Preliminary Construction and Demolition Management Plan · Preliminary Construction and Demolition...

22
patrickparsons.co.uk Preliminary Construction and Demolition Management Plan Dublin Whitewater Course Georges Dock, Dublin for Urban Agency Architect N17397 January 2019

Transcript of Preliminary Construction and Demolition Management Plan · Preliminary Construction and Demolition...

Page 1: Preliminary Construction and Demolition Management Plan · Preliminary Construction and Demolition Management Plan Page | 1 Dublin Whitewater Course N17397 patrickparsons.co.uk 1.0

patrickparsons.co.uk

Preliminary Construction and

Demolition Management Plan

Dublin Whitewater Course

Georges Dock, Dublin

for

Urban Agency Architect

N17397

January 2019

Page 2: Preliminary Construction and Demolition Management Plan · Preliminary Construction and Demolition Management Plan Page | 1 Dublin Whitewater Course N17397 patrickparsons.co.uk 1.0

patrickparsons.co.uk 3.001.1 PPL DMS

Preliminary Construction and Demolition Management Plan

Dublin Whitewater Course

for

Urban Agency Architect

Revision Date of issue Comments Prepared By Checked By

0 05/02/19 Draft issue DSH PVS

1 19/02/19 Amended following design team

feedback DSH PVS

2 10/05/19 Updated to include demolition

considerations DH PVS

3 28/05/19 Referenced Legislation amended and

asbestos information included

DH PVS

4 13/08/19 Issued for Part 8 DH PVS

Should you have any queries relating to this document please contact:

Darren Holmes

Patrick Parsons Limited

Fourth Floor

Central Square

Forth Street

Newcastle upon Tyne

NE1 3PJ

T: +44 (0) 191 691 8175

E: [email protected]

Page 3: Preliminary Construction and Demolition Management Plan · Preliminary Construction and Demolition Management Plan Page | 1 Dublin Whitewater Course N17397 patrickparsons.co.uk 1.0

Preliminary Construction and Demolition Management Plan Dublin Whitewater Course

N17397 patrickparsons.co.uk

Contents

1.0 Introduction ...................................................................................................................... 1

2.0 Material and resource use ................................................................................................ 2

3.0 Environmental effects ...................................................................................................... 3

4.0 Construction phase control measures.............................................................................. 5

5.0 Demolition phase control measures .............................................................................. 11

6.0 Summary ......................................................................................................................... 16

Disclaimer

It should be noted that this document is preliminary and is to be used only for planning

purposes. It is not a substitute for a detailed Construction Management Plan as would

typically be completed by the Main Contractor. This document is for the internal use of the

project design team and for Part 8 planning purposes only, it is not be used by or sent to any

parties external to the appointed design team or Dublin City Councils planning team without

the written permission of Patrick Parsons. This document is not to be used under any

circumstances for tendering or costing purposes. All information is to be read in conjunction

with Patrick Parsons engineering drawings.

Page 4: Preliminary Construction and Demolition Management Plan · Preliminary Construction and Demolition Management Plan Page | 1 Dublin Whitewater Course N17397 patrickparsons.co.uk 1.0

Preliminary Construction and Demolition Management Plan Page | 1 Dublin Whitewater Course

N17397 patrickparsons.co.uk

1.0 Introduction

1.1.1 Terms of reference

The CMP describes the proposed programme of the construction works and the key activities

that will be undertaken. The project compromise of two separate entities, construction of a

Whitewater Course within the existing Georges Dock and construction of two Quayside

Buildings in the place of the former DDDA building. It then identifies, in general terms,

potential significant environmental effects associated with the activities and outlines the

proposals for the construction phase control of them. Detailed consideration of effects during

construction and proposed control measures are provided in each associated report

submitted with the planning application. The CMP forms part of the overall Project

Management and as such, activities described would be integrated with other Quality,

Sustainability and Health and Safety management processes.

1.1.2 Programme of works

The construction programme for the Whitewater Course and two Quayside Buildings will span

approximately 18months.

1.1.3 Description of works

The construction activities associated with the Whitewater Course comprises briefly of piling

or raft (enabling works), construction of reinforced concrete structures within Georges Dock

and mechanical and electrical fit out including a canoe conveyor, 4 axial pumps, water

treatment and lighting.

The construction activities associated with the Quayside Buildings building briefly comprises

asbestos removal and demolition of the former DDDA building, piling and or raft (enabling

works), erection of frame, cladding, roofing and glazing and mechanical and electrical fit out.

Page 5: Preliminary Construction and Demolition Management Plan · Preliminary Construction and Demolition Management Plan Page | 1 Dublin Whitewater Course N17397 patrickparsons.co.uk 1.0

Preliminary Construction and Demolition Management Plan Page | 2 Dublin Whitewater Course

N17397 patrickparsons.co.uk

2.0 Material and resource use

Plant and Equipment

Consideration has been given to the types of plant that are likely to be used during the

construction works. The plant and equipment associated with each key element and of the

construction process is set out below;

Stage

Enabling works Construction

Tracked/wheeled 360-degree

excavator

* *

Dumpers *

Mobile crane *

Mobile pile rig *

Air compressors *

Power tools including percussion

drills and cutting discs

*

Hand / power tools * *

Wheel washing plant * *

Scaffold *

Mobile access platform *

Delivery trucks * *

Skips and skip trucks *

Concrete pumping apparatus * *

Forklift trucks *

Hours of working

It is anticipated that the normal hours of working for construction will be:

− Weekdays 07.30 to 18.00 hours, and 08.00 to 13.00 hours on Saturdays.

These working arrangements will be agreed with Dublin City Council prior to commencement.

Hours of working will be governed by planning condition, including arrangements for carrying

out specific tasks outside the agreed hours. Night time working will be restricted to

exceptional circumstances. Hours of working will be covered in the Code of Construction

Practice.

Page 6: Preliminary Construction and Demolition Management Plan · Preliminary Construction and Demolition Management Plan Page | 1 Dublin Whitewater Course N17397 patrickparsons.co.uk 1.0

Preliminary Construction and Demolition Management Plan Page | 3 Dublin Whitewater Course

N17397 patrickparsons.co.uk

3.0 Environmental effects

A review has been undertaken of the potential environmental issues and adverse effects

associated with the demolition and construction works. This has been undertaken using the

experience of the project team in association with a review of the proposed development.

Environmental effects can arise either from day to day construction operations, or from

individual instances of mishap or accident.

Issue Anticipated

site activities

Potential

effects

Receptor Period of

effects

Noise Construction

traffic, piling

Vehicle

movement and

activity within

site, regrading

of soil and

excavation,

general

building and

construction

activity

Nearby

residential and

business

properties

Short term

Dust/ Air quality Construction

traffic and

operations,

excavations,

materials

handling and

storage,

regarding and

earth moving,

concrete

batching.

Windblown

dust affecting

adjacent

properties.

Effects on air

quality from

airborne

material

Nearby

residential and

business

properties

Short term

Traffic Deliveries to

and from site

Noise and

general

disturbance

Nearby

residential and

business

properties

Short term

Access to adjacent

business and

properties

Material

storage

Hazards from

construction

traffic

and building

operations

Adjacent roads Short term

Hazardous materials Storage of

hazardous

materials on

site

Spill and

general

contamination

hazards

Watercourses/

site

workers

Short term

Page 7: Preliminary Construction and Demolition Management Plan · Preliminary Construction and Demolition Management Plan Page | 1 Dublin Whitewater Course N17397 patrickparsons.co.uk 1.0

Preliminary Construction and Demolition Management Plan Page | 4 Dublin Whitewater Course

N17397 patrickparsons.co.uk

Water/Groundwater Excavation and

construction

activities,

vehicle

movements,

human activity

generally

Pollution to

adjacent

watercourse

and

groundwater

Watercourses

&

groundwater

Short term

Asbestos Carryout

asbestos

removal using

approved

cntractors

from the

existing DDDA

building prior

to demolition

Release of

asbestos fibres

into

atmosphere

and exposure

of construction

workers

Public at

nearby

properties and

construction

staff

Short and

Longterm

Page 8: Preliminary Construction and Demolition Management Plan · Preliminary Construction and Demolition Management Plan Page | 1 Dublin Whitewater Course N17397 patrickparsons.co.uk 1.0

Preliminary Construction and Demolition Management Plan Page | 5 Dublin Whitewater Course

N17397 patrickparsons.co.uk

4.0 Construction phase control measures

Procedures and code of practice

The following measures will be pursued to eliminate, reduce or offset the potential adverse

environmental effects identified in the table above. Any detrimental or potential adverse

effects will be appropriately mitigated through a variety of procedures and actions that are

set out in this report and in the identified control measures for construction phase activities

set out in individual reports carried out for the benefit of this site.

− Preparation of procedures which will clearly set out the methods of managing

environmental issues for all involved with the construction works, including supply

chain management

− Requirement to comply with these procedures included as part of the contract

conditions for each element of the work. All contractors tendering for work will be

required to demonstrate that their proposals can comply with the procedures, and

current best practice techniques

− Establishing a dedicated point of contact and responsibility to deal with issues if

they arise. The point of contact will be a named representative from the

construction manager or contractor, part of the professional team (the

Construction Liaison Officer, see below)

− Production of a regular newsletter to be circulated to neighbouring occupiers,

residents and the relevant authorities

− Regular dialogue with Dublin City Council and the local community

The procedures will be set out in the Code of Construction Practice and circulated to Dublin

City Council and other relevant bodies, prior to commencement of the works. It will include

the following:

− The broad plan of the phasing of the works and its context within the whole project

− Baseline levels for noise and dust and details of any monitoring protocols that may

be necessary during the works

− Housekeeping procedures and environmental control measures; Any requirement

for monitoring and record keeping;

− Contact details during normal working hours and emergency details outside

working hours

− Provision for reporting, public liaison, and prior notification

− The mechanism for residents and other members of the public to register

complaints and the procedures for responding to complaints

− Prohibited or restricted operations (location or hours.)

− Details of construction operations highlighting any operations likely to result in

disturbance and/or working hours outside the core working period, with an

indication of the expected duration of key phases and dates

The details of proposed routes for heavy goods vehicles travelling to and from the application

site, and details of all works involving interference (where necessary) with a public highway,

including temporary carriageway/footpath closures, realignment and diversions.

Page 9: Preliminary Construction and Demolition Management Plan · Preliminary Construction and Demolition Management Plan Page | 1 Dublin Whitewater Course N17397 patrickparsons.co.uk 1.0

Preliminary Construction and Demolition Management Plan Page | 6 Dublin Whitewater Course

N17397 patrickparsons.co.uk

Management of subcontractors

Individual contracts (for example for groundworks and site preparation) will incorporate

relevant requirements in respect of environmental control, based largely on the standard of

'good working practice' as well as Statutory Requirements. Potential sub-contractors will be

required to demonstrate how they will achieve best practice, how targets will be met and how

potential effects will be minimised.

The following will be put in place to assist the management of sub-contractors:

− Health and Safety Management Plan (HASMP), setting out the construction

methodology and relevant legislation, guidelines and best practice;

− Code of Construction Practice (CCP), which is intended to establish a framework

for the environmental aspects of the HASMP. This document will apply to all

construction work, building site activities, cleaning and maintenance,

transportation of materials and spoil, landscaping activities, and includes both

preventative and construction phase control measures;

Management of construction works

There will be a designated liaison officer (the 'Construction Liaison Officer') who will be in

regular contact with the public, will keep residents informed of progress and will deal with

complaints and enquiries. This nominated individual will be named at the application site

entrance, with a contact number, and will be identified to Dublin City Council and local

resident/community groups, prior to the start of site activities, and whenever a change of

responsibility occurs.

Response to complaints

Any complaints will be logged on site and, where necessary, reported to the relevant

individual within the Local Planning Authority (and vice versa) as soon as practicable.

The procedures will specify the roles and responsibilities of the Construction Liaison Officer

and the Local Planning Authority in respect of breaches and complaints from the public. The

required actions will be different in each specific case, depending on the operation, equipment

or location or applying additional controls (for example screening).

Prior notice of specific activities or operations

In the event of unusual or specific activities and operations that can be anticipated, (e.g.

special large-scale delivery of materials outside normal working hours) such events will be

notified to Dublin City Council and to the relevant property owners or occupiers wherever

possible and neighbours, in advance of the activity. The relevant ‘notifiable’ activities will be determined by agreement with the Local Planning Authority once the detailed programme of

construction is defined and will include:

− Commencement of construction in certain areas;

− Necessary night time, weekend or evening working (outside core areas) of a type

which may affect properties;

− Road or footpath closures/diversions and movements of wide loads; and

− Work on roads affecting land used by others.

Page 10: Preliminary Construction and Demolition Management Plan · Preliminary Construction and Demolition Management Plan Page | 1 Dublin Whitewater Course N17397 patrickparsons.co.uk 1.0

Preliminary Construction and Demolition Management Plan Page | 7 Dublin Whitewater Course

N17397 patrickparsons.co.uk

Traffic management

Closures and Diversions - whilst no long-term road closures are envisaged, short term closures

may be required in order to deliver large items of building plant or equipment, or for works to

the highway. If this is required, then consent will be obtained from Dublin City Council.

Notice regarding possible short-term closure or diversion of public rights of way within and/or

adjacent to the application site shall be given by the Contractor/Construction Manager to the

relevant local authorities and to the emergency services in advance of the required closure or

diversion dates.

HGV access to the proposed course area will be from the southern side of the site via Custom

House Quay where the main site access is to be located. There will be specific areas for

construction compounds, designated offloading points, access gates, and security barriers. It

should be noted that the contractor will need to maintain access to adjacent properties

throughout the works. The compound location and preliminary access arrangement is

included in Appendix A. The area designated as the ‘Canoe Polo’ is a flat slab with a large

associated area so may be used as material storage and a temporary compound when

required.

All construction traffic entering and leaving the application site will be closely controlled.

Vehicles making deliveries to the application site or removing spoil or other material, will

travel via designated routes. All HGV movements to and from the site are proposed to be

routed along Custom House Quay. Signs will be placed at the site, and on surrounding roads,

to inform drivers that other routes are not available to construction traffic. The proposed

designated route will be subject to the agreement of the Dublin City Council. Construction

access routes will avoid using any roads that may compromise use of the LUAS Tram.

Deliveries should be phased and controlled on a 'just in time' basis, all being clearly marked to

show their destination. This will minimise travel time around the application site and any

associated noise. All transportation to and from the application site will be on rubber tyre

vehicles. Tracked vehicles will only operate within the site. The timing of deliveries will seek

to avoid the periods of peak traffic flows on the local road network.

It is anticipated that a workforce of approximately 100-120 people will be employed, working

for the main contractor, sub-contractors, suppliers and other organisations. Cars and other

vehicles used by workers may have some limited parking available within the site, however

private transport use is to be kept to a minimum and the use of public transport to site

encouraged. Restrictions on parking on neighbouring roads will be strictly enforced.

Monitoring and environmental management of works

The following summarises the construction phase control measures to be adopted in relation

to noise, vibration and air quality issues:

− Contractors must carry out their duties in accordance with the “Air Quality

Monitoring and Noise Control Unit’s Good Practice Guide for Construction and

Demolition” document provided by Dublin City Council. (This document is

appended to the Noise Statement that is issued as part of this application).

Page 11: Preliminary Construction and Demolition Management Plan · Preliminary Construction and Demolition Management Plan Page | 1 Dublin Whitewater Course N17397 patrickparsons.co.uk 1.0

Preliminary Construction and Demolition Management Plan Page | 8 Dublin Whitewater Course

N17397 patrickparsons.co.uk

− Designated and supervised areas and compounds for storage of materials, storage

of plant and equipment, site huts and parking of vehicles, storage of building

materials, and locations for loading and unloading of vehicles.

− Agreed construction methodology to minimise generation of noise, vibration and

dust;

− Use of hoardings, where appropriate, to assist acoustic screening;

− Requirement for engines to be switched off on-site when not in use, use of quieter

plant, noise suppression equipment, regular plant maintenance, screening of plant

(if appropriate);

− Spraying of spoil heaps, excavated material and other areas with water when

conditions dictate;

− Effective wheel/body washing facilities to be provided and used as necessary;

− A road sweeper will be used as and when the need for road cleaning arises;

− Vehicles carrying waste material off-site to be sheeted;

− Vibration monitoring will be required for all piling operation;

Waste management, recycling and disposal

Waste will be generated during all stages of the construction works. Major sources of waste

within the construction process are:

− Removal of existing fill material from Georges Dock

− Demolition of existing DDDA building

− Packaging – plastics, pallets, packaging

− Materials generated from site wastage – temporary works, shuttering

All relevant contractors will be required to investigate opportunities to minimise waste

arisings at source and, where such waste generation is unavoidable, to maximise the recycling

and reuse potential of construction materials. Wherever feasible, such arisings will be dealt

with in a manner that reduces environmental impact and maximises potential re-use of

materials. Recycling of materials will largely take place off-site where noise and dust are less

likely to influence the surrounding area to the application site.

Georges Dock is currently filled with what is believed to be demolition rubble, stone and silt

this will need to be excavated to formation level and removed from site. Opportunities to

either encapsulate or reuse should be investigated however due to limited material storage

available this would seem unfeasible. The classification has not yet been proved by material

testing. The formation level is -1.30m and whilst the top level of the demolition rubble varies

it is generally circa 1m. This would mean removal of approximately 18285m³ of material.

The destination of all waste or other materials removed from site will be notified by the

Contractor/Construction Manager for approval (via consultation with the Authorities). Loads

will only be deposited at authorised waste treatment and disposal sites. Deposition will be in

accordance with the requirements of the Environment Protection Agency, the Waste

Management Acts 1996-2003, Waste Management (Licensing) Regulations 2004, Waste

Management (Registration of Broker and Dealers) Regulations 2008, Waste Management

(Collection Permit) Regulations 2007-2008 and Waste Management (Hazardous Waste)

Regulations 1998-2000.

To prove the correct depositing of excavated material and to prevent the occurrence of fly-

tipping, a docket system will be used. The Contractor/Sub-contractor will operate a

Page 12: Preliminary Construction and Demolition Management Plan · Preliminary Construction and Demolition Management Plan Page | 1 Dublin Whitewater Course N17397 patrickparsons.co.uk 1.0

Preliminary Construction and Demolition Management Plan Page | 9 Dublin Whitewater Course

N17397 patrickparsons.co.uk

sequentially numbered docket system, to confirm that each load is received at the approved

disposal site. Copies of the dockets are to be provided to the nominated manager, and

available for inspection at the application site. In addition, direct routes via main roads to

designated tips will be agreed with the sub-contractors. No burning of construction waste will

be undertaken on the application site.

It should be noted that during construction no discharge from the construction areas is

permitted to the Liffey or the existing surface water drainage system (which discharges to the

Liffey). If any dewatering of excavations is required water will be required to discharge to the

combined or foul water sewer - the contractor is to be responsible for providing appropriate silt

control measures to the satisfaction of Irish Water. The contractor is to make all necessary

arrangement with Irish Water for temporary connections. All works must comply with the

Greater Dublin Regional Code of Practice for Drainage Works.

The construction of the dismount stairs at the start of the Whitewater facility will require

dewatering of the local section to allow installation of what will be a precast form of

construction.

Temporary Protection

George’s Dock is a Protected Structure including the dock walls. All appropriate measures

must be taken in order to protect historic fabric, protected structures and trees from damage

during the construction phase of the project.

Removal of any fill material from the base of the dock must be carefully undertaken to

minimise damage to the dock walls. Removal of material directly adjacent to the existing

granite walls should be undertaken by hand. Nothing is to be fixed to or placed against the

dock walls during construction. No items which are heavy or may cause damage to the

stonework can be placed upon the granite capstones surrounding the dock throughout

construction. The capping stones should be protected and covered by structural plywood for

the duration of the works.

Protection needs to be provided for the Triumphal Arch during construction. The structure

must be fully hoarded to its full height using a plywood clad timber frame which includes an

access doorway. A low level protective barrier may be needed to avoid potential damage by

vehicles as well as a Heras perimeter fence.

The winch closest to the Triumphal Arch is to be hoarded and retained in position on site

during the works. The Conservation Architect will prepare a photographic record of the winch

prior to its enclosure. Following an assessment of the detailed construction plan provided by

the Appointed Contractor for the works, the risks to the winch will be reviewed. If deemed

necessary by the Conservation Architect, the winch will be temporarily removed and stored

securely on site in a suitable container, being reinstated upon completion of the works. The

winch on the west side of the lock and the crane on the east dock wall are to be protected

through the works with hoarding to the dock side.

The River Liffey quay wall is also to be protected throughout the works similarly to the dock

wall using plywood protection over the capping stones. Following the demolition of the DDDA

building, the existing buttresses of the river wall will be carefully exposed (by hand) to ensure

that the proposed piled foundations and loadings will avoid the buttresses.

Page 13: Preliminary Construction and Demolition Management Plan · Preliminary Construction and Demolition Management Plan Page | 1 Dublin Whitewater Course N17397 patrickparsons.co.uk 1.0

Preliminary Construction and Demolition Management Plan Page | 10 Dublin Whitewater Course

N17397 patrickparsons.co.uk

Page 14: Preliminary Construction and Demolition Management Plan · Preliminary Construction and Demolition Management Plan Page | 1 Dublin Whitewater Course N17397 patrickparsons.co.uk 1.0

Preliminary Construction and Demolition Management Plan Page | 11 Dublin Whitewater Course

N17397 patrickparsons.co.uk

5.0 Demolition phase control measures

The demolition phase of a project should also be planned and managed to ensure this can be

done safely and with limited impact on the environment.

Procedures and code of practice

The environmental effects identified in the table in Section 3.0 of this report will also apply to

the demolition phase of the project. The following measures will be pursued to eliminate,

reduce or offset the potential adverse environmental effects identified in Section 3.0. Any

detrimental or potential adverse effects will be appropriately mitigated through a variety of

procedures and actions that are set out in this report and in the identified control measures

for demolition phase activities set out in individual reports carried out for the benefit of this

site.

− Preparation of procedures which will clearly set out the methods of managing

environmental issues for all involved with the demolition works, including supply

chain management

− Requirement to comply with these procedures included as part of the contract

conditions for each element of the work. All contractors tendering for work will be

required to demonstrate that their proposals can comply with the procedures, and

current best practice techniques

− Establishing a dedicated point of contact and responsibility to deal with issues if

they arise. The point of contact will be a named representative from the demolition

manager or contractor, part of the professional team (the Construction Liaison

Officer, see below)

− Production of a regular newsletter to be circulated to neighbouring occupiers,

residents and the relevant authorities

− Regular dialogue with Dublin City Council and the local community

The procedures will be set out in the Code of Construction Practice and circulated to Dublin

City Council and other relevant bodies, prior to commencement of the works. It will include

the following:

− The broad plan of the phasing of the demolition works and its context within the

whole project

− Baseline levels for noise and dust and details of any monitoring protocols that may

be necessary during the demolition works

− Housekeeping procedures and environmental control measures; Any requirement

for monitoring and record keeping;

− Contact details during normal working hours and emergency details outside

working hours

− Provision for reporting, public liaison, and prior notification

− The mechanism for residents and other members of the public to register

complaints and the procedures for responding to complaints

− Prohibited or restricted operations (location or hours.)

− Details of demolition operations highlighting any operations likely to result in

disturbance and/or working hours outside the core working period, with an

indication of the expected duration of key phases and dates

Page 15: Preliminary Construction and Demolition Management Plan · Preliminary Construction and Demolition Management Plan Page | 1 Dublin Whitewater Course N17397 patrickparsons.co.uk 1.0

Preliminary Construction and Demolition Management Plan Page | 12 Dublin Whitewater Course

N17397 patrickparsons.co.uk

The details of proposed routes for heavy goods vehicles travelling to and from the application

site, and details of all works involving interference (where necessary) with a public highway,

including temporary carriageway/footpath closures, realignment and diversions.

Management of subcontractors

Individual contracts will incorporate relevant requirements in respect of environmental

control, based largely on the standard of 'good working practice' as well as Statutory

Requirements. Potential sub-contractors will be required to demonstrate how they will

achieve best practice, how targets will be met and how potential effects will be minimised.

The following will be put in place to assist the management of sub-contractors:

− Health and Safety Management Plan (HASMP), setting out the demolition

methodology and relevant legislation, guidelines and best practice;

− Code of Construction Practice (CCP), which is intended to establish a framework

for the environmental aspects of the HASMP. This document will apply to all

demolition work.

Asbestos Removal

Dublin City Council commissioned an asbestos survey and report for the former DDDA

building which was undertaken in March 2019. Asbestos was found to be present I the form

of bitumen adhesive on the floor beneath the screed in a vacant office. As the building is still

extensively used, intrusive access was limited and therefore asbestos may be present in

other parts of the building. As recommended in the report, a full survey should take place

after the building has been vacated. The full survey should be used to plan and manage

asbestos removal which will need to be completed prior to demolition and in accordance

with Safety, Health and Welfare at Work (Exposure to Asbestos) Regulations 2006.

Management of demolition works

There will be a designated liaison officer (the 'Construction Liaison Officer') who will be in

regular contact with the public, will keep residents informed of progress and will deal with

complaints and enquiries. This nominated individual will be named at the application site

entrance, with a contact number, and will be identified to Dublin City Council and local

resident/community groups, prior to the start of site activities, and whenever a change of

responsibility occurs.

Response to complaints

Any complaints will be logged on site and, where necessary, reported to the relevant

individual within the Local Planning Authority (and vice versa) as soon as practicable.

The procedures will specify the roles and responsibilities of the Construction Liaison Officer

and the Local Planning Authority in respect of breaches and complaints from the public. The

required actions will be different in each specific case, depending on the operation, equipment

or location or applying additional controls (for example screening).

Page 16: Preliminary Construction and Demolition Management Plan · Preliminary Construction and Demolition Management Plan Page | 1 Dublin Whitewater Course N17397 patrickparsons.co.uk 1.0

Preliminary Construction and Demolition Management Plan Page | 13 Dublin Whitewater Course

N17397 patrickparsons.co.uk

Prior notice of specific activities or operations

In the event of unusual or specific activities and operations that can be anticipated, (e.g.

special large-scale removal of materials outside normal working hours) such events will be

notified to Dublin City Council and to the relevant property owners or occupiers wherever

possible and neighbours, in advance of the activity. The relevant ‘notifiable’ activities will be determined by agreement with the Local Planning Authority once the detailed programme of

construction is defined and will include:

− Commencement of demolition in certain areas;

− Necessary night time, weekend or evening working (outside core areas) of a type

which may affect properties;

− Road or footpath closures/diversions and movements of wide loads; and

− Work on roads affecting land used by others.

Traffic management

Closures and Diversions - whilst no long-term road closures are envisaged, short term closures

may be required in order to remove large items of building plant or materials. If this is

required, then consent will be obtained from Dublin City Council.

Notice regarding possible short-term closure or diversion of public rights of way within and/or

adjacent to the application site shall be given by the Contractor/demolition Manager to the

relevant local authorities and to the emergency services in advance of the required closure or

diversion dates.

HGV access will be from the southern side of the site via Custom House Quay where the main

site access would be located. There will be specific areas for site compounds, designated

loading points, access gates, and security barriers.

All demolition traffic entering and leaving the application site will be closely controlled.

Vehicles removing spoil or other material, will travel via designated routes. All HGV

movements to and from the site are proposed to be routed along Custom House Quay. Signs

will be placed at the site, and on surrounding roads, to inform drivers that other routes are

not available to demolition traffic. The proposed designated route will be subject to the

agreement of the Dublin City Council. Demolition access routes will avoid using any roads that

may compromise use of the LUAS Tram.

Deliveries should be phased and controlled on a 'just in time' basis, all being clearly marked to

show their destination. This will minimise travel time around the application site and any

associated noise. All transportation to and from the application site will be on rubber tyre

vehicles. Tracked vehicles will only operate within the site. The timing of deliveries will seek

to avoid the periods of peak traffic flows on the local road network.

Monitoring and environmental management of works

The following summarises the demolition phase control measures to be adopted in relation

to noise, vibration and air quality issues:

− Contractors must carry out their duties in accordance with the “Air Quality

Monitoring and Noise Control Unit’s Good Practice Guide for Construction and

Page 17: Preliminary Construction and Demolition Management Plan · Preliminary Construction and Demolition Management Plan Page | 1 Dublin Whitewater Course N17397 patrickparsons.co.uk 1.0

Preliminary Construction and Demolition Management Plan Page | 14 Dublin Whitewater Course

N17397 patrickparsons.co.uk

Demolition” document provided by Dublin City Council. (This document is

appended to the Noise Statement that is issued as part of this application).

− Designated and supervised areas and compounds for storage of materials, storage

of plant and equipment, site huts and parking of vehicles, storage of building

materials, and locations for loading and unloading of vehicles.

− Agreed demolition methodology to minimise generation of noise, vibration and

dust;

− Use of hoardings, where appropriate, to assist acoustic screening;

− Requirement for engines to be switched off on-site when not in use, use of quieter

plant, noise suppression equipment, regular plant maintenance, screening of plant

(if appropriate);

− Spraying of spoil heaps, excavated material and other areas with water when

conditions dictate;

− Effective wheel/body washing facilities to be provided and used as necessary;

− A road sweeper will be used as and when the need for road cleaning arises;

− Vehicles carrying waste material off-site to be sheeted;

Waste management, recycling and disposal

Waste will be generated during all stages of the demolition works. Major sources of waste

within the demolition process are:

− Removal of Asbestos from the DDDA building

− Demolition of the DDDA building

All relevant contractors will be required to investigate opportunities to minimise waste

arisings at source and, where such waste generation is unavoidable, to maximise the recycling

and reuse potential of construction materials. Wherever feasible, such arisings will be dealt

with in a manner that reduces environmental impact and maximises potential re-use of

materials. Recycling of materials will largely take place off-site where noise and dust are less

likely to influence the surrounding area to the application site.

The destination of all waste or other materials removed from site will be notified by the

Contractor/Demolition Manager for approval (via consultation with the Authorities). Loads

will only be deposited at authorised waste treatment and disposal sites. Deposition will be in

accordance with the requirements of the Environment Protection Agency, the Waste

Management Acts 1996-2003, Waste Management (Licensing) Regulations 2004, Waste

Management (Registration of Broker and Dealers) Regulations 2008, Waste Management

(Collection Permit) Regulations 2007-2008 and Waste Management (Hazardous Waste)

Regulations 1998-2000.

To prove the correct depositing of excavated material and to prevent the occurrence of fly-

tipping, a docket system will be used. The Contractor/Sub-contractor will operate a

sequentially numbered docket system, to confirm that each load is received at the approved

disposal site. Copies of the dockets are to be provided to the nominated manager, and

available for inspection at the application site. In addition, direct routes via main roads to

designated tips will be agreed with the sub-contractors. No burning of construction waste will

be undertaken on the application site.

It should be noted that during demolition no discharge from the demolition areas is permitted

to the Liffey or the existing surface water drainage system (which discharges to the Liffey). If

Page 18: Preliminary Construction and Demolition Management Plan · Preliminary Construction and Demolition Management Plan Page | 1 Dublin Whitewater Course N17397 patrickparsons.co.uk 1.0

Preliminary Construction and Demolition Management Plan Page | 15 Dublin Whitewater Course

N17397 patrickparsons.co.uk

any dewatering of excavations is required water will be required to discharge to the combined

or foul water sewer - the contractor is to be responsible for providing appropriate silt control

measures to the satisfaction of Irish Water. The contractor is to make all necessary

arrangement with Irish Water for temporary connections. All works must comply with the

Greater Dublin Regional Code of Practice for Drainage Works.

Demolition must be carried out without damage to protected structures including the original

dock walls, lock gate, quay wall and triumphed arch. The lock gates are to be carefully removed

and stored off site for use elsewhere by Dublin City Council.

Careful attention should be made to the proposed construction details which include a layer

of protection between the reinforced concrete walls of the course and the existing dock walls.

This detail is to allow the removal of the proposed concrete sides if the watercourse ever

needs to be removed without impacting on the dock walls behind.

Page 19: Preliminary Construction and Demolition Management Plan · Preliminary Construction and Demolition Management Plan Page | 1 Dublin Whitewater Course N17397 patrickparsons.co.uk 1.0

Preliminary Construction and Demolition Management Plan Page | 16 Dublin Whitewater Course

N17397 patrickparsons.co.uk

6.0 Summary

The construction programme will span approximately 18 months, and it is envisaged that the

development will be completed in two main phases; enabling works and construction.

The initial phase of the development will be involving excavation works, demolition and slab

construction.

Plant and equipment to be used during construction has been identified.

Potential effects arising from construction and demolition activities have been identified and

control measures are identified in this CMP report and in other relevant reports submitted to

support the planning application. A Code of Construction Practice will be written by the main

contractor upon appointment and submitted to Dublin City Council and other relevant

organisations to set out the agreed procedures and ‘best practice’ on construction operations, and in accordance with relevant legislative requirements. Likely significant adverse effects will

be appropriately mitigated.

Management of subcontractors will be through procurement procedures and an agreed

commitment to the Code of Construction Practice. A designated liaison officer will be in

regular contact with the public, will keep residents informed of all relevant matters, and will

deal with complaints and inquiries. Monitoring of construction activities will be reported back

to the local authority on a regular basis.

The comments stated above are based on information received from other consultees, and

this report is based upon the recommendations stated within these reports. This report is

intended for the use of the project design team in support of the planning application for the

site only.

Page 20: Preliminary Construction and Demolition Management Plan · Preliminary Construction and Demolition Management Plan Page | 1 Dublin Whitewater Course N17397 patrickparsons.co.uk 1.0

Preliminary Construction and Demolition Management Plan Page | 17 Dublin Whitewater Course

N17397 patrickparsons.co.uk

Appendix A

Site Compound Plan

Page 21: Preliminary Construction and Demolition Management Plan · Preliminary Construction and Demolition Management Plan Page | 1 Dublin Whitewater Course N17397 patrickparsons.co.uk 1.0

Wa

ll

Wall

EBOX

EBOX

EBOX

FHFH

FH

GY

FH

FH FH

Kerb Top

Kerb Top

Kerb Top

Fence

Gate

Bu

ildin

g

Wa

llB

uild

ing

LPLP

RS

SV

SV

SVSV

SV

BDBDBDBDBDBDBDBDBD

LP

LP

LP

LPV

V

V

LP

LP

LP

LP

LP

SV

SV

BD

BD

BD

BDBD

BDBD

BD BDBD

V

SV

SV

SV

SVSV

LP

V

LP

LP

BD

BD

BD

BD

BD

LP

LP

LP

LP

LP

LP

LP

LP

LP

LP

LP

LP

LP

LP

LP

LP

V

EV

EV

APX

APX

APX

EV

EV

PAR

PAR

EV

ICIC

IC

MH

MHMH

MHIC

ICIC

IC

ICIC

ICMH

IC

ICICTIC

IC

IC

ICT

IC

IC

IC

IC

IC

IC

IC

IC

MH

MH

IC

IC

ICIC

ICIC

MH

MH

IC

IC

IC

ICT

IC

IC

IC

IC

MH

MH

MH

IC

IC

IC

MH

MH

ICMH

11.60

16.07

4.1

9 4.30

4.5

34.2

5

4.61

CL 4.51CL 4.52

CL 4.54

CL 4.57

CL 4.57CL 4.59

CL 4.74CL 4.74

CL 4.82CL 4.81

CL 4.81

CL 4.83CL 4.81

CL 4.77CL 4.76

CL 4.71

4.52CL 4.53CL 4.47

CL 4.45

CL 4.47

CL 4.48

CL 4.51

CL 4.51

CL 4.84

CL 4.43

CL 4.42

CL 4.76

CL 4.73

CL 4.41

CL 4.43

CL 4.48

CL 4.52

CL 4.36

CL 4.42

CL 4.79CL 4.91

CL 4.92CL 4.87

CL 4.89

CL 4.53

CL 4.49

CL 4.46

CL 4.46

CL 4.47

CL 4.59

CL 4.58

CL 4.56

CL 4.48

4.59

4.50 4.54

4.3

5

4.4

5

4.3

8

4.3

7

4.3

2

4.4

7

4.62

4.69

4.39

4.94

4.71

4.32

4.424.36

4.4

3

4.36

4.42

4.42

4.4

2

4.97

4.4

5

4.49

4.434.42

4.4

2

4.39 4.47

4.44

4.3

9

CL 4.34

CL 4.31

CL 4.31

CL 4.36

CL 4.38

CL 4.41

4.3

6

4.34

CL 4.39

CL 4.39

CL 4.38CL 4.41

GY

GY

Building

Bu

ildin

g

GY

GY

GY

Bridge Deck

Railing

Wall

Footpath

Footpath

GY

FH

FH

FH

GY

GY

LP

LP

LP

LP

LP

LP

LP

LP

LP

LP

LP

LP

SV SV

BDBDBDBDBDBD

SV

SV

SV

PolePole

Pole

Pole

LP

BDBDBDBDBD

BDBD

LP

LP

BD

LP

V

LP

LP

BD

IC

MH

MH

MH

MH

MH

IC

MH

MH

MH

MH

IC

MH

MH

IC

MH

MH

IC

IC

MH

IC

ICIC

MH

MH

MH

IC

MH

IC

MH

IC

IC

MH

4.36

4.31

CL 4.40

CL 4.41

CL 4.53

CL 4.45

CL 4.60

CL 4.68

CL 4.40

CL 4.52

CL 4.73

CL 4.62

CL 4.64

CL 4.66

CL 4.68

CL 4.63

CL 4.65

CL 4.63

CL 3.95

3.94

CL 4.08

CL 4.27

CL 4.32

CL 4.11

CL 4.13CL 4.29

4.41

CL 4.43

CL 4.34

4.2

94.29

4.31

4.3

2

4.3

6

CL 4.31

4.18 4.14

4.37

4.40

4.37

4.32

4.24

4.23

4.21

4.21

4.23

4.13

CL 4.18

4.10

CL 4.29

CL 4.32

4.2

4

4.16

4.22

4.27

CL 4.35

4.34

4.30

CL 4.31

CL 4.32

CL 2.19

lock positions

lock positions

Hoarding

Building

Buildin

g

Kerb Top

Kerb Top

Fen

ce

EBOX

FH

EBOXEBOX

FH

WM

Wall

Ga

te

Hoarding

Gate

LP

LP

LP

LP

LP

LP

LP

LP

LP

LPTL

TLTL

BS

TLTL

BDBD

BDBD

BDBDBD

BDBDBDBDBDBDBDBDBDBDBD

BDBD

BD

LP

LP

POST

V

V

EV

IC

IC

IC MH

IC

MHMH

IC IC

IC

IC

IC

IC

IC

IC

MHIC

IC

IC

MH

MHICT

MH

ICICTC

IC

MH

3.34

3.53

3.38

3.2

1

3.38

3.1

0

CL 3.99

CL 3.90

CL 3.79 CL 3.70

CL 3.51

CL 3.45CL 3.45

CL 3.59 CL 3.51

CL 3.57

CL 3.72

CL 3.61

CL 3.36

CL 3.34

CL 3.373.37

CL 3.39CL 3.34

CL 3.38

CL 3.37

CL 3.43

CL 3.51CL 3.50

CL 3.51

CL 3.55CL 3.58

CL 3.55

CL 3.48

RS

RS

RS

Bicycle Vending Machine

POSTRS

Wa

ll

Wall

EBOX

EBOX

EBOX

FHFH

FH

GY

FH

FH FH

Kerb Top

Kerb Top

Kerb Top

Fence

Gate

Bu

ildin

g

Wa

llB

uild

ing

LPLP

RS

SV

SV

SVSV

SV

BDBDBDBDBDBDBDBDBD

LP

LP

LP

LPV

V

V

LP

LP

LP

LP

LP

SV

SV

BD

BD

BD

BDBD

BDBD

BD BDBD

V

SV

SV

SV

SVSV

LP

V

LP

LP

BD

BD

BD

BD

BD

LP

LP

LP

LP

LP

LP

LP

LP

LP

LP

LP

LP

LP

LP

LP

LP

V

EV

EV

APX

APX

APX

EV

EV

PAR

PAR

EV

ICIC

IC

MH

MHMH

MHIC

ICIC

IC

ICIC

ICMH

IC

ICICTIC

IC

IC

ICT

IC

IC

IC

IC

IC

IC

IC

IC

MH

MH

IC

IC

ICIC

ICIC

MH

MH

IC

IC

IC

ICT

IC

IC

IC

IC

MH

MH

MH

IC

IC

IC

MH

MH

ICMH

11.60

16.07

4.1

9 4.30

4.5

34.2

5

4.61

CL 4.51CL 4.52

CL 4.54

CL 4.57

CL 4.57CL 4.59

CL 4.74CL 4.74

CL 4.82CL 4.81

CL 4.81

CL 4.83CL 4.81

CL 4.77CL 4.76

CL 4.71

4.52CL 4.53CL 4.47

CL 4.45

CL 4.47

CL 4.48

CL 4.51

CL 4.51

CL 4.84

CL 4.43

CL 4.42

CL 4.76

CL 4.73

CL 4.41

CL 4.43

CL 4.48

CL 4.52

CL 4.36

CL 4.42

CL 4.79CL 4.91

CL 4.92CL 4.87

CL 4.89

CL 4.53

CL 4.49

CL 4.46

CL 4.46

CL 4.47

CL 4.59

CL 4.58

CL 4.56

CL 4.48

4.59

4.50 4.54

4.3

5

4.4

5

4.3

8

4.3

7

4.3

2

4.4

7

4.62

4.69

4.39

4.94

4.71

4.32

4.424.36

4.4

3

4.36

4.42

4.42

4.4

2

4.97

4.4

5

4.49

4.434.42

4.4

2

4.39 4.47

4.44

4.3

9

CL 4.34

CL 4.31

CL 4.31

CL 4.36

CL 4.38

CL 4.41

4.3

6

4.34

CL 4.39

CL 4.39

CL 4.38CL 4.41

GY

GY

Building

Bu

ildin

g

GY

GY

GY

Bridge Deck

Railing

Wall

Footpath

Footpath

GY

FH

FH

FH

GY

GY

LP

LP

LP

LP

LP

LP

LP

LP

LP

LP

LP

LP

SV SV

BDBDBDBDBDBD

SV

SV

SV

PolePole

Pole

Pole

LP

BDBDBDBDBD

BDBD

LP

LP

BD

LP

V

LP

LP

BD

IC

MH

MH

MH

MH

MH

IC

MH

MH

MH

MH

IC

MH

MH

IC

MH

MH

IC

IC

MH

IC

ICIC

MH

MH

MH

IC

MH

IC

MH

IC

IC

MH

4.36

4.31

CL 4.40

CL 4.41

CL 4.53

CL 4.45

CL 4.60

CL 4.68

CL 4.40

CL 4.52

CL 4.73

CL 4.62

CL 4.64

CL 4.66

CL 4.68

CL 4.63

CL 4.65

CL 4.63

CL 3.95

3.94

CL 4.08

CL 4.27

CL 4.32

CL 4.11

CL 4.13CL 4.29

4.41

CL 4.43

CL 4.34

4.2

94.29

4.31

4.3

2

4.3

6

CL 4.31

4.18 4.14

4.37

4.40

4.37

4.32

4.24

4.23

4.21

4.21

4.23

4.13

CL 4.18

4.10

CL 4.29

CL 4.32

4.2

4

4.16

4.22

4.27

CL 4.35

4.34

4.30

CL 4.31

CL 4.32

CL 2.19

lock positions

lock positions

Hoarding

Building

Buildin

g

Kerb Top

Kerb Top

Fen

ce

EBOX

FH

EBOXEBOX

FH

WM

Wall

Ga

te

Hoarding

Gate

LP

LP

LP

LP

LP

LP

LP

LP

LP

LPTL

TLTL

BS

TLTL

BDBD

BDBD

BDBDBD

BDBDBDBDBDBDBDBDBDBDBD

BDBD

BD

LP

LP

POST

V

V

EV

IC

IC

IC MH

IC

MHMH

IC IC

IC

IC

IC

IC

IC

IC

MHIC

IC

IC

MH

MHICT

MH

ICICTC

IC

MH

3.34

3.53

3.38

3.2

1

3.38

3.1

0

CL 3.99

CL 3.90

CL 3.79 CL 3.70

CL 3.51

CL 3.45CL 3.45

CL 3.59 CL 3.51

CL 3.57

CL 3.72

CL 3.61

CL 3.36

CL 3.34

CL 3.373.37

CL 3.39CL 3.34

CL 3.38

CL 3.37

CL 3.43

CL 3.51CL 3.50

CL 3.51

CL 3.55CL 3.58

CL 3.55

CL 3.48

RS

RS

RS

Bicycle Vending Machine

POSTRS

Wa

ll

Wall

EBOX

EBOX

EBOX

FHFH

FH

GY

FH

FH FH

Kerb Top

Kerb Top

Kerb Top

Fence

Gate

Bu

ildin

g

Wa

llB

uild

ing

LPLP

RS

SV

SV

SVSV

SV

BDBDBDBDBDBDBDBDBD

LP

LP

LP

LPV

V

V

LP

LP

LP

LP

LP

SV

SV

BD

BD

BD

BDBD

BDBD

BD BDBD

V

SV

SV

SV

SVSV

LP

V

LP

LP

BD

BD

BD

BD

BD

LP

LP

LP

LP

LP

LP

LP

LP

LP

LP

LP

LP

LP

LP

LP

LP

V

EV

EV

APX

APX

APX

EV

EV

PAR

PAR

EV

ICIC

IC

MH

MHMH

MHIC

ICIC

IC

ICIC

ICMH

IC

ICICTIC

IC

IC

ICT

IC

IC

IC

IC

IC

IC

IC

IC

MH

MH

IC

IC

ICIC

ICIC

MH

MH

IC

IC

IC

ICT

IC

IC

IC

IC

MH

MH

MH

IC

IC

IC

MH

MH

ICMH

11.60

16.07

4.1

9 4.30

4.5

34.2

5

4.61

CL 4.51CL 4.52

CL 4.54

CL 4.57

CL 4.57CL 4.59

CL 4.74CL 4.74

CL 4.82CL 4.81

CL 4.81

CL 4.83CL 4.81

CL 4.77CL 4.76

CL 4.71

4.52CL 4.53CL 4.47

CL 4.45

CL 4.47

CL 4.48

CL 4.51

CL 4.51

CL 4.84

CL 4.43

CL 4.42

CL 4.76

CL 4.73

CL 4.41

CL 4.43

CL 4.48

CL 4.52

CL 4.36

CL 4.42

CL 4.79CL 4.91

CL 4.92CL 4.87

CL 4.89

CL 4.53

CL 4.49

CL 4.46

CL 4.46

CL 4.47

CL 4.59

CL 4.58

CL 4.56

CL 4.48

4.59

4.50 4.54

4.3

5

4.4

5

4.3

8

4.3

7

4.3

2

4.4

7

4.62

4.69

4.39

4.94

4.71

4.32

4.424.36

4.4

3

4.36

4.42

4.42

4.4

2

4.97

4.4

5

4.49

4.434.42

4.4

2

4.39 4.47

4.44

4.3

9

CL 4.34

CL 4.31

CL 4.31

CL 4.36

CL 4.38

CL 4.41

4.3

6

4.34

CL 4.39

CL 4.39

CL 4.38CL 4.41

GY

GY

Building

Bu

ildin

g

GY

GY

GY

Bridge Deck

Railing

Wall

Footpath

Footpath

GY

FH

FH

FH

GY

GY

LP

LP

LP

LP

LP

LP

LP

LP

LP

LP

LP

LP

SV SV

BDBDBDBDBDBD

SV

SV

SV

PolePole

Pole

Pole

LP

BDBDBDBDBD

BDBD

LP

LP

BD

LP

V

LP

LP

BD

IC

MH

MH

MH

MH

MH

IC

MH

MH

MH

MH

IC

MH

MH

IC

MH

MH

IC

IC

MH

IC

ICIC

MH

MH

MH

IC

MH

IC

MH

IC

IC

MH

4.36

4.31

CL 4.40

CL 4.41

CL 4.53

CL 4.45

CL 4.60

CL 4.68

CL 4.40

CL 4.52

CL 4.73

CL 4.62

CL 4.64

CL 4.66

CL 4.68

CL 4.63

CL 4.65

CL 4.63

CL 3.95

3.94

CL 4.08

CL 4.27

CL 4.32

CL 4.11

CL 4.13CL 4.29

4.41

CL 4.43

CL 4.34

4.2

94.29

4.31

4.3

2

4.3

6

CL 4.31

4.18 4.14

4.37

4.40

4.37

4.32

4.24

4.23

4.21

4.21

4.23

4.13

CL 4.18

4.10

CL 4.29

CL 4.32

4.2

4

4.16

4.22

4.27

CL 4.35

4.34

4.30

CL 4.31

CL 4.32

CL 2.19

lock positions

lock positions

Hoarding

Building

Buildin

g

Kerb Top

Kerb Top

Fen

ce

EBOX

FH

EBOXEBOX

FH

WM

Wall

Ga

te

Hoarding

Gate

LP

LP

LP

LP

LP

LP

LP

LP

LP

LPTL

TLTL

BS

TLTL

BDBD

BDBD

BDBDBD

BDBDBDBDBDBDBDBDBDBDBD

BDBD

BD

LP

LP

POST

V

V

EV

IC

IC

IC MH

IC

MHMH

IC IC

IC

IC

IC

IC

IC

IC

MHIC

IC

IC

MH

MHICT

MH

ICICTC

IC

MH

3.34

3.53

3.38

3.2

1

3.38

3.1

0

CL 3.99

CL 3.90

CL 3.79 CL 3.70

CL 3.51

CL 3.45CL 3.45

CL 3.59 CL 3.51

CL 3.57

CL 3.72

CL 3.61

CL 3.36

CL 3.34

CL 3.373.37

CL 3.39CL 3.34

CL 3.38

CL 3.37

CL 3.43

CL 3.51CL 3.50

CL 3.51

CL 3.55CL 3.58

CL 3.55

CL 3.48

RS

RS

RS

Bicycle Vending Machine

POSTRS

LUASBRIDGE

GEORGE'S

DOCK

EAST

QUAYSIDE

WEST

QUAYSIDE

SOUTH

QUAYSIDE

CHQ

STACK B

IFSC HOUSE

LA TOUCHE

HOUSE

MUNCHIES

IFSCSPAR IFSC

JP MORGAN

HOUSE

2 HARBOUR

MASTER

1 HARBOUR

MASTER

GEORGE'S

DOCK

HOUSE

WHITEWATER

COURSE

QUAYSIDE BUILDINGS

SCHERZERBRIDGE

CUSTOM HOUSE QUAY

GEORGES DOCK

SITE COMPOUND FOR

WHITEWATER COURSE

STACK B

CAR PARK

SITE

COMPOUND

FOR DDDA

BUILDING

CURRENT ROUTE TO

STACK B CAR PARK

ASSUMED SITE

GATE LOCATION

RIVER LIFFEY

TRIUMPHAL ARCH TO REMAIN

AND TO BE PROTECTED

EXISTING

COFFERDAM

CRANE TO BE

PROTECTED

WINCH TO BE TEMPORARILY

REMOVED IS ADEQUATE

PROTECTION CAN NOT BE

GUARANTEED THROUGH THE

WORKS

WINCH TO BE PROTECTED

EXISTING

COFFERDAM

PUBLIC

CARPARK

HOTEL

G

G

MH

ENTRANCE LOCKBRIDGE

TIMBER AND IRON LOCK GATES

TO BE CAREFULLY REMOVED AND

STORED FOR RE-USE

ELSEWHERE BY DCC

TREES TO BE

REMOVED

EXISTING BRICK CULVERT IN THIS AREA

TO BE PROTECTED DURING THE WORKS

REFERENCE MUST BE MADE TO HOWLEY HAYES

CONSERVATION REPORT BEFORE COMMENCING WORKS

1.3. LOCATIONS OF ALL EXISTING SERVICES ON-SITE TO

BE CONFIRMED & PROVIDED TO THE ENGINEER

PRIOR TO COMMENCEMENT OF WORKS.

1.4. THIS DRAWING IS TO BE READ IN CONJUNCTION

WITH ALL RELEVANT PATRICK PARSONS LTD

DRAWINGS & SPECIFICATIONS.

Revisions

Rev. Amendments

GENERAL NOTES

1.1. THIS DRAWING IS COPYRIGHT AND SHOULD NOT BE

REPRODUCED IN WHOLE OR PART WITHOUT THE WRITTEN

CONSENT OF PATRICK PARSONS LTD.

1.2 DO NOT SCALE FROM THIS DRAWING.

A3At original size

Date ChkDrg

P2 AMENDED FOLLOWING DESIGN

TEAM COMMENTS

19.02.19 DSH PVS

Drawing No.

Drawn byDate

Scales

Checked by

Client

Status

Drawing

Project

E. [email protected]

T. +44 (0)191 261 9000

Central Square

Forth Street

Fourth Floor

Newcastle upon Tyne

W. www.patrickparsons.co.uk

Rev.

NE1 3PJ UK

URBAN AGENCY ARCHITECTS

DUBLIN WHITEWATER COURSE

PRELIMINARY SITE COMPOUND

LOCATION PLAN

1:1000

FEB 19DSH PVS

PRELIMINARY

N17397-260 P6

P3 SITE PLAN UPDATED 13.05.19 DH PVS

P4 PROTECTED STRUCTURES SHOWN 28.05.19 DH PVS

P5 ISSUED FOR PART 8 05.06.19 DH PVS

P6 REVISED AND ISSUED FOR PART 8 13.08.19 DH PVS

Page 22: Preliminary Construction and Demolition Management Plan · Preliminary Construction and Demolition Management Plan Page | 1 Dublin Whitewater Course N17397 patrickparsons.co.uk 1.0

UK locations:

Newcastle upon Tyne

London

Manchester

Glasgow

Huddersfield

Chester

Birmingham

Guildford

International locations:

Dubai

Sydney

Telephone +44 (0)191 261 9000

Email [email protected]

Online patrickparsons.co.uk