PRESENTATION BOARDS
-
Upload
shenia-lay -
Category
Documents
-
view
220 -
download
0
description
Transcript of PRESENTATION BOARDS
ambivalence.In architecture, Optimisation and Transparency have been explored extensively. In our approach to the Wyndham City Gateway Project we studied both dis-courses in parallel which have become mutually dependant in our exploration.
Our technique expresses transparency through framing, hiding, progressive reveal and conceal, directional views and filtering,; which were optimised through aper-ture size, layering and density to create strategic hiding and designed sightlines.
Our final design also achieved the conceptual aim to explore the rela-tionship between the natural and manmade, with a particular focus on the enhancement of natural features using manmade design. The innova-tion of our approach reconceptualises the use of opitimisation and trans-parency. We approached the challenge using “Phenomenal Transparen-cy” as opposed to “Literal Transparency” (Rowe and Slutzky, Transparency, 1997) exploring how it can create multiple perceptions. The natural en-vironment and manmade environment become two interpenetrating worlds which are represented by the process of looking through the layers of weathering steel towards a natural backdrop. This result is illustrative of the “intensive relationship between the natural environments and the ac-tivities of human settlement,” which is embedded in Wyndham’s History.
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRO
DU
CED
BY
AN
AU
TOD
ESK
ED
UC
ATI
ON
AL
PRO
DU
CT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCTPR
OD
UC
ED B
Y AN
AU
TOD
ESK ED
UC
ATIO
NA
L PRO
DU
CT
1. 6MM OXIDATED STEEL SHEETING2. 250UB WITH 20MM INSULATION3. STEEL BRACING4. 70MM INSULATION5. FOOTING
1
5
4
2
3
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRO
DU
CED
BY
AN
AU
TOD
ESK
ED
UC
ATI
ON
AL
PRO
DU
CT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRO
DU
CED
BY A
N A
UTO
DESK
EDU
CA
TION
AL PR
OD
UC
T
1. OUTMOST MODEL LAYER
2. INTERNAL MODEL LAYER
3. INNERMOST MODEL LAYER
5. SITE PLAN
4. CONSTRUCTION DETAIL - CONNECTION TO GROUND
SHENIA LAY 390117, LUCY GRIFFITH 389404, BELTAS JAP 387915