1 Presentation by the Government of Manipur in the “NORTH EAST INDIA INVESTMENT “NORTH EAST INDIA INVESTMENT OPPORTUNITIES WEEK” OPPORTUNITIES WEEK” on October 1 on October 1 – 4, 2007 in Bangkok 4, 2007 in Bangkok On the theme of attracting investments into North Eastern Region of India 2 N v New Delhi – 2642 Km. v Kolkata – 1650 Km. v Guwahati – 592 Km. Distance from Imphal

Transcript of Presentation by the Government of Manipur in...

1

Presentation by the Government of Manipur

in the

“NORTH EAST INDIA INVESTMENT “NORTH EAST INDIA INVESTMENT OPPORTUNITIES WEEK”OPPORTUNITIES WEEK”

on October 1 on October 1 –– 4, 2007 in Bangkok4, 2007 in Bangkok

On the theme of attracting investments into North Eastern Region of India

2

N

v New Delhi – 2642 Km.

v Kolkata – 1650 Km.

v Guwahati – 592 Km.

Distance from Imphal

2

33

Distance from Imphal to Bangkok is 1396 kilometersDistance from Imphal to Bangkok is 1396 kilometers

vv TotalTotal AreaArea 44 2222,,327327 SqSq.. KmKm..vv TotalTotal ForestForest AreaArea 44 1717,,418418 Km(Km(7878%%))vv TotalTotal PopulationPopulation 44 22..44 millionmillionvv DensityDensity ofof PopulationPopulation 44 107107 personperson perper SqSq.. KmKm

vv HillyHilly TerrainTerrain 44 9090%%vv LiteracyLiteracy RateRate ((20012001 Census)Census) 44 7070 %%

3

55

Manipur : Plus factorsManipur : Plus factors

qq Good agro climatic conditionGood agro climatic conditionqq Rich bioRich bio--diversity diversity -- Herbal & Herbal &

Medicinal PlantsMedicinal Plantsqq High horticultural potentialHigh horticultural potentialqq Rich forest and water resourcesRich forest and water resourcesqq High Literacy rateHigh Literacy rateqq Large potential in IT SectorLarge potential in IT Sectorqq Gateway to South East AsiaGateway to South East Asia

66

Manipur : Plus factorsManipur : Plus factors

qq Large potential of Sport talentsLarge potential of Sport talentsqq Rich cultural heritageRich cultural heritageqq Easiest Land route connectivity to Easiest Land route connectivity to

ThailandThailandqq On the proposed Trans On the proposed Trans -- Asian Asian

Railway line linkRailway line linkqq Excellent air connectivityExcellent air connectivity

4

77

Priority sectors for investment Priority sectors for investment in Manipurin Manipur

ØØ HorticultureHorticultureØØ Agro & Food ProcessingAgro & Food ProcessingØØ Handloom & HandicraftHandloom & HandicraftØØ TourismTourismØØ PowerPower

88Dendrobium parishii (Sempak lei)

5

99

Potential Projects under Horticulture SectorPotential Projects under Horticulture SectorProject No. 1Project No. 1

NameName ofof ProjectProject CultivationCultivation ofof variousvarious HorticulturalHorticultural cropscrops

ProjectProject CostCost INRINR

HorticultureHorticulture potentialpotential areaarea 22,,7777,,064064 HaHa

HorticultureHorticulture cropscrops areaarea 4545,,919919 HaHa

FruitsFruits areaarea 2727,,008008 HaHa

VegetablesVegetables areaarea 76707670 HaHa

SpicesSpices areaarea 99529952 HaHa

OthersOthers 12891289 HaHa

MajorMajor HorticulturalHorticultural CropsCrops FruitsFruits :: Pineapple,Pineapple, Banana,Banana, Orange,Orange, Citrus,Citrus,Papaya,Papaya, Plum,Plum, Pear,Pear, PassionPassion FruitFruit etcetc..VegetablesVegetables :: Cabbage,Cabbage, Cauliflower,Cauliflower, Tomato,Tomato,Pea,Pea, Capsicum,Capsicum, Brinjal,Brinjal, FrenchFrench Bean,Bean, PotatoPotatoetcetc..SpicesSpices :: Turmeric,Turmeric, Ginger,Ginger, FibrelessFibreless Ginger,Ginger,Clove,Clove, PungentPungent ChiliChili (U(U--Morok)Morok) etcetc..

1010Orange Festival at Tamenglong DistrictOrange Festival at Tamenglong District

6

1111

Potential Projects under Horticulture Sector (Contd)Potential Projects under Horticulture Sector (Contd)

Project No. 2Project No. 2NameName ofof thetheProjectProject

PlantationPlantation ofof OrchidsOrchids (Cymbidium)(Cymbidium) inin ManipurManipur

LocationLocation ImphalImphal

AreaArea ofof thetheProjectProject

20002000 SqSq mm..

ShadeShade HouseHouse HiHi--TechTech infrastructureinfrastructure willwill bebe constructedconstructed

BedBed preparationpreparation LocallyLocally availableavailable materialmaterial includingincluding woodwood shavings,shavings, cinder,cinder,woodwood barkbark andand otherother organicorganic materialmaterial.. CocoCoco--pithpith isis alsoalsoreadilyreadily availableavailable

PlantPlant varietiesvarieties BestBest plantplant andand HybridHybrid varietiesvarieties whichwhich areare internationallyinternationally ininhighhigh demanddemand

GuidanceGuidance IndianIndian CouncilCouncil ofof AgriculturalAgricultural ResearchResearch (ICAR),(ICAR), CentralCentralAgricultureAgriculture UniversityUniversity (CAU)(CAU)

MarketingMarketing AirAir transportation,transportation, PrivatePrivate AgenciesAgencies

1212CymbidiumCymbidium giganteumDendrobium dalhousieanum Vanda teres

7

1313

Vandopsis parishii (Kwakleina thabi)

1414Thunia marshalliana (U - Takhelei)

8

1515

Paphiopedilum hirsutissimum (Khonguplei tujombi)

1616

Dendrobium ochreatum (Saranglei)

9

1717

1818

Potential Projects under Agro & Food ProcessingPotential Projects under Agro & Food Processing

Project No. 3Project No. 3NameName ofof ProjectProject FruitFruit JuiceJuice ConcentrationConcentration PlantPlantCapitalCapital EquipmentEquipment Processing,Processing, Concentration,Concentration, AsepticAseptic

FillingFilling andand ColdCold StorageStorageRawRaw MaterialMaterial Pineapple,Pineapple, Orange,Orange, Lemon,Lemon, PassionPassion

fruit,fruit, FibrelessFibreless GingerGinger etcetc..PromotersPromoters PrivatePrivate investorinvestor oror JointJoint VenturesVenturesPolicyPolicy frameworkframeworkapplicableapplicable toto thetheProjectProject

StateState IndustrialIndustrial Policy,Policy, IndustrialIndustrialPolicyPolicy ofof NERNER

10

1919

Potential Projects under Agro & Food ProcessingPotential Projects under Agro & Food ProcessingProject No. 4Project No. 4

NameName ofof ProjectProject ProcessingProcessing ofof BambooBamboo ShootShootProjectProject CostCost INRINR 8383..11 millionmillionCapitalCapital EquipmentEquipment Processing,Processing, ConcentrationConcentration andand ColdCold

StorageStorageRawRaw MaterialMaterial BambooBamboo shootsshoots areare availableavailable inin plentyplentyPromotersPromoters PrivatePrivate investorinvestor oror JointJoint VenturesVenturesPolicyPolicy frameworkframeworkapplicableapplicable toto thetheProjectProject

StateState IndustrialIndustrial Policy,Policy, IndustrialIndustrialPolicyPolicy ofof NERNER

AnnualAnnual AverageAverageproductionproduction

5050 thousandthousand tonstons

IRRIRR 1010..5555 %%

Bamboo in Manipur

11

21Bamboo ShootBamboo Shoot

2222

Potential Projects under Agro & Food Processing (Contd)Potential Projects under Agro & Food Processing (Contd)

Project No. 5Project No. 5NameName ofof ProjectProject IntegratedIntegrated MushroomMushroom ProductionProduction &&

ProcessingProcessing PlantPlantCapitalCapital EquipmentEquipment Processing,Processing, Concentration,Concentration, AsepticAseptic

FillingFilling andand ColdCold StorageStorageRawRaw MaterialMaterial MushroomsMushrooms areare availableavailable inin plentyplenty

bothboth naturalnatural asas wellwell asas cultivationcultivationPromotersPromoters PrivatePrivate investorsinvestors oror JointJoint VenturesVentures

PolicyPolicy frameworkframeworkapplicableapplicable toto thetheProjectProject

StateState IndustrialIndustrial Policy,Policy, IndustrialIndustrialPolicyPolicy ofof NERNER

12

2323

Potential Projects under Agro & Food Potential Projects under Agro & Food Processing (Contd)Processing (Contd)

Project No. 6Project No. 6NameName ofof ProjectProject ProductionProduction ofof OleoresinsOleoresins andand SpiceSpice

OilOil PlantPlantProjectProject CostCost INRINR 184184..55 millionmillionCapitalCapital EquipmentEquipment ProcessingProcessing && Solvent,Solvent, ExtractionExtraction

EquipmentEquipmentRawRaw MaterialMaterial LocallyLocally AvailableAvailable [Ginger,[Ginger, Clove,Clove, TurmericTurmeric andand

PungentPungent ChilliChilli (U(U--Morok)Morok) etcetc..]]

PromotersPromoters PrivatePrivate investorinvestor oror JointJoint VenturesVenturesPolicyPolicy frameworkframeworkapplicableapplicable toto thetheProjectProject

StateState IndustrialIndustrial Policy,Policy, IndustrialIndustrialPolicyPolicy ofof NERNER

IRRIRR 1313..3030 %%

2424

Potential Projects under Agro & Food Potential Projects under Agro & Food Processing (Contd)Processing (Contd)

Project No. 7Project No. 7NameName ofof ProjectProject EstablishmentEstablishment ofof AgriAgri--ExportExport ZoneZone forfor

PassionPassion FruitFruitRawRaw MaterialMaterial PassionPassion fruitfruit areare growngrown inin plentyplenty

ProjectProject CostCost INRINR 589589..66 millionmillionPromotersPromoters PrivatePrivate investorinvestor oror JointJoint VenturesVenturesPolicyPolicy frameworkframeworkapplicableapplicable toto thetheProjectProject

StateState IndustrialIndustrial Policy,Policy, IndustrialIndustrialPolicyPolicy ofof NorthNorth EasternEastern RegionRegion ofofIndiaIndia

IRRIRR 1616..0606 %%

13

25

26Handloom ProductsHandloom Products

14

2727

Potential Projects under Handloom SectorPotential Projects under Handloom SectorProject No. 8Project No. 8

NameName ofof ProjectProject SettingSetting upup HandloomHandloom ExportExport SchemeScheme forfor weaverweaver

LocationLocation AnyAny ClusterCluster inin Manipur,Manipur, IndiaIndia

EnvironmentalEnvironmentalImpactImpact

ItIt isis aa handhand woven,woven, operatedoperated manually,manually, withoutwithoutchemicals,chemicals, electricelectric powerpower.. NoNo pollutionpollution..

PolicyPolicyframeworkframeworkapplicableapplicable totothethe ProjectProject

StateState IndustrialIndustrial Policy,Policy, NorthNorth EastEast IndustrialIndustrial andandInvestmentInvestment PolicyPolicy

PromotersPromoters PrivatePrivate InvestorInvestor oror JointJoint VenturesVentures

SovereignSovereign andandmultilateralmultilateralguaranteesguarantees

Promoter’sPromoter’s CollateralCollateral SecuritySecurity

2828

Project offer under Handicrafts SectorProject offer under Handicrafts SectorProject No. 9Project No. 9

NameName ofof ProjectProject KounaKouna (Reed)(Reed) CraftCraft ProductionProduction

LocationLocation IdentifiedIdentified valleyvalley areasareas havinghaving kounakouna craftcraftconcentrationconcentration // clustercluster withinwithin thethe StateState

CapitalCapital EquipmentEquipment HandHand operatedoperated equipmentequipment suchsuch asas woodenwoodenreedreed matmat weavingweaving frames,frames, mortisemortise chisel,chisel,sickle,sickle, TT.. BoxBox Clamp,Clamp, hammer,hammer, plierspliers andandotherother toolstools

RawRaw MaterialMaterial KounaKouna ReedReed areare LocallyLocally availableavailable inin plentyplenty

ForeignForeign ExchangeExchangeCostCost

NilNil

PromotersPromoters PrivatePrivate investorinvestor oror JointJoint VenturesVentures

PolicyPolicy frameworkframeworkapplicableapplicable toto thetheProjectProject

StateState IndustrialIndustrial Policy,Policy, NorthNorth EastEast IndustrialIndustrialandand InvestmentInvestment PolicyPolicy

15

29Kauna (Reed) products

30Cane & Bamboo / Kauna (Reed)Cane & Bamboo / Kauna (Reed)

16

31Nungbi PotteryNungbi Pottery

3232

17

33

Potential Projects under Tourism Sector

LOKTAK LAKE

PROJECT NO. 10

Name of Project Loktak Tourism / Wildlife Circuits

Location Bishnupur District, Manipur, India

Capital Equipment Boats, circuit train, amusement and recreationfacilities etc.

EnvironmentalImpact

Environmental friendly

Promoters Private investor or Joint Ventures

Sovereign & Multi-collateral

Collateral security of private investor andGovernment Guarantee

Others The circuit comprises of 4 units linkingLoktak, Keibul Lamjao, Sendra, Karangislands

34Fishing at Loktak Lake

18

35Hut on Phumdi (Floating Island) at Loktak

36Shree Shree Govindaji Temple

19

3737

38India - Myanmar Border

Project No. 11Name of Project Culture / Adventure Tourism

Location Bishnupur, Tamenglong, Ukhrul, Senapati andChurachandpur District

Capital Equipment Paragliding, hang gliding, trekking and adventuresport equipment etc.

Environmental Impact Environmental friendly

Promoters Private investor or Joint Ventures

Other The project is built around the concept of ethnictourism and adventure sports. Ukhrul, Senapati &Tamenglong are hilly districts with thick forest andperennial rivers/ streams. Sports facilitiesparticularly river rafting, hang and paragliding areincluded. Tribal/ ethnic events and lifestyle

Potential Projects under Tourism Sector (Contd)

20

39

4040

21

41

STATE SECTOR GENERATION ,STATE SECTOR GENERATION ,TRANSMISSION & DISTRIBUTION SYSTEMTRANSMISSION & DISTRIBUTION SYSTEM

Sl. Sl. No.No.

ParticularParticular UnitUnit CapacityCapacityAs on As on

31/3/200731/3/2007

1.1. GenerationGenerationvv HydroHydrovv Heavy FuelHeavy Fuel

MWMWMWMW

0.6000.60036.000 36.000

2.2. 132132 KVKV S/SS/S MVAMVA 191.300 191.300

3.3. 132132 KVKV lineslines KMKM 376.210376.210

4.4. 3333 KVKV S/SS/S MVAMVA 218.400218.400

5.5. 3333 KVKV lineslines KMKM 728.628728.628

42

POWER REQUIREMENT PROJECTED AS PER POWER REQUIREMENT PROJECTED AS PER 1717TH TH ELECTRIC POWER SURVEY OF INDIAELECTRIC POWER SURVEY OF INDIA

POWER REQUIREMENT METPOWER REQUIREMENT MET

ParticularParticular 20072007--0808 20082008--0909 20092009--1010 20102010--1111 20112011--1212

PeakPeak LoadLoad (MW)(MW) 161161 170170 186186 204204 223223

Energy Requirement Energy Requirement (MU)(MU)

712712 759759 838838 928928 10271027

YearYear Peak Power Peak Power Requirement Requirement

(MW)(MW)

PeakPeakDemand metDemand met

(MW)(MW)

EnergyEnergyRequirement Requirement

(MU)(MU)

EnergyEnergyDemand metDemand met

(MU)(MU)

20052005--0606 140140 115115 653653 468.89

20062006--0707 155155 110 110 677677 489.52

22

4343

Potential Projects under Power SectorPotential Projects under Power SectorProject No. 12Project No. 12

NameName ofof ProjectProject NungleibandNungleiband HydroHydro ElectricElectric ProjectProject ((7070 MW)MW)

LocationLocation TamenglongTamenglong District,District, Manipur,Manipur, IndiaIndia

NearestNearest Rail,Rail, RoadRoad &&SeaSea ConnectionConnection

(i)(i) AirAir –– ImphalImphal (ii)(ii) RailRail –– DimapurDimapur (iii)(iii) RoadsRoads –– NHNH3939,,150150,,5353 (iv)(iv) SeaSea –– KolkataKolkata

ProjectProject CostCost INRINR 72007200..4040 millionmillion

CapitalCapital EquipmentEquipment INRINR 40734073..4949 millionmillion (i(i..ee ElectroElectro MechanicalMechanical –– INRINR459459..8181 millionmillion.. andand PowerPower PlantPlant –– INRINR 36133613..6868million)million)

PromotingPromoting DepttDeptt.. PrivatePrivate InvestorInvestor oror JointJoint VenturesVentures

DesignDesign DischargeDischarge 6565..7676 cumecscumecs

DesignDesign HeadHead 123123 mm

AnnualAnnual EnergyEnergy 363363..9595 MUMU (Million(Million Unit)Unit)

CostCost ofof GenerationGeneration INRINR 33..3030 perper unitunit

CostCost ofof InstallationInstallation // MWMW INRINR 102102..9090 millionmillion

IRRIRR 1313..8181 %%

44

Thank YouLoktak Lake of Manipur