Presentation Philippe Heim: Delivering results with Datacenter ...

25
Unrestricted © Siemens AG 2015 siemens.com Delivering results with Datacenter Clarity LC TM Philippe Heim | Boston, September 9th, 2015

Transcript of Presentation Philippe Heim: Delivering results with Datacenter ...

Page 1: Presentation Philippe Heim: Delivering results with Datacenter ...

Unrestricted © Siemens AG 2015 siemens.com

Delivering results withDatacenter Clarity LCTM

Philippe Heim | Boston, September 9th, 2015

Page 2: Presentation Philippe Heim: Delivering results with Datacenter ...

Unrestricted © Siemens AG 201520XX-XX-XXPage 2 Siemens Industry Analyst Conference Boston 2015

Intro movie

Page 3: Presentation Philippe Heim: Delivering results with Datacenter ...

Unrestricted © Siemens AG 201520XX-XX-XXPage 3 Siemens Industry Analyst Conference Boston 2015

Table of contents

1 Challenges

2 Integrated DCIM – solution overview

3 Feature landscape and license model

4 Results of Clarity LC

5 Roadmap, outlook

Page 4: Presentation Philippe Heim: Delivering results with Datacenter ...

Unrestricted © Siemens AG 201520XX-XX-XXPage 4 Siemens Industry Analyst Conference Boston 2015

Divided data center operations

Facility/Real Estate• Custom

vs. Industrial• First cost vs. TCO• Power and Cooling• Location• Aging Facilities• Regulations• Flexibility

IT• Information

Explosion• IT Complexity• Cloud• Converged infrastructure• Virtualization• High density• Unified Communications

Business• Globalization• M&A• IoT

• Economy• Competition• Growth Strategy

Operations• Increase process efficiency• Accommodate rapid change• Increase IT service revenue

• Ensure maximum uptime• Reduce carbon footprint• Improve energy efficiency

IntegratedDCIM

“DCIM helps to build a strong culture, collaboration and support among all members!”

Page 5: Presentation Philippe Heim: Delivering results with Datacenter ...

Unrestricted © Siemens AG 201520XX-XX-XXPage 5 Siemens Industry Analyst Conference Boston 2015

Trend implications on data center operationsHow DCIM can help customers

Issues in power, space, cooling, and uptime impede innovation

…consequences to the business31% 30% 27% 26%

Delay inapplicationrollouts

Disrupted ability toprovide service tocustomers

Forced to spendunplannedOPEX budget

Need to roll backan applicationdeployment

84%of datacenters had issues with power, spaceand cooling capacity, assets, and uptime thatnegatively impacted business operations

Content adopted from: IDC Global DCIM Survey, 2012

Page 6: Presentation Philippe Heim: Delivering results with Datacenter ...

Unrestricted © Siemens AG 201520XX-XX-XXPage 6 Siemens Industry Analyst Conference Boston 2015

Possibilities to improve data center operationsHow DCIM can help customer

Three Commonly-Cited Reasons things go wrong in the datacenter

Inconsistent datacenter information of datacenters do nothave a standard set ofmanagement tools

63%1

Inconsistent datacenter maturity of datacenter managersconsider their data-centers to be inefficient oronly moderately efficient

57%3

Businesses have datacenters with varying maturity levels

[sdksm] v 3Adkicmdjuw skdi

Host: root

Divided datacenter operations of enterprises have ITand facilities living inseparate organizations

58%2

Responsibility for a wide range of operations is splitbetween IT, facilities, and other groups

Content adopted from: IDC Global DCIM Survey, 2012

Page 7: Presentation Philippe Heim: Delivering results with Datacenter ...

Unrestricted © Siemens AG 201520XX-XX-XXPage 7 Siemens Industry Analyst Conference Boston 2015

Data centers – factories of the 21st centuryTransforming the process of innovation through technology

§ Factory process automation as a key common factor§ Years of Expertise transforming the process of innovation

Industry revolution 4.0

-19B smart devices- 8 zettabyte data storage- $200M cloud-services- 40% internet user (penetration)

Page 8: Presentation Philippe Heim: Delivering results with Datacenter ...

Unrestricted © Siemens AG 201520XX-XX-XXPage 8 Siemens Industry Analyst Conference Boston 2015

Table of contents

1 Challenges

2 Integrated DCIM – solution overview

3 Feature landscape and license model

4 Results of Clarity LC

5 Roadmap, outlook

Page 9: Presentation Philippe Heim: Delivering results with Datacenter ...

Unrestricted © Siemens AG 201520XX-XX-XXPage 9 Siemens Industry Analyst Conference Boston 2015

Integrated data center management – holistic viewBMS – DCIM - ITSM

Fire safety and securityFire safety and security

Energy & PowermanagementEnergy & Powermanagement

Condition supervision andcontrolCondition supervision andcontrol

Cooling (HVAC)Cooling (HVAC)

Control and monitor facilityinfrastructureControl and monitor facilityinfrastructure

IT load and applicationmanagementIT load and applicationmanagement

Control and monitor IT applications and services

Manage and monitordata center infrastructure

Control and monitordata center facility infrastructure

Power monitoringPower monitoring

CFD and real time heatmapCFD and real time heatmap

Workflow managementWorkflow management

IT/FM asset managementIT/FM asset management

Manage and monitordata center infrastructureManage and monitordata center infrastructure

IT network managementIT network management

Visualizations 3D, 4DVisualizations 3D, 4D Visualization, real 3D, 4DVisualization, real 3D, 4D

Monitoring Server PowerMonitoring Server PowerAlarms, alerts andnotificationsAlarms, alerts andnotifications

Page 10: Presentation Philippe Heim: Delivering results with Datacenter ...

Unrestricted © Siemens AG 201520XX-XX-XXPage 10 Siemens Industry Analyst Conference Boston 2015

Table of contents

1 Challenges

2 Integrated DCIM – solution overview

3 Feature landscape and license model

4 Results of Clarity LC

5 Roadmap, outlook

Page 11: Presentation Philippe Heim: Delivering results with Datacenter ...

Unrestricted © Siemens AG 201520XX-XX-XXPage 11 Siemens Industry Analyst Conference Boston 2015

Datacenter Clarity LCDC suite landscape, user based and modular model (need based add-ons)

PowerManagement

InfrastructureLifecycleManagement

Dashboardfor KeyPerformanceIndicators

Network CableManagement

Workflow &Work OrderManagement

High-DefinitionAssetVisualization

DocumentManagement &Reporting

3rd PartyIntegrations

Real-TimeMoni-toring &Historian withAlarms andNotifications

ComputationalFluid Dynamics(CFD)

Real-time HeatMap &Hot spots

API, OpenInterface, WebServices,and ProtocolSupport

# User # Data point’

ü “Siemens license model allows us to ‘pay as we grow’”

1 1

1

1

2

3

4

5

Page 12: Presentation Philippe Heim: Delivering results with Datacenter ...

Unrestricted © Siemens AG 201520XX-XX-XXPage 12 Siemens Industry Analyst Conference Boston 2015

Table of contents

1 Challenges

2 Integrated DCIM – solution overview

3 Feature landscape and license model

4 Results of Clarity LC

5 Roadmap, outlook

Page 13: Presentation Philippe Heim: Delivering results with Datacenter ...

Unrestricted © Siemens AG 201520XX-XX-XXPage 13 Siemens Industry Analyst Conference Boston 2015

Datacenter Clarity LC – dashboardHow can I plan capacity and run forecast scenarios?

Lack of visibility for key-drivers,power / cooling / u-space / floorspace.

Single pane of glass,monitor trends to forecastcapacity. Get the factsand figures at yourfingertips.

Reduce overall costs duefull visibility and capacityplanning.→ increase IT revenuewith same staff

Reduce time, due to realtime values reported in aDashboard. Fasterdecisions based on facts.

ü Plan your capacities based on facts and figures!

Challenge Benefit

Page 14: Presentation Philippe Heim: Delivering results with Datacenter ...

Unrestricted © Siemens AG 201520XX-XX-XXPage 14 Siemens Industry Analyst Conference Boston 2015

Datacenter Clarity LC – asset managementHow long would it take me to find a server?

Lack of transparency about mygrey room and white spaceassets.

Improve global efficiencyand collaboration→ increase IT revenuewith same staff.

Reduce overall costs dueto non value addedactivities→ increase IT revenuewith same staff

Reduce wasted timelooking for information→ increase IT revenuewith same staff

ü 40% to 60% reduction of time searching for assets!

Challenge Benefit

Page 15: Presentation Philippe Heim: Delivering results with Datacenter ...

Unrestricted © Siemens AG 201520XX-XX-XXPage 15 Siemens Industry Analyst Conference Boston 2015

Datacenter Clarity LC – network management - web clientHow can my network team add connections on the fly?

Dependency on thick clients anddesktop to operate the DCIMSystem on the fly.

Web client is cross-browser and cross-devicecompatible (includingtablets), with no local footprint.

Reduce overall costs dueto non value addedactivities→ increase IT revenuewith same staff

Reduce time, due toadding connections onthe fly.→ increase IT revenuewith same staff

ü Be faster, thanks to an intuitive web client!

Challenge Benefit

Page 16: Presentation Philippe Heim: Delivering results with Datacenter ...

Unrestricted © Siemens AG 201520XX-XX-XXPage 16 Siemens Industry Analyst Conference Boston 2015

Datacenter Clarity LC – workflowHow can I know if the server exchange was done?

Lack of transparency and tools toaddress multiple teams forexecution.

Improve deliverablesquality and consistency.

Enable project decisionsbased on up-to-dateinformation andavoid overruns.

Reduce wasted timesearching and compilinginformation for projectexecution.

ü Project cost savings and IT service revenue increase

Challenge Benefit

Page 17: Presentation Philippe Heim: Delivering results with Datacenter ...

Unrestricted © Siemens AG 201520XX-XX-XXPage 17 Siemens Industry Analyst Conference Boston 2015

Datacenter Clarity LC – alarm managementHow can I ensure operation is pro-active for alarms?

Having unreliable alarms orseeking them or even guessing.Sometimes physical inspectionon site.

Avoid damages ordowntime, due to pre-warnings and alarms.

Reduce OpEx due to apro-active alarm handling.

Reduce time, due tomonitoring all alarms andrun pro-active scenarios.

ü Avoid downtime, due to pro-active operation!

Challenge Benefit

Page 18: Presentation Philippe Heim: Delivering results with Datacenter ...

Unrestricted © Siemens AG 201520XX-XX-XXPage 18 Siemens Industry Analyst Conference Boston 2015

Datacenter Clarity LC – heatmapHow can I save energy and ensure enough cooling?

Unable to detect hot spots andsee cold air volume. What ifscenarios can’t be performed.

Visualization of hot spotsperformed in a heat mapor Computational FluidDynamics (CFD)simulation.

Safe money, by using coldair where it should be.Avoid OpEx due tooverheated and damagedassets.

Reduce wasted timecaused by unnecessaryasset replacements.

ü What if planning, based on CFD calculation!

Challenge Benefit

Page 19: Presentation Philippe Heim: Delivering results with Datacenter ...

Unrestricted © Siemens AG 201520XX-XX-XXPage 19 Siemens Industry Analyst Conference Boston 2015

Additional value DCIM brings in pre-operationMake small steps to ensure success

Design and build Operation

Establishingan accurateasset inventory andprovide real time visibility

Alarming and notifying inreal-time using previousasset behavior knowledgeto control and optimizeutilization

Developing an accuratebaseline using currentstate and utilization forcapacity planning andforecasting

Using the rich set ofexisting data from design

Using DCIM to plan andoptimize the transition fromdesign phase to operations

Establish your baseline Optimize and controlyour baseline

Manage your baseline

Construct andInstrument

BMS EPMS

Hand over AssetDB ITSM Operate IT

Design

OperateFacility

Maintain

Page 20: Presentation Philippe Heim: Delivering results with Datacenter ...

Unrestricted © Siemens AG 201520XX-XX-XXPage 20 Siemens Industry Analyst Conference Boston 2015

Table of contents

1 Challenges

2 Integrated DCIM – solution overview

3 Feature landscape and license model

4 License model

5 Roadmap, outlook

Page 21: Presentation Philippe Heim: Delivering results with Datacenter ...

Unrestricted © Siemens AG 201520XX-XX-XXPage 21 Siemens Industry Analyst Conference Boston 2015

Summary

Benefits of Datacenter Clarity LC for data centers• Competitive advantage to deliver the expected service• Streamlined operations minimizing re-work & SPOF• Capacities can be planed and forecasted• Maximize effective utilization of existing infrastructure• Improved asset life cycle and longevity• Safe virtualization projects with clear impacts insight• Minimize risk of downtime with accurate information

Optimized operations, smarter decisions,higher flexibility, future-proof architecture

Page 22: Presentation Philippe Heim: Delivering results with Datacenter ...

Unrestricted © Siemens AG 201520XX-XX-XXPage 22 Siemens Industry Analyst Conference Boston 2015

Datacenter Clarity LCQ & A

Page 23: Presentation Philippe Heim: Delivering results with Datacenter ...

Unrestricted © Siemens AG 201520XX-XX-XXPage 23 Siemens Industry Analyst Conference Boston 2015

More InformationSiemens DCIM website

► Link to Internet www.siemens.com/dcim

Page 24: Presentation Philippe Heim: Delivering results with Datacenter ...

Unrestricted © Siemens AG 201520XX-XX-XXPage 24 Siemens Industry Analyst Conference Boston 2015

Philippe HeimGlobal Portfolio Manager DCIMSiemens Building Technologies

Gubelstrasse 226301 Zug, Switzerland

Phone: +41 41 724 40 32Mobile: +41 79 924 13 37

E-mail:[email protected]

ContactThank you for your attention

Solutions for data centers.

Page 25: Presentation Philippe Heim: Delivering results with Datacenter ...

Unrestricted © Siemens AG 201520XX-XX-XXPage 25 Siemens Industry Analyst Conference Boston 2015

Datacenter Clarity LCA practical example based on an Atos Datacenter, UK