Pre-Qualification For Structural Steel · PDF fileABOUT US Strutech Engineering (Formerly...
Transcript of Pre-Qualification For Structural Steel · PDF fileABOUT US Strutech Engineering (Formerly...
ABOUT US
Strutech Engineering (Formerly Bhanes Steel) initially started with two
experienced Xsteel modelers jointly working with one of the engineering &
fabrication company in the year 2005. Today Strutech Engineering having well
trained and experienced Tekla modelers with Tekla Licenses Head office based in
Dubai-UAE and Back Office in Chennai – Tamil Nadu - India.
Strutech Engineering has excellent experience as an individual detailing
company serving to support the Engineering & Fabrication companies in Oil & Gas,
Power, Petrochemical, Process Industries, Cement Plants and also Commercial
Projects. Our Engineering solutions contribute to better business outcome for
clients.
With our dedicated staff of Engineers & Designers we have the capability of
handling projects of all sizes. The services afford by us are Good in the industry in
the field of any kind of Structural Steel Engineering.
DUBAI OFFICE
500 Sqft Office Space
High Configured Work Stations with 1 Gbps Network
A3 Printer and Scanner
24 hrs 10 mbps Internet
Unlimited FTP Server
5000 E-mail Id’s
2000 Sqft Office Space
High Configured Work Stations with 1 Gbps Network
A3 Printer and Scanner
24 hrs 8 mbps Internet
Unlimited FTP Server
5000 E-mail Id’s
Standby Power Generator
INDIA OFFICE
INFRASTRUCTURE
OUR EXPERTISE
AISC - Commercial Buildings
AISC - Industrial and Oil & Gas Structures
Oil & Gas Modules and Offshore Platforms
Petro Chemicals
Piperack
Technological Structures
Commercial Buildings
Conveyor Structures
Misc. Structures
Circular Platforms
Rectangular Platforms
Crossovers
Staircase, Ladders
Power Plants
Aluminium Plants
COMPLETED PROJECTS 2016 - 2015
PROJECT NAME EPC CONTRACTOR SCOPE OF WORK S. .NO
1 Beey'ah Headquarters
Building
2
3
4
5
6
7
8
Rabab Harweel Integrated
Project - Petroleum
Development Oman
Sulphur Recovery Unit Fadhili
Saudi Arabian Oil Company
Zubair Oil Field Development
Project
Cement Grinding Unit-
Shuaiba - Ind Area
State Of Kuwait
Connection design,
Detailing of commercial
building - 1200 tons
Detailing of Pipe Racks, Tech
Structures, Grade Mounted,
Pipe Supports 1600 TONS
Detailing of Pipe Racks, Tech
Structures, Grade Mounted,
Pipe Supports 1500 TONS
Detailing of cement mill
including conveyor
supporting structures
600 tons
Detailing of circular &
rectangular vessel mounted
platforms - 600 tons
Detailing of circular &
rectangular vessel mounted
platforms - 700 tons
Detailing of anchor bolts,
beams, columns and
bracings, handrails & stairs
Detailing of anchor bolts,
beams, columns, bracings,
embeds for panels, handrails &
stairs
Detailing of wall support beams
and columns - 200 tons
Al Futtaim - Carillion
Petrofac E & C Oman LLC
Petrofac E & C Oman LLC
FL-SMIDTH
Samsung Engineering Co Ltd
JGC
STANTEC
TEXAS - IBI GROUP-INC
HYUNDAI/ GS E & C
Clean Fuels Project - Kuwait
Mina Al-ahmadi Refinery -
Knpc
Brabham Middle School
Additions - Willis Independ-
ent School District - Texas
(Aisc Detailing)
Kerr Hs Fine Arts Additions &
Renov. - Texas
(Aisc Detailing)
Marina One- Green Heart
Wall - Singapore9
COMPLETED PROJECTS 2015 - 2014
COMPLETED PROJECTS 2014 - 2015
PROJECT NAME EPC CONTRACTOR SCOPE OF WORK S. .NO
1 Khazzan Central Processing
Facility - Khazzan ProjectPetrofac E & C Oman LLC Detailing of Pipe Racks, Tech
Structures, Grade Mounted, P ipe S uppor ts Equi pment mounted Rectangular/Circular Platforms etc.,
5500 TONS
2 Reggane Nor Development
Project Surface Facilities
Petrofac International
UAE LLC
3 Jazzan Refinery Tank Farm -
Saudi Aramco
Petrofac Saudi Arabia Detailing of Pipe/Cable Tray Supports and Stair Towers etc.,
3200 tons
4 AURORA EOS Project -
Singapore
MITSUI ENGINEERING AND
– SHIP BUILDING CO LTD
( )EXXONMOBIL
Detailing of Pipe Rack and
Shelters etc.,
500 tons
5 OIL FIELD SUPPLY CENTER –
WARE HOUSE DEVELOPMENT
Jasaf Building Technology
LLC
Det ail ing Ware House OF
Building
650 tons
6 Jebel Ali Power Station
M Extention
Mott Mac Donald Detailing Work Gas Turbine FORBuilding
1000 tons
7 UMM EPC Wu’al Project Dragdos Gulf Construction
Co Ltd.
Detailing Work Conveyor FOR
Structures, Transfer Towers etc
1500 tons
8 MARKET STREET
ROOF CROWN
Takenaka Corporation/
Tritech Consultants Pte Ltd.
Detailing of Roof Features Work
1500 tons
9 Polo Club at Dubai Land Al Habtoor Group LLC Detailing of Club Building
650 tons
10 SATAH Facilites - New DG
Building
ZADCO/SICON OIL &GAS Detailing Work BuildingFor
Structures,
425 tons
Detailing of Pipe Racks, Tech Structures, Grade Mounted, P ipe S uppor ts Equi pment mounted Rectangular/Circular Platforms etc.,
2500 TONS
COMPLETED PROJECTS 2015 - 2014
PROJECT NAME EPC CONTRACTOR SCOPE OF WORK S. .NO
11 Carbon Black and Delayed
Coker Project
Samsung Engineering De tai li ng o f Mi s c S tee l
Structures
500 tons
12 Real Free Zone Logistics Jasaf Building Technology
LLC
C o n ne c t i o n D e s i g n &
Detailing of Ware House
steel structures
13 Fujairah Oil Terminal FZC Rotary Engineering Limited Detailing of Pipe Bridges &
Misc structures
250 tons
450 tons
14 Pedestrian Bridges Al Souf
Tram Station & Abu Dhabi
Airport Road
RTA D e t a i l i n g o f B r i d g e s
Structures
350 tons
15 OSC Development
Technopark
Jasaf Building Technology
LLC
C o n ne c t i o n D e s i g n &
D e t a i l i n g W o r k s h o p
Buildings
16 EPC FOR POWER UPGRADE
( )AT ZIRKU ZADCO
ABB Detailing Work Pipe FOR racks
250 tons
650 tons
COMPLETED PROJECTS 2013 - 2006
PROJECT NAME EPC CONTRACTOR/ S. .NO TONNAGE YEAR
2ROAD BRIDGE DIBBA CORNICHE ROAD –
HALCROW Road Bridge Grider600 2012-2013
3
SUNTEC CITY PHASE SINGAPORE -1A/1B & 2 – -
/SAMSUNG AECOM
Floor Beams & Columns etc.,
2500 2012-2013
SPORTS HUB SINGAPORE –
/ buildingsAQC MPIA 2012-2013
SOUTH BEACH RESIDENCE SINGAPORE ARUP – -
Canopies Ribbons / Columns / Crowns2012-2013
BAIJI POWER PLANT MW ORASCOM EGYPT 6 X 160 – /
Turbine Buildings/Sub Station Bldgs. / Platforms and
Misc etc.,
2011-2012
1000
3500
4000
7EMAL PHASE ALSTOM POWER 2 –
/ / Misc. etc.GTC FTC STACKS BAG FILTERS STRS AND2011-2012500
6
5
4
8
9
10
NATIONAL ART GALLERY (FSC - CITY HALL)
Takenaka - Singapore Piling JV (TCSP - JV)7500 2011-2012
EMAL PHASE OUTOTEC 2 –
Conveyor structures500 2011-2012
QUSAHWIRA FULL FIELD DEVELOPMENT –
/ - Pipe RacksNPCC HYUNDAI2000 2011-2012
1 ITCC SAUDI ARABIA - CANOPY
ALBAWANI
450 2012-2013
COMPLETED PROJECTS 2013 - 2006
PROJECT NAME EPC CONTRACTOR/ S. .NO
11VAM AAL SINGAPORE ENGINEERS PTE4 & 4 – – 9000
- Technological structure incl MiscLTD4500
TONNAGE YEAR
2011-2012
12
TURKMENGAS DEVELOPMENT PETROFAC –
Pipe Racks/Tech Structures/Sub Station Bldgs./Circular/
Horizontal Platforms/ Pipe supports and Misc etc.,
15000 2010-2011
450 2010-2011QP PETROFAC –
Pipe Racks/Tech Structures/Misc. etc.
BOROUGE UTILITIES OFFSITE PROJECTS HYUNDAI 3 – & -
Pipe Racks2010-2011
NATIONAL UNIVERSITY HOSPITAL TYLIN INTL –
19 . - STORY UNIV HOSPITALS SINGAPORE 2010-2011
2500
5500
16WWTPP BAHRAIN GS ENGG CONSTRCTION – – &
Pipe Racks/shelters and Misc. etc.2010-2011850
15
14
13
17
18
19
CAR PARKING STRUCTURE DUBAI AL HIKMA TOWER – –
Building structure incl Stair case1200 2010-2011
STRATEGIC GRAIN RESERVE STRUCTURE FUJAIRAH –
Packing tower, Silo support Structures850 2010-2011
DUBAI METRO GREEN LINE ATKINS – /
Foot Bridges - 11 stations
Entrance Pods – 11 stations
Entrance Pod Canopy – Narrow & Wide
2500
2500
500
2009-2010
2
COMPLETED PROJECTS 2013 - 2006
PROJECT NAME EPC CONTRACTOR/ S. .NO
20EL MERK ALGERIA PETROFAC- – –
Pipe Racks/Tech Structures/Sub Station Bldgs. etc.5250
TONNAGE YEAR
2009-2010
21
COMMERCIAL PROJECTS UAE -
PROJECT TECHNIP–
Pipe Racks2009-2010850
23ADCO ABU DHABI PETROFAC – –
Pipe Racks/Tech Structures/Sub Station Bldgs. etc.2009-20102500
22
24
25
26
QATALUM QATAR FATA KHOME – / –
DUBAI METRO RED LINE ATKINS – /
2008-2009
WASTE TO ENERGY PLANT QATAR KEPPEL SEGHERS / – /
- Boiler StructureANSALDO
U-Bora Tower - Dubai
buildings - DubaiTRA
Platinum Tower - Jumeirah
Park Tower – Dubai
Zamalek Tower - Dubai
Pinnacle Tower - Dubai
650
250
350
235
155
100
2009-2010
2009-2010
2009-2010
2009-2010
2009-2010
2009-2010
Anode Baking Plant
Cast House 1 – 7 (Phase 1)
Cast House 7 -14 (Phase 2)
3500
2500
2800
2008-2009
Foot Bridges - 15 stations
Entrance Pods – 15 stations
Station Extensions – 15 stations
Entrance Pod Canopy – Narrow & Wide
6000
1800
2100
1500
2800 2008-2009
27 MARINA BAY HOTEL TOWER SINGAPORE ARUP / – 4500 2008-2009
COMPLETED PROJECTS 2013 - 2006
PROJECT NAME EPC CONTRACTOR/ S. .NO
28 QURRAYYAH SEAWATER PLANT SAUDI SNAMPROGETTI/ – 6000
TONNAGE YEAR
2007-2008
29ARAMCO KHURAIS DEVLOPMENT SAUDI – / –
SNAMPROGETTI4800 2007-2008
30 QATAR RASGAS TRAIN CHIYODA CTJV 6&7 – – 6500 2007-2008
31 OLEFINES PLANT YANBU TECHNIP ITALY/ – 1800 2007-2008
32 YEMEN LNG TECHNIP ITALY – 1800 2007-2008
33 FPSO TOPSIDE MODULES SAIPEM SBM – / 2500 2007-2008
34AWEER GAS TURBINE POWER STATION –
- ( H – )FICHTNER GMBH STATION PHASE III4000 2007-2008
35RABIGH EXPANSION TECHNIP ITALY –
MISC STEEL DETAILING800 2007-2008
36 NORTH BELUT ACCOM MODULE CONOCCO PHILLIPS – 500 2007-2008
37 QATAR GAS DODSAL – - Pipe Bridges 1500 2007-2008
COMPLETED PROJECTS 2013 - 2006
AISC DETAILING
PROJECT NAME EPC CONTRACTOR/ S. .NO
38 CHIYODA PROJECT 1200
TONNAGE YEAR
2007-2007
39 QNCC PROJECT IHI - 1200 2007-2008
40 FCC SEAWATER SCRUBBER ALSTOM - 430 2007-2008
41EMIRATES ENGG HANGER ADPI DAR – /
MISC STEEL DETAILING800 2007-2008
42 LAYYAH POWER STATION EXP SIDEM – - 250 2006-2007
43 RASLAFFAN QP KIRCHNER ITALY – – 400 2006-2007
44 RAG AND FLARE MITIGATION PETROFAC - 250 2006-2007
45 SOHAR ALUMINIUM BECHTEL - 4150 2006-2007
Buffalo public schools – Hillery Park elementary – Buffalo, New york
Walgreens Pharmacy – Michigan
Orchard Park High School –New York
Buffalo Public School – Addition/renovation – Buffalo, New york.
LCRA - Ferguson Replacement Project
Borgess Lee Memorial Hospital – Michigan
KEIP - Keral Plant 2 - Froth Treatment
Fox Ford/Mazda – Michigan - 800 Tons
- 1000 Tons
- 850 Tons
Qatalum – Qatar - Fata/khome - Anode Baking Plant
Qatalum – Qatar - Fata/khome - Cast House - 1
Aluminium Plant
Tel: +1 403 836 5986
Tel : 04 269 6028
P.O. Box : 504043, Dubai - UAE
Email : [email protected]
Strutech Ltd.110, Eversyde Close sw
Calgary, Alberta T2Y 5E2, Canada
Email : [email protected]: +1 403 836 5986