Presentation
Transcript of Presentation
Pre Proposal Forum &
Networking Meeting
May 13, 2008
Dr. P. Phillips Orlando Performing Arts Center
Kathy RamsbergerDPAC PRESIDENT
WELCOME
•Provide a SHOWCASE for regional arts groups.
•Create a great MULTI-CULTURAL center for artistic excellence.
•Develop a center of ARTS EDUCATION for children and adults alike.
•Establish a premier DESTINATION for Floridians and tourists.
•Build a WELCOMING place that strengthens community PRIDE.
DPAC MISSION
Forum Focus
•Construction Manager at Risk
•Wayfinding Graphics Consultant
•Audio/Video Consultant
Today’s Line Up1. M/WBE Participation and Guidelines
Veronica Anderson- Anderson & Associates, M/WBE Consultant
2. Teaming OpportunitiesCarlos Barrios- Baker Barrios Architects, Lead Principal
3. Construction Manager at Risk RFP Mark Chenoweth – Hines, VP Conceptual Construction
4. Wayfinding Graphics Consultant & Audio/Video Consultant Mike Woollen- HKS Architects, Overall Project Manager
5. Introductions
6. Networking
Veronica AndersonM/WBE Consultant
Anderson and Associates, P.A.
Minority/Women Business Enterprises
A responsive proposal shall respond to how the Proposer will comply with the M/WBE
Program and The City of Orlando Blueprint
Minority/Women Business Enterprise Participation
The project will comply with the City of Orlando's Chapter 57 Code for the contractual participation of:
– 18% Minority Business Enterprises – 6% Women Business Enterprises. – Additionally, the Code requires 18% Minority and 6% Women employment on the project
The Production Architect, HKS, Inc./Baker Barrios Architects, Inc. has established goals for M/WBE Participation for these design packages
The Developer, Hines, has established goals for M/WBE Participation for the Construction Management services
The M/WBEs must be certified by the City of Orlando or Orange County
Minority/Women Business Enterprises
• M/WBEs are encouraged to compete as the Prime Consultant
• Non-M/WBEs are encouraged to joint venture, subcontract or create associations with certified M/WBE firms
• Exclusive relationships with certified M/WBE firms are strongly discouraged
The City of Orlando’s BlueprintBlueprint for Using Community Venues to
Create a Sustainable Economic Impact establishes goals to:
•Assist the development and support of local, small and historically disadvantaged businesses as an important aspect of the continuing
growth and development of the community;
•Develop a local workforce initiative to provide trained workers;
•Collaboratively work with the community stakeholders to identify andexplore long-term business opportunities in the affected areas;
•Explore the creation of local vendor development/mentor programs through partnerships with Contractors, Consultants, Vendors and
Community Based Organizations
Firms must address how they will comply with the Blueprint requirement
Resources to Gather Information & Assistance
M/WBE Consultant:Veronica Anderson, Principal in ChargeSusan Brosch, Project Manager
Anderson and Associates, P.A.805 S. Kirkman Road, Suite 204Orlando, FL 32811407-843-9901 Telephone407-843-9903 [email protected]@andersonandassocpa.com
Blueprint Office:Janeiro R. Coulter, Special Projects Manager
Orlando Venues Project OfficeCity of OrlandoMailing: P.O. Box 4990, Orlando, FL 32802-4990Physical: 450 S. Orange Av, Ste 150, Orlando, Fl 32801407.246.3180 Telephone407-246-3435 Fax407-242-6959 [email protected]
Blueprint Hotline: [email protected]
DPAC GUIDING PRINCIPAL
No Influence by Responders/Bidders
Any responders/bidders, either directly or indirectly through any third party, attempting to contact any member of the Board of Directors of
the Corporation or any government official (elected or appointed) in an effort to influence
the selection process for contracts to be awarded or entered into by the Corporation may
be immediately disqualified.
Carlos BarriosLead Principal
Baker Barrios Architects, Inc.
• Teaming Mentoring Opportunities
• Local Participation
• Diversity
TEAMING PROCESS
Mark Chenoweth VP Conceptual Construction
Hines
DPAC Construction Manager (CM)
Construction Manager At Risk; GMP contract
CM selected during Design Development
Two step selection process will be complete in September 2008
CM participates actively during Design Development and the completion of Construction Documents
CM will manage the subcontractor selection process
CM is responsible for all construction activities through final completion
CM Selection Process
Two Steps:
Request for Proposal: Part 1
Project scope description
Form of Contract
Form of General Conditions
Preconstruction schedule
Request for Proposal: Part 2
Schematic level design documents
CM Selection ProcessRFP: Part 1 Requirements:
Experience of the firm and key staff
Exceptions to draft contract and general conditions
M/WBE commitment (minimum 24%)
Financial strength and bonding capacity
Safety record
LEED experience
BIM experience
Preconstruction capabilities
Shortlist to three firms following evaluation of RFP: Part 1 responses
DPAC Procurement Committee will select the shortlist based on scoring system to be defined in the RFP
CM Selection ProcessRFP: Part 2 Requirements:
General Conditions and Lump Sum Fee proposal
Detailed construction schedule
Site logistics plan
Detailed staffing plan
Project safety plan
Detailed plan to achieve Blueprint and M/WBE goals
Interviews / Evaluation
Formal presentation
Follow-up interviews
Possible site visits
Selection by DPAC Procurement Committee
CM Selection ProcessRFP: Part 2
Selection Criteria
Experience / Staffing
Blueprint and M/WBE commitment
General Conditions and Fee proposal
Proposed revisions to contract and general conditions
Approach to the project – schedule, logistics plan, staffing, safety, etc.
All information received in responses to RFP: Part 1 or RFP: Part 2 will be considered in the final selection
CM Selection Process
Key Dates (all dates are subject to change)
June 17 – RFP: Part 1 available on DPAC website (www.orlandopac.org)
July 10 – RFP: Part 1 responses due
July 15 – Procurement Committee determines shortlist
July 17 – RFP: Part 2 distributed to selected shortlist
August 12 – RFP: Part 2 responses due
August 13 – 27 – Interview period
August 28 – Procurement Committee selects CM
September – Approval at City Council meeting
CM Selection Process
Questions regarding Construction Manager at Risk must be sent by email to:
Hines, c/o Mark Chenoweth at [email protected]
Michael WoollenOverall Project Manager
HKS Architects, Inc.
PROJECT DESIGN TEAMDr. P. Phillips Orlando Performing Arts Center
Baker Barrios ArchitectsProduction Architect
Barton Myers Assoc. Design Architect
HKS Architects, Inc.Production Architect
Current Round of Sub-Consultant Selection
SelectedSub-Consultants
Next Round of Sub-Consultant Selection
Donnell Consultants, Inc.Cost Consultants
Anderson & Associates, P.A.M/WBE Consultants
HinesDevelopment Manager
Production Architect Team
PROJECT DESIGN TEAMDr. P. Phillips Orlando Performing Arts Center
Baker Barrios ArchitectsProduction Architect
Barton Myers Assoc. Design Architect
HKS Architects, Inc.Production Architect
Current Round of Sub-Consultant Selection
Selected Sub-Consultants
Next Round of Sub-Consultant Selection
Donnell Consultants Inc.Cost Consultants
Anderson & Associates, P.A.M/WBE Consultants
HinesDevelopment Manager
Production Architect Team
PROJECT DESIGN TEAMDr. P. Phillips Orlando Performing Arts Center
Baker Barrios ArchitectsProduction Architect
Barton Myers Assoc. Design Architect
HKS Architects, Inc.Production Architect
Current Round of Sub-Consultant Selection
Selected Sub-Consultants
Next Round of Sub-Consultant Selection
Donnell Consultants, Inc.Cost Consultants
Anderson & Associates, P.A.M/WBE Consultants
HinesDevelopment Manager
• Wayfinding Graphics Consultant• Audio/Video Consultant
Production Architect Team
PROJECT DESIGN TEAMDr. P. Phillips Orlando Performing Arts Center
Baker Barrios ArchitectsProduction Architect
Barton Myers Assoc. Design Architect
HKS Architects, Inc.Production Architect
Current Round of Sub-Consultant Selection
Previously Selected Sub-Consultants
Donnell Consultants Inc.Cost Consultants
Anderson Associates, P.A.M/WBE Consultants
HinesDevelopment Manager
• Building Controls• FF&E • Window Washing• Food Service• Enhanced Commissioning• Wind Studies
Production Architect Team
Next Round of Sub-Consultant Selection
CONSULTANT RFP PROCESS• RFP’s Available:
– DPAC Web site: www.orlandopac.org
• RFP Package:– Project Overview and Submittal Requirements
– M/WBE Goals (30%)
– Scope of Services
– Prime Agreement (to be attached to consultant agreement)
– Draft Architect-Consultant Agreement
– Preliminary Project Schedule
– Current Plan Concepts
• Current Round of Proposals
– Due June 5, 2008 by 1:00 pm at the office of HKS Architects, Inc.
• Last Round of RFQ’s/RFP’s Expected in July-August, 2008
CONSULTANT RFP PROCESS• Two Types of Submittals:
– RFQ’s for Consultants That Fall Under Florida’s CCNA – Qualifications Only; 2-Step Selection Process: Shortlist and Interviews
– RFP’s for Consultants That Do Not Fall Under Florida’s CCNA Process – Qualifications and Fee Proposals; No Shortlist and Interviews Required
– The Graphics and A/V submittals will be RFP’s.
• Proposed Consulting Team – Including Contracting Entity
• Consultants’ Credentials
• Proposed M/WBE Participation – Including Teaming Arrangements if Applicable
• Fee Proposal
• Send Questions by Email to HKS, c/o Mike Woollen at [email protected]
CONSULTANT RFP PROCESS
• Clarifications from Q&A and all Addenda will be Posted on DPAC Web site
• Proposals will be Reviewed by the Selection Committee – representatives of DPAC, Hines, Anderson & Associates, Barton Myers Associates, and HKS/Baker Barrios
• All Consultants will contract directly with HKS Architects, Inc.