PREPARING YOUR TRADES – PROJECT GOALS AND REQUIREMENTS
6
Page 24
![Page 2: PREPARING YOUR TRADES – PROJECT GOALS AND REQUIREMENT S](https://reader030.fdocuments.net/reader030/viewer/2022032805/56813343550346895d9a39e8/html5/thumbnails/2.jpg)
G|PRO 2
Everyone on your team needs to be on the same page about the requirements of a green job.
Sustainability Training Issues Across Trades Pages 24-25
Management of Green Job-Sites
![Page 3: PREPARING YOUR TRADES – PROJECT GOALS AND REQUIREMENT S](https://reader030.fdocuments.net/reader030/viewer/2022032805/56813343550346895d9a39e8/html5/thumbnails/3.jpg)
G|PRO
Inter-Trade Coordination
Examples:•Floor penetrations•Underfloor distribution of HVAC and wiring•Building management systems•Low-VOC materials
Sustainability Training Issues Across Trades Pages 25-26
![Page 4: PREPARING YOUR TRADES – PROJECT GOALS AND REQUIREMENT S](https://reader030.fdocuments.net/reader030/viewer/2022032805/56813343550346895d9a39e8/html5/thumbnails/4.jpg)
G|PRO
Waste Disposal
• Fluorescent lamps
• Magnetic ballasts
• Recycle or reuse steel conduit
Sustainability Training Issues Across Trades Page 26
Fluorescent lampsSteel conduit
![Page 5: PREPARING YOUR TRADES – PROJECT GOALS AND REQUIREMENT S](https://reader030.fdocuments.net/reader030/viewer/2022032805/56813343550346895d9a39e8/html5/thumbnails/5.jpg)
G|PRO
Temporary Light and Power
• Reuse equipment and material at future job sites
• Minimize energy use during construction
• All non-emergency lights to shut down and emergency lights to drop to code minimums
• Efficient design of on-site and temporary power
Sustainability Training Issues Across Trades Pages 26-27
Construction site at nightEfficient lighting saves energy and money.
![Page 6: PREPARING YOUR TRADES – PROJECT GOALS AND REQUIREMENT S](https://reader030.fdocuments.net/reader030/viewer/2022032805/56813343550346895d9a39e8/html5/thumbnails/6.jpg)
G|PRO Sustainability Training Issues Across Trades Page 27
Site Environmental Quality:No-Smoking Policy
![Page 7: PREPARING YOUR TRADES – PROJECT GOALS AND REQUIREMENT S](https://reader030.fdocuments.net/reader030/viewer/2022032805/56813343550346895d9a39e8/html5/thumbnails/7.jpg)
G|PRO
Site Environmental Quality
Pay attention to conditions while construction is underway:•Bathroom Use•Food Waste•Air Filters
Sustainability Training Issues Across Trades Pages 27-28
![Page 8: PREPARING YOUR TRADES – PROJECT GOALS AND REQUIREMENT S](https://reader030.fdocuments.net/reader030/viewer/2022032805/56813343550346895d9a39e8/html5/thumbnails/8.jpg)
G|PRO
Job-Site Orientation
• Orientation should occur whenever new trades show up on job-site.
• Every worker on the job should understand:
• This is a green building• What makes this project
green• What are responsibilities
of trades to achieve sustainable goals
Sustainability Training Issues Across Trades Page 28
![Page 9: PREPARING YOUR TRADES – PROJECT GOALS AND REQUIREMENT S](https://reader030.fdocuments.net/reader030/viewer/2022032805/56813343550346895d9a39e8/html5/thumbnails/9.jpg)
G|PRO
Trade Training – All Trades
• IAQ and VOCs
• Materials storage
• Waste reduction
• Cx process
• How to collect and provide documentation
• Green sequence of installation issues
• Recycled & regional materials
Sustainability Training Issues Across Trades Pages 24-28
![Page 10: PREPARING YOUR TRADES – PROJECT GOALS AND REQUIREMENT S](https://reader030.fdocuments.net/reader030/viewer/2022032805/56813343550346895d9a39e8/html5/thumbnails/10.jpg)
G|PRO
Issues Relevant to Specific Trades: Core and Shell
Issues Relevant to Specific Trades Pages 28-29
Excavation/Demolition: •ESC Plan
•Low-sulfur fuel use
Formwork:•FSC wood requirements
•Reusable formwork
•Formaldehyde-free wood for forms that remain in place
•Layout issues with in-slab or underground elements
![Page 11: PREPARING YOUR TRADES – PROJECT GOALS AND REQUIREMENT S](https://reader030.fdocuments.net/reader030/viewer/2022032805/56813343550346895d9a39e8/html5/thumbnails/11.jpg)
G|PRO
Green Construction Impacts: Core and Shell
Foundation:•Concrete wash-out control
Steel:•Recycled content documentation
Concrete:•Recycled content calculations (mix or just cement)
•Regional content requirements: sand/gravel
•Submittals for recycled and regional content
Issues Relevant to Specific Trades Pages 29-30
![Page 12: PREPARING YOUR TRADES – PROJECT GOALS AND REQUIREMENT S](https://reader030.fdocuments.net/reader030/viewer/2022032805/56813343550346895d9a39e8/html5/thumbnails/12.jpg)
G|PRO
Green Construction Impacts: Core and Shell
Envelope:Specifications for:
• Hi-performance glazing
• Wall and roof insulation
• Reflective roofing
• Green roof systems
• Sealing of joints & penetrations
Issues Relevant to Specific Trades Page 30
![Page 13: PREPARING YOUR TRADES – PROJECT GOALS AND REQUIREMENT S](https://reader030.fdocuments.net/reader030/viewer/2022032805/56813343550346895d9a39e8/html5/thumbnails/13.jpg)
G|PRO
• Confirm specified materials
• Rapidly renewable materials
• FSC wood
• Material storage
Issues Relevant to Specific Trades Page 30
![Page 14: PREPARING YOUR TRADES – PROJECT GOALS AND REQUIREMENT S](https://reader030.fdocuments.net/reader030/viewer/2022032805/56813343550346895d9a39e8/html5/thumbnails/14.jpg)
G|PRO
• Allow for possible longer curing times when using low-VOC materials
• Provide MSDS documentation for all products
• Air sealing coordination
• Lead abatement
Issues Relevant to Specific Trades Page 30
![Page 15: PREPARING YOUR TRADES – PROJECT GOALS AND REQUIREMENT S](https://reader030.fdocuments.net/reader030/viewer/2022032805/56813343550346895d9a39e8/html5/thumbnails/15.jpg)
G|PRO
• New products & technologies
• Piping routes & installation sequences
• Consider sequence installation
• HVAC controls
• Systems training
Issues Relevant to Specific Trades Page 31
![Page 16: PREPARING YOUR TRADES – PROJECT GOALS AND REQUIREMENT S](https://reader030.fdocuments.net/reader030/viewer/2022032805/56813343550346895d9a39e8/html5/thumbnails/16.jpg)
G|PRO
• New products & technologies
• Commissioning of lighting & dimming controls and other electrical systems
• Coordination with air sealing
Issues Relevant to Specific Trades Page 30
![Page 17: PREPARING YOUR TRADES – PROJECT GOALS AND REQUIREMENT S](https://reader030.fdocuments.net/reader030/viewer/2022032805/56813343550346895d9a39e8/html5/thumbnails/17.jpg)
G|PRO
• Separation of recyclables
• On-site sorting
• Tracking pickups
• Material storage
Issues Relevant to Specific Trades Page 31
![Page 18: PREPARING YOUR TRADES – PROJECT GOALS AND REQUIREMENT S](https://reader030.fdocuments.net/reader030/viewer/2022032805/56813343550346895d9a39e8/html5/thumbnails/18.jpg)
G|PRO
CLASS DISCUSSION:
Tradesperson training:
Introduce new trades to your green building goals
![Page 19: PREPARING YOUR TRADES – PROJECT GOALS AND REQUIREMENT S](https://reader030.fdocuments.net/reader030/viewer/2022032805/56813343550346895d9a39e8/html5/thumbnails/19.jpg)
G|PRO
TEST YOURSELF:1. Why is it important to train your trades on project
goals and requirements?
2. What are the primary green training issues for all trades?
3. Which sustainable strategies can be classified as construction process activities?
4. What green issues must the CM/GC track in each work area as the project proceeds?
Page 31
![Page 20: PREPARING YOUR TRADES – PROJECT GOALS AND REQUIREMENT S](https://reader030.fdocuments.net/reader030/viewer/2022032805/56813343550346895d9a39e8/html5/thumbnails/20.jpg)
G|PRO
SHOP DRAWINGS & SUBMITTALS7
Page 32
![Page 21: PREPARING YOUR TRADES – PROJECT GOALS AND REQUIREMENT S](https://reader030.fdocuments.net/reader030/viewer/2022032805/56813343550346895d9a39e8/html5/thumbnails/21.jpg)
G|PRO
Submittal Process Overview
Submittal Process Overview Page 32
Integrated with standard best practices.
Review subs' submittals before they go to A/E for compliance with sustainability goals.
![Page 22: PREPARING YOUR TRADES – PROJECT GOALS AND REQUIREMENT S](https://reader030.fdocuments.net/reader030/viewer/2022032805/56813343550346895d9a39e8/html5/thumbnails/22.jpg)
G|PRO 22
Material Submissions – Substitute Carefully!
Anyone making purchases or overseeing receipt of materials must ensure that the materials match the specifications.
•Wood certified by the Forest Stewardship Council (FSC)
•VOC limits
•Recycled content
Submittal Process Overview Pages 32-33
![Page 23: PREPARING YOUR TRADES – PROJECT GOALS AND REQUIREMENT S](https://reader030.fdocuments.net/reader030/viewer/2022032805/56813343550346895d9a39e8/html5/thumbnails/23.jpg)
G|PRO
Sustainable Sites:
• Erosion & Sedimentation Control Plan (ESC)
Water Efficiency:
• WaterSense and ENERGY STAR labeling
Energy & Atmosphere:
• Verification of ENERGY STAR labeling
• Cx documentation
23Special Issues for the CM/GC to
Require, Track, and Document Page 33
Special Issues for the CM/GC to Require, Track, and Document
Dual-flush toilet
![Page 24: PREPARING YOUR TRADES – PROJECT GOALS AND REQUIREMENT S](https://reader030.fdocuments.net/reader030/viewer/2022032805/56813343550346895d9a39e8/html5/thumbnails/24.jpg)
G|PRO 24Special Issues for the CM/GC to Require,
Track, and Document Page 33
Special Issues for the CM/GC to Require, Track, and Document
![Page 25: PREPARING YOUR TRADES – PROJECT GOALS AND REQUIREMENT S](https://reader030.fdocuments.net/reader030/viewer/2022032805/56813343550346895d9a39e8/html5/thumbnails/25.jpg)
G|PRO
Indoor Environmental Quality:
• Green labeling and low-VOC product letters
• IAQ inspection checklist
25Special Issues for the CM/GC to Require,
Track, and Document Page 33
Special Issues for the CM/GC to Require, Track, and Document
![Page 26: PREPARING YOUR TRADES – PROJECT GOALS AND REQUIREMENT S](https://reader030.fdocuments.net/reader030/viewer/2022032805/56813343550346895d9a39e8/html5/thumbnails/26.jpg)
G|PRO
• Materials certification letters
• Reporting templates
Sample Materials Certification Form
![Page 27: PREPARING YOUR TRADES – PROJECT GOALS AND REQUIREMENT S](https://reader030.fdocuments.net/reader030/viewer/2022032805/56813343550346895d9a39e8/html5/thumbnails/27.jpg)
G|PRO
1. Four students will receive a LEED credit reporting form and are responsible for gathering verification data and filling the reporting form out.
2. All other students use cut sheets to deliver verification data to appropriate “Construction Manager.”
CLASSROOM EXERCISE:
![Page 28: PREPARING YOUR TRADES – PROJECT GOALS AND REQUIREMENT S](https://reader030.fdocuments.net/reader030/viewer/2022032805/56813343550346895d9a39e8/html5/thumbnails/28.jpg)
G|PRO
TEST YOURSELF:1. Is the shop drawing submittal process
different on a green job? If so, how?
2. What types of additional documentation are required from the CM/GC and your subcontractors?
3. What products require additional documentation to verify sustainable specification conformance?
Page 33
![Page 29: PREPARING YOUR TRADES – PROJECT GOALS AND REQUIREMENT S](https://reader030.fdocuments.net/reader030/viewer/2022032805/56813343550346895d9a39e8/html5/thumbnails/29.jpg)
G|PRO
ROUGH-IN, FINISHES & FIT-OUT
8
Page 34
![Page 30: PREPARING YOUR TRADES – PROJECT GOALS AND REQUIREMENT S](https://reader030.fdocuments.net/reader030/viewer/2022032805/56813343550346895d9a39e8/html5/thumbnails/30.jpg)
G|PRO Primary Job Management Areas: Rough-In Pages 34-35
… and don't forget commissioning!
Primary Job Management Areas: Rough-In
![Page 31: PREPARING YOUR TRADES – PROJECT GOALS AND REQUIREMENT S](https://reader030.fdocuments.net/reader030/viewer/2022032805/56813343550346895d9a39e8/html5/thumbnails/31.jpg)
G|PRO
CLASS DISCUSSION:
What project management practices and tools can be used to ensure that you are properly tracking and addressing issues at this stage?
![Page 32: PREPARING YOUR TRADES – PROJECT GOALS AND REQUIREMENT S](https://reader030.fdocuments.net/reader030/viewer/2022032805/56813343550346895d9a39e8/html5/thumbnails/32.jpg)
G|PRO
Indoor Air Quality
1.Sequence installation
2.Proper on-site storage of materials
3.Ductwork protection per SMACNA guidelines
4.Confirm all openings in piping or ductwork sealed until start-up
5.Low VOC-emitting finishes
Primary Job Management Areas: Finish & Fit-Out Work Pages 35-36
Primary Job Management Areas:Finish & Fit-Out Work
Ductwork protection
![Page 33: PREPARING YOUR TRADES – PROJECT GOALS AND REQUIREMENT S](https://reader030.fdocuments.net/reader030/viewer/2022032805/56813343550346895d9a39e8/html5/thumbnails/33.jpg)
G|PRO 33
MEP & Life Safety Systems
1. Confirm HVAC controls meet specs & set points
2. Ensure specifications on lighting, sensors, & renewable systems
3. Verify pipes and ducts are properly insulated
4. Confirm plumbing fixtures meet low-use specifications
Primary Job Management Areas: Finish & Fit-Out Work Page 36
Primary Job Management Areas:Finish & Fit-Out Work
![Page 34: PREPARING YOUR TRADES – PROJECT GOALS AND REQUIREMENT S](https://reader030.fdocuments.net/reader030/viewer/2022032805/56813343550346895d9a39e8/html5/thumbnails/34.jpg)
G|PRO
TEST YOURSELF:
1. What green elements require CM/GC tracking and verification at rough-in?
2. How do you use your Quality Control Plan to ensure that you are catching all the issues?
3. What are the primary green issues the CM/GC must watch out for at the finishes and fit-out stage?
Page 36
![Page 35: PREPARING YOUR TRADES – PROJECT GOALS AND REQUIREMENT S](https://reader030.fdocuments.net/reader030/viewer/2022032805/56813343550346895d9a39e8/html5/thumbnails/35.jpg)
G|PRO
COMMISSIONING & CLOSE-OUT9
Page 37
![Page 36: PREPARING YOUR TRADES – PROJECT GOALS AND REQUIREMENT S](https://reader030.fdocuments.net/reader030/viewer/2022032805/56813343550346895d9a39e8/html5/thumbnails/36.jpg)
G|PRO
The Commissioning Process
Commissioning Page 37
Commissioning (Cx):•Verifies that a facility has been designed, constructed and tested to perform as expected.•Relies on coordination and cooperation with all contractors for a successful project.
![Page 37: PREPARING YOUR TRADES – PROJECT GOALS AND REQUIREMENT S](https://reader030.fdocuments.net/reader030/viewer/2022032805/56813343550346895d9a39e8/html5/thumbnails/37.jpg)
G|PRO
Primary tasks:• Design Review• Construction
Inspections• Performance Testing• O&M Training &
Turnover
Commissioning Agent (CxA)'s Responsibilities
Commissioning Page 38
![Page 38: PREPARING YOUR TRADES – PROJECT GOALS AND REQUIREMENT S](https://reader030.fdocuments.net/reader030/viewer/2022032805/56813343550346895d9a39e8/html5/thumbnails/38.jpg)
G|PRO
Design Review
• Assist in value engineering
• Support development of the Cx Plan
• Provide submittals and shop drawings for review
Construction Inspections
• Arrange for installation inspections
• Coordinate pre-functional and start-up tests
O&M Training and Turnover
• Develop O&M manuals and training
• Troubleshoot systems
How the CM/GC is Involved in Cx Activities
Commissioning Page 38
![Page 39: PREPARING YOUR TRADES – PROJECT GOALS AND REQUIREMENT S](https://reader030.fdocuments.net/reader030/viewer/2022032805/56813343550346895d9a39e8/html5/thumbnails/39.jpg)
G|PRO
Fundamental vs. Enhanced Cx
Commissioning Page 38
![Page 40: PREPARING YOUR TRADES – PROJECT GOALS AND REQUIREMENT S](https://reader030.fdocuments.net/reader030/viewer/2022032805/56813343550346895d9a39e8/html5/thumbnails/40.jpg)
G|PRO
The Commissioning Plan
Commissioning Pages 38-39
The Commissioning Plan is generated during the design phase.
Cx Plan Details: •Overall testing plan and schedule of tests•Forms to record outcome•Required test devices•Personnel responsibilities
![Page 41: PREPARING YOUR TRADES – PROJECT GOALS AND REQUIREMENT S](https://reader030.fdocuments.net/reader030/viewer/2022032805/56813343550346895d9a39e8/html5/thumbnails/41.jpg)
G|PRO Commissioning Pages 39-40
Coordination with the Trades
Best known benefit of Cx: Smoother, quicker turnover of building systems to operations staff.
A clear description of the expectations and responsibilities of each team member will help the Cx process.
![Page 42: PREPARING YOUR TRADES – PROJECT GOALS AND REQUIREMENT S](https://reader030.fdocuments.net/reader030/viewer/2022032805/56813343550346895d9a39e8/html5/thumbnails/42.jpg)
G|PRO
Primary Systems to be Commissioned
Energy-related systems including:
HVAC&R: Mechanical and passive systems and associated controls
Plumbing: Pumps, boilers, domestic hot water, recycling systems
Electrical: Lighting and daylighting controls,renewable energy systems
Commissioning Page 40
![Page 43: PREPARING YOUR TRADES – PROJECT GOALS AND REQUIREMENT S](https://reader030.fdocuments.net/reader030/viewer/2022032805/56813343550346895d9a39e8/html5/thumbnails/43.jpg)
G|PRO
Possible Other Systems to be Commissioned
Commissioning Page 40
![Page 44: PREPARING YOUR TRADES – PROJECT GOALS AND REQUIREMENT S](https://reader030.fdocuments.net/reader030/viewer/2022032805/56813343550346895d9a39e8/html5/thumbnails/44.jpg)
G|PRO
What Occurs During Testing?
During testing:• Check for damage,
deterioration, and component failures
• Functional tests of individual components
• Operational tests and measurements of the energized system
• (Deferred testing may not occur until after occupancy)
Commissioning Page 40
![Page 45: PREPARING YOUR TRADES – PROJECT GOALS AND REQUIREMENT S](https://reader030.fdocuments.net/reader030/viewer/2022032805/56813343550346895d9a39e8/html5/thumbnails/45.jpg)
G|PRO
If problems occur:• Troubleshooting
techniques• Consult equipment and
component manuals• Check wiring• Re-verify wiring
terminations
Troubleshooting During Testing
Safety checks should be performed at all times.
Commissioning Page 40
![Page 46: PREPARING YOUR TRADES – PROJECT GOALS AND REQUIREMENT S](https://reader030.fdocuments.net/reader030/viewer/2022032805/56813343550346895d9a39e8/html5/thumbnails/46.jpg)
G|PRO
Documentation for Commissioning
Keep track of all documentation including failed tests and remedial actions.
•Deficiency reports leads to remedial action
•Resolution record will show that the system functions correctly
•Use these records to help support future troubleshooting
(Don't forget to take photos)
Commissioning Pages 40-41
![Page 47: PREPARING YOUR TRADES – PROJECT GOALS AND REQUIREMENT S](https://reader030.fdocuments.net/reader030/viewer/2022032805/56813343550346895d9a39e8/html5/thumbnails/47.jpg)
G|PRO
O&M Training
Equipment is fully operational for the first time during Cx – use the opportunity to train O&M staff to prevent callbacks.
Commissioning Page 41
![Page 48: PREPARING YOUR TRADES – PROJECT GOALS AND REQUIREMENT S](https://reader030.fdocuments.net/reader030/viewer/2022032805/56813343550346895d9a39e8/html5/thumbnails/48.jpg)
G|PRO
Electrical Work and Commissioning
• The electrical distribution system is the foundation for all other systems in the building.
• Electricians play a critical role in building performance by preventing electrical failures.
Commissioning Page 41
![Page 49: PREPARING YOUR TRADES – PROJECT GOALS AND REQUIREMENT S](https://reader030.fdocuments.net/reader030/viewer/2022032805/56813343550346895d9a39e8/html5/thumbnails/49.jpg)
G|PRO
What Electrical Systems are Commissioned?
• Lighting and lighting controls• Emergency power• HVAC equipment• Uninterruptible power
Commissioning Page 41
![Page 50: PREPARING YOUR TRADES – PROJECT GOALS AND REQUIREMENT S](https://reader030.fdocuments.net/reader030/viewer/2022032805/56813343550346895d9a39e8/html5/thumbnails/50.jpg)
G|PRO 50
OPERATIONS
Turning Building Over to Owner
COMMISSIONING CONSTRUCTION
![Page 51: PREPARING YOUR TRADES – PROJECT GOALS AND REQUIREMENT S](https://reader030.fdocuments.net/reader030/viewer/2022032805/56813343550346895d9a39e8/html5/thumbnails/51.jpg)
G|PRO
• Documentation is filed as project progresses
• CM/GC must obtain & organize verifications
• Sustainability Manager files final paperwork online with GBCI
• LEED certification depends on thorough filing!
Formal Project Close-Out Process Page 42
Formal LEED Close-Out
![Page 52: PREPARING YOUR TRADES – PROJECT GOALS AND REQUIREMENT S](https://reader030.fdocuments.net/reader030/viewer/2022032805/56813343550346895d9a39e8/html5/thumbnails/52.jpg)
G|PRO 52
Close-Out Documentation Required
• LEED templates • HVAC systems
manuals• Materials &
certifications
Formal Project Close-Out Process Page 42
![Page 53: PREPARING YOUR TRADES – PROJECT GOALS AND REQUIREMENT S](https://reader030.fdocuments.net/reader030/viewer/2022032805/56813343550346895d9a39e8/html5/thumbnails/53.jpg)
G|PRO
Construction ProcessCourse Wrap-Up Discussion
What questions do you still have about managing a green project?
What are the biggestchallenges and the bestsolutions you have learned?
![Page 54: PREPARING YOUR TRADES – PROJECT GOALS AND REQUIREMENT S](https://reader030.fdocuments.net/reader030/viewer/2022032805/56813343550346895d9a39e8/html5/thumbnails/54.jpg)
G|PRO
TEST YOURSELF:1. Which building systems require the CM/GC's
involvement in the commissioning process?
2. How is the CM/GC's role different with Enhanced as opposed to Fundamental Commissioning?
3. What are the CM/GC's roles in commissioning at the various stages of construction?
4. What types of green-related documentation must the CM/GC provide at project close-out?
Page 40
![Page 55: PREPARING YOUR TRADES – PROJECT GOALS AND REQUIREMENT S](https://reader030.fdocuments.net/reader030/viewer/2022032805/56813343550346895d9a39e8/html5/thumbnails/55.jpg)
G|PRO
MEASUREMENT &VERIFICATION10
Page 41
![Page 56: PREPARING YOUR TRADES – PROJECT GOALS AND REQUIREMENT S](https://reader030.fdocuments.net/reader030/viewer/2022032805/56813343550346895d9a39e8/html5/thumbnails/56.jpg)
G|PRO Measurement and Verification Pages 41-42
Measurement and Verification
You can't manage what you don't measure!
![Page 57: PREPARING YOUR TRADES – PROJECT GOALS AND REQUIREMENT S](https://reader030.fdocuments.net/reader030/viewer/2022032805/56813343550346895d9a39e8/html5/thumbnails/57.jpg)
G|PRO
Verification that Purchased Items Meet Specs
Find out what documentation is required and make sure all documents are retained
(Don't forget to take photos)
Measurement and Verification Page 42
![Page 58: PREPARING YOUR TRADES – PROJECT GOALS AND REQUIREMENT S](https://reader030.fdocuments.net/reader030/viewer/2022032805/56813343550346895d9a39e8/html5/thumbnails/58.jpg)
G|PRO
M&V and Retrofits
Simple!
Measure energy consumption before and after retrofits and improvements by collecting utility data.
Measurement and Verification Page 42
![Page 59: PREPARING YOUR TRADES – PROJECT GOALS AND REQUIREMENT S](https://reader030.fdocuments.net/reader030/viewer/2022032805/56813343550346895d9a39e8/html5/thumbnails/59.jpg)
G|PRO
M&V in New Construction
Measurement and Verification Pages 42-43
![Page 60: PREPARING YOUR TRADES – PROJECT GOALS AND REQUIREMENT S](https://reader030.fdocuments.net/reader030/viewer/2022032805/56813343550346895d9a39e8/html5/thumbnails/60.jpg)
G|PRO
• Description of the energy efficiency measures implemented
• Selection of the baseline and reporting periods
• Identification of routine and non-routine adjustments
• Selection of meters
What is Included in an M&V Plan
Measurement and Verification Page 43
![Page 61: PREPARING YOUR TRADES – PROJECT GOALS AND REQUIREMENT S](https://reader030.fdocuments.net/reader030/viewer/2022032805/56813343550346895d9a39e8/html5/thumbnails/61.jpg)
G|PRO
IPMVP from the EVO
IPMVP Protocols
Standards for verifying energy efficiency in buildings
•Efficiency Valuation Organization (EVO)
•International Performance Measurement and Verification Protocol (IPMVP)
Measurement and Verification Pages 43-44
![Page 62: PREPARING YOUR TRADES – PROJECT GOALS AND REQUIREMENT S](https://reader030.fdocuments.net/reader030/viewer/2022032805/56813343550346895d9a39e8/html5/thumbnails/62.jpg)
G|PRO
IPMVP Protocols
Four options for M&V depending on whether it's a:
•Retrofit
•New construction project
•Whole building
•Single system
Measurement and Verification Pages 43-44
IPMVP from the EVO
![Page 63: PREPARING YOUR TRADES – PROJECT GOALS AND REQUIREMENT S](https://reader030.fdocuments.net/reader030/viewer/2022032805/56813343550346895d9a39e8/html5/thumbnails/63.jpg)
G|PRO
Digital meter
Electromechanical meter
Meters For Measurement and Verification
• Standard energy meters
• Time-of-day meters
• Demand meters
• Interval meters
• Smart meters
Measurement and Verification Pages 44-45
![Page 64: PREPARING YOUR TRADES – PROJECT GOALS AND REQUIREMENT S](https://reader030.fdocuments.net/reader030/viewer/2022032805/56813343550346895d9a39e8/html5/thumbnails/64.jpg)
G|PRO
A Post-Occupancy Review & Assessment is the process of engaging a project team to review how goals stacked up to outcomes.
It looks at:
•Work flow•Management decisions•Team member accountability•Successes and failures•Possible improvements
Post-Occupancy Review and Assessment Page 45
Post-Occupancy Review and Assessment
![Page 65: PREPARING YOUR TRADES – PROJECT GOALS AND REQUIREMENT S](https://reader030.fdocuments.net/reader030/viewer/2022032805/56813343550346895d9a39e8/html5/thumbnails/65.jpg)
G|PRO 65
Post-Occupancy Review and Assessment
What are the benefits of Review and Assessment?
1.Documents best practices
2.Learning exchange which benefits the group
3.Increase in understanding
4.Greater job satisfaction due to being able to give and receive constructive feedback
Post-Occupancy Review and Assessment Page 45
ACROS Fukuoka Prefectural International Hall
![Page 66: PREPARING YOUR TRADES – PROJECT GOALS AND REQUIREMENT S](https://reader030.fdocuments.net/reader030/viewer/2022032805/56813343550346895d9a39e8/html5/thumbnails/66.jpg)
G|PRO Post-Occupancy Review and Assessment Pages 45-47
Conducting a Post-Occupancy Review and Assessment
![Page 67: PREPARING YOUR TRADES – PROJECT GOALS AND REQUIREMENT S](https://reader030.fdocuments.net/reader030/viewer/2022032805/56813343550346895d9a39e8/html5/thumbnails/67.jpg)
G|PRO
1. How accurate were our original estimates?
2. Were the funding opportunities realized?
3. What was most frustrating?
4. Describe any warning signs to notice next time?
5. Were the constraints, limitations, and requirements made clear to all?
6. Was there adequate clarity?
67
Sample Questions
Post-Occupancy Review and Assessment Pages 46-47
![Page 68: PREPARING YOUR TRADES – PROJECT GOALS AND REQUIREMENT S](https://reader030.fdocuments.net/reader030/viewer/2022032805/56813343550346895d9a39e8/html5/thumbnails/68.jpg)
G|PRO Post-Occupancy Review and Assessment Page 48
Conducting a Post-Occupancy Review and Assessment
![Page 69: PREPARING YOUR TRADES – PROJECT GOALS AND REQUIREMENT S](https://reader030.fdocuments.net/reader030/viewer/2022032805/56813343550346895d9a39e8/html5/thumbnails/69.jpg)
G|PRO
TEST YOURSELF:1. Describe the different options available for
M&V in the IPMVP published by EVO.
2. Describe how energy efficiency is predicted and measured in the construction of a new building versus a retrofit.
3. Describe the value of a Post-Occupancy Review and Assessment.
Page 48
![Page 70: PREPARING YOUR TRADES – PROJECT GOALS AND REQUIREMENT S](https://reader030.fdocuments.net/reader030/viewer/2022032805/56813343550346895d9a39e8/html5/thumbnails/70.jpg)
G|PRO
A knowledgeable and prepared CM/GC is critical to the successful construction of a green building.
You now have the tools and knowledge needed to facilitate a green project and are now part of a growing green building workforce and industry.
Conclusion
Conclusion Page 49
![Page 71: PREPARING YOUR TRADES – PROJECT GOALS AND REQUIREMENT S](https://reader030.fdocuments.net/reader030/viewer/2022032805/56813343550346895d9a39e8/html5/thumbnails/71.jpg)