMYes

    19-Sep-2008Yes

    GSMYes

    20-Sep-2008Yes

    GSM 40M GBT Yes 31-Oct-2008 Yes

    GSM 40M GBT Yes 19-Sep-2008 Yes

    GSM 15M RTT Yes 19-Sep-2008 Yes

    GSM 15M RTT Yes 31-Oct-2008 Yes

    Sainico Engineers 62.5KVA Yes Yes

    Sainico Engineers 62.5KVA Yes Yes

    Make- HBL 1000 AH Yes Yes

    Make- Microtex 1000 AH Yes 29-Jul-2010 Yes

    Make- Microtex 1000 AH Yes 29-Jul-2010 Yes

    Make- Microtex 1000 AH Yes Yes

    2KVA Yes Yes

    1KVA Yes Yes

    Make- Microtex 1000 AH Yes Yes

    Make- Exicom 300A Yes Yes

    Amar Raja 4000 AH Yes Yes

    Microtex 1000 AH Yes Yes

    Offered forA/T (Yes/

    No)

    A/Tcompleted(Yes/ No)New/ Redploy/

    Swap/ Expn. etc.

  • 8/6/2019 Progress Report- Apr'2011

    7/55

    Microtex 1000 AH Yes Yes

    HBL 1000 AH Yes Yes

    Microtex 1000 AH Yes Yes

  • 8/6/2019 Progress Report- Apr'2011

    8/55

    1-May-09

    2-May-09

    4-May-09

    5-May-09

    6-May-098-May-09

    11-May-09

    11-May-09

    26-May-09

    27-May-09

    28-May-09

    29-May-09

    29-Jan-10

    12-Mar-10

    13-Sep-10

    14-Sep-10

    8-Oct-10

    24-02-2011

    24-02-2011

    Date of A/TCompletion

    Vendor Nilstatusreports

    issued(Yes/

    No)

    Date ofissue of

    vendor Nilstatus

    report

    ATC issued(Yes/No)

    Date ofissue of

    ATC

    5/12/2009 to5/13/2009

    5/14/2009 to5/15/2009

    5/16/2009 to5/17/2009

    22-Mar-10 & 23-Mar-10

    06-Aug-2010 & 07-Aug-2010

    11-Aug-2010 & 12-Aug-2010

    23-Aug-2010 & 08-Sep-2010

    06-Oct-2010 & 07-Oct-2010

  • 8/6/2019 Progress Report- Apr'2011

    9/55

    10-Mar-2011

    10-Mar-2011

    03-Mar-2011 & 05-Mar-2011

  • 8/6/2019 Progress Report- Apr'2011

    10/55

    BSNL pending points Vendor pending points

    Alarms- i/p low, frequency out of range & reverse polarity are pending

    Alarms- i/p low, frequency out of range & reverse polarity are pending

  • 8/6/2019 Progress Report- Apr'2011

    11/55

  • 8/6/2019 Progress Report- Apr'2011

    12/55

    Staff Deployment Remarks

    Neeraj Singh T & D Circle

    Neeraj Singh T & D Circle

    Neeraj Singh T & D Circle

    Neeraj Singh T & D Circle

    Neeraj Singh T & D CircleNeeraj Singh T & D Circle

    Neeraj Singh T & D Circle

    Neeraj Singh T & D Circle

    Neeraj Singh T & D Circle

    Neeraj Singh T & D Circle

    Neeraj Singh T & D Circle

    Neeraj Singh T & D Circle

    Neeraj Singh T & D Circle

    Neeraj Singh T & D Circle

    Neeraj Singh T & D Circle

    Neeraj Singh T & D Circle

    Neeraj Singh T & D Circle

    Neeraj Singh T & D Circle

    Neeraj Singh T & D Circle

    Neeraj Singh T & D Circle

    Neeraj Singh T & D Circle

    Neeraj Singh T & D Circle

    Neeraj Singh T & D Circle

    Neeraj Singh T & D Circle

    Neeraj Singh T & D Circle

    Neeraj Singh T & D Circle

    Neeraj Singh T & D Circle

    Name of theofficer conducting

    A/T

    From T&DCircle/

    TerritorialCircle

  • 8/6/2019 Progress Report- Apr'2011

    13/55

    Neeraj Singh T & D Circle

    Neeraj Singh T & D Circle

    Neeraj Singh T & D Circle

  • 8/6/2019 Progress Report- Apr'2011

    14/55

    Circle SSA Site/ Location Project/ Scheme

    December' 2008

    1 UPW Etawah Main TE, Etawah GSM PH-V.1

    January'2009

    1 UPW Mainpuri Aron NBSNL GSM PH-IV+++

    2 UPW Mainpuri Nagla Manjh TE GSM PH-IV+++

    3 UPW Mainpuri Nouner TE GSM PH-IV+++

    4 UPW Mainpuri Jyoti TE GSM PH-IV+++

    5 UPW Mainpuri Alipur Khera TE GSM PH-IV+++

    6 UPW Etawah Dewarpur TE GSM PH-IV+++

    7 UPW Etawah Kudarkot TE GSM PH-IV+++

    8 UPW Etawah Barhalokpur TE GSM PH-IV+++

    9 UPW Etah Dhumri TE GSM PH-IV+++

    10 UPW Etah Thanadariaganj TE GSM PH-IV+++

    11 UPW Etah Sarai Aghat TE GSM PH-IV+++

    February'2009

    S.No.

  • 8/6/2019 Progress Report- Apr'2011

    15/55

    1 UPW Agra TAX Bhawan, Agra GSM PH-V.1

  • 8/6/2019 Progress Report- Apr'2011

    16/55

  • 8/6/2019 Progress Report- Apr'2011

    17/55

  • 8/6/2019 Progress Report- Apr'2011

    18/55

    P.O. No.& date Vendor/ Technology

    Ericsson

    Ericsson

    Ericsson

    Ericsson

    Ericsson

    Ericsson

    Ericsson

    Ericsson

    Ericsson

    Ericsson

    Ericsson

    Ericsson

  • 8/6/2019 Progress Report- Apr'2011

    19/55

    Ericsson

  • 8/6/2019 Progress Report- Apr'2011

    20/55

  • 8/6/2019 Progress Report- Apr'2011

    21/55

  • 8/6/2019 Progress Report- Apr'2011

    22/55

    A/T Status of CMTS

    Type of equipment etc Date or Month of Offering

    (MSC/ BSC/ BTS/ Coverage etc.

    BSC New Yes Yes

    Coverage New Yes 21.07.2008 Yes

    Coverage New Yes 21.07.2008 Yes

    Coverage New Yes 21.07.2008 Yes

    Coverage New Yes 21.07.2008 Yes

    Coverage New Yes 21.07.2008 Yes

    Coverage New Yes 21.07.2008 Yes

    Coverage New Yes 21.07.2008 Yes

    Coverage New Yes 21.07.2008 Yes

    Coverage New Yes 24.01.2008 Yes

    Coverage New Yes 24.01.2008 Yes

    Coverage New Yes 21.07.2008 Yes

    InstalledCapacity

    (K lines)

    Offeredfor A/T(Yes/No)

    A/Tcompled (Ye

    No)

    New/ Redploy/ Swap/Expn. etc.

  • 8/6/2019 Progress Report- Apr'2011

    23/55

    MGW02 New Yes 29.01.2009 Yes

  • 8/6/2019 Progress Report- Apr'2011

    24/55

  • 8/6/2019 Progress Report- Apr'2011

    25/55

  • 8/6/2019 Progress Report- Apr'2011

    26/55

    Date of A/T Completion

    19.12.2008

    06.01.2009

    06.01.2009

    07.01.2009

    07.01.2009

    09.01.2009

    12.01.2009

    12.01.2009

    14.01.2009

    13.01.2009

    13.01.2009

    14.01.2009

    VendorNil

    statusreports

    issued(Yes/No)

    Date ofissue ofvendor

    Nilstatusreport

    ATCissued

    (Yes/No)

    Date ofissue of

    ATC

  • 8/6/2019 Progress Report- Apr'2011

    27/55

    04.02.2009

  • 8/6/2019 Progress Report- Apr'2011

    28/55

  • 8/6/2019 Progress Report- Apr'2011

    29/55

  • 8/6/2019 Progress Report- Apr'2011

    30/55

    BSNL pending points Staff D

    Neeraj Sing

    SACFA certification pending Neeraj Sing

    SACFA certification pending Neeraj Sing

    SACFA certification pending Neeraj Sing

    SACFA certification pending Neeraj Sing

    SACFA certification pending Neeraj Sing

    SACFA certification pending Neeraj Sing

    SACFA certification pending Neeraj Sing

    SACFA certification pending Neeraj Sing

    SACFA certification pending Neeraj Sing

    SACFA certification pending Neeraj Sing

    SACFA certification pending Neeraj Sing

    Vendorpendingpoints

    Name of thofficer

    conductinA/T

    Approved C Module not provided.Approved Software Version List for reference not provided.TEST no. 6.4 Intra BSC Handover is PENDING.TEST no. 6.5 MMS Testing is PENDING.TEST no. 14 Inter working with LBS is PENDING.TEST no. 17 Test of Codecs is PENDING.TEST no. 20 3 G RELATED TESTS is PENDING.Documents pending.

  • 8/6/2019 Progress Report- Apr'2011

    31/55

    Neeraj Sing

    GENERAL POINTS

    P.O. not providedBOM not providedHumidity Meter not installed in switch room.Approved I.P. and Soft Version of Eqpt. To be provided.PCM & Fiber Test Report.All PCs not installed.All Logs & Screen Shots are to be submitted.

    INFRASTRUCTURE TEST

    Approved Layout and floor plan not provide for Eqpt and DDF.Approved Trunking Diagram not provided.Approved earth layout plan not providedNeither earth is measured nor any earth certificate is providedUPS/Inverter not Offered for AT

  • 8/6/2019 Progress Report- Apr'2011

    32/55

    PRE & POST SWITCH ON TEST

    Approved Layout and floor plan not provide.QA Inspection certificate not issuedAll documents are with planning section. None is available on site.

    Approved DDF Layout Not Provided.Emergency light not provided.Installation of PC Monitor and printer is pendingApproved Connectivity diagram not provided

    Jumper taken is not through proper path.Voltage drop is 1.2 V.

    CDR yet to be providedConnectivity of OSS from MPBN is not throughApproved C module not provided. Cable laying on the DDF is not proper.No provision of Emergency light & there isno provision for measuring humidity in the switch roomNo Connectivity diagram present at site.Approved Software list not providedNo redundancy available for ET-C41 cardOnly one clock is available from Nokia MSC Agra.No second option is availableET-MC 41 card is not available4.3.1.6.1 LSL Out of 16 LSL with BSC1 only 8 are Working.4.3.1.6.2 HSL over TDM Not defined4.3.1.6.3 HSL over ATM Not defined4.3.1.6.4 HSL over NNI-SAAL Not defined4.5.6.2 No HSL with POI

  • 8/6/2019 Progress Report- Apr'2011

    33/55

    Test case no 4. QA certificate of all equipmentTest case no 5. Check of Documentation, Hard / soft copyTest case no 6. Network connectivity diagram2) POST SWITCH ON TESTFollowing are the test which are still pending:Test case no 4.2.1.4 ET-C41 pair redundancyTest case no 4.2.2 Clock SynchronizationTest case no 4.3.1.4 Verification of TDM Cross ConnectionsTest case no 4.3.1.8 Verification of Protection GroupTest case no 4.3.1.9 Coding schemes supportTest case no 4.5.2 Verification of E1 Physical Path Termination Point Status (ET-MC1)

    Test case no 4.5.4 Verification of TDM Cross ConnectionsTest case no 4.5.8 Verification of Protection GroupTest case no 4.6.1 Verification of ATM Layer (User Part)Test case no 4.6.2 Verification of ATM Layer (Signaling Part)Test case no 4.6.3 Verification of IP Layer (SIGTRAN)Test case no 4.7.1 Verification of Media Stream Device Pool Data- Pending for UMTS servicesTest case no 4.7.2 Verification of Interactive Messaging- Pending for UMTS servicesTest case no 4.8.1.3Test case no 4.8.1.5Test case no 4.8.1.7Test case no 4.8.2 Load measurement

  • 8/6/2019 Progress Report- Apr'2011

    34/55

    loyment Remarks

    IN Circle

    IN Circle

    IN Circle

    IN Circle

    IN Circle

    IN Circle

    IN Circle

    IN Circle

    IN Circle

    IN Circle

    IN Circle

    IN Circle

    From T&DCircle/

    TerritorialCircle

  • 8/6/2019 Progress Report- Apr'2011

    35/55

    IN Circle

  • 8/6/2019 Progress Report- Apr'2011

    36/55

  • 8/6/2019 Progress Report- Apr'2011

    37/55

  • 8/6/2019 Progress Report- Apr'2011

    38/55

    S.No. Circle SSA Site/ Location Type of equipment

    December'2008

    1 UPW Agra Baroli Ahir TE DSLAM 108 Yes2 UPW Agra Samsabad TE DSLAM 108 Yes

    3 UPW Agra Kagarol TE DSLAM 64 Yes

    4 UPW Etah Kasganj TE DSLAM 432 Yes

    5 UPW Mathura Township TE DSLAM 432 Yes

    6 UPW Mathura Dampier Nagar TE DSLAM 432 Yes

    7 UPW Mathura Krishna Nagar TE DSLAM Yes

    Nov '2009

    1 UPW Aligarh Main TE Switch (RPR Tier I) Yes

    Project/Scheme

    P.O. No.&date

    Vendor/Technology

    InstalledCapacity

    ( No. ofPorts.)

    Offerfor A(YesNo)

    (Switch/ Node/Router/ DSLAM)

    Main/Expn

  • 8/6/2019 Progress Report- Apr'2011

    39/55

    Staff Deployment Remarks

    Neeraj Singh T & D Circle A/T of pending point done. Letter send to offNeeraj Singh T & D Circle A/T of pending point done. Letter send to off

    Neeraj Singh T & D Circle A/T of pending point done. Letter send to off

    Neeraj Singh T & D Circle

    Neeraj Singh T & D Circle

    Neeraj Singh T & D Circle

    Neeraj Singh T & D Circle A/T of pending point done. Letter send to off

    Neeraj Singh IN Circle Pending point detail & Undertaking Letter se

    Name of theofficer deputedfor A/T

    From T&DCircle/TerritorialCircle

  • 8/6/2019 Progress Report- Apr'2011

    40/55

    Circle SSA Site/ Location Type of equipment etc

    January'2009

    1 UPW Agra Tax Bhawan UTL/ ZTE BSCB

    March'2009

    1 UPW Aliagarh Main TE UTL/ ZTE BTS New

    2 UPW Aliagarh Kasimpur TE UTL/ ZTE BTS New

    3 UPW Aliagarh MCC UTL/ ZTE BTS New

    4 UPW Aliagarh Dhanipur Mandi UTL/ ZTE BTS New

    5 UPW Aliagarh Delhi Gate UTL/ ZTE BTS New

    6 UPW Aliagarh Sasni Gate UTL/ ZTE BTS New

    7 UPW Aliagarh Nagla Nai (MainTE), Hathras UTL/ ZTE BTS New

    February'2010

    1 UPW Agra Tax Bhawan ITI / ZTE BSCB Expn 50K to 100K Type

    March'2010

    1 UPW Agra Tax Bhawan UTL/ ZTE BSCB

    April'2010

    1 UPW Agra Tax Bhawan UTL/ ZTE BSCB

    S.No.

    Project/Scheme

    P.O. No.&date

    Vendor/Technology

    Installed Capacit( No. K lines)(MSC/

    BSC/ BTS/Coverage

    etc.)

    New/Redeploy/

    Swap/ Expn.

    Pendingpoints

    Pendingpoints

  • 8/6/2019 Progress Report- Apr'2011

    41/55

    BSNL pending points Sta

    EVDO service is still pending Neeraj S

    All documents pending

    Neeraj S

    Neeraj S

    Neeraj S

    Neeraj S

    Neeraj S

    Neeraj S

    Neeraj S

    Full report with pending point sent by mail Neeraj S

    Full report with pending point sent by mail Neeraj S

    Full report with pending point sent by mail Neeraj S

    A/TCertific

    ateissued(yes or

    No)

    Date ofissue of A/TCertificate

    Vendorpendingpoints

    Name oofficerdeputedA/T

  • 8/6/2019 Progress Report- Apr'2011

    42/55

    A/T Status of Transmission Systems/SchemesS. No. SSA Site/ Location Project/ Sc

    December'2008

    1UPW Aligarh Mazupur Subkara to Andala TE SSA depth (Sche

    UPW Aligarh Mazupur Subkara to Andala TE SSA fiber (Schem

    2UPW Aligarh Barauli Khas to Amrauli TE SSA depth (Sche

    3

    UPW Aligarh

    Gadrana UHF to Panethi Road

    SSA depth (Sche

    September'2009

    1 UPW Kanpur Chibramau-Kannauj-Chaubepur-Kanpur (Part of Agra- Kanpur DWDM 40 Chl Scheme) Project Schem

    Circle /Project

  • 8/6/2019 Progress Report- Apr'2011

    43/55

    RKM (Fibre A/T KM) No of System

    Yes 26.12.2008 Yes 30.12.2008

    5.456 KM (approx) Yes 26.12.2008 Yes 30.12.2008

    Yes 26.12.2008 Yes 30.12.2008

    Yes 26.12.2008 Yes 30.12.2008

    Yes 17.08.2009 Yes 29.08.2009

    SKM (System A/TKM -per Fibre pair)

    Offered for A/T(Yes/ No)

    Date of A/Toffering

    A/T Completed(Yes /No)

    Date Of A/TCompletion

  • 8/6/2019 Progress Report- Apr'2011

    44/55

    A/T Status of EP (Poleless)Circle SSA Site/ Location Vendor Detail of Eqpmt(Lines)S.N

    o.W.O. No.&

    dateOfferedfor A/T(Yes/No)

    Date orMonth ofOfferingfor A/T

    A/Tcompleted (Yes/

    No)

    Date of CompletioNo. of

    DELOfferedfor A/T

    No. ofDELA/Ted

    No. ofDELCleared

    Total Line A/Ted:(Positive Output)

  • 8/6/2019 Progress Report- Apr'2011

    45/55

    S.No. Circle SSA Site/ Location P.O. No.& date Vendor Type of equipment

    Main/ Expn.

    April'2009

    1 UPW NTR Sanjay Place, Agra TAX EWSD ExpansionMarch'2010

    1 UPW NTR Tax Bhawan, Agra ZTE IPTAX ZTE Main 2

    May'2010

    1 UPW Agra Tax Bhawan, Agra ZTE IPTAX ZTE Pending Points 2

    July'2010

    1 UPW Agra Tax Bhawan, Agra ZTE IPTAX ZTE Pending Points 2

    Aug'2010

    1 UPW Agra Tax Bhawan, Agra ZTE IPTAX ZTE Pending Points 2

    2 UPW Aligarh Main TE, Aligarh ZTE IPTAX ZTE New

    Sep'2010

    1 UPW Agra Tax Bhawan, Agra ZTE IPTAX ZTE Pending Points 2

    Dec'2010

    1 UPW Agra Tax Bhawan, Agra ZTE IPTAX ZTE Pending Points 2

    InsCapac

    (Nli

    ( Local/TAX/RSU)etc.

    Technology (OCB/EWSD/AXE etc.)

  • 8/6/2019 Progress Report- Apr'2011

    46/55

    Pending points Staff Deployment

    All Documents Pending Neeeraj Singh T & D Circle

    Details to be sent in IPTAX PP performa Neeeraj Singh T & D Circle

    Details to be sent in IPTAX PP performa Neeeraj Singh T & D Circle

    Details to be sent in IPTAX PP performa Neeeraj Singh T & D Circle

    Details to be sent in IPTAX PP performa Neeeraj Singh T & D Circle

    Details to be sent in IPTAX PP performa Neeeraj Singh T & D Circle

    Details to be sent in IPTAX PP performa Neeeraj Singh T & D Circle

    Details to be sent in IPTAX PP performa Neeeraj Singh T & D Circle

    Name of theofficer deputedfor A/T

    From T&D CTerritorial C

  • 8/6/2019 Progress Report- Apr'2011

    47/55

    A/T Status of POIS.No. Circle SSA Site/ Location W.O. No.& date Vendor /Operator Type of equipment

    April'2010

    7 UPW Mathura TTSL POI NLD MAIN

    July'2010

    8 UPW Etawah POI CMTS MAIN 2 E1s

    Aug'2010

    9 UPW Etawah POI CMTS MAIN 2 E1s

    Sep'2010

    10 UPW Etawah TTSL POI NLD MAIN 1 E1s

    11 UPW Etawah TTSL POI NLD MAIN 1 E1s

    12 UPW AGRA VIDEOCON POI CMTS MAIN 4 E1 (ISD

    Oct'2010

    13 UPW Etawah AIRCEL POI CMTS MAIN 2 E1s

    Nov'2010

    14 UPW Etawah TTSL POI NLD MAIN 1 E1s

    Dec'2010

    15 UPW Etawah TTSL POI NLD MAIN 1 E1s

    16 UPW Mainpuri SSTL POI CMTS MAIN 1 E1s

    17 UPW Aligarh SSTL POI CMTS MAIN 1 E1s

    18 UPW Etah SSTL POI CMTS MAIN 1 E1s

    Jan'201119 UPW Etah SSTL POI CMTS MAIN 1 E1s

    Apr'2011

    20 UPW AGRA IDEA POI CMTS EXP

    21 UPW AGRA IDEA POI CMTS EXP

    InstalleCapacity

    ( No.E1s )

    Type ofSwitch(MSC/GMSC/Local/TAX)

    Type of POI(NLD/ ILD/Basic/CMTSetc.)

    Main/Expn

    C-DOT Exch, DampierNagar, Mathura

    1 E1s (Aclink)

    AXE10 Exch, Main TE,Etawah

    UNINOR(UNITECH)

    AXE10 Exch, Main TE,Mainpuri

    UNINOR(UNITECH)

    OCB Exch, Main TE,Etawah

    OCB-RSU Exch,Bhartana

    EWSD Exch, SanjayPlace, Agra

    AXE10 Exch, Main TE,Etawah

    CDOT Exch, Main TE,Auraiya

    CDOT Exch, Main TE,Bidhuna

    AXE10 Exch, Main TE,Mainpuri

    L-2 EWSD Exch, MainTE, Aligarh

    AXE10 Exch, Main TE,Etah

    AXE10 Exch, Main TE,Etawah

    EWSD Exch, SanjayPlace, Agra

    54 E1- MAT

    OCB TAX, TAXBhawan, Agra

    30 E1- MAT

  • 8/6/2019 Progress Report- Apr'2011

    48/55

    Staff Deployment

    Neeraj Singh IN Circle

    Neeraj Singh IN Circle

    Neeraj Singh IN Circle

    Neeraj Singh IN Circle

    Neeraj Singh IN Circle

    Neeraj Singh IN Circle

    Neeraj Singh IN Circle

    Neeraj Singh IN Circle

    Neeraj Singh IN Circle

    Neeraj Singh IN Circle

    Neeraj Singh IN Circle

    Neeraj Singh IN Circle

    Neeraj Singh IN Circle

    Neeraj Singh IN Circle

    Neeraj Singh IN Circle

    Name of theofficerdeputed forA/T

    From INCircle/TerritorialCircle

  • 8/6/2019 Progress Report- Apr'2011

    49/55

    S.No. Circle SSA Vendor Type of equipmentSite/Location

    P.O.No.&date

    Installed

    Capacity( no. of

    K lines)

    Type ofequipment( Local/

    TAX)

    Technology(OCB/EWSD/

    AXEetc.)

    Main/expansion

  • 8/6/2019 Progress Report- Apr'2011

    50/55

    Offeredfor A/T(Yes/No)

    Date orMonthofOfferingfor A/T

    A/Tcompleted (Yes/

    No)

    Date ofA/TCompletion

    A/TCertific

    ateissued(yes or

    No)

    Date ofissue of

    A/TCertific

    ate

    Pendingpoints

    Staff Conducting RemarksName of

    theofficerdeputed

    for A/T

    FromT&DCircle/Territori

    al Circle

  • 8/6/2019 Progress Report- Apr'2011

    51/55

    S.No. Circle SSA Site/ Location Project/ Scheme P.O. No.& date Vendor/ Technology Installed CapacType of equipment

    (MSC/ BSC/BTS/

    Coverageetc.)

    New/Redeploy/

    Swap/ Expn.

  • 8/6/2019 Progress Report- Apr'2011

    52/55

    A/T Status of WLLDate or Month of Offering for A/T A/T completed (Yes/ No) Date of A/T Completion A/T Certificate issued (yes or No) Date of is

  • 8/6/2019 Progress Report- Apr'2011

    53/55

    Staff Deployment Remarks

    From T&D Circle/ Territorial Circle

  • 8/6/2019 Progress Report- Apr'2011

    54/55

    Month FEBRUARY_10

    1 UPW AGRA SQoS of Basic, Broadband and CMTS Services at Agra SSA 21.12.09 to 24.12.09

    MonthJune_10

    1 UPW AGRA SQoS of Basic, Broadband and CMTS Services at Agra SSA 14.06.10 to 16.06.10

    MonthJan_11

    1 UPW AGRA SQoS of Basic, Broadband and CMTS Services at Agra SSA 12.01.11 to 15.01.11