REHABILITATION PROCESS FOR NEW TOWNSHIP, SILIGURI KAWAKHALI - PORAJHAR

Transcript of Presentation on New Township Siliguri 24-11-2011

Page 1: Presentation on New Township Siliguri 24-11-2011

REHABILITATION PROCESS FOR

NEW TOWNSHIP, SILIGURIKAWAKHALI - PORAJHAR

Page 2: Presentation on New Township Siliguri 24-11-2011

NEW TOWNSHIP PROJECT LAND AREA

Page 3: Presentation on New Township Siliguri 24-11-2011

PROJECT LAND AREA IN MOUZA MAP

Page 4: Presentation on New Township Siliguri 24-11-2011

DETAILS OF REHABILITATION PACKAGE

Have Get

House on > 10 katha retained land

5 katha developed plot

5 – 10 katha retained land

3 katha developed plot / 750 Sq.ft flat

> 2 katha and < 5 katha retained land

2 katha developed plot / 500 Sq.ft flat

1 decimal – 2 katha retained land

1.5 katha developed plot / 380 Sq.ft flat

Page 5: Presentation on New Township Siliguri 24-11-2011

DETAILS OF REHABILITATION PACKAGE

Have Get

Squatters on vested land

2 katha developed plot

Upto 20.5 katha retained land in a single deed of members of different families

Proportionate plot category wise

Joint deed in a single family

plot for one and flat for others

Other affected families with retained land, through lottery

Flats in respective category

Page 6: Presentation on New Township Siliguri 24-11-2011

DETAILS OF REHABILITATION PACKAGE

CATEGORY PRICE

Upto 2 Katha developed plot

Nil

More than 2 Katha developed plot

LA Cost for above 2 Katha portion

For B.P.L./Economically Weaker

Nil

380 Sq.ft flat Rs.75,000/-(Rs.197/-per Sq.ft )

500 Sq.ft flat Rs.2,00,000/-(Rs.400/-per Sq.ft )

380 Sq.ft flat Rs.3,00,000/-(Rs. 400/-per Sq.ft )

Page 7: Presentation on New Township Siliguri 24-11-2011

COMPENSATION FOR STRUCTURECATEGORY COMPENSATION

Structures on retained land before 2004

Compensation by LA Dept

Structures on retained land after 2004

Compensation by SJDA directly

Kuchha house / Bamboo wall & Tin shed on vested land

Rs. 5000.00

Above and pucca toilet on vested land

Rs. 10000.00

Kuchha wall, R.C.C foundation & Tin shed on vested land

Rs. 12000.00

Pucca wall & Tin shed on vested land

Rs. 20000.00

Shifting Cost Rs. 4000.00

Page 8: Presentation on New Township Siliguri 24-11-2011

OTHER BENEFITS

CATEGORY/TYPE COMPENSATION

Consent Award 10% of LA Compensation

Building Grant for BPL /poor allottee

Rs. 80000.00

compensation for occupiers of vested land/ Unregistered bargadar

60% land value (LA Cost)

Shop for shop owners identified by the survey 2007

at construction cost

Stamp Duty & Registration charge for land registration

Nil

Page 9: Presentation on New Township Siliguri 24-11-2011

SOCIAL FACILITIES

Education grant / scholarship

Reimbursement of medical treatment cost

Vocational training for one member of intending family

Old age pension for BPL landowners > 65 years

Identity card to each affected families

Shop for dependant family member like mentally retarded or physically handicapped child

Shop for unmarried daughter over the age of 35 years or widow or married daughter deserted by her husband

Supply of building materials through Co-operatives

Page 10: Presentation on New Township Siliguri 24-11-2011

DETAILS OF REHABILITATION PLAN

Page 11: Presentation on New Township Siliguri 24-11-2011

REHABILITATION PLAN REVISED

Page 12: Presentation on New Township Siliguri 24-11-2011

DETAILS OF MASTER PLAN

Small commercial plots 1.98 acre

Parks and open space 5.80 acre

Area for group housing 3.01 acre

Market Complex 2.11 acre

Haat / Sit —out commercial 0.93 acre

Health care Education facilities 12.35 acre

Roads balance

Total 80.06 acre

Page 13: Presentation on New Township Siliguri 24-11-2011

DETAILS OF MASTER PLAN

Residential plots

No. of Units

1st & 2nd phase

For 3rd phase

Vacant

A 1.5 katha

149 43 11 95

B 2.0 katha

462 380 59 23

C 3.0 katha

281 181 98 2

D 5.0 katha

05 05 Nil Nil

Page 14: Presentation on New Township Siliguri 24-11-2011

DETAILS OF LAND ACQUISITION / SETTLEMENT

Land area of Township

a) Jalpaiguri District 208.87 acre

i) Retained land 180.88 acre

ii) Vest land (acquired) 27.99 acre

iii) Total L.A Cases 25

b) Darjeeling District

i) Retained land 82.26 acre

ii) Vest land (to be settled) 12.35 acre

iii) Total L.A Cases 3

Page 15: Presentation on New Township Siliguri 24-11-2011

DETAILS OF LAND ACQUISITION / SETTLEMENT

Compensation deposited with Collector by SJDA

a) Jalpaiguri District Rs. 30,84,52,034/-

b) Darjeeling District Rs. 12,20,32,770/-

Compensation disbursed by Collector to Land Owners

a) Jalpaiguri District Rs. 18,55,25,013/-

b) Darjeeling District Rs. /-

Page 16: Presentation on New Township Siliguri 24-11-2011

DETAILS OF LAND ACQUISITION / SETTLEMENT

Nos. of affected retained Land Owners families (as per award)

a) Jalpaiguri District 879

b) Darjeeling District 974

Nos. of affected families given compensation (as per award)

a) Jalpaiguri District 724

b) Darjeeling District 677

Nos. of pending cases (not disbursed)

a) Jalpaiguri District 155

b) Darjeeling District 297

Page 17: Presentation on New Township Siliguri 24-11-2011

DETAILS OF LAND ACQUISITION / SETTLEMENT

Court case (area affected)

a) Jalpaiguri District 31.58 acre

b) Darjeeling District 4.30 acre

Nos. of persons involved in court case

a) Jalpaiguri District 148

b) Darjeeling District 49

Payment / package taken by persons involved in court case

a) Jalpaiguri District 84

b) Darjeeling District 23

Page 18: Presentation on New Township Siliguri 24-11-2011

DETAILS OF LAND ACQUISITION / SETTLEMENT

Occupiers on vest / patta land (settled)

a) Jalpaiguri District 84

b) Darjeeling District 119

Occupiers on vest land (given compensation)

a) Jalpaiguri District 15

b) Darjeeling District 15/

Further claims on vested land (not settled)

a) Jalpaiguri District 48

b) Darjeeling District 15

Page 19: Presentation on New Township Siliguri 24-11-2011

DISBURSEMENT OF PACKAGE BENEFITS

Affidavit submitted to accept package

a) Jalpaiguri District 545

b) Darjeeling District 361

c) Vest / patta 166

Consent award taken

a) Jalpaiguri District 545

b) Darjeeling District 361

School / college education grant disbursed – 633

Higher education grant disbursed – 28

Health grant disbursed – 51

Old age pension disbursed - 9

Page 20: Presentation on New Township Siliguri 24-11-2011

DISBURSEMENT OF PACKAGE BENEFITS

Allotment of plots

a) 1st & 2nd phase lottery 609

b) possession handed over 470

c) various problems in 126

handing over in possession

d) allotment letter issued but 168

lottery not done

e) Affidavit submitted for plots 80

requires verification

Page 21: Presentation on New Township Siliguri 24-11-2011

DISBURSEMENT OF PACKAGE BENEFITS

House building grant disbursed

a) upto Rs. 20,000/- ???

b) upto Rs. 60,000/- ???

c) upto Rs. 80,000/- ???

Structure compensation 156 nos.

Shifting charge 130 nos.

Identity card issued

a) Jalpaiguri District 564

b) Darjeeling District 462

c) Occupiers on vest / patta lands ???

Page 22: Presentation on New Township Siliguri 24-11-2011

FACILITIES & INFRASTRUCTURE IN REHABILITATION AREA

Streets & Roads: 3 categories (10M , 7.5M, 6M wide) 6.780 K.M.– Rs. 594.93 lakh

Land Development: Rs. 138.70 lakh

Peripheral and Internal Drainage: Rs. 300.00 Lakh

Safe Drinking Water: by PHE, street points

Electricity: Rs. 213.00 lakh, 204 street light, LT & HT infrastructure

Protection of embankment of River Balason

Page 23: Presentation on New Township Siliguri 24-11-2011

LOTTERY ON 10.08.2008

Page 24: Presentation on New Township Siliguri 24-11-2011

LOTTERY ON 26.07.2009

Page 25: Presentation on New Township Siliguri 24-11-2011

LAND DEVELOPMENT

Page 26: Presentation on New Township Siliguri 24-11-2011

Houses Built on Rehabilitation Plots

Page 27: Presentation on New Township Siliguri 24-11-2011

Infrastructures provided

Page 28: Presentation on New Township Siliguri 24-11-2011

Infrastructures provided

Page 29: Presentation on New Township Siliguri 24-11-2011