• Identify key trades where Apprenticeship Placements are possible

• Embed the apprentice placement requirement within sub-contractor procurement

‘The sub-contractor will provide ‘one’ full apprenticeship placement from the ATA for the duration of their works. The Contractor is deemed to have allowed to have included for the delivery of the apprentice placement

within their tendered / contract sum

Supply Chain Engagement

Employment and Skills Plan

Trade NumberStart Date

Placement Duration

Electrical 1 Nov-12 12 MonthsNov-12 12 MonthsMay-13 6 Months

Dry-liner 1 Nov-12 10 Months

Construction Operative 1 Nov-12 6 Months

Business Admin 1 Nov-12 12 Months

Painter & decorator 2 Feb-13 8 Months

Carpenter 1 Feb-13 7 Months

Plumber 2

`

``````

HackneyGreenwich

Waltham ForestBarking & Dagenham

RedbridgeHarrow

EalingSutton

SouthwarkKensington & Chelsea

IslingtonTower Hamlets

LewishamCroydon

HounslowWandsworth

LambethNewham

Fragmented Supply chain

OPLCJohn Laing

Berkeley HomesSanctuary Housing

CCURVTESCOS

Mouchel Countryside Properties

Catalyst HousingAffinity Sutton

Metropolitan HousingSt George

Taylor WimpeyWates ConstructionSir Robert McAlpine

Berkeley HomesVolker Highways

Allenbuild

McLarensArdmoreFarrans

Hill PartnershipMorgan Sindall

Skanska

AC FlooringAF Connell Ltd

All Metal RoofingArdmore GroupAsh Contracting

BDLBlue Mechanical

Box and CharnockBreyer GroupBugler Limited

Chaps LtdChine Brickwork

DWS

Malden GroupMcGee

MPG LtdPanteraPentacle

RAKRosedale

Rydon GroupS. Lucas

S&R LondonSE Carpentry

Eddercliff CarpentryBrenbar

Commercial InsulationDB ScaffoldingGR Carpentry

H&V ServiceplanHaydon M&EHouston Cox

Imtech G&H LimitedIrvine-Whitlock

JC Carpentry LtdJ ReddingtonJJ Sweeney

KafftenStraton & Hasler

Bugler LimitedDurkan

Lovells PartnershipMansells

Telford HomesBarnes Construction

Town & CountryTaylor WimpeyHammersons

London & QuadrantStanhope

KOP Properties

Regal HomesNine ElmsSt. James

Hyde HousingSouthern Housing

Derwent

OsbourneBAM Nuttall

Barratt HomesBreyer GroupWillmott Dixon

SkinnersConneely

D&L ElectricalEW Gee Limited

FMSMcGinnNeilcott

NPSNRT Carpentry

StanmoreSwift Brickwork

WDHHaslemere Carpentry

Laser ElectricalGrangewood Brickwork

Hanover ElectricalMacs Plasterboard

Muranda LTDPage & GleesonPrice Building Ltd

Robinsons PlumbingSelect Interiors

CJ O’SheaKaybridge Construction

SkanskaDimension Data

Apprentice Placement Planner

Completed Apprenticeship

Sustainable Employment

Case Study – REDS10 Host Employer

Matt Ramsey•Barking & Dagenham Resident•Apprentice Carpenter•Building Crafts College

Present Future

MAY 2011

JAN 2012

MAR 2012

AUG 2012

DEC 2012

JUN 2013

Under-represented & Disadvantaged Groups

Community WomenWOMEN INTO CONSTRUCTION NEWHAM Women FC TOWER HAMLETS WFC

Disability

Outreach Partners

Colleges

Apprenticeship Programme

The future Queen Elizabeth Olympic Park

Delivering the Socio Economic Legacy

•Provide transparency in relation to the activity being undertaken on the project.

•Ensure there is an early intervention in the procurement process to ensure that Labour forecasting and skills demand analysis is undertaken to provide specific useful information through which to manage your recruitment and training provision.

•Where possible ensure we are both meet short term vacancies and long term needs where there is a lack of trained individuals within a particular skill gap provide you with that intelligence.

•Work in a spirit of collaboration where rather than us providing you with a regular update a member of your team can work with us on either a part time or full time basis

•Provide a regular update on progress against targets

•Provide regular case studies as positive role models on individuals from the host boroughs that go into training and employment to ensure we meet our objectives around Equality, Diversity and Inclusion.

Overview of transformation works• Removal of a number of temporary structures including the

Athletes Training Centre at Eton Manor, Basketball Arena, Water Polo, warm-up track and Games-time security areas and spectator stands.

• Demolition• Logistics• Traffic Marshalling

• Building connections to the new footways and cycle paths and reconfiguration of 30 Games’ bridges and underpasses to improve public access.

• Laying footpaths• Bridge dismantling and construction• Create cycle paths

• Doubling the amount of parkland to 102 hectares including the planting of a further 4,000 trees, ten hectares of meadow, new lawns and two large allotment sites

• Planting trees• Planting hedges• Laying turf