Profile PROCA (New)

download Profile PROCA (New)

of 44

description

this is company profile

Transcript of Profile PROCA (New)

HEAD OFFICE551, 5TH FLOOR, BLOCK A1, LEISURE COMMERCE SQUARE,NO. 9, JALAN PJS 8/9, 46150 PETALING JAYA,SELANGOR DARUL EHSANTEL : 03-78774053/4057 FAX : 03-78774059BRANCH OFFICEA-31, TINGKAT 1, LORONG INDERA MAHKOTA 5/2,JALAN PERSIARAN SULTAN ABU BAKAR,25200 KUANTAN, PAHANG DARUL MAKMUR.TEL : 09-5732503 FAX : 09-5732507COMPANY PROFILE

TABLE OF CONTENTS

1.0Registration0. Company Incorporation, Form 90. Bumiputera Status0. Sijil Perolehan Kerja Kerajaan0. Registration with CIDB

2.0Corporate Information

3.0Project Management Group

4.0Organisation Structure

5.0Key Personnel Curriculum Vitae

6.0Past and Present Project (Civil & Structure)

7.0Past and Present Project (Mechanical & Electrical)

8.0Banking Facilities

9.0Credit Facilities

REGISTRATION

CORPORATE INFORMATION

PROCA HOLDINGS SENDIRIAN BERHAD

CORPORATE INFORMATION

NAME OF COMPANYPROCA HOLDINGS SDN BHDDATE OF INCORPORATION25TH APRIL 1984REGISTRATION NO.118617-TBOARD OF DIRECTORSAMIR KAMAROL HEDZREE BIN KAMARUDINPUAN ROZANA BINTI EMBI

SHARE CAPITALAUTHORISEDRM 1,000,000.00 DIVIDED INTO 1,000,000 ORDINARY SHARES OF RM 1.00 EACH

FULLY PAID UPRM 750,000.00 DIVIDED INTO 750,000 ORDINARY SHARES OF RM 1.00 EACH

EQUITY STATUS100% BUMIPUTERA

REGISTERED ADDRESSNO. 35, JALAN GASING 6/5, 46000 PETALING JAYA

BUSINESS ADDRESSHEAD OFFICE

551, TINGKAT 5, BLOK A1,PUSAT DAGANG SETIA JAYA,NO. 9, JALAN PJS 8/9,46150 PETALING JAYA.TEL : 03-78774053/4057 FAX : 03-78774059

BRANCH OFFICE

A-31, TINGKAT 1, LORONG IM 5/2,JALAN PERSIARAN SULTAN ABU BAKAR,25200 KUANTAN, PAHANG.TEL & FAX : 09-5730129 TEL : 09-5732503 FAX : 09-5732507

PROJECT MANAGEMENT GROUP

PROJECT MANAGEMENT GROUP

ARCHITECTARKITEK MZD SDN BHDNo. 22A-2, Jalan PJU 8/3A,Perdana Business Centre,Damansara Perdana,47820 Petaling Jaya.Tel : 03-77258051 Fax : 03-77297689

CIVIL/STRUCTURAL ENGINEERPERUNDING BUDIMAN UTAMA SDN BHD551, Tingkat 5, Blok A1, Pusat Dagang Setia Jaya,No. 9, Jalan PJS 8/9,46150 Petaling Jaya.Tel : 03-78774053/4057 Fax : 03-78774059

MECHANICAL/ELECTRICAL ENGINEERPAN SEJATI ASSOCIATES SDN BHD26-1, Jalan 4/76C,Desa Pandan, 55100 Kuala Lumpur.Tel : 03-92876125 Fax : 03-92870126

QUANTITY SURVEYORABRA ASSOCIATESNo. 60-2, Jalan 8/2,Taman Danau Kota,53300 Kuala Lumpur.Tel : 03-41492255 Fax : 03-41496108

LAND SURVEYORJURUKUR KAMARUDIN30-2, Jalan Tanjung SD 13/2,Bandar Sri Damansara,52200 Kuala Lumpur.Tel : 03-62750389 Fax : 03-62750413

FINANCIAL CONSULTANTGERALD & CO.No. 10-4, Tingkat 10,Wisma Bandar, No. 18,Jalan Tunku Abdul Rahman,50100 Kuala Lumpur.Tel : 03-26981090 Fax : 03-26944090

ORGANISATION STRUCTURE

ORGANISATION STRUCTURE

The daily management of the Company is handled by the Board of Directors and the supporting staffs. The list of personnel involved are as stipulated below :-

Ir Amir Kamarol Hedzree KamarudinExecutive Director

Hashbudin Bin HashimExecutive ChairmanPuan Rozana EmbiDirector

S Jamal Bin Shaikh MohamedDirector

Ir Daud IsmailProject Manager

Ahmad Munawar ZakariaAssistant Project Manager

Ir Abdul Hadi DaudCivil Engineer, Kuantan Branch

Ir Mohammad Jamil KhamisCivil Engineer

Yong Kim WahEngineering Assistant

Chua Kok SeangEngineering Assistant

Abdullah SallehEngineering Assistant

Noor Azman Mohd AriffinEngineering AssistantSafarrudin TaharDraughtsman

Noreha ManapDraughtlady

Norazura KhairuddinDraughtlady

Alias HusinSite Supervisor

Rozita EmbiSecretary

Noorbaya Iman SaujanaAccountant

Mohd Zamir Khan Mohd Najib KhanOffice Assistant

Mohd Nortarmimi Ab. AzizGeneral Clerk cum dispatch, Kuantan Branch

KEY PERSONNELCURRICULUM VITAE

CURRICULUM VITAEPERSONEL DATA

Name:Ir Amir Kamarol Hedzree KamarudinI/C No.:801015-06-5131Date of Birth:15 October 1980Sex:MaleNationality:MalaysianTelephone:03-78774053/7877/4057Hand phone:012-3812231E-mail:[email protected]:No. 11, Jalan PJU 1A/32,Ara Damansara, 47301 Petaling Jaya,Selangor.

EDUCATION QUALIFICATION

2001:Bachelor of Engineering with University Manchester (UMIST)

2001:Diploma in Information Technology with Informatics

PROFESSIONAL MEMBERSHIP

:Registered with the Board of Engineers, Malaysia B.Eng (Civil)

FIELD OF PROFESSIONAL EXPERIENCE

2001 2006:Projects handled in Perunding Budiman Utama Sdn Bhd are as follows :-

1.Kerja-Kerja Rekabentuk Terperinci Bagi Menaiktaraf Sg. Hampar, Di Kampung Baru Sungai Buloh, Daerah Petaling, Selangor.Project Cost: RM 15 million

2.Kerja-Kerja Rekabentuk Terperinci Sg. Rawang, Selangor.Project Cost: RM 15 million

3.Pembinaan Asrama Kediaman Pelajar Perempuan Ketujuh (7), Universiti Islam Antarabangsa Malaysia, Gombak, Selangor.Project Cost: RM 29 miliion

Ir Amir Kamarol Hedzree Kamarudin

2006 Present:Director of Perunding Budiman Utama Sdn Bhd and also Proca Holdings Sdn Bhd

4.Cadangan Membina dan Menyiapkan Kolej Professional Mara (KPM) Melaka di Atas Lot 43,2132,2141,2142,2513,2514,3198 dan 3199 Jalan Kandang/Bemban, Mukim Bukit Lintang, Daerah Melaka Tengah, Melaka.Project Cost: RM 30 million

5.Cadangan Pindaan dan Pengubahsuaian ke Atas Kilang Sediada di Atas Lot 143, PT 14534, Jalan Industrial Semambu 9, Taman Perindustrian Semambu, Mukim Kuala Kuantan, Kuantan, Pahang Darul Makmur.Project Cost: RM 6 million

6.Cadangan Menaiktaraf Pusat Latihan Angkat Berat (Kebangsaan) Di Kampung Kolam, Mukim Rompin, Pahang Darul Makmur.Project Cost: RM 4 million

7.Cadangan Membina dan Menyiapkan Bangunan Pra Sekolah Serta Kemudahan Berkaitan Bagi Negeri Johor sebagai Projek Kementerian Pelajaran Malaysia Dibawah Bidang Keberhasilan Utama Negara (NKRA) Pakej 5Project Cost: RM 19 million

8. Cadangan Membina dan Menyiapkan Bangunan Pra Sekolah serta Kemudahan Berkaitan Bagi Negeri Johor sebagai Projek Kementerian Pelajaran Malaysia Dibawah Bidang Keberhasilan Utama Negara (NKRA) Pakej 5 Bagi Tahun 2012 & 2013Project Cost: RM 10.8 million

CURRICULUM VITAE

PERSONEL DATA

Name:Hashbudin Bin Hashim

LANDMARK PROJECT

1981 19841.Fasa 3,4,5 Penang BridgeProject Cost: RM 600 million

1984 19871.Senawang Air Keroh HighwayProject Cost: RM 320 million

1995 19971.East West Link MetramacProject Cost: RM 120 million2.Low & Medium Cost Housing in MauritiusProject Cost: RM 120 million

CURRICULUM VITAE

PERSONEL DATA

Name:Ir Daud Bin IsmailI/C No.: 610716-07-5357Date of Birth:16 July 1961Sex: MaleNationality: MalaysianTelephone:03-78774053/7877/4057Hand phone:016-3827677E-mail:[email protected]:No. 28, Jalan USJ 11/1A,UEP Subang Jaya,47620 Petaling Jaya.

EDUCATION QUALIFICATION

:University of Glasgow, Scotland, U.K.Obtained B.Sc. in Civil Engineering with 2nd Class (Division II)Honors (1983 1985)

:University of Technology Malaysia (UTM) Kuala LumpurObtained a 2nd Class Diploma in Civil Engineering

PROFESSIONAL MEMBERSHIP

:Corporate member of the Institution of Engineers, Malaysia(M.E.M)

:Registered with the Board of Engineers, Malaysia (P.Eng)

FIELD OF PROFESSIONAL EXPERIENCE

1992 Present:Executive Partner of Perunding Budiman Utama Sdn Bhd:Director of Perunding Budiman Utama Sdn Bhd:Associates of Proca Holdings Sdn Bhd

Projects handled in Perunding Budiman Utama Sdn Bhd are as follows:-

1.Cadangan Menaiktaraf Pusat Latihan Angkat Berat (Kebangsaan) Di Kampung Kolam, Mukim Rompin, Pahang Darul Makmur.Project Cost: RM 4 million

Ir Daud Bin Ismail

2.Cadangan Membina dan Menyiapkan Bangunan Pra Sekolah serta Kemudahan Berkaitan Bagi Negeri Johor sebagai Projek Kementerian Pelajaran Malaysia Dibawah Bidang Keberhasilan Utama Negara (NKRA) Pakej 5Project Cost: RM 19 million

3.Cadangan Membina dan Menyiapkan Bangunan Pra Sekolah serta Kemudahan Berkaitan Bagi Negeri Johor sebagai Projek Kementerian Pelajaran Malaysia Dibawah Bidang Keberhasilan Utama Negara (NKRA) Pakej 5 Bagi Tahun 2012 & 2013Project Cost: RM 10.8 million

4.Kerja-Kerja Rekabentuk Terperinci Bagi Menaiktaraf Sg. Hampar, Di Kampung Baru Sungai Buloh, Daerah Petaling, Selangor.Project Cost: RM 15 million

5.Kerja-Kerja Rekabentuk Terperinci Sg. Rawang, Selangor.Project Cost: RM 15 million

6.Pembinaan Asrama Kediaman Pelajar Perempuan Ketujuh (7), Universiti Islam Antarabangsa Malaysia, Gombak, Selangor.Project Cost: RM 29 million

7.Cadangan Membina dan Menyiapkan Kolej Professional Mara (KPM) Melaka di Atas Lot 43,2132,2141,2142,2513,2514,3198 dan 3199 Jalan Kandang/Bemban, Mukim Bukit Lintang, Daerah Melaka Tengah, Melaka.Project Cost: RM 30 million

8.Cadangan Pindaan dan Pengubahsuaian ke Atas Kilang Sediada di Atas Lot 143, PT 14534, Jalan Industrial Semambu 9, Taman Perindustrian Semambu, Mukim Kuala Kuantan, Kuantan, Pahang Darul Makmur.Project Cost: RM 6 million

Ir Daud Bin Ismail

9.Membina dan Menyiapkan Kerja-Kerja Menaikkan Taraf Jalan Kg. Tualang Padang ke Kampung Chenera, Dong, Raub, Pahang.Project Cost: RM 7.8 million

10.Cadangan Projek Menaiktaraf Jalan Persiaran Dayang Endah ke Projek Hospital Baru Tanah Rata, Ca,eron Highlands, Pahang.Project Cost: RM 2.5 million

11.Cadangan Projek Jalan Masuk Ke II ke Bandar Kuala Lipis Melalui Simpang Keretapi Lipis, Pahang.Project Cost: RM 1.0 million

12. Melebar dan Menggantikan Jambatan Lama di KM 2.5, Jalan Sungai Buaya, Daerah Hulu Selangor.Project Cost: RM 4.9 million

13.Cadangan Projek Membina Jalan Lencongan Sungai Ruan, Raub, Pahang.Project Cost: RM 2.9 million

14.Cadangan Membina dan Menyiapkan Jalan dan Jambatan ke SRK Sungai II, Bentong, PahangProject Cost: RM 3.3 million

15.Cadangan Membina dan Menyiapkan Jambatan Sg. Klau, Kg. Lengkok, Bentong, Pahang.Project Cost: RM 3.5 million

16.Cadangan Membina dan Menyiapkan Jambatan Batu di Atas Landasan Keretapi di Laluan 8, 64 & 87, Pahang, Pakej 3 (Jerantut Flyover) Jerantut, PahangProject Cost: RM 10.2 million

17.Membina Baru Istana Permai, Pekan, PahangProject Cost: RM 20.0 million

18.Cadangan Membina dan Menyiapkan Pusat Kegiatan (KEMAS) Jenis A & B (17 sites)Project Cost: RM 35.0 million

Ir Daud Bin Ismail

19.Cadangan Membina Bangunan Pejabat, Stor, Rumah Kakitangan dan Kelab Kilat di atas Lot 768, Mukim Jasin, Melaka untuk Tenaga Nasional Berhad.Project Cost: RM 13.0 million

20.Proposed Development on Lot 16042, 16043 & 2416, Mukim Kajang, Selangor untuk Bank Kerjasama (M) Berhad.Project Cost: RM 40.0 million

21.Proposed Construction of Mosque at Kuantan, Pahang.Project Cost: RM 30.0 million

22.Cadangan Bangunan Asrama di Kompleks Pendidikan di Gombak untuk Universiti Islam Antarabangsa Project Cost: RM 11.0 million

23.Proposed Faculty of Law & Faculty of Economics Buildings at Gombak Campus for Universiti Islam Antarabangsa.Project Cost: RM 40.0 million

24.Proposed Infrastructure Works within the Campus (M & E Works) at Gombak Campus for Universiti Islam Antarabangsa, Phase II.Project Cost: RM 17.0 million

25.Cadangan Membina dan Menyiapkan Pejabat 3 Tingkat Sementara untuk MPK di Jalan Tanah Putih, Kuantan Pahang.Project Cost: RM 5.0 million

26.Proposed Astana Golf Estate at Bandar Indera Mahkota, Kuantan, Pahang.Project Cost: RM 150 million

Ir Daud Bin Ismail

1989 1992:Civil and Structural Engineer for Perunding Budiman Sdn Bhd. Project handled are as follows:-

1.Client: Malaysian Industrial Estates Berhad1.1Construction of 13 Units of Factories at Silibin, Ipoh, Perak

1.2Construction of 16 Units of Factories at Batang Kali, Selangor

1.3Construction of Recreation Centre at Batang Kali, Selangor

1.4Construction of Factories at Padang Lalang, Phase II, Pahang Darul Makmur.

1.5Construction of 26 Units of Factories at Shah Alam, Selangor

1.6Construction of Factories at Batu Berendam, Melaka2.Client: SEDC JohorConstruction of 8 Units of Factories at Pasir Gudang, Johor

3.Client: Jabatan Haiwan SelangorConstruction of the Jabatan Haiwan Head Office at Shah Alam, Selangor

4.Client: PLUSConstruction of Toll Plaza at Batu 3 and Sungai Rasau- Federal Highway Route 2 for PLUS

5.Client: JKR PahangConstruction of Kompleks Belia, Kuantan, Pahang Darul Makmur

6.Client: Universiti Islam Antarabangsa MalaysiaDesign and Construction of Faculty of Law & Economics at Gombak Campus for U.I.A.

Ir Daud Bin Ismail

1987 1988:Resident Engineer at Perunding Budiman Sdn Bhd. Projects handled are as follows:-

a)Construction of 12 Units Duplex Type and 9 Units Detached Factories for Malaysian Industrial Estates Berhad at Pasir Gudang, Johor.Project Cost: RM 5.7 million

b)Construction of 10 Units Duplex Type Factory for Malaysian Industrial Estates Berhad at Sabilin, Ipoh, PerakProject Cost: RM 2.7 million

1985 1987:Project Engineer at Arcon Sdn Bhd

Work involved: Site Engineer for the Construction of 200 Units Low Cost Houses for Jabatan Kerja Raya at Hulu Bernam, Hulu Selangor.Project Cost: RM 4.1 million

1982 1983:Technical Assistant at JKR Krian, Parit Buntar

Involved in a school project: Prepare Site Plan and Tender Documents, Site Supervisions, Estimating and Preparing Variation Orders and Progress Payments.

CURRICULUM VITAE

PERSONEL DATA

Name:Ir Abdul Hadi Bin DaudDate Of Birth:1960Sex: MaleNationality:Malaysian

EDUCATION QUALIFICATION

:Diploma in Civil Engineering, Institute Technology MARA, Kuala Lumpur (1982)

:B.Sc. (civil) University of Hartford, Connecticut

PROFESSIONAL MEMBERSHIP

:Member of Lembaga Jurutera Malaysia.

FIELD OF PROFESSIONAL EXPERIENCE

1996 Present :Project Manager for Perunding Budiman Utama Sdn Bhd based in Kuantan Branch Office. Handle the overall projects in Kuantan including:-

1.Cadangan Kerja-Kerja Kajian dan Rekabentuk bagi Menaiktaraf Loji Air Ulu Jempul, Maran, Air Batu Balai dan Padang Piol di Jerantut, Pahang Darul Makmur.

2.Cadangan Projek Menaiktaraf Jalan Persiaran Dayang Endah ke Projek Hospital Baru Tanah Rata, Cameron Highlands.

3.Cadangan Projek Jalan Masuk Ke II ke Bandar Kuala Lipis Melalui Simpang Keretapi Lipis, Pahang Darul Makmur.

4.Cadangan Projek Membina Jalan Lencongan Sg. Ruan, Raub, Pahang Darul Makmur.

5.Cadangan Membina dan Menyiapkan Jalan dan Jambatan ke SRK Sungai II, Bentong, Pahang.

6.Cadangan Membina dan Menyiapkan Jambatan Sg. Klau, Kg. Lengkung, Bentong, Pahang.

7.Cadangan Membina dan Menyiapkan Jambatan Baru di Atas Lintasan Keretapi di Laluan 8, 64 & 87, Pakej 3 (Jerantut Flyover), Jerantut, Pahang

Ir Abdul Hadi bin Daud

8.Membina Baru Istana Permai, Pekan, Pahang

9.Membina dan Menyiapkan Kerja-Kerja Menaiktaraf Jalan Kg. Tualang Padang ke Kg. Chenera, Dong, Raub, Pahang.

10.Cadangan Memajukan Tanah Seluas 1300 Ekar yang Mengandungi Lot Industri Kecil Sederhana (SMI), Lot Perdagangan dan Lot Perumahan di Gebeng, Pahang

Feb 1991 - 1996:Resident Engineer for Perunding Budiman Utama.Project : Construction of Wisma Belia, Kuantan, Pahang DarulMakmur.Project Cost : RM 40 million

Project : Construction of Factories at Padang Lalang, Kuantan and Construction of Factories at Batu Berendam, Melaka.Project Cost : RM 20 million

July 1990 - Jan 1991:Project Manager for Syarikat Pembenaan Fajar Baru (Rembau) Sdn Bhd

Project : Proposed Petronas Regional Centre at Bandar Indera Mahkota, Kuantan, Pahang DarulMakmur.Project Cost : RM 6.2 millionResponsibilities : Planning and managing the works and workers at site. Liaise with resident engineer and local authorities. Arranging for material supply.

Dec 1989 - June 1990:Planning and Liaison Engineer for GKM Development, Yong Peng, Johor.Responsibilities : Liaison with TNB, JBA, JKR, STMB and Resident Engineer. Designing State Road Diversion, Planning for Bridge Construction and Supervise 675 mm dia. water Main Installation.

Ir Abdul Hadi bin Daud

Sep 1986 - Mei 1988:Further study for Engineering Degree in Civil at University of Hartford, America.

June 1982 - July 1986:Technical Assistant at Lembaga Kemajuan NegeriPahang. Project handled are as follows :-1.Pembinaan Bangunan PERKIM NegeriPahang2.Sistem Perparitan di Kawasan IndustriSemambu3.Pembinaan Perumahan Setali Maju 2, Kuantan4.Penyelenggaraan Asrama Belia, TanjungApi.

July 1979 - Mei 1982:Taking up Diploma Course for Civil Engineering at Institute Technology MARA, Shah Alam Selangor.

CURRICULUM VITAE

PERSONEL DATA

Name:Ir Mohammad Jamil bin KhamisDate of Birth:1963Sex:MaleNationality:Malaysian

EDUCATION QUALIFICATION

:Bachelor of Engineering (Hons.) in Civil Engineering Thames Polytechnic London, England 1987

:Diploma in Civil Engineering (UTM)

PROFESSIONAL MEMBERSHIP

:Member of Lembaga Jurutera Malaysia

FIELD OF PROFESSIONAL EXPERIENCE

1992 - Present:C & S Engineer for Proca Holdings Sdn Bhd. Handle the overall C & S Designing Work for the following projects :-

1.Cadangan Kerja-Kerja KajiandanRekabentuk bagi Menaiktaraf Loji Air UluJempul, Maran, Air Batu Balai dan Padang Pioldi Jerantut, Pahang Darul Makmur.

2.Cadangan Projek Menaiktaraf Jalan PersiaranDayang Endah ke Projek Hospital Baru Tanah Rata, Cameron Highlands.

3.Cadangan Projek Jalan Masuk ke II ke Bandar Kuala Lipis melalui Simpang Keretapi Lipis, Pahang Darul Makmur.

4.Cadangan Projek Membina Jalan LenconganSg. Ruan, Raub, Pahang Darul Makmur.

5.Cadangan Membina dan Menyiapkan Jalandan Jambatan ke SRK Sungai II, Bentong, Pahang

6.Cadangan Membina dan MenyiapkanJambatan Sg. Klau, Kg. Lengkung, Bentong, Pahang

7.Membina dan Menyiapkan Kerja-KerjaMenaiktaraf Jalan Kg. Tualang Padang ke Kg. Chenera, Dong, Raub, Pahang Darul Makmur.Ir Mohammad Jamil bin Khamis

8.Cadangan Memajukan Tanah Seluas 1300 Ekar yang Mengandungi Lot Industri Kecil Sederhana (SMI), Lot Perdagangan dan Lot Perumahan di Gebeng, Mukim Sg. Karang, Pahang Darul Makmur.

9.Proposed Polofield at Bandar Indera MahkotaKuantan, Pahang

10.Cadangan Membinadan Menyiapkan PusatKegiatan Masyarakat (KEMAS) Jenis A dan B

11.Cadangan Tatatur Kawasan Perumahan Blok H Bandar Al-Muktafi Billah Shah, Daerah Dungun, Terengganu

12.Cadangan Membina Bangunan Pejabat, Stor, Kantin danTempat Letak Lori Tertutup di atasLot 3190, MukimJasin, Melaka untukTenagaNasional Berhad.

Oct 1991 1992:C & S Engineer for Perunding Budiman Utama SdnBhd. Project handle are as follows :-

1.Cadangan membina dan menyiapkanjambatan baru di atas lintasan keretapi di laluan 8, 64 & 87, Pakej 3 (Jerantut Flyover), Jerantut, Pahang

2.Cadangan Astana Golf Resort in Bandar InderaMahkota, Kuantan, Pahang

3.Design of bridge for Cadangan Jalan Bukit Ibam di Kampung Aur, Pahang for DARA

Sept 1990 - Sept 1991:C & S Engineer for Kemasrunding Sdn Bhd. Project handled are as follows :-

1.Design 2 numbers of highway bridge for Cadangan Landasan Berkembar KTM at Bangi, Selangor and Labis, Negeri Sembilan

2.Civil and structural design for CadanganPerumahan Westcourt Corporation at Sungai Buloh, Selangor

3.Structural design for the Proposed Subway and R.C Ramp of GATEWAY, UDA Project at Kampung Baru, Kuala Lumpur

Ir Mohammad Jamil bin Khamis

Sept 1989 1990:C & S Engineer in Tengku Sidek Associates. Project handled include:-

1.Design four numbers of PretensionedPrestressed - Concrete Bridges, 2 R.C. Box Culverts and Approach Metalled Road for JKR Selangor

2.Design 2 numbers of Post-Tensioned Prestressed Consrete Bridges and Approach Metalled Road for JKR Pahang

3.Structural and Civil Engineering Design for Cadangan Perumahan KUB, Rawang, Selangor

4.Supervision of the construction of 1 block 3-storey shop houses at Port Dickson, Serembanfor MARA

Sept 1987 - Aug 1989:Site Engineer - Pernas Engineering Sdn Bhd

1.Supervision of the construction of 63 nos. 132 KV transmission towers from Bandar BaruBangi to Semenyih for TNB, Malaysia

July 1984 - Oct 1985:Technical Engineer - Airport Unit, JKR, HQ.

Sept 1979 - Jan 1982:Assist airport engineer in the design and supervision of various airport projects in peninsular Malaysia and Labuan. Most of the works were resurfacing of airport runway/taxiway, drainage system, extension works of runway and airport building for DCA Malaysia.

PAST AND PRESENT PROJECTS

(CIVIL & STRUCTURE)

1. STAR PUBLICATION FACTORY IN PETALING JAYAClientPapyrus Printing Sdn BhdProject CostRM 1.8 millionStageCompleted in 1982

2. BENTONG INDUSTRIAL ESTATE, BENTONG, PAHANG DARUL MAKMURClientLembaga Kemajuan Negeri PahangProject CostRM 8.8 millionStageCompleted in 1982

3. FACTORIES AT PASIR GUDANG, JOHORClientMalaysian Industrial Estates Sdn BhdProject CostRM 20.0 millionStageCompleted in 1983

4. GEBENG INDUSTRIAL ESTATE, PAHANG DARUL MAKMURClientLembaga Kemajuan Negeri PahangProject CostRM 1.0 millionStageCompleted in 1983

5. CADANGAN PUSAT PERKHIDMATAN JAYA GADING DALAM (RME) KUANTAN, PAHANG DARUL MAKMURClientLembaga Kemajuan Negeri PahangProject CostRM 1.6 millionStageCompleted in 1984

6. BALOK BARU HOUSING SCHEME, KUANTAN, PAHANG DARUL MAKMURClientPahang State Economic Development CorporationProject CostRM 3.3 millionStageCompleted in 1985

7. SPORTS COMPLEX, KUANTAN, PAHANG DARUL MAKMURClientYayasan Pahang Darul MakmurProject Cost RM 1.80 millionStageCompleted in 1987 (appointed infrastructure works)

8. ADDITIONS TO PRINTING FACTORY AT JABATAN PERCETAKAN KESELAMATAN BUILDING, JALAN CHAN SOW LIN, KUALA LUMPURClientJabatan Percetakan NegaraProject CostRM 1.2 millionStageCompleted in 1987

9. ROAD AND BRIDGES AT PULAU TIOMAN, PAHANG DARUL MAKMURClientPahang State Economic Development CorporationProject CostRM 0.45 millionStageCompleted in 1987

10. MALAYSIAN CAN COMPANY FACTORY AT BANGI, SELANGOR (2-PIECE CAN MANUFACTURING)ClientMalaysian Can Company Sdn BhdProject CostRM 10.0 millionStage Completed in 1988

11. OFF-COURSE CENTRE AT SUNGAI BESI, KUALA LUMPURClientLembaga Totalisator MalaysiaProject CostRM 1.7 millionStageCompleted in 1988

12. 12 UNITS FACTORY DUPLEX TYPE IN SECTION 16, SHAH ALAM, SELANGOR (PHASE 5)ClientMalaysian Industrial Estates Sdn BhdProject CostRM 5.7 millionStageCompleted in 1988

13. CONSTRUCTION OF 10 UNITS DUPLEX TYPE FACTORIES IN SECTION 16, SHAH ALAM (PHASE 7)ClientMalaysian Industrial Estates Sdn BhdProject CostRM 2.8 millionStageCompleted in 1988

14. CONSTRUCTION OF 10 UNITS DUPLEX TYPE FACTORIES, PHASE II, SILIBIN, IPOH PERAKClientMalaysian Industrial Estates Sdn BhdProject CostRM 2.3 millionStageCompleted in 1989

15. PROPOSED FACTORY BUILDING AT PADANG LALANG, PHASE II, KUANTAN, PAHANGClientMalaysian Industrial Estates Sdn BhdProject CostRM 3.8 millionStageCompleted in 1989

16. CONSTRUCTION OF 8 UNITS FACTORY IN PASIR GUDANG, JOHORClientMalaysian Industrial Estates Sdn BhdProject CostRM 3.6 millionStageCompleted in 1989

17. PROPOSED PARTIAL RING ROAD AT BANDAR INDERA MAHKOTA, KUANTAN, PAHANGClientPahang State Economic Development CorporationProject CostRM 9.5 millionStageCompleted in 1989

18. PROPOSED NEW TOWNSHIP AT BANDAR INDERA MAHKOTA, KUANTAN, PAHANGClientPahang State Economic Development CorporationProject CostRM 20 millionStageCompleted in 1989

19. SRI KEMUNING LOW COST HOUSING, KUANTAN, PAHANGClientPahang State Government j.v. Streamland Dev. Sdn BhdProject CostRM 5.0 millionStageCompleted in 1989

20. MARDI BERTAM, SEBERANG PRAI, PULAU PINANGClientInstitut Penyelidikan & Kemajuan Pertanian MalaysiaProject CostRM 5.4 millionStageCompleted in 1990 (September)

21. BRIDGE OVER SUNGAI TELANG, LUBUK KULIT, PAHANGClientJabatan Kerja Raya Negeri PahangProject CostRM 0.7 millionStageCompleted in 1991

22. CADANGAN DEWAN REKREASI DI KAWASAN PERINDUSTRIAN BATANG KALI, SELANGORClientMalaysian Industrial Estates Sdn BhdProject CostRM 1.2 millionStage Completed in 1991

23. PROPOSED HOUSING PROJECT AT MUKIM DAMANSARA, PETALING JAYA, SELANGORClientCoral Land Corporation Sdn BhdProject CostRM 16.8 millionStageCompleted in 1991

24. PROPOSED HOUSING SCHEME AT TANJONG TOKONG, PULAU PINANGClientUrban Development Authority (UDA)Project CostRM 15.0 millionStageCompleted in 1991

25. PROPOSED SECONDARY RELIGIOUS SCHOOL AT PUSAT BANDAR JENGKA, PAHANGClientJabatan Kerja Raya Negeri PahangProject CostRM 6.5 millionStageCompleted in 1992

26. PROPOSED HOUSING SCHEME AT GADEK, ALOR GAJAH, MELAKAClientNorman Agencies Sdn BhdProject CostRM 3.5 millionStage Completed in 1992

27. RANCANGAN PERUMAHAN AWAM KOS RENDAH DI PANTAI KUNDUR TANJUNG KELING, DAERAH MELAKA TENGAHClientPembinaan Hariz (Pantai Kundur) Sdn BhdProject CostRM 2.0 millionStageCompleted in 1992

28. PROPOSED FACTORIES AT PADANG LALANG INDUSTRIAL AREA, PHASE II, PAHANG DARUL MAKMURClientMalaysian Industrial Estates Sdn BhdProject CostRM 1.8 millionStageCompleted in 1992

29. EXTENSION TO EXISTING FACTORY FOR PLASTICON (M) SDN BHDClientFima Metal Box (M) Sdn BhdProject CostRM 0.8 millionStageCompleted in 1993

30. PROPOSED POLOFIELD AT BANDAR INDERA MAHKOTA, KUANTAN, PAHANGClientIndera Mahkota Sports ClubProject CostRM 1.0 millionStageCompleted in 1993

31. CADANGAN IBUPEJABAT PEJABAT HAIWAN DI SHAH ALAMClientJabatan Haiwan SelangorProject CostRM 3.6 millionStageCompleted in 1993

32. FEDERAL HIGHWAY ROUTE 2, TOLL PLAZA WORKS AT BATU TIGA AND SUNGAI RASAUClientMalaysia Highway AuthorityProject CostRM 2.3 millionStageCompleted in 1993

33. PROPOSED CONSTRUCTION OF MOSQUE AT KUANTAN, PAHANG ClientJabatan Kerja Raya Negeri PahangProject CostRM 12.0 millionStageCompleted in 1994

34.CADANGAN PROJEK KOMPLEKS BELIA NEGERI PAHANG DI BANDAR INDERA MAHKOTA, KUANTAN, PAHANG DARUL MAKMURClientJabatan Kerja Raya Negeri PahangProject CostRM 5.0 millionStageCompleted in 1995

PAST AND PRESENT PROJECTS

(MECHANICAL & ELECTRICAL)

1. SUPPLY FAN SWITCHBOARD C/W WITH INVERTER SYSTEM, CALIBRATION TESTING & COMMISSIONINGClientRadicare (M) Sdn Bhd (Hospital Besut)Project CostRM 148,900.00Year2008

2.DESIGN AND INSTALL NEW NEGATIVE PRESSURE SYSTEM, MECHANICAL AND CIVIL WORKSClientPusat Perubatan Universiti MalayaProject CostRM 180,000.00Year2008

3.HEPA FILTER INSTALLATION WORKS AT ED OT-1 (AHU) AND ED OT2 AT HOSPITAL SG. BULOHClientRadicare (M) Sdn Bhd (Hospital Sg. Buloh)Project CostRM 317,400.00Year2008

4.KERJA-KERJA REKA DAN BINA BILIK BERSIH MINOR OT ROOM BERGRED ISO CLASS DI IPR (HOSPITAL KUALA LUMPUR)ClientZas Makmur Sdn BhdProject CostRM 132,920.00Year2008

5.CONSULTATION AND TECHNICAL ADVICE FOR SOLVING MATTER C/W FUMIGATION AND IPA CLEANING & PARTICLE COUNT TESTINGClientRadicare (M) Sdn Bhd (Hospital Serdang)Project CostRM 238,800.00Year2008

6.PPM AIRCOND FOR HOSPITAL SG. BULOH. MAINTENANCE AND SERVICING FOR HVAC SYSTEM AT HOSPITAL SG. BULOH & KOLEJ SAINS KESIHATAN BERSEKUTUClientRadicare (M) Sdn Bhd (Hospital Sg. Buloh) (BUMI MAJU MTE ENGINEERING SDN BHD)Project CostRM 820,616.00Year2008 2010

7.FUMIGATION FOR OT 13,14,15,16,17 AND 18 AT HOSPITAL SERDANGClientRadicare (M) Sdn Bhd (Hospital Serdang)Project CostRM 214,000.00Year2009

8.REPAIR AIR COOLED CHILLER 2 AT KOLEJ SAINS KESIHATAN BERSEKUTUClientRadicare (M) Sdn Bhd (Hospital Sg. Buloh)Project CostRM 230,000.00Year2009

9.CADANGAN REKA DAN BINA BANGUNAN RUMAH HAIWAN BERTARAF CERTIFIED BSL 2 DI FAKULTI SAINS DAN TEKNOLOGI , UKM BANGI.ClientUniversiti Kebangsaan Malaysia (UKM) (BUMI MAJU MTE ENGINEERING SDN BHD)Project CostRM 2.9 millionYear2009

10.TO SUPPLY AND INSTALL HEPA FILTER AT ORTHOPEDIK & ACC OTClientRadifems (M) Sdn Bhd (Hospital Terengganu)Project CostRM 149,900.00Year2010

11.OT SHUTDOWN WORKS, TO DO ROBOTIC DUCT CLEANINGClientRadifems (M) Sdn Bhd (Hospital Terengganu)Project CostRM 137,000.00Year2010

12.MODIFICATION & UPGRADING WORKS FOR MONITORING AND CONTROL SYSTEM FOR TEMP & HUMIDITY AT OT ROOM 1,2 & 3 FOR HOSPITAL KAJANGClientRadifems (M) Sdn Bhd (Hospital Kajang)Project CostRM 193,465.00Year2010

13.FUMIGATION/ FOGGING BY FUMIGATOR SET AND AGENT SINOSIL HIDROGEN PEROKSIDEClientRadifems (M) Sdn Bhd (Hospital Terengganu)Project CostRM 113,000.00Year2010

14.CADANGAN REKA DAN BINA BILIK BERSIH UNTUK SEL PARASIT BERGRED ISO CLASS 7 DI BILIK 1147, PUSAT PENGAJIAN BIOSAINS DAN BIOTEKNOLOGI, BANGUNAN SAINS BIOLOGI, FAKULTI SAINS DAN TEKNOLOGI UKM BANGI.ClientUniversiti Kebangsaan MalaysiaProject CostRM 235,428.00Year2010

15.TO CHEMICAL CLEANING WORKS, REPLACE HEPA FILTER, PRE-FILTER AND TO DO PARTICLE COUNT TEST AT ROOM HOSPITAL SG. BULOH (HOA4/AC/AHU-8 & AHU-10)ClientRadifems (M) Sdn Bhd (Hospital Sg. Buloh)Project CostRM 199,620.00Year2010

16.YEARLY SHUTDOWN FOR CYCLOTRON PRODUCTION ROOM AT NUCLEAR MEDICINE BUILDING HOSPITAL PUTRAJAYAClientRadifems (M) Sdn Bhd (Hospital Putrajaya)Project CostRM 119,740.00Year2010

17.KERJA-KERJA MEMASANG, MENGUJI SERTA MENGUJITERIMA SISTEM PENYAMANAN UDARA DAN PENGUDARAAN MEKANIKAL UNTUK PEJABAT KESIHATAN, NEGERI PAHANGClientJabatan Kerja Raya Malaysia, Negeri Pahang (BUMI MAJU MTE ENGINEERING SDN BHD)Project CostRM 3,032,650.00Year2010

18.KERJA-KERJA PENUTUPAN DAN MENAIKTARAF SISTEM HAWADINGIN DAN UJILARI PENTAULIAHAN BILIK BEDAH OT1 DAN OT2 HOSPITAL PEKAN, PAHANG DARUL MAKMUR.ClientRadifems (M) Sdn Bhd (Hospital Pekan)Project CostRM 162,000.00Year2011

19.CADANGAN MEREKABENTUK, MEMBINA, MENYIAPKAN, MENGUJITERIMA, MENTAULIAHKAN DAN MENYELENGGARA UNTUK KERJA NAIKTARAF OT, WAD KECEMASAN 6 WARD, HDW, BLOOD BANK, MAKMAL, CSSD DAN CT SCAN, PENDAFTARAN MASUK DI HOSPITAL BATU PAHAT, JOHORClientAxis Jaya Sdn Bhd(BUMI MAJU MTE ENGINEERING SDN BHD)Project CostRM 1.2 millionYear2011

20.MEREKABINA DAN MEREKABENTUK BAGI PROJEK MEMBEKAL, MEMASANG, MENGUJI SERTA MENGUJITERIMA SISTEM PENYAMAN UDARA UNTUK CADANGAN MEMBINA PUSAT KARDIOTORASIK DI HOSPITAL TENGKU AMPUAN AFZAN KUANTAN, PAHANGClientJKR Negeri Pahang(BUMI MAJU MTE ENGINEERING SDN BHD)Project CostEstimated RM 2.7 millionYear2011

21.KERJA-KERJA PENYELENGGARAAN SISTEM PENYAMAN UDARA JENIS AIR COOLED PACKAGE UNIT DAN WATER COOLED PACKAGE UNIT DI LINGKUNGAN PERTAMA, KAMPUS BANGI, UKMClientUniversiti Kebangsaan Malaysia (UKM)(BUMI MAJU MTE ENGINEERING SDN BHD)Project CostRM 534,072.80Year2008 - 2011

22.INFRASTRUCTURE MAINTENANCE CONTRACT (2 YEARS) FRAME PREVENTIVE MAINTENANCE SERVICES FOR PCU AIR-CONDITION AT CELCOM SITE NATIONWIDEClientCelcom (M) Berhad(BUMI MAJU MTE ENGINEERING SDN BHD)Project CostRM 945,600.00Year2009 - 2011

23.SERVICES MAINTENANCE FOR ROUTINE SERVICE & MAINTENANCE SETS OF EXISTING CHILLED WATER FAN COIL AT LEVEL 31 PABX ROOMClientTalisman Malaysia LimitedProject CostRM 129,650.00Year2009 - 2011

24.SERVICING FOR AHU, FAN COIL UNIT, VRV UNIT, AIR COOLED AND HEAT RECOVERY WHEEL AT COLUMBIA ASIA PUCHONGClientColumbia Asia Sdn Bhd(BUMI MAJU MTE ENGINEERING SDN BHD)Project CostRM 120,000.00Year2009 2011

Banking facilities

credit facilities

CENDOR CUKAI TRADING (M) SDN. BHD. (Co. No. 359778-D) Cendor Cukai Trading (M) Sdn Bhd, A-31, Lorong IM 5/2, Jalan Persiaran, Sultan Abu Bakar, 25200 Kuantan, Pahang Darul Makmur.Tel: 609-5732503 Fax: 609-5732507

Date : 06th JUNE 2011

TO WHOM IT MAY CONCERN

Dear Sir

RE: SUPPORTED PROCA HOLDINGS SDN BHD AS SUB-CONTRACTOR

With matter above is referred, I Dato Marina Binti Mahammad, Managing Director of Cendor Cukai Trading (M) Sdn Bhd is willing to supported Proca Holdings Sdn Bhd in whatever project that they are participated in.

Your time regarding this matter will be appreciated.

Thank You.

Yours sincerelyCENDOR CUKAI TRADING (M) SDN BHD

.DATO MARINA BINTI MAHAMMADMANAGING DIRECTOR

______________________________________________________________________________________________________No. 3A-1, Jalan Gombak Ria, Taman Gombak Ria, 68100 Batu Caves, Selangor Darul EhsanTel: 603-6185 0862 Fax: 603-6185 0860