process plus TM [powered by vali from belsim] The online system Process PLUS™ provides unique visualisation and extensive analysis possibilities of plant processes

Transcript of process plus TM - BTB · PDF fileprocess plus TM [powered by vali ... specified tolerance...

Page 1: process plus TM - BTB · PDF fileprocess plus TM [powered by vali ... specified tolerance bands for selected process val- ... efficiency, boiler efficiency, Lambda etc. In a clock-hand

process plusTM

[powered by vali from belsim]

The online system

ProcessPLUS™ providesunique visualisation and extensive analysis possibilities of plant processes

Page 2: process plus TM - BTB · PDF fileprocess plus TM [powered by vali ... specified tolerance bands for selected process val- ... efficiency, boiler efficiency, Lambda etc. In a clock-hand

Project duration

Modelling of plant process, data reconciliation, integration of ProcessPLUS™ Online in the exist-ing IT infrastructure, fine-tuning and approval of the system as well as training of employees takes approximately 15 weeks. Installation of the Process-PLUS™ online system does not require downtime of the plant and can therefore be performed during operation.

ProcessPLUS™ online system scope of services

+ ProcessPLUS™ client (based on MS Visio) • Key Performance Indicator (KPI) overview • Suspected tag list • Calibration list • Operation mode • Characteristics • Component monitoring • Process image • TreeView (suspected/filtered tags) • Sensitivity analysis • History • Heat balance sheet • Cockpit • Cockpit-Optimization • Correction factors

+ ProcessPLUS™ Server+ ProcessPLUS™ Graph+ ProcessPLUS™ Overview+ ProcessPLUS™ Benchmark+ ProcessPLUS™ Report+ ProcessPLUS™ Start Up+ ProcessPLUS™ Coal mills+ ProcessPLUS™ Correct+ Software package VALI 4 (company Belsim)+ Modelling of plant in VALI 4+ Modelling of plant in ProcessPLUS™+ Installing application/software in existing IT environment, connection to process control computer (OSI PI/XU/etc.)+ Fine-tuning of models+ Model documentation+ Training of 5 employees respectively á 2 days

The ProcessPLUS™ Online system is an application for the process visualisation and optimisation of technical processes based on VDI 2048.

The ProcessPLUS™ Online system is used in numer-ous nuclear and conventional power stations as pro-cess monitoring system.

It guarantees synoptic and clearly structured pro-cess visualisation as well as the provision of infor-mation applicable to the specific needs of the indi-vidual organisational units.

Objectives of installing the ProcessPLUS™ Online system

• Vizualisation of reconciled process data and raw measurements (mean value und actual value)

• Continuous monitoring of technical processes and their systems or components.• Minimizing measurement uncertainties and consequently determining the ‘real’ process values.• Utilisation of the reconciled values as calibration standards• Fast detection of internal leaks.• Fast detection of condenser fouling.• Immediate determination of measurement drifts and process changes.• Automatic creating weekly / monthly balances

and site reports• Benchmark between several units• Coal mill monitoring• Optimization of soot blower action plan• Start up monitoring• Creating awareness of reconciled process data for a large number of employees.• Data democratization. This means the incorporation of a major part of the organization in the circle of information recipients.

Process PLUS™ ONLINE SYSTEMPAGE 2

Page 3: process plus TM - BTB · PDF fileprocess plus TM [powered by vali ... specified tolerance bands for selected process val- ... efficiency, boiler efficiency, Lambda etc. In a clock-hand

Process PLUS™ ONLINE SYSTEM

Visuals

ProcessPLUS™ process visualization

ProcessPLUS™ HTML EventLog

Depending on the modelled plant the water-steam cycle (in nuclear power plants the secondary and primary cycle), the combustion and the stoichio- metry is clearly visualized. The application has a sim-ple and intuitive surface for efficient manoeuvring within and between the individual process areas. Measurements and reconciled values are presented and updated every hour. Process changes can conse-quently be localized in real time and distinguished from measurement drifts.

If a measurement does not comply with the quali- ty criteria according to VDI 2048, it appears as ‘sus-pected’. These suspected tags are clearly marked and visualized in the application. The list of suspected tags should be understood as a maintenance over-view and processed in order to ensure an optimal perspective of the real process status. In addition, a list of so-called ‘filtered tags’ is displayed. Filtered tags are measuring points that are not taken into account in the calculation due to their implausi-bility.

The ProcessPLUS™ server application automatically sends hourly or daily event logs to all interested plant employees. The overview list displays details about the number and identification of suspected tags (deviating measurements), which must be cali-brated or repaired. Green indicates zero suspected tags and consequently no reason for action. Yellow indicates minor warning notices, red indicates the need to perform an analysis immediately.

PAGE 3

ProcessPLUS™ process visualisation - suspected and f iltered tags

Page 4: process plus TM - BTB · PDF fileprocess plus TM [powered by vali ... specified tolerance bands for selected process val- ... efficiency, boiler efficiency, Lambda etc. In a clock-hand

Visuals

ProcessPLUS™ process visualisation - properties of the measuring points

ProcessPLUS™ plant characteristics overview

ProcessPLUS™ component monitoring

Process PLUS™ ONLINE SYSTEM

After double-clicking on any measurement, an overview of information on the respective measur-ing point is opened. The bandwidth of information stretches from visualisation options, characteristics history, details of reconciliation runs, measurement trends within a specific period of time, to sensitivity analyses of the selected measurement with refer-ence to other measuring points in the process.

The ProcessPLUS™ Plant Characteristics Overview is at a higher detail level than the process visuali-sation. It informs the user about the current ‘real’ plant capacity compared to the design specification. In addition, another screen displays the measured and reconciled power with the associated uncer-tainties. At the same time, the screen shows, e.g. for nuclear power plants, the potential for safe power increase up to the emergency cooling limit of 102%.

This application represents the highest and most global level of process monitoring. Individually specified tolerance bands for selected process val-ues trigger the green coloring of the components (correct operation) or a red coloring (operation not optimal). As soon as a component is colored red, the respective person responsible should initiate analy-ses and diagnostics with the tools available from ProcessPLUS™. ProcessPLUS™ customers in the field of nuclear power use a direct connection of Process-PLUS™ Component Monitoring with a binary signal (control room lamp), to visually warn the shift staff.

PAGE 4

Page 5: process plus TM - BTB · PDF fileprocess plus TM [powered by vali ... specified tolerance bands for selected process val- ... efficiency, boiler efficiency, Lambda etc. In a clock-hand

Process PLUS™ ONLINE SYSTEM

The ProcessPLUS™ Heat Balance Sheet is a standard visualization within the online system. It offers plant employees a quick overview of thermodynamic variables such as enthalpy or steam moisture con-tent. In this view, only reconciled data is displayed.

Trend analysis and presentation over specific time intervals, presentation of measurement drifts or process changes can be generated quickly and easily with the aid of ProcessPLUS™ Graph. The application comprises an intuitive function for data selection and standard analyses for a selection of plant types. The flexible design also provides the user with the possibility to create individual analyses with other diagram types.

ProcessPLUS™ Graph provides evaluations of the rec-onciled thermal load, efficiencies, feed water mass flow, normalized gross powers, etc. for a continuous view on the behavior of process values and calcu-lated parameters.

Visuals

ProcessPLUS™ Heat Balance Sheet

ProcessPLUS™ Graph

PAGE 5

Page 6: process plus TM - BTB · PDF fileprocess plus TM [powered by vali ... specified tolerance bands for selected process val- ... efficiency, boiler efficiency, Lambda etc. In a clock-hand

The ProcessPLUS™ Cockpit visualization displays all important and/or limiting values, such as plant efficiency, boiler efficiency, Lambda etc. In a clock-hand display, the actual value and the upper and lower limits are shown. If the actual value leaves the defined limit range, the display changes its color.

The ProcessPLUS™ Cockpit-Plant Optimization dis-plays relevant plant economical values. In a clock-hand display, the actual value and the upper and low-er limits are shown. If the actual value leaves the defined limit range, the display changes its color and financial gains/losses are indicated.

The view ProcessPLUS™ Correction Factors displays archived correction factors for control values. Correc-tion factors are calculated as:

Correction factor = reconciled value/measurement

The archived (blue) and the actual (red) correction factor can be displayed as a trend over the time and can be adjusted if necessary.

Visuals

ProcessPLUS™ Cockpit

ProcessPLUS™ Cockpit-Plant Optimization

ProcessPLUS™ Correction factors

Process PLUS™ ONLINE SYSTEM PAGE 6

Page 7: process plus TM - BTB · PDF fileprocess plus TM [powered by vali ... specified tolerance bands for selected process val- ... efficiency, boiler efficiency, Lambda etc. In a clock-hand

Creating of suspected/filtered tag statistic

The suspected/filtered tag statistics indicates measuring devices which were erroneous most of the time during a certain time period.

Creating of component statistic

The component statistics indicates components which were operating suboptimally most of the time during a certain time period.

Statistics can be created for any period of time.

The ProcessPLUS™ Coal mill monitoring application indicates quantities of milled coal over a defined time period. Based on the quantities, the degree of wear for each coal mills can be evaluated and main-tenance activities can be initiated.

Visuals

New monitoring functions

ProcessPLUS™ Coal mill

New monitoring functions

Process PLUS™ ONLINE SYSTEM PAGE 7

Page 8: process plus TM - BTB · PDF fileprocess plus TM [powered by vali ... specified tolerance bands for selected process val- ... efficiency, boiler efficiency, Lambda etc. In a clock-hand

The ProcessPLUS™ Start Up application enables the user to monitor and optimize the plant start-up process.

Quality-assured weekly and monthly balancing reports can be created by the push of a button. The user can choose between weekly and monthly reports for each power plant unit or a report for the entire power plant site.

The application ProcessPLUS™ Overview enables the user to compare key operational parameters of identical or similar power plant units in a fast and intuitive manner.

Visuals

ProcessPLUS™ Start Up

ProcessPLUS™ weekly / monthly / site reports

ProcessPLUS™ Overview

Process PLUS™ ONLINE SYSTEM PAGE 8

Page 9: process plus TM - BTB · PDF fileprocess plus TM [powered by vali ... specified tolerance bands for selected process val- ... efficiency, boiler efficiency, Lambda etc. In a clock-hand

The application ProcessPLUS™ Benchmark facilitates a comparison of similar power plant units based on rec-onciled process data. Input data is filtered in such way that only comparable operational states are taken into account for the benchmark.

Visuals

ProcessPLUS™ Benchmark

Process PLUS™ ONLINE SYSTEM PAGE 9

Page 10: process plus TM - BTB · PDF fileprocess plus TM [powered by vali ... specified tolerance bands for selected process val- ... efficiency, boiler efficiency, Lambda etc. In a clock-hand

ProcessPLUS™ Online system project steps, duration and customer input.

The average duration to a successful installation of the ProcessPLUS™ system is 15 weeks with an aver-age input of 20 man days by the customer.

Required data and documentation

+ Piping and instrumentation diagrams (P&ID) for allocation of measuring points in the model+ List of all measuring points from the process control computer+ Heat balance sheets at approx. 100% load+ Operating data or one-hour averages at 100% load over 4 weeks

The extent of the required process data and docu-mentation is limited due to the basic approach fol-lowed by the reconciliation methodology. This way e.g. information on the characteristics of individual components is not required.

In the past BTB Jansky has successfully implement-ed several online versions of their data reconcilia-tion system ProcessPLUS™ both in nuclear and fossil power plants. The installation of additional measur-ing points is not required.

Process PLUS™ ONLINE SYSTEMPAGE 10

ProcessPLUS™ project plan for power plants

Utility labor input in man

days

Week1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Proc

ess d

ata

anal

ysis

Sending of all required documents, draw-ings, data and heat balance sheets 2

Inspection of forwarded data

Requesting missing data 1

Model creation

Impl

emen

tatio

n

Finalization of plant model in VALI4 and ProcessPLUS™

Installation and IT integration 2

Training, 5 persons, duration two days 10

Create to do list

Fine-tuning of model/processing of to do list 5

Project steps, duration and input by the customer

Page 11: process plus TM - BTB · PDF fileprocess plus TM [powered by vali ... specified tolerance bands for selected process val- ... efficiency, boiler efficiency, Lambda etc. In a clock-hand

process plusTM

[powered by vali from belsim]

Integration of the ProcessPLUS™ system including VALI4 into existing IT environment

The ProcessPLUS™ system has already been inte-grated into numerous IT environments with vari-ous interfaces to process control computers such as Siemens XU, OSI-PI, PlantConnect, etc. Thereby the ProcessPLUS™ system has proven itself as very flex-ible, in order to comply with the high safety require-ments in the power plants.

Example of an IT integration with the ProcessPLUS™ online system

Process PLUS™ IT INTEGRATION0 PAGE 11

Process Process control computer

MeasurementsTransfer of raw measurementsInterfaces already in place- OSI-PI- XU (OM 690 Siemens)- PlantConnect (ABB)- File transfer

Hourly1. Importing the raw measurement file2. Averaging3. Reconciliation with Vali 4 (Belsim S.A.)4. Result archiving in database5. Updating html events file

Modelling and reconciliation toolVALI 4

Office network

Workstation Workstation

SoftwareMS-ExcelMS-VisioInternet browser Adobe Acrobat

DatabaseAccessOracleMS-SQLOthers

Event fileEvent fileTimestampStatusKey parameters of reconciliation qualityNumber of suspected tags, Thermal load, etc.

Event file

ServerAutomation

BTB Process PlusTM

AutomatisierungClient

BTB Process PlusTM

AutomatisierungClient

BTB Process PlusTM

G

Q

Page 12: process plus TM - BTB · PDF fileprocess plus TM [powered by vali ... specified tolerance bands for selected process val- ... efficiency, boiler efficiency, Lambda etc. In a clock-hand

Technical consulting

• Process data reconciliation• Acceptance tests • Process optimization• Recovery of ‘lost’ megawatts• Ageing management• Optimization of maintenance cycles• Damage analyses• Vibration measurements• Technical expertises• Plant refurbishment concepts• Infrared images

Management/Organisation consulting

• Organisational restructuring• Process benchmarking• Efficiency benchmarking• Optimization of business processes• Plant integration/synergy projects• Detailed plant process cost analysis

Creating Transparency

BTBJANSKYG M B H

BTB Jansky GmbHEngineering andManagement Consulting

Gerlinger Strasse 15171229 LeonbergGermanyTel.: +49 (0) 7152 3087-0

[email protected]

Eastern Europe

BTB Jansky + Partners s.r.o. Ke Kaplicce 44525241 Dolni BrezanyCzech RepublicTel.: +420 728 551 [email protected]

Benelux and France

BTB Janskyvan Koetsveldstraat 1013532 ER Utrechtthe NetherlandsTel.: +31 6 51 57 34 [email protected]