Page 1: Pre Qualification -Firefreeze - 2014a

FIREFREEZE EST.Prequalification Documents

Head Office

FIREFREEZE EST.P.O. Box 14148Dammam – 31424Saudi ArabiaTEL : (+96613) 8462047/ 8462079FAX : (+96613) 8465254EMAIL : [email protected]

[email protected]

Page 2: Pre Qualification -Firefreeze - 2014a

Contents

1. Company Profile

2. Mutual Confidentiality Agreement

3. Company Documents

4. Scope of work

5. Organization Chart

6. Curriculum Vitae

7. Project Management Procedure

8. Quality Assurance Procedure

9. Project Reference

10. Authorization Certificates

11. Partners/Associates

Page 3: Pre Qualification -Firefreeze - 2014a

1 : Company Profile

ABSTRACT:-

FIREFREEZE is one of the leading company to provide services of design, installation, testing & commission and maintenance services for fire-protection system and fire alarm system. Our team is capable of providing onsite training to operation people and maintenance people.

Since 1995, FIREFREEZE is involved in providing high quality services to the industrial installation. Our company can provide complete range of fire protection system and Fire alarm system & gas detection system.

Our partnership with many leading manufacture of the world enables us to utilize scientific and technical skills of leaders in the field.

FIREFREEZE has engineering team, installation team, financial resource and expertise to handle the turnkey project.

FIREFREEZE have HCIS approval to work on industrial mega project along with vendor approval with Saudi Aramco, Sabic, Saudi Electricity Company (SEC), Saudi Telecom Company (STC), Ministry of Health (MOH), Ministry of interior (MOI) and saline water conversion corporation (SWCC), EPCC and Local civil defence authorities. We are approved supplier to many global EPC contractors working in Saudi Arabia.

Page 4: Pre Qualification -Firefreeze - 2014a

COMPANY AIM

Our mandate is to protect you and your property from fire. FIREFREEZE is dedicated to finding the suitable solution for any fire protection problem. We offer total fire protection capabilities with quality products and trained, experienced technicians.

FIREFREEZE is aligned with the leading manufacturers who select only very qualified representation. We have a working knowledge of worldwide fire protection rules and regulations to ensure complete safety and compliance anywhere. On time, reliable, accurate, and on budget.

FIREFREEZE - FIRST For Fire Protection.

As you can see our experience covers the complete range of Fire Protection, from fire sprinklers and special hazard protection to alarms and detection we can handle your fire challenge. Understanding our customer’s needs, concerns and business is our number one priority.

FIREFREEZE - your first call for Fire Protection!

POTENTIAL OF COMPANY

Our Services are genuinely innovative, comprehensive and represent an excellent value. We consider our customers as our partners ensuring their objective are met as efficiently and economically as possible.

FIREFREEZE believes in a team approach for creating a safer facility. We work closely with our clients to formulate and implement high-quality, comprehensive programs that exceed their expectations.

OUR MISSION

The key to the success of any Fire & Safety equipment or system is its suitability for the hazard and workforce which uses it.

Fires and toxic spillage especially threaten the oil and petrochemical industries. Many other industries such as plastics, paints or paper are facing similar hazards. Offices, shops, hospitals and hotels are all at risk with fire class.

At FIREFREEZE we not only supply the entire Saudi Arabian market with firefighting and safety equipment produced by many of the US and Europe’s leading manufacturers, we also provide technical advisory services and comprehensive

Page 5: Pre Qualification -Firefreeze - 2014a

testing, servicing and maintenance program which ensure the safety of working people in oil fields, petrochemical plants, electrical companies, desalination plants, industrial installations, airports, militaries, civil defense, hospitals, schools, university, offices, building and other location throughout the region. Most of our projects are industrial project with EPC contractor.

SAFETY

The company operates a safety policy in compliance with internal set objectives of recognized standard. Safety consultants are retained to advise on all safety matters related to company activities. We work with international consultant for certifying the design and drawing.

Safety awareness is highlighted for all projects and risk assessment is prepared to recognized standards to control hazards.

The safety policies followed are aimed at working together with clients to achieve the objective of zero safety related incidents.

ENVIRONMENTAL

Environmental policies are operated to ensure safeguards in respect of the environment and society in connection with all of its activities. The company additionally complies with all client requirements regarding environmental policies, which are in force at its sites or operating locations. The company policy is aimed reducing environmental impact to a minimum and ensuring that all related activities are carried out in accordance with recognized approved procedures.

INTERNAL RELATIONSHIP

It is our firm conviction that our employees are our “Best Assets” and we wish to be recognized as a “Great Place to Work” our personnel shall be guided by this desire and our approach to our employees shall be governed by the principles of “Mutual Respect” and “Trust”.

We recognize the need to nurture team spirit. For this purpose we shall provide an environment of friendliness and mutual support within the organization at the same time encourage individual initiative and creative skills. We keep training our design and operation team at manufacture factories to keep them update with knowledge and latest technologies and best design techniques

Page 6: Pre Qualification -Firefreeze - 2014a

AREAS OF SPECIALIZATION

A. Fire Protection and Detection Systems Construction. B. Fire Fighting Equipment Supply. C. Maintenance and Inspection Services for Fire Protection

Systems.D.Refilling of clean Agent System. E. Room integrity test. F. Co2 concentration test. G.Training to operation & maintenance staff H.Gas detection system I. Spare parts of pumps & other Electromechanical

machineries

ACTIVITIES

1- Clean Agent Filling Capability:

We provide refilling of following I. FM-200 SystemII. NOVEC-1230 System

III. Wet Chemical System IV. Dry Chemical System V. Co2 cylinder VI. Nitrogen cylinder VII. All type of fire extinguisher

2- Consultancy and Engineering Services:

Design verification and as-built drawings in accordance to the international codes and standards.

Review of plans, P&ID drawings. Risk analysis and Process Safety Management. Issuance and review of the specification and scope of works in accordance

to the international codes and standards (ASME, OSHA, NFPA, DIN, EN, BS). Projects supervision and management. Damage analysis and loss adjustment.

Page 7: Pre Qualification -Firefreeze - 2014a

3- Fire Lose Prevention Engineering:

Design,Hazard and Risk Analysis, Fire Control, Construction, Testing and Commissioning

4- Maintenance and Inspection Services For Fire Protection Systems and Fire Fighting Equipment:

Periodic Inspection Preventive Maintenance

CAPABILITIES

FIREFREEZE, cooperate with international companies. These companies offer everything from Design, Supply, Installation, Commissioning and Testing.

The company team is committed to delivering its customer's projects on time, safely, within budget and with the highest degree of quality.

PRODUCTS

In line with the comprehensive scope of our advisory services, materials supply, maintenance services, FIREFREEZE carries a large inventory of specialized fire protection and safety items.

We can supply of fire extinguishers, portable, mobile and fixed fire monitors, wide range of effective fire nozzles, a range of fire & safety valves, various diameters of industrial and municipal fire hoses, Breathing apparatus, fire hose cabinet, hydrant, hose reel station.

All types of fire-fighting fire entry suits and fire retardant station uniforms including fire helmets, fire gloves and fire boots. A large selection of chemical suits against all type of chemicals at various concentrations.

Safety equipment such stretchers, burn kits, flashlights, various types of safety shower personal protection, gas masks and accessories.

FIREFREEZE has an established firefighting and safety equipment business which is also involved in marketing and distribution of a wide range materials, services and equipment’s for many industrial activities.

Page 8: Pre Qualification -Firefreeze - 2014a

Fire Fighting Flow Control group

Pipe & Pipe Fittings, Tubing, & Flow Meters Rubber Covered Hose Hose Hardware and Accessories Nozzles & Accessories

Fire Extinguishers Cartridge-OperatedPortable Fire Extinguishers Stored Pressure Portable Fire Extinguishers Wheeled Extinguisher

Fire Fighting Clean Agent (FM-200 & NOVEC-1230 System, Argonite System, FE-13 System, vehicle fire protection & marine fire protection)Foam Fire Extinguishing Carbon Dioxide Fire Extinguishing Dry Chemical/Powder Fire Extinguishing Wet Chemical

Fire Protection Specialties & Equipments

Control, Detection and Alarm Equipments

Page 9: Pre Qualification -Firefreeze - 2014a

2 : Mutual Confidentiality Agreement

Please find enclosed the Mutual Confidentiality Agreement on behalf of FIREFREEZE. Should you require any further clarification, please do not hesitate to contact us.

Page 10: Pre Qualification -Firefreeze - 2014a

MUTUAL CONFIDENTIALITY AGREEMENTBETWEEN FIREFREEZE EST

P.O. Box 14148Dammam 31424, Saudi Arabia(here in after together referred to as “the Parties”)

AND [Counterparty name]__________________

having a place of business at:

[Counter party current address]………………………….……………………………………..

WHEREAS : The Parties have agreed to discuss possible collaboration on programs relating to:

XXXXXX – Saudi Arabia

AND WHERAS: The Parties wish to exchange information which may be of a proprietary or a confidential nature for thepurpose of such possible collaborationNOW THEREFORE IT IS AGREED AS FOLLOWS THAT:

1. The Receiving Party shall hold in confidence all confidentialinformation relating to such possible collaboration disclosed toit by the Disclosing Party, which: (a) is marked as confidentialat the time of disclosure; or (b) is not in a form that can bereadily marked (e.g. verbal disclosures) but is verballyidentified as confidential at the time of disclosure, and isdesignated as confidential by the Disclaimer in writingto the Recipient’s primary representative within thirty days ofdisclosure. “Confidential Information” means all information inrespect of either parties’ business and finances including,without prejudice to the generality thereof, any ideas, businessmethods, finances, prices, products, specifications supplierlists, business, financial, marketing, development, manpoweror new product development plans, customer lists or details,computer systems and software, Intellectual property or othermatters connected with the parties’ products or serviceand information concerning relationships with actual orpotential customers and the needs and requirements of suchpersons.2. The Receiving Party undertakes to apply to all ConfidentialInformation disclosed in accordance with the provisions of thisagreement the same degree of care with which it treats andprotects its own proprietary information against publicdisclosure. All such information and idea shall not be disclosedto any third party without the written consent of the DisclosingParty. Where such consent is granted disclosure shall only bemade to another party where such party accepts similarobligations of confidence to those contained in thisAgreement or where such a party is a government orgovernment agency and agrees to treat such information asconfidential and proprietary information.Notwithstanding the foregoing, either party may disclose

confidential information to subsidiary, affiliate and parentcompanies, both direct and indirect, provided such companiesagree to comply with the provision of this Agreement.3. The Receiving Party undertakes to restricts its use ofConfidential Information to work performed in conjunctionwith the Disclosing Party related to such possible

c. disclosed to the Receiving Party without restriction by a thirdparty having the full right to disclose, ord. independently developed by an employee of the Receivingparty to whom no disclosure of Confidential Information hasbeen made, or e. specially required by a government body orcourt of law to be disclosed, provided that (i) prior to suchrequired disclosure, the receiving Party shall give the DisclosingParty reasonable notice of such required disclosure (to theextent permitted by the law) and shall cooperate with theDisclosing Party in any action taken by the Disclosing Party toprotest against and/or limit such disclosure and (ii) suchdisclosure shall be limited to the specific disclosurerequirements.6. This agreement shall only apply to information disclosedduring the (12 month) period commencing on the EffectiveDate (“Disclosure Period”). Any Agreementto extend the Disclosure Period shall be written in form. [selectappropriate one of [I ]or [ii] and delete the other: [i] Theconfidentiality obligations under this agreement shall continueuntil such time as the Confidential Informationbecomes part of the public domain through no act or omissionof the Receiving Party. [ii] The obligation here to relating toconfidentiality and use of information and ideas shall continuefrom the effective date until [3 years ] after the End of theagreed Disclosed Period.]7. The Receiving Party shall not assign or transfer any of itsrights or obligations hereunder without the prior writtenconsent of the Disclosing Party.8. All Confidential Information disclosed hereunder shallremain the property of the Disclosing Party. Nothing in thisAgreement shall deemed to grant a license directly or byimplication under any registered design, patent, copyright,trade secret or patent application.

9. After the end of the Disclosure Period, the Receiving Partyundertakes, upon written demand, to return to the DisclosingParty all documents & materials (and any copies ) containing,reflecting, incorporating, or based on the Disclosing Party’sConfidential Information from its computer systems to theextent possible; and/or certify in writing to the Disclosing party

Page 11: Pre Qualification -Firefreeze - 2014a

collaboration and to ensure that dissemination of ConfidentialInformation within its own organization is on a strict “need toknow” basis.4. Each Party acknowledges that any breach by it of itsobligations under this Agreement would inevitably causesubstantial and irreparable damage to the otherparty , and that money damages would be an Inadequateremedy there for. Accordingly, each Party acknowledges andagrees that the other party will be entitled, in addition to anyother available remedies, to an injunction, specificperformance, and/or other equitable relief to prevent theviolation of such obligations.5. The obligations of Confidentiality in this Agreement shall notapply to those sections of confidential Information which are:a. in or passed into the public domain other than by breach ofthis Agreement or b. Known to the Receiving party prior todisclosure by the Disclosing party, or

that it has complied with the requirements of this clause,provided that the Receiving Party may retain documents andmaterials containing, reflecting incorporating, or based on theDisclosing Party’s Confidential Information to the extentrequired by law or any applicable governmental or regulatoryauthority, and to extent reasonable to permit the ReceivingParty to keep evidence that it has performed its obligationsunder this Agreement.10. This Agreement constitutes the Entire understandingbetween the Parties related to the protection of ConfidentialInformation disclosed hereunder and supersedes all prior andcollateral communications, reports and understandingbetween the parties hereto relating to ConfidentialInformation. It shall come into effect on [date] (“EffectiveDate”).11. The Agreement will be governed by and interpreted inaccordance with the Laws of [England And Wales] and will besubject to the jurisdiction of the Courtsof [England And Wales].

Place and Date: Dudley DD/MM/YYYY

Signed for and behalf of FIREFREEZE

Name:___________________________

Title: ____________________________

Place and Date:__________________________

Signed for and behalf of a[Counterpartyname):_________________________________

Name: __________________________________

Title: __________________________________

Page 12: Pre Qualification -Firefreeze - 2014a

3 : Company Documents

Please find enclosed a copy of FIREFREEZE’s Registration certificate.

Page 13: Pre Qualification -Firefreeze - 2014a
Page 14: Pre Qualification -Firefreeze - 2014a
Page 15: Pre Qualification -Firefreeze - 2014a
Page 16: Pre Qualification -Firefreeze - 2014a
Page 17: Pre Qualification -Firefreeze - 2014a
Page 18: Pre Qualification -Firefreeze - 2014a

4 : Scope of work

FIREFREEZE offer a total integrated fire engineering solution encompassing Water, Foam, Sprinkler, Gas and Site Wide Detection systems. The solutions we offer are in accordance with internationally recognized standards on a global scale.

The services FIREFREEZE offers are: -

A. Full turnkey – Design, Supply, Installation/Erection, Testing and Commissioning and Training

B. Design & Engineering Only C. Supply Only D. Site Services – Site Supervision, Testing, Servicing &

MaintenanceE. Erection – Full installation Works F. Training – Onsite training, factory training.

Page 19: Pre Qualification -Firefreeze - 2014a

5 : Organization Chart

Page 20: Pre Qualification -Firefreeze - 2014a

S

As

Naseem AkhtarProject Engin

MuhammedIlyasProject Engin

MuhammedShakeerFire Alarm Engi

Giyassudin

Project Coordin

Sohail IftikhaCAD/Design Eng

Sohaib Ul HassanCAD/Design Eng

Sameer MasoodTechnical Manag

srar AhmedDesign&Estm. Engine

neer

neer

d  

ineer

nator

rgineer

gineer

KY

Kha

MuA

M

Ays

Tah

Nah

ger

eer

Kamran YounasCAD/Design Engineer

aja NizamCAD/Design Engineer

hammed AwaisCAD/Design Engineer

ani LaalCAD/Design Engineer

sha Faleej

CAD Operator

ani Faleej

CAD Operator

hed Faleej

CAD Operator

Naeem

Proje

ShahzTaimProje

Tariq AKhaProje

Zia Ulla

Site

RawPrash

Site

Zubair AKhaProje

Jonat

Saf

M. NaUddProje

BinuSulocha

Project 

 uddin

ect Enginer

zada mourect Engineer

Ayub anect Engineer

h Khan

e Engineer

wat hante Engineer

Ahmed anect Engineer

than

ety Officer

aeem dinect Engineer

u nan Manager

Naeem Ahm

Mech. Fo

MuhammNasib

Mech. Fo

Kamran As

Elect. Fo

M. JavaidRasulElect. Fo

Abdul Rao

F. Alarm Fo

Zeshan Sarw

Mech. Fo

med

reman

ed 

reman

lam

reman

reman

of

oreman

war

reman

M

M

M

M

M

M

F

Muhammed Wahed

Electrici

Muhammed Shahid

Electrici

Muhammed Ramzan

Pipe Fitt

Mohiu Ddin

Weld

Muhammed Naveed

Pipe Fitt

HafizShahzad

Electrici

Muhammed Imran

Labo

Surendra Limbu

Piper Fitt

FIREF

an

an

ter

der

ter

an

our

ter

MuhAht

Ye

Kash

Rahi

Rizwa

Nade

Abu 

MuhHa

MuhSh

FREE

Mutlaq

Bassam 

Operation D

hammed tisham

Electrician

sh Pall

Welder

if  Sohail

Pipe Fitter

im Ullah

Labour

an Abbas

Pipe Fitter

eem Ullah

Electrician

Huraira

Pipe Fitter

hammad aroon

Pipe Fitter

hammed hakeel

Electrician

EZE O

q Azzam Al-

G

M

Parvez

Department

Nazrul I

MuhamAsif

P

DipaDanuw

E

Adna Iq

Mech

MuhamTahi

E

Naeem HUlla

P

PareeRawth

P

MuhamQaise

Pi

Atif ali Z

E

ORGA

-Khaldi

General Manager

M. Parvez NagraOperation Manage

Islam

Welder

mmed fPipe Fitter

ak warElectrician

qbal

. Tecnician

mmed irElectrician

Habib hPipe Fitter

ed herPipe Fitter

mmed erper Fitter

Zafar

Electrician

ANIZA

r

er

Zakir Hussa

Piper 

Shahidusala

Elect

Prem Prasa

Pipe 

Adnan Rafi

Pipe 

Adnan AbdKhaliq

Pipe  

Shoaib But

Elect

Ejaz Cheem

W

Hemlal  Limbu

Elect

Ansar Mehmood

Elect

ATIO

ain

Fitter

am

rician

ad

Fitter

iq

Fitter

ul 

Fitter

tt

rician

ma

Welder

rician

drician

Sh

M

Ab

M

A

ON

Mu

oaib LiaqatMaterial Procureme

Mubashar Hussain

Purchase

bdul Razzaq

Purchase

uhammed Zahid

Purchase

baid Ullah

Tea / Office Bo

Nauf Bin GhanamComp. Operato

hammed IrfanAdministrator

ent

er

er

er

oy

or

Muna

Adm

Muna

Adm

Sara 

Ad

Abi

Adm

MuzaSaAdm

Sara 

Co

Hassa

Co

Mun

Co

Sara H

Co

a Fahad

min  Support

a Sultan

min. Support

Sultan

mn. Support

ir Esa

min. Support

avi Bint aoodmin. Support

Fahad

omp. Operator

a Azzam

omp. Operator

a Saad

omp. Operator

Hamood

omp. Operator

Waqar AhFinance 

Abdul Rah

A/C A

hmed/ Accounts

hman

Assistant

Nasir Bin. MJahranLogistic Sup

Reem Salim

Logistic Sup

Musab

Logistic Sup

 

M. 

port

m

port

port

Page 21: Pre Qualification -Firefreeze - 2014a

6 : Curriculum Vitae

Page 22: Pre Qualification -Firefreeze - 2014a
Page 23: Pre Qualification -Firefreeze - 2014a
Page 24: Pre Qualification -Firefreeze - 2014a
Page 25: Pre Qualification -Firefreeze - 2014a
Page 26: Pre Qualification -Firefreeze - 2014a
Page 27: Pre Qualification -Firefreeze - 2014a
Page 28: Pre Qualification -Firefreeze - 2014a
Page 29: Pre Qualification -Firefreeze - 2014a
Page 30: Pre Qualification -Firefreeze - 2014a
Page 31: Pre Qualification -Firefreeze - 2014a
Page 32: Pre Qualification -Firefreeze - 2014a
Page 33: Pre Qualification -Firefreeze - 2014a
Page 34: Pre Qualification -Firefreeze - 2014a
Page 35: Pre Qualification -Firefreeze - 2014a
Page 36: Pre Qualification -Firefreeze - 2014a
Page 37: Pre Qualification -Firefreeze - 2014a
Page 38: Pre Qualification -Firefreeze - 2014a
Page 39: Pre Qualification -Firefreeze - 2014a
Page 40: Pre Qualification -Firefreeze - 2014a
Page 41: Pre Qualification -Firefreeze - 2014a
Page 42: Pre Qualification -Firefreeze - 2014a
Page 43: Pre Qualification -Firefreeze - 2014a
Page 44: Pre Qualification -Firefreeze - 2014a
Page 45: Pre Qualification -Firefreeze - 2014a
Page 46: Pre Qualification -Firefreeze - 2014a
Page 47: Pre Qualification -Firefreeze - 2014a
Page 48: Pre Qualification -Firefreeze - 2014a
Page 49: Pre Qualification -Firefreeze - 2014a
Page 50: Pre Qualification -Firefreeze - 2014a
Page 51: Pre Qualification -Firefreeze - 2014a
Page 52: Pre Qualification -Firefreeze - 2014a
Page 53: Pre Qualification -Firefreeze - 2014a
Page 54: Pre Qualification -Firefreeze - 2014a
Page 55: Pre Qualification -Firefreeze - 2014a
Page 56: Pre Qualification -Firefreeze - 2014a
Page 57: Pre Qualification -Firefreeze - 2014a
Page 58: Pre Qualification -Firefreeze - 2014a
Page 59: Pre Qualification -Firefreeze - 2014a
Page 60: Pre Qualification -Firefreeze - 2014a
Page 61: Pre Qualification -Firefreeze - 2014a
Page 62: Pre Qualification -Firefreeze - 2014a
Page 63: Pre Qualification -Firefreeze - 2014a
Page 64: Pre Qualification -Firefreeze - 2014a
Page 65: Pre Qualification -Firefreeze - 2014a
Page 66: Pre Qualification -Firefreeze - 2014a
Page 67: Pre Qualification -Firefreeze - 2014a
Page 68: Pre Qualification -Firefreeze - 2014a
Page 69: Pre Qualification -Firefreeze - 2014a

7 : Project Management Procedure

Project Management Process

FIREFREEZE will assign a single point of contact for all major projects and use modern Project Management processes and tools to execute a project which will include but not be limited to the use of “PRIMA VERA” to record the sequence of works and the time frame for completion along with all project milestones. This will be reviewed against a baseline, up-dated and submitted on a regular basis (Frequency to be project specific) during the project execution period as part of the Progress Report. The Progress Report will detail all other project information from procurement and delivery activities, design & document submittal, Technical Query (TQ’s) progress, Installation & Commissioning progress, Commercial and Contractual information and any other information deemed necessary to the scope of works.

FIREFREEZE employ a robust QEHS (Quality, Environment, Health and Safety) system that also controls and houses all other Project Management processes, procedures, forms and documents necessary for completing a successful and well documented project.

Page 70: Pre Qualification -Firefreeze - 2014a

8 : Quality Assurance Procedure

Page 71: Pre Qualification -Firefreeze - 2014a

TABLE OF CONTENTS

1. INTRODUCTION1.1 Purpose

2. PROJECT QUALITY PLAN, ISSUE AND AMENDMENTS2.1 Distribution2.2 Amendment record2.3 Amendment record document

3. TERMS AND DEFINITIONS

4. PROJECT QUALITY MANAGEMENT SYSTEM 4.1 General Requirements 4.2 Documentation Requirements

4.2.1 General 4.2.2 Project quality plan 4.2.3 Control of Documents 4.2.4 Control of records

5. MANAGEMENT RESPONSIBILITY5.1 Management Commitment 5.2 Customer Focus 5.3 Project Quality Policy 5.4 Planning

5.4.1 Quality Objectives 5.4.2 Quality Management System Planning

5.5 Responsibility, Authority 5.5.1 Responsibility and Authority 5.5.2 Internal communication

5.6 Management Review

6. RESOURCES MANAGEMENT6.1 Provision of Resources 6.2 Human Resources

6.2.1 General 6.2.2 Competence, awareness and training

6.3 Infrastructure 6.4 Work Environment

Page 72: Pre Qualification -Firefreeze - 2014a

  

 

This Document is the property of FIRE FREEZE FIRE PROTECTION & SAFETY SOLUTIONS, Dammam KSA.

7. PRODUCT REALIZATION 7.1 Planning of Product Realization 7.2 Customer Related Processes

7.2.1 Determination of Requirements Related of the Product/Service 7.2.2 Review of Requirements Related of the Product/Service 7.2.3 Customer Communication

7.3 Design and Development 7.4 Purchasing 7.5 Production and Services Provision

7.5.1 Control of Production and Services Provision 7.5.2 Validation of Processes for Production and Services Provision 7.5.3 Identification and Traceability 7.5.4 Customer property

7.5.5 Preservation of product 7.6 Control of monitoring and measuring devices

8. MEASUREMENT, ANALYSIS AND IMPROVEMENT 8.1 General 8.2 Monitoring and measurement

8.2.1 Customer satisfaction 8.2.2 Internal Audits 8.2.3 Monitoring and measurement of processes

Page 73: Pre Qualification -Firefreeze - 2014a

1. INTRODUCTION This Project Quality Plan defines the Quality Management System that shall be used to control the activities involved in FIREFREEZE.

The activities included in this project are defined in the scope of work prepared and issued to FIREFREEZE by Client.

Purpose:

The purpose of this Project Quality Plan is to demonstrate the ability of the Company to provide scope of work / services for the project which meets the requirements of ISO 9001:2008 Quality Management Systems. In addition to this, the PQP documents the commitment of the Company in meeting the Client requirements and all applicable statutory and legislative requirements.

2. PROJECT QUALITY PLAN, ISSUE AND AMENDMENTS

Once a contract signed with FIREFREEZE All amendment to this Project Quality Plan shall be reviewed by the Project QA/QC Manager and shall be approved by the Project Manager and QHSE Department Manager (If necessary). The revision, updating and distribution will be the responsibility of the Project QA/QC Manager. He will be responsible for retrieving the obsolete copies of the PQP (if necessary).Revisions to the Project Quality Plan are carried out by section by section. In case of minor change requiring the revision of one or several pages of section of the Project Quality Plan only such page or pages shall be revised.Project QA/QC Manager revised this Project Quality Plan and he or his designate will do the issue control. The issue shall be subject to the review and approval by project QA/QC Manger, Project Manager and FIREFREEZE (as applicable).The same personnel as original issue or authorization by Project Manager shall subject all subsequent revisions to review and approval. The Project Quality Plan shall be subjected to review during the course of the project by Project QA/QC Manager or his designate to ensure that any developments or improvements in the FIREFREEZEIntegrated Management Systems are accurately reflected in this document.

Distribution:

The original PQP/Master Copy shall be retained with Project QA/QC Manager. Approved copies shall be distributed to the following:

Others as directed by Project Manager (list retained with project QA/QC Manager)

Page 74: Pre Qualification -Firefreeze - 2014a

The distribution shall be “Controlled” and shall be recorded. All controlled copies shall be identified with a blue color stamp “CONTROLLED COPY” “No. ……”.

All amendments shall be issued to the approved copyholders and it is the responsibility of the copyholder to replace the old one with the amendments. All old documents shall be destroyed.The project Quality Plan is the property of FIREFREEZE and shall not be reproduced or transmitted to any third party without the written approval of FIREFREEZE QHSE Manager.

Amendment record: This section will show the revisions done on this document with the reason for change. The objective is to trace the document history. It is the project quality In-charge responsibility to update these details.When changes will be made in any part of manual, the revision number will be incremented. The revised areas will be identified with blue color and italic text. Internally this document will be issued and revisions will be communicated through document Form. Internally this document will be issued to the relevant managers and they will communicate this to the relevant staffs. Any printout without original “CONTROLLED COPY” stamp will be treated as invalid.

TERMS AND DEFINITIONS: The Quality Management and related terms used in this Quality Plan are defined below. Wherever possible, reliance is placed on ISO 9000:2005 Quality Management Systems - Fundamentals and Vocabulary, and if a term is defined therein, the definition is quoted, with explanatory notes as relevant. FFE: FIREFREEZE EST. Company mean – ClientCompany representative mean – Client representative at site

Supplier Appraisal:Assessment of supplier’s capability of controlling quality carried out before placing orders.

Certification: The authoritative act of documenting compliance with requirements. The requirements can relate to personnel, processes, products, organizations and services.

Compliance: An indication or judgment that the product or service meets the requirements of the relevant specification or regulation; also the state of meeting the requirements.

Customer:Recipient of a product provided by the supplier.

1. In a contractual situation, the customer is called the “COMPANY”.

Page 75: Pre Qualification -Firefreeze - 2014a

2. The customer may be, for example, the ultimate consumer, user, beneficiary or purchaser.3. The customer can be either external or internal to the organization.

Corrective Action:Action taken to eliminate the causes of an existing nonconformity, defect or other undesirable situation in order to prevent recurrence.

Documentation:Any recorded or pictorial information describing, defining, procedures or results.

Defect:Non-fulfillment of an intended usage requirement or reasonable.

Design Control: The verification that design criteria comply with specified requirements; that design data and methods are valid for the range of application; and that the completed design satisfies the design criteria.

Design Review:A documented, comprehensive and systematic examination of a design to evaluate its capability to fulfill the requirements for quality identify problems, if any and propose the development of solutions.

Work will be held until the inspection or test has been satisfactorily completed.

Improvement:Actions taken by FIREFREEZE to increase the effectiveness and efficiency of activities and processes in order to provide added benefits to both FIREFREEZE and its Sub-contractors.

Inspection:An activity such as measuring, examining, testing or gauging one or more characteristics of an entity and comparing the results with specified requirements in order to establish whether conformity is achieved for each characteristic.

Non-conformity:Non-fulfillment of a specific requirement. The definition covers the departure or absence of one or more quality characteristics (including dependability characteristics), or quality system elements form specified requirements.

Procedure:A specified way to perform an activity. In many cases, procedures are documented (e.g. quality system procedures). When a procedure is documented, the term “written procedure” or “documented procedure” is frequently used.

Page 76: Pre Qualification -Firefreeze - 2014a

Product:Result of activities or processes.

1. A product may include service, hardware, processed materials, software or a combination thereof.

2. A product can be tangible (e.g. assemblies or processed materials) or intangible (e.g. Knowledge of concepts) or a combination thereof.

3. A product can be either intended (e.g. offering to customers) or unintended (e.g. Pollutant or unwanted effects.)

Quality:The totality of features and characteristics of a product or service that leads to customer satisfaction. In other words, “degree to which a set of inherent characteristics fulfill requirements”.

Quality Policy:The overall intentions and direction of an organization with regard to quality, as formally expressed by top management.

Quality Management:All activities of the overall management function that determine the quality policy, objectives and responsibilities, and implement them by means such as quality planning, quality control, quality assurance and quality improvement with FIREFREEZE. In simple “coordinated activities to direct and control an organization with regard to quality”.

Quality System:FIREFREEZE organizational structure, procedures, processes and resources needed to implement quality management.

Quality Assurance:All the planned and systematic activities implemented within FIREFREEZE quality system, and demonstrated as needed, to provide adequate confidence that an entity will fulfill requirements of quality.

Quality Control: FIREFREEZE employs operational techniques and activities that are used so that its operations and services conform to the quality requirements as laid down in Company’s documents.

Quality Plan: A document setting out the specific quality practices resources and sequence of activities relevant to a particular product, service, contract or product.

Page 77: Pre Qualification -Firefreeze - 2014a

Quality Audit:A systematic and independent examination to determine whether quality activities and related results comply with planned arrangements and whether these arrangements are implemented effectively and are suitable to achieve objectives.

Repair:Action taken on a non-conforming product so that it will fulfill the intended usage requirements although it may not conform to the originally specified requirements.

Repair is one type of disposition of a non-conforming product. Repair includes remedial action taken to restore, for usage, a once conforming but now non-conforming product.

Review:An independent assessment undertaken by an individual or group for the area under review.

Rework:Action taken on a non-conforming product so that it will fulfill the original requirement. Rework is one type of disposition of a non-conforming product.

Safety-related:Pertaining to those items of plant, the satisfactory performance of that is important to the prevention of consequences of such accidents.

Specification:The document that prescribes in detail the requirements with which the product or service has to comply.

Standard:A document approved by a generally recognized body that results from the process of formulating and applying rules for an orderly approach to a specific activity.

Service:The result generated, by activities at the interface between the supplier and the customer and by supplier internal activities, to meet customer needs. Personnel or equipment may represent the supplier or the customer at the interface. Customer activities at the interface with the supplier may be essential to the service delivery. Delivery or use of tangible product may form part of the service delivery. A service may be linked with the manufacture and supply of tangible product.

Service Delivery: Those supplier activities necessary to provide the service.

Page 78: Pre Qualification -Firefreeze - 2014a

Supplier:Any individual or organization that furnishes items or services to a procurement document. An all-inclusive term that may be used in place of any of the following: Vendor, Seller, Contractor, Fabricator, Consultant and Sub-tier levels.

Test:The determination or verification of the capability of an item to meet specified requirements by subjecting the item to a set of physical, chemical, environmental or operating conditions.

Witness Point:The inspection (notified in advance) will be witnessed by inspection of QC staff. Work may proceed even if the QC personnel have not witnessed the test.

4. PROJECT QUALITY MANAGEMENT SYSTEM 4.1 General Requirements Before starting the project execution, FIREFREEZE shall identify all processes involved in the project. FIREFREEZE shall identify the sequence and interaction of these processes, resources required, information required to support the execution, monitor and measure and analyze these processes, etc. FIREFREEZE submit its Project Quality Plans to COMPANY Representative for review and approval prior to the scheduled start date of the procurement, construction and pre-commissioning phases as specified in the Work Schedule provided in Schedule. Moreover, the Quality System described in the Quality Plan demonstrates that FIREFREEZE has a planned and systematic approach for obtaining and maintaining quality. It shows that personnel have the necessary training to perform their work and definitions for quality and quality related activities are reflected in the documented system and represent FIREFREEZE interpretation to suit its own objectives. Prior to commencement of any activity, FIREFREEZE shall designate one qualified personnel as Project Quality Assurance/Quality Control Manager/Engineer who from his other responsibilities shall be responsible for Implementation and Monitoring of project quality Management System.4.2 Documentation Requirements The hierarchy of the quality management system to be applied for this project mainly consists of three main levels of documents, which are described below:4.2.1 GeneralThe project quality plan documentation is structure in the order of precedence

Page 79: Pre Qualification -Firefreeze - 2014a

4.2.2 Project quality plan 4.2.2.1Project quality plan Level 1Project Quality Plan (PQP) which states the overall quality management systems project specification and in which the project quality policy has been published. PQP is supported by a comprehensive series of Integrated Management System Standard Operating Procedure (SOP) that define in detail, the standard approach that shall be adopted. Wherever necessary, project specific procedures shall be prepared as supplement or otherwise developed and defined operational quality activities contains in the existing procedures.

The Project QA/QC Manger or his designate in consultation with the Project Manager shall review and update the PQP, as necessary, to ensure that it matches with the scope of work. Any such modifications shall be agreed by Project Manager and approved by QHSE Department Manager (as appropriate) prior to submission for FIREFREEZE Approval.A list of the following is attached at the end of this PQP:

Audit Schedule. Processes. Inspection and Test Plan- Project Specific. Standard Operating Procedures – Project Specific. Method of Statement / Work Instructions- Project Specific.

4.2.2.2IMS Company procedures (Level2)Standard Operating Procedure (SOP) which describes the responsibilities and methods to be followed for carrying out various activities and task in adequate manner. These procedures define how the requirements of applicable clauses of ISO 9001:2008 are applied to the services. These are confidential and their circulation is restricted to internal use without authorization. 4.2.2.3 Work instructions (Level 3)Work Instructions (WI) for the execution of specific activities on the project form level 3 of the IMS. It includes drawings, Welding Procedures, Construction method statements. The preparation and control of above-mentioned documents shall be included in project requirements as appropriate.4.2.3 Control of DocumentsFIREFREEZE has an established maintained procedure for control of all documentation relating to the Project Quality Plan.

All essential documents affecting quality shall be reviewed for adequacy and approved for release by project QA/QC Manager.FIREFREEZE shall make the applicable issues of such documents based on the contractual freeze date available at all functional areas, inspection and test points where they apply so they are readily accessible to the personnel concerned.

Page 80: Pre Qualification -Firefreeze - 2014a

The issue, control and recall of all engineering documents, is under the jurisdiction of the project QA/QC Manager. Inspection and Test Plans and other related instructions (ITP & IC) shall be issued by the project QA/QC Manager.Test Reports shall be prepared and issued by Discipline Quality Control personnel. The system of documentation and data control shall ensure that essential drawings, technical requirements, contract change information, inspection instructions, specifications or any other document required by Quality Management, are available at the time and place of the operation.Approved IMS documents (latest issue) – Forms, etc. shall be distributed by the QHSE Department Manager to all locations, where required, for the effective functioning of the Quality Management System.

All changes to these documents shall be implemented in writing and processed in a manner that ensures prompt action at the specified locations. Changes to documents shall receive the same authorizations as the original documents. Records shall be

maintained for changes as they are made. Provision shall be made to promptly remove obsolete documents from all points of issue and activity locations.

4.2.4 Control of recordsRecords are generated and maintained in order to demonstrate achievements of the required quality of the products and effective operation of the documented Quality System.The records to be generated during a process are defined in the Quality plan, Process Document and Work Instructions. The records are stored and maintained in a way, which would prevent damage, deterioration or loss and are readily retrievable. Identification, collection, indexing, filling, maintenance and retention are carried out by authorized persons, as per relevant Process Document and Work Instruction.

Method of retentionThe records are identified date-wise, customer- wise, supplier/client –wise, component code-wise as the case may be.Every effort will be made by FIREFREEZE to cultivate joint working relationships with Client, to enable an open and free exchange of information, in order to ensure that the project is completed safely, on time, within budget, to the required quality and in conformity with all applicable statutory/Legislative requirements, commitment to achieve client satisfaction.5.4 Planning5.4.1 Quality Objectives The quality objectives for the project are as follows:

a. Project Quality Performance Index

Page 81: Pre Qualification -Firefreeze - 2014a

b. Equipment’s/Material Delivered to Site: Zero EDR c. Weld Rejection Rate (on joint basis): <5.0% on Weekly basisd. Weld Rejection Rate (On Linear basis): <1.0% on weekly basis e. RTFI Assessment Disagreement: <5.0% f. Client NCR 0g. Client Worksheet: 0h. Non-Authorized Manufacturers 0i. Inspection acceptance rate of RFI Shall be more than 95%

5.4.2 Quality Management System Planning In order to achieve the project quality policy, the commitment of policy statement is translated in terms of SMART (Specific, Measurable, Achievable, Relevant and Time Framed) or SWOT (Strength, weakness, opportunity, threat) Project Quality Objectives for each functional activities and are communicated to the relevant personnel to continuously monitor and periodically measure the achievement. It is ensured that the defined objectives are in the service and other business requirements. These objectives reflect the following principles;

Improve service quality by comparing the service quality of projects and maintain a better completion time compared to our competitors.

Identify and implement improvements within the quality management system by utilizing the systems and through involvement of the employees.

Reduce the wastage of raw materials and other resources. Maintain the Integrity of the project quality system.

5.5 Responsibility, Authority This section of the Quality Plan sets forth the organizational arrangement employed by FIREFREEZE in providing support services and in executing projects they undertake. It also defines the organizational relationship, responsibility, authority and lines of communication of the Quality Management function.In providing effective management of projects and support services, FIREFREEZEassures optimum use of manpower, technological and financial resources utilizing expertise from a variety of disciplines to meet the requirements of their customers. Such expertise is developed in engineering and construction techniques.To this end, FIREFREEZE has an obligation to ensure that the final product i.e. “result of activities or processes meets its fitness for purpose” and has been carried out in accordance with the Job Specification and is consistent with design requirements. The overall organization for the project shall be in accordance with the organization chart attached to this Project Quality Plan.

Page 82: Pre Qualification -Firefreeze - 2014a

FIREFREEZE Site organization consists of the following: Project Manager Construction Managers Project QA/QC Manager QA/QC Supervisor Procurement /Material Engineer Project Engineers Planning and scheduling Engineer QC Inspectors for various disciplines Document Controllers

The mobilization of key personnel shall be as per approved mobilization plan. As a general principle, only trained, qualified and experienced personnel shall be assigned to the work.The Project QA/QC Manger shall has close liaison with Project Manager concerning day to day project execution matters and QHSE Department Manager with reference to QA/QC and HSE related problems that require FIREFREEZE Management resolution. All project QA/QC personnel shall be made available for interview with FIREFREEZE, ifrequired, prior to assignment ensuring they meet the Client requirements. 5.5.1 Responsibility and Authority The organization of the Company has been defined and is illustrated in Appendix of this project quality plan.The responsibilities, authorities of personnel and their communication have been defined and documented in order to facilities effective quality management system. The duties, responsibilities of the key personnel are as follows: Project Manager Project Manager has the overall authority and responsibility for all aspects of the Project.His responsibilities include but are not limited to the following:

Representation of towards Company for all matters relating to the Contract. Overall management of the project activities and control of the related personnel. Approval of the Project Master Schedule and control of its fulfillment. Implementation of any step that may be required to prevent or minimize delays

budget over-running, conditions adverse to quality objectives. Submittal of progress reports to the Client. Coordination and supervision of activities of the subcontractors.

Page 83: Pre Qualification -Firefreeze - 2014a

Maintenance and coordination of contacts with the local authorities for all matters related to the work execution.

The above task will be achieved by coordinating activities of the Project Personnel. Project QA/QC ManagerThe Project QA/QC Manager directs activities of the Project Quality Organization, reporting to QHSE Department Manager.His responsibilities include but are not limited to:

Preparation, review, updating and distribution of the Project Quality Plan. Issue of Project Quality Control Procedures, Inspection and Test Plans and Forms. Review of Quality documentations issued by FIREFREEZE. Assignment of Quality related tasks within the framework of the project. Review of Inspection Reports and Non-conformance Reports, if any. Evaluation of Suppliers/Sub-contractor’s Quality systems. Verification, by means of a planned Audit schedule that Sub-contractors are

implementing the established Quality Program. Verification by means of a planned Audit schedule that the requirements set in the

Quality Plan is met. Coordination and supervision of activities related to the collation of the “Project

Record Books”. Determine and inform to the Project Manager the principal causes of quality loses. Determine with the Project Manager where improvements are required and where

necessary, recommending corrective action. Managing Quality Control functions for the Project including planning of Quality

Control inspections and preparation of reports controlling corrective actions Assign Quality Control personnel to various areas of activity. Monitor inspections

progress; review Inspector’s reports and documentation. Upon completion of the work, ensure that all requirements have been met and the required Quality records have been collated and filed.

Monitor on day-to-day basis, and review the deviations reported, if any, with the approved quality plans(s).

Following a suitably start and approved procedure for the formal control of deviation/waivers from the project specification.

Review and approve as necessary, quality related procedures such as: - Welding procedure specifications & welding procedure qualifications.- Welder qualifications NDT procedures. - Heat Treatment Procedures Cleaning and Pressure Testing Procedures.

Page 84: Pre Qualification -Firefreeze - 2014a

- Preservation Procedures. Monitor the content and consistency of subordinate’s daily inspection activities. Preparation and submission of “Two Week look Ahead Schedule” for both

construction and procurement phases as per “Client” requirements. Preparation and submission of “Monthly Management Review Reports” on monthly

basis as per the requirements of “Client”. Establishing Inspection and Test Plan for procurement, construction and

commissioning phases as required by ‘Client. Procurement and Project Inspection, witnessing, & monitoring in accordance with

the approved inspection and test plan. Note: Supervisor and discipline inspectors support the Project QA/QC Manager. Construction ManagersThe Construction Manager controls and coordinates all Work activities carried out in the construction site. His responsibilities include but are not limited to:

Establishment and implementation of work procedures for the execution of work. Review detailed construction schedule, including redefinition of priorities, where

necessary. Control and coordination of the work entrusted to Sub-contractors. Planning and scheduling of the work force and equipment. Review of the materials delivery schedule. Preparation of data required for compilation of the Work Progress Report. Preparation of the change order proposals. Assistance to the Project Manager in discussions with Company (Client)

QA/QC SupervisorThe duties and responsibilities of QA/QC Supervisor. QUALITY

Prepare Inspection and Test Plans, Inspection Check-Lists, Work Instruction etc., in accordance with project requirements.

Prepare / review of quality Procedures for special process such as welding, NDE concreting, refectory, RTR pipe–work etc.

Implement and monitor Quality procedures, monitor, and control and supervise inspection activities.

Page 85: Pre Qualification -Firefreeze - 2014a

To prepare and submit “Two Week look Ahead Schedule” of all inspections and activities for both construction and procurement phases as per the requirements of “Client”.

To highlight all the QA/QC concerns and issues during the “Weekly Project Progress Meetings”.

To make sure the distribution of only control documents (Quality records, Procedures, Instruction and IFC drawings) within the quality department and at site.

Co-ordinate with construction group, Company representative and / or third party inspection agency to perform stage inspection in line with the approved Inspection & Test Plans, Inspection Check-list etc.

Monitoring the implementation of Receiving Inspection, Identification and Traceability of all materials for the project.

Monitoring the use of proper calibration instruments at proper location for delivering inspection activities.

Control of Non-conformance and corrective as well as preventive action. Identify the activities where improvement can be done.

Procurement / Materials Engineer The Materials Engineer reports to the Project Manager. His responsibilities include but are not limited to:

Receiving inspection and record keeping of all material-both ‘free issue’ from Company and FIREFREEZE supplied material and purchased material.

Reporting of non-conformances, the monitoring of careful segregation of quarantined material and rectification of defects and clearance of materials from quarantine.

Assuring the traceability of uniquely identified critical materials while materials are in storage.

The monitoring and recording of the condition and state of preservation of materials at store until released for processing and /or construction.

With the assistance of Construction personnel, perform maintenance of equipment and materials at store as per approved procedures.

Procurement Quality Control Supervisor He shall report to Project QA Manager. His responsibilities include but are not limited to:

Review of requisitions dossier for compliance with contract requirements and submit to Company for review.

Preparation of inspection assignment packages. Review of sub-vendors quality procedures. Establish agenda for pre-inspection meeting.

Page 86: Pre Qualification -Firefreeze - 2014a

Ensure inspection assignment packages are correctly distributed. Scheduling and coordination of source inspection Assist Vendor inspectors in all aspects of their work to ensure that all project

requirements are fulfilled and that all inspections required are carried out and correctly recorded.

Drawing and Document Controller The Drawings and Document Controller assists Project Manager and Project QA/QC Manager for all the information concerning the Project Documents.His responsibilities include but are not limited to:

Promote the formal management of the information system. Record and manage incoming and outgoing Technical documents. Distribute documents in a “Controlled” manner.

Discipline QA/QC Inspectors (civil, mechanical, HVAC, Painting, communication, electrical, instrumentation, etc.)The Quality Control Inspectors for various disciplines report to Project QA/QC Engineer.His responsibilities include but are not limited to:

Ensure compliance with the requirements of the contract scope of work, technical specifications and contract quality plan insofar as it applies to: - Civil construction job

(Excavation, backfilling, concreting, asphalting etc.)- Structural work - Piping installation - Instrumentation work - Electrical work- Painting work- Welding work

Assisting the Procurement/ Material Coordinator in the task of overseeing final dimension checking.

Reporting both verbally and in writing any non-conformance discovered. Reporting daily a descriptive of each day’s work. Conduct weekly QA/QC Toolbox meeting. Conduct of inspection as per FIREFREEZE ITPS & SAICs etc. Shall report/coordinate with personnel for witnessing all inspections and acceptance

of the work items.

Page 87: Pre Qualification -Firefreeze - 2014a

5.5.2 Internal communication FIREFREEZE has an established internal communication system. The communication within the Company takes place in various formats, such as internal internet facilities, memos, letters, internal meeting with concerned personnel, non-conformance reports and management review meetings to ensure effectiveness on the quality management system.The Project Manager conducts a meeting once in month at the project site along with concerned site personnel to ensure effective implementation of quality system processes/procedures. The conclusion of the meeting or action required to be taken is recorded and distributed accordingly by the site Secretary. 5.6 Management Review

A Management Committee, that comprises the senior executives of FIREFREEZE shall monitor and review project specific quality systems and continued effectiveness of FIREFREEZE QMS.The Project QA/QC Manager, who shall be responsible for setting the agenda and recording of minutes, shall convene the meeting at approximately six months intervals.These management reviews are additional to the findings of internal audits conducted to ensure continued adherence to the system.The Management Review shall:

Ensure that management quality policy objectives, assignments, delegations and methods are achieving the required results.

Reveal defects or irregularities in any of the elements examined. Indicate possible improvements. Check on the effectiveness of Management at all levels. Uncover potential danger spots to eliminate waste or loss. Examine the complaints received from customers/end users. Verify that corrective action procedures are effective.

FIREFREEZE shall ensure that Senior Management Reviews are scheduled event included in the quality audit schedule approved by Company Representative.

FIREFREEZE shall inform the Company Representative in writing of the results and recommended actions of Management reviews within two (2) weeks after the scheduled review date. Changes to the Quality System that result from Management Reviews shall be incorporated in the project Quality Plans, with the approval of Company Representative.

Page 88: Pre Qualification -Firefreeze - 2014a

6. RESOURCES MANAGEMENT 6.1 Provision of Resources Resources are identified primarily through quality planning stages, also it is identified during as and when needs arise. Based on the quality planning & needs, resources are provided.Main aim of this exercise is to have adequate resources:

To implement and maintain the quality management systems. To continually improve the quality management system effectiveness. To ensure customer satisfaction through consistent achievement of customer

requirements.FIREFREEZE shall be responsible for maintaining up-to-date procedures for his area of management.FIREFREEZE identifies the requirements of resources including competent/trained personnel, equipment, machine, and software, with regards to meeting the project quality plan requirements.6.2 Human Resources 6.2.1 General Job Description is defined for each position in the organization, which will be independently handling the activities; which affect the product or service quality and hence contributes to customer satisfaction. The profile shall include the minimum academic qualification, training undergone, skill, industrial experience, certification, etc. required for the position. This job description forms the basic input for the recruitment. It is ensured that the competence of all potential recruits is complying with those defined in these job descriptions.6.2.2 Competence, awareness and training All new employees are given an induction training (to an extent necessary as per their responsibilities) to familiarize the organization, its business operations, Established QMS, etc. Quality documents relevant to one’s job are issued to the employees, whenever required. New employees are assigned to an existing employee for “on-job” training, if found required. The performance of all employees is reviewed by the reporting superior, at least once in a year; to identify the training need required for the employee. The identified training is reviewed and feasible trainings are provided in co-ordination with external agencies, wherever required.

Page 89: Pre Qualification -Firefreeze - 2014a

Upon completion of the training, the effectiveness of the training is evaluated through one or more of the following methods:

Based on the quality of material presented in the classroom. Certificates of completion for externally provided training. Measuring process outcomes before and after training. Performance monitoring and reviews of new hires.

The Project Manager shall be responsible for assessing the training needs of personnel assigned to the project team. Any training needs shall be arranged in conjunction with the HR & A Manager. HR & A Manager or his coordinator shall arrange for updating the training records in employees personnel file.

— Recruiting Process — Performance Management System Process — Training & Development Process — Leave Application / Vacation Process

6.3 Infrastructure Infrastructure for the project is maintained as required and as appropriate to the location and operations. The management has planned, implemented, provided and shall periodically review the infrastructure needs.

Office Facilities. Facilities associated with Office. Equipment’s & machinery — Hardware & Software. Support Services — Transportation, Communication, etc.

The adequacy of such infrastructure is reviewed during the Management Review Meeting and any additional requirements are identified and made available.6.4 Work Environment Work Environment is maintained as per the requirements and as appropriate to the operations. Department Managers are responsible to identify these requirements and provide the same. Most significant areas are:

• Facilities• Health and Safety• Housekeeping

• Work Ethics

Page 90: Pre Qualification -Firefreeze - 2014a

7. PRODUCT REALIZATION 7.1 Planning of Product Realization All the product & services requirements are determined as per Client needs and guidelines. For existing/new product & services proper quality planning are done.Once a contract is signed, it is turned over to the Project Team. The flow of information both at the Home Office and to/from the Field Site shall be established. This process is further detailed by description of the following functional groups responsible for the process:

Project Management Engineering QA/QC Purchasing Project Controls Environmental Health & Safety

7.2 Customer Related Processes7.2.1 Determination of Requirements Related of the Product/Service Service requirements are identified based on the following:

Stated requirements specified by customer. Implied requirements not specified by customer but necessary for specified or

intended use. Statutory and regulatory requirements related to the service.

Activities such as inquiry receipt, estimation, providing the quotation/proposal, order receipt, handling order amendments, etc. are carried out by the Sales & marketing. 7.2.2 Review of Requirements Related of the Product/Service Prior to the submission of the quotation/proposal, acceptance of order/contract and acceptance of the amendments in accepted order/contract, a review of requirements of the product & service is conducted to ensure that:

Product & Services requirements are clearly defined. All the ambiguities and queries are resolved with the Client.

FIREFREEZE has the ability to meet the requirements Where documented requirements are not provided by the customer, the customer is consulted with the requirements proposed by FIREFREEZE and customer approval is obtained for such requirements. In case of changes to the requirement, concerned documents are amended and circulated to the personnel involved in the product & service provision and support activities.

Page 91: Pre Qualification -Firefreeze - 2014a

Service order, Contracts7.2.3 Customer Communication Customer communications are practiced in the following modes:

Requisitions, Client enquiries, tenders, orders/contracts and amendments are handled as per process description.

Meetings, Discussions, etc. during visits by staff at the customer premises. Through identifying customer feedback (complaint, appreciation, satisfactory job

completion, etc.) Suitable records of such communications are maintained. 7.2.3.1Technical requirements All technical requirements forming part of the contract shall be identified, reviewed, confirmed as acceptable or for further negotiation and record. These shall include as applicable:

Work scope. Technical standards or specifications to be followed. Space, loading and environmental requirements. Company supplied product/services/information of any type, e.g. Standard drawings

or details, standard specifications, materials, equipment, etc. Use of methods of analysis specified by Company. Regulatory requirements.

7.2.3.2Project program – Delivery schedules Key dates for delivery of documents, drawings, and material/equipment shall be reviewed, confirmed as acceptable or for further negotiation, and record.7.3 Design and Development FIREFREEZE Quality Management System shall ensure that design and development is a controlled function. Procedures shall be established and implemented that assure activities are performed effectively and efficiently.FIREFREEZE ensures that design decisions are made by authorized qualified agencies that are in possession of or have access to the pertinent design criteria, contractual requirements, codes, regulations, standards and guidelines.Essential design considerations, calculations and decisions are precisely, clearly and completely documented in design documents, such as design calculation sheets, specifications, drawings, computer programs, documented quality procedures and instructions, those are free of ambiguities and conflicting requirements and conform to all governing standards and system procedures for such documents. Design documents and the design concepts and requirements expressed therein, are subjected to review and approval by qualified personnel, other than those who did the

Page 92: Pre Qualification -Firefreeze - 2014a

original design, with clearly designated responsibility and authority to do so, prior to release for purchasing, fabrication or construction.Design approvals are based on one or more of the following:

Evidence of related experience. Independent review of analysis and calculations involved in design concepts and

decisions. Other appropriate and adequate objective evidence that the design criteria. And documentation requirements have been satisfied.

FIREFREEZE engineering department shall also review independently essential aspects of the design by third parties.Design documents shall identify those items of the design that are crucial to its safe and proper functioning and specify the quality standards to which these items shall be produced. Deletions, additions and changes to design documents, subsequent to approval for release shall be identified and documented.Deviations from the requirements of design and contract documents, including designated quality standards, shall be subject to the same authorizations as the requirements involved.Incomplete, ambiguous, or conflicting requirements shall be resolved by those responsible for generation and approval of the requirements.In order to control and verify the design of products to meet the criteria as cited above, FIREFREEZE shall implement and operate design controls.7.4 Purchasing Supply of raw material, fabrications, services and finished items shall be processed from acceptable suppliers.To the extent practical, FIREFREEZE will procure its equipment and material from Company approved sources as per “SABIC”, attachment IV. Company shall approve alternative sources for material identified in Company’s Regulated Vendors Lists (RVL) prior to placing of purchase orders. Other sources for material selected by purchasing function shall be evaluated and approved by project QA/QC Manager prior to placing them on the acceptable supplier/sub-contractors list. Material, for which inspection requirements are specified on Company Form 175, shall be evaluated as specified in Schedule.The extent of control over purchasing includes quality surveys and monitoring at the supplier’s premises as required.Material Requisition and/or Purchase Orders shall be reviewed and endorsed by the Project QA/QC Manager to the extent required to ensure that all pertinent drawings, specifications and complete information relative to the item(s) procured are listed and that the sources of supply have all the data required to supply goods of an acceptable

Page 93: Pre Qualification -Firefreeze - 2014a

quality. All purchase orders and associated reference data shall be available for review by Company when requested. Project QA/QC Manager shall review all procurement documents prior to release to Company to assure that the appropriate quality levels are designated for materials or services purchased.Project QA/QC Manager shall evaluate all purchased items where any of the following conditions apply.Inspection of quality characteristics cannot be verified during subsequent processing or would require destructive testing Inspection is necessary to verity that specific processes, tests or inspections required by the supplier were adequately accomplished Inspection at any other point would destroy or require the replacement of costly packaging materials Amendments to the purchase orders (PO) shall be processed in the same way as the original with reference made to the original PO. 7.5 Production and Services Provision7.5.1 Control of Production and Services Provision FIREFREEZE shall carryout the project under controlled conditions with known information of project. The work instruction or construction method of statement will be constituted of the project quality plan.7.5.2 Validation of Processes for Production and Services Provision Validation of processes shall demonstration the ability to achieve planned results and such special processes will be perform by qualified personnel either using documented procedures or under continues monitoring. 7.5.3 Identification and Traceability FIREFREEZE shall establish and maintain systems that:

Identify each item (lot, component or part) to the applicable drawing, specification or other technical document, from receipt through fabrication and construction.

Assign to each item a unique identification. This will distinguish those items that are otherwise identical, but have been produced in separate batches. Record this identification on all process, inspection and test records where traceability is specified.

Ensure alloy steels, stainless steel or non-ferrous alloys in contact with service fluids are tested for Positive Material Identification.

FIREFREEZE Traceability System shall operate from the specification of the material through its manufacture to its inclusion as finished product in a facility, pipeline or platform.FIREFREEZE Traceability requirements shall be kept to the minimum consistent with the safe and efficient operation of the installation concerned, and shall only be applied when failure of the equipment or material could result in a hazard to persons or the environment, or a significant loss of production output.

Page 94: Pre Qualification -Firefreeze - 2014a

7.5.4 Customer property FIREFREEZE shall establish and maintain procedures for the verification, storage and maintenance of Company or FIREFREEZE supplied product such as equipment and material, information and data supplied by the customer, which shall be incorporated into the work. Product realization.FIREFREEZE procedure shall set out details of verification to be carried out on receipt of any Company supplied items. It might require the QC Inspector, in consultation with leaders of any other disciplines involved, to determine the extent of verification requiredin order to satisfy the project requirements, so far as this is possible, as to the suitability/accuracy, and so on, of the Company supplied items.7.5.5 Preservation of product Handling, storage, preservation and delivery A system shall be maintained for the handling, storage and shipping, including cleaning, packing and preservation of all items through the entire manufacturing and construction process. Precautions shall be taken to protect material from abuse, misuse, damage, deterioration and unauthorized use.Items subject to deterioration or corrosion due to environment shall be cleaned and preserved to fully protect at all times. The responsible inspector in the particular discipline shall monitor handling and marking of parts during construction/installation.Unsatisfactory conditions shall be brought to the attention of the project QA/QC Manager for resolution.Suspected items shall be placed on “Hold” and transferred to a restricted storage area until acceptability is established or other disposition arranged.Restricted storage areas shall be made available for the isolation and protection of accepted raw material, semi-finished parts and finished parts pending use or shipment.FIREFREEZE shall develop and maintain procedures for handling, storage and preservation of all material and equipment.For critical, sensitive, perishable or high-value items, specific written procedures shall be used. Handling tools and equipment shall be provided and controlled as necessary to ensure safe and adequate handling.Where preservation and/or packaging are disturbed, it shall be restored to its original condition unless other appropriate and acceptable storage arrangements have been made.To prevent deterioration, items in stock shall be inspected periodically for condition or shelf life expiry.Data concerning, handling storage and preservation shall be included on the Monthly Material Procurement Status Report as specified in Schedule.

Page 95: Pre Qualification -Firefreeze - 2014a

7.6 Control of monitoring and measuring devices All Inspection, measuring and test equipment and devices used to determine

conformance to FIREFREEZE specification, including that used for welding, nondestructive testing, dimensional control, pressure testing, coating thickness, shall be controlled, calibrated and maintained with an established written calibration and maintenance schedule.Equipment/instrument shall be calibrated and certified by approved facilities having standards traceable to “National Standard”. Where no National Standard exists the basis employed for calibration shall be documented. Records shall be evaluated periodically to ascertain adequacy of inspection intervals presently in use. The system shall be designed to ensure all measurement resources have the capability of making measurements within limits designated as appropriate to these requirements. It shall provide in the prevention of inaccuracy by prompt detection of deficiencies and timely action for their correction.All measuring and test equipment and devices having an effect on quality shall bear a tag, sticker or other suitable marking, indicating status. The validity of previous inspection and test results when measuring and test equipment are found be out of calibration shall be assessed and documented. The standards and masters shall be made available for verification by Company.Equipment and devices used for measuring, testing and inspection shall require an initial inspection for accuracy, or shall be proven prior to release for use on production.The system shall provide for a pre-planned calibration frequency chart showing all applicable test and inspection equipment, calibration frequency and status. In no case shall equipment/instrument calibration cycles exceed six (6) months per Schedule. 8. MEASUREMENT, ANALYSIS AND IMPROVEMENT 8.1 General FIREFREEZE has established and implemented the required processes of the quality system to demonstrate conformity of the product/project and to continually improve the effectiveness of the quality management system.8.2Monitoring and measurement 8.2.1 Customer satisfaction FIREFREEZE attaches critical importance to satisfy the client’s requirements. The method for obtaining information relating to the client’s satisfaction is either by conforming appreciation letter, awards / repeated order from the client or meeting with the client’s personnel before and/or after completion of the project as appropriate.8.2.2 Internal Audits Third Party Client Approved Lead Auditor as appropriate shall establish, document and implement a plan for audits that shall objectively evaluate the effectiveness and adequacy of the functions, systems and procedures as referenced in this Project Quality Plan.

Page 96: Pre Qualification -Firefreeze - 2014a

The audit plan shall define: The functions, systems and procedures to be audited. Schedule of audits. Method of reporting findings and recommendations and corrective and preventive

actions. The means for having corrective actions agreed upon an implemented.

FIREFREEZE shall submit a quality audit schedule to Company for review and approval within 30 calendar days from effective date of the Contract. Audits shall be carried out at fifteen percent (15%) and sixty percent (60%) of completion stage for design, procurement and construction WORK phases. This schedule is a part of the Project Quality.Audits shall include an evaluation of:

Activities, processes, work areas, items and services being produced. Quality practices, systems, procedures and instructions.

Certification documents and records.Audits shall be performed in accordance with documented procedures and checklists that identify essential characteristics.Personnel performing audits shall not have direct responsibility for the areas being audited. The minimum requirements of the auditor shall be as per Client requirements.Management responsible for the area audited shall review, agree and correct deficiencies revealed in the audit reports. All actions taken to correct deficiencies shall be re-audited to verify compliance and a close out report issued.FIREFREEZE shall submit to Company a copy of each audit report within two (2) weeks of its completion. 8.2.3 Monitoring and measurement of processes8.2.3.1 Inspection and inspection schedule A 2-week look ahead schedule for procurement, construction and pre-commissioning phases including current week Inspection Schedule shall be submitted every week to the Company to schedule their inspection activities. 8.2.3.2 Inspection and test plan – Guidelines to prepare ITP FIREFREEZE shall use Client typical Inspection Plans (ITP) that indicates the QC activities necessary to verify that the work has been carried out in compliance with the technical and quality requirements set out in the Contract.The approved and relevant inspection Checklist (ICs) shall be utilized for the project.Process Description will briefly describe the process e.g. welding, coating, etc.

Page 97: Pre Qualification -Firefreeze - 2014a

Quality Control requirements. Brief description of the inspection or test, that verifies compliance with specified requirements notification requirements, for Request for Inspection (RFI). 24 hr., 48 hr., etc.Responsibilities - identifies the personnel responsible for each item. Applicable procedures. Identify the specific procedure used for this particular quality control activity. Acceptance Criteria will be the acceptance criteria specified in the Technical Specification for the QC activity undertaken. This can be a value or specific reference to a national, Company or Contractor standard. Verifying Document will be the document that is produced as objective evidence that the component or equipment or test has been inspected in accordance with and complies with the specified requirements (e.g. checklist, test report, etc) .

Page 98: Pre Qualification -Firefreeze - 2014a

9 : Project Reference

Page 99: Pre Qualification -Firefreeze - 2014a

LIST OF PROJECTS Completed By M/s FIREFREEZE Formerly Khaldi World Communication & Protection is as follows :

Sr.No.

Project Client Description Of Project Work

1 Addressable Fire Alarm System in Water Desalination Plant

SWCC – Al Khobar

Installation , Testing , Commissioning of Addressable fire Alarm panel along with detectors, bells etc.

2 Door Holders in Trenches for Fire Protection System

SWCC – Al Khobar

Installation of Automatic magnetic door holders in cable trenches for fire protection system.

3 FM-200 fire Protection System & Addressable Fire Alarm System in Ibn Zahr Sub Station

SaudiEuropean

Petrochemical Co. (Ibn Zahr )

MainContractor :

ABB

Installation , Testing , Commissioning of FM-200 Fire Protection System and Addressable Fire Alarm System along with all equipment .

4 FTH Computer Room SWCC – Jubail Re-installation of Halon Control Panel & BGT boxes in FTH Computer Room at Saline Water Conversion Corporation-Jubail Plant

5 Emergency Warning Siren System

SWCC – Al Khobar

Supply, Engineering, Installation, Testing and Commissioning of New Emergency Warning System in Turbine Halls of SWCC Plant and Integration of same with Fire Alarm System

Page 100: Pre Qualification -Firefreeze - 2014a

LIST OF PROJECTS Completed By M/s FIREFREEZE Formerly Khaldi World Communication & Protection is as follows :

Sr.No.

Project Client Description Of Project Work

6 Refixing Of Fire Alarm System

SWCC-Jubail Refixing of conduits and Renewal of Existing System.

7 FM-200 Fire Protection System

SHOW TIME Supply, Engineering, Installation, Testing & Commissioning of FM-200 fire protection system at their facility in Al Khobar

8 Water Sprinkler System National Gases Company

Installation , Testing and Commissioning of Water Sprinkler System in Administration Building of National Gases Company

9 Fire Alarm System / Fire Fighting System

Fire Fighting Main

Contractor

Installation of fire Alarm and fire protection system on various projects for other main contractors.

10 Hazardous Chemical Warehouse

SWCC – Al Khobar

Installation of fire Alarm and Gas Detection system in Hazardous Chemical Warehouse.

11 Deluge Foam Spray System – Helipad

Al Mansouryah Est.

Installation of Deluge Foam Spray System on Helipad in King Fahd Specialist Hospital.

Page 101: Pre Qualification -Firefreeze - 2014a

LIST OF PROJECTS Completed By M/s FIREFREEZE Formerly Khaldi World Communication & Protection is as follows :

Sr.No.

Project Client Description Of Project Work

12 Fire Alarm System & Gas Detection System

SWCCAl Khobar

Installation of fire Alarm and Gas Detection system in New Hydrogen Plant.

13 Fire Alarm System ARAMCO / AFI

Supply , Testing & Commissioning of fire Alarm System in Bachelors Building Tanajib.

14 Fire Alarm System AFI Supply , Testing & Commissioning of fire Alarm System in Rubber Factory Dammam.

15 Gas Detection System Petrokemya / Binzagr

Supply , Testing & Commissioning of Gas Detection System in Olefins-I of Petrokemya.

16 Gas Detection System Petrokemya / Binzagr

Supply , Testing & Commissioning of Gas Detection System in PVC of Petrokemya.

17 Fire Alarm System & Fire Protection Systems

Hi-TechSystems - Dammam

Supply , Installation, Testing& Commissioning of Fire Alarm System and fire protection system in Hi-tech factory Dammam –2nd Industrial Estate.

Page 102: Pre Qualification -Firefreeze - 2014a

LIST OF PROJECTS Completed By M/s FIREFREEZE is as follows :

Sr.No.

Project Client Description Of Project Work

18 Fire Protection System Fowzan – Riyadh

Supply, Engineering ,Installation, Testing of fire Protection system at GSM Warehouse.

19 Fire Alarm System ARAMCO Supply of Fire Alarm Systems Spares, Fire Fighting Systems Spares on Various ARAMCO requirements.

20 Fire Alarm System- Govt Hospital Hafr Al Batin

Govt Hospital / Main

contractorNasir Khaliwy

Supply, Installation, testing, commissioning of of Fire Alarm Systems at Govt hospital in Hafr Al Batin.

21 CO2 Fire Protection System – Press , Dammam , KSA

ALUPCO Supply, Installation, testing, commissioning of of CO2 Fire Protection system on Underneath of Press at Aluminium Product Company Limited.

22 Fire Extinguishing System Naval Base - Jubail

Testing Commissioning & Trouble Shooting of Halon 1301 Fire Extinguishing at three sub stations. Supply of Water sprinklers for different locations.

23 Deluge Water Spray System – Transformers , Bisha Shudaig Power Plant

ABB Supply, Installation, testing, commissioning of of Water Deluge Spary System at Shudaig Power Plant.

Page 103: Pre Qualification -Firefreeze - 2014a

LIST OF PROJECTS Completed By M/s FIREFREEZE is as follows :

Sr.No.

Project Client Description Of Project Work

24 Fire Alarm System- Fire Protection System Saudi Electric Company – Western Region ( Four Locations )

SEC / Segia Supply, Installation, testing, commissioning of of Fire Alarm Systems at Administration buildings & in polyclnic. Supply, Installation, testing, commissioning of of Fire Protection System at Administration buildings & in polyclnic

25 Fire Fighting Pump Set UL listed in Hospital Project

Govt Hospital / Main

contractorNasir Khaliwy

Supply, Installation, testing, commissioning of of Fire Fighting Pump Set at Govt hospital in Hafr Al Batin.

26 FM-200 Fire Protection System in Civil Affairs building Al Hasa

Civil Affairs , M.O.I. / Main

contractorSRACO

Supply, Installation, testing, commissioning of of FM-200 Fire Protection System at Civil Affairs Building Al Hasa – M.O.I.

27 Deluge Foam Spray System – Helipad

Al Mansouryah Est.

Installation of Deluge Foam Spray System on Helipad in Al Rass General Hospital at Al Rass.

28 CO2 Fire Protection System – Press , Dammam , KSA

ALUPCO Supply, Installation, testing, commissioning of of CO2 Fire Protection system on Press -4 at all sensitive location of Press at Alupco Dammam.

Page 104: Pre Qualification -Firefreeze - 2014a

LIST OF PROJECTS Completed By M/s FIREFREEZE is as follows :

Sr.No.

Project Client Description Of Project Work

29 Water Sprinkler System, Fire Hose Cabinets, Fire Extinguisher

UDI Factory / Project Build

Supply, Installation, testing, commissioning of of Water Sprinkler System, Fire Hose Cabinets, Fire Extinguisher at UDI factory at industrical city –II.

30 Conduiting work for Royal Commission facility

RoyalCommission

Jubail / Delta

Installation of RGS conduiting work at Royal commission Jubail & Cable Pulling.

31 Fire Hose Cabinets & Fire Fighting Pump Set at Fatima Bin Abu Bakr Siddik School

F.B.A.B.S / Sffeco

Installation, testing, commissioning of of Fire Hose Cabinets, Fire Fighting Pump Set at F.B.A.B.S. School At H. Al Doha

32 FM-200 Fire Protection System & Addressable Fire Alarm System

KFUPM – Dahran

Installation, testing, commissioning of FM-200 Fire Protection System & Addressable Fire Alarm System at Telephone Exchange Building.

33 Fire Alarm System – Academic Building # 2

KFUPM – Dahran

Installation, testing, commissioning of Fire Alarm System at Academic Building # 2

33 Fire Alarm System – Academic Building # 3

KFUPM – Dahran

Installation, testing, commissioning of Fire Alarm System at Academic Building # 3

Page 105: Pre Qualification -Firefreeze - 2014a

LIST OF PROJECTS Completed By M/s FIREFREEZE is as follows :

Sr.No.

Project Client Description Of Project Work

34 Fire Alarm System Camp # 9, # 10, # 11

RoyalCommission/

ZamilOperation & Maintenance

Supply, engineering , Installation, testing, commissioningof Fire Alarm System at All Camps.(Awarded to us, to be started in May 2005 )

35 Fire Alarm System & Siren System

SWCC – Al Khobar

Supply, engineering , Installation, testing, commissioningof Fire Alarm System at All MMD office & Inaugration Building.

36 FM-200 Fire Protection System – Class Room Project

Al Ohadeih / KFUPM

Installation, testing, commissioning of FM-200 Fire Protection System at Electrical Rooms of Class Room Project.

37 Fire Alarm System – Black Start Diesel Generator , Bisha Shudaig Power Plant

Al Sharief Supply, Installation, testing, commissioning of of Fire Alarm System at Black Start Diesel Generator at Shudaig Power Plant.

38 FM-200 Fire Protection System – Server Room

United Arab CAN

ManufacturingCo.

Installation, testing, commissioning of FM-200 Fire Protection System at Server Room.

Page 106: Pre Qualification -Firefreeze - 2014a

LIST OF PROJECTS Completed By M/s FIREFREEZE is as follows :

Sr.No.

Project Client Description Of Project Work

39 Deluge Water Spray System – LPG Tanks , NABISCO Dammam – Saudi Arabia

NABISCO Supply, Installation, testing, commissioning of of Water Deluge Spary System at LPG Tank , NABISCO.

40 Fire Protection System Al Jouf Power Plant

KANOO Supply, Installation, testing, commissioning of of Deluge Foam Water Spary System at Fuel Treatment Room and FM-200 System in Control Room at Al Jouf Power Plant.

41 Zamil Steel Dammam KSA Zamil Steel Supply, Installation of Fire Alarm System for Monitoring All Fire Alarm Panel in Guard House and New System in Paint Storage Area.

42 Water Sprinkler System – Chemical Warehouse

SWCC-Al Khobar

Design , Supply, Installation of Water Sprinkler System at Chemical Warehouse in SWCC – Al Khobar

43 Utility Control Room – Saudi Aramco – Abqaiq

Saudi Aramco Design , Supply, Installation of FM-200 Fire Protection System at Control Building in UCR - Abqaiq

Page 107: Pre Qualification -Firefreeze - 2014a

LIST OF PROJECTS Completed By M/s FIREFREEZE is as follows :

Sr.No.

Project Client Description Of Project Work

44 Fire Alarm Building # 23 KFUPM – Dahran

KFUPM Design, Supply, Installation of Fire Alarm System in KFUPM Dahran.

45 Modification of Fire Alarm System And fire Protection system Building # 1770 / 8730 , Saudi Aramco Dahran

Al Nassar Supply & Testing Commissioning of fire Alarm and Fire Protection System in Saudi Aramco Dahran

46 Fire Protection System – Show Room & Offices – JAMJOOM

JAMJOOM Design , Supply, Installation of Water Sprinkler System & Fire Protection System at Showroom & Offices for JAMJOOM – Al Khobar

47 North Control Room – Saudi Aramco – Abqaiq

Saudi Aramco Design , Supply, Installation of FM-200 Fire Protection System at Control Building in UCR – Abqaiq

48 South Control Room – Saudi Aramco – Abqaiq

Saudi Aramco Design , Supply, Installation of FM-200 Fire Protection System at Control Building in UCR – Abqaiq

Page 108: Pre Qualification -Firefreeze - 2014a

LIST OF PROJECTS Completed By M/s FIREFREEZE is as follows :

Sr.No.

Project Client Description Of Project Work

49 Sub Station , Pump Stn # 6 Saudi Aramco / Nesma

Design , Supply, Installation of FM-200 Fire Protection System at Pump Stn # 6.

50 Wet Chemical Kitchen Fire Protection System

Saudi Aramco Supply, Engineering, Installation, Testing Commissioning of Wet Chemical Fire Protection System in Saudi Aramco Dahran- 5 areas

51 Wet Chemical Kitchen Fire Protection System

Saudi Aramco Supply, Engineering, Installation, Testing Commissioning of Wet Chemical Fire Protection System in Saudi Aramco Abqaiq – 2 areas

52 Server Room EniRepSa Gas Ltd / MTTS

Design , Supply, Installation of FM-200 Fire Protection System at Server Room

53 Server Room Zamil operations & Maintenance

Design , Supply, Installation of FM-200 Fire Protection System at Server Room

Page 109: Pre Qualification -Firefreeze - 2014a

LIST OF PROJECTS Completed By M/s FIREFREEZE is as follows :

Sr.No.

Project Client Description Of Project Work

54 Hazardous Chemical Warehouse

SWCC – Al Khobar

Design , Supply, Installation of Water Sprinkler System , Hose Cabinets , & Hydrant System for Chemical Warehouse.

55 Eastern Water Tower – Al Khobar

SaudiTechnical

Supply, Engineering, Installation, Testing Commissioning of Water Sprinkler System , FM-200 System, CO2 System in Water Tower ( on going )

56 Al Hugayat Tower – Al Khobar

ATCO Supply, Engineering, Installation, Testing Commissioning of Water Sprinkler System Tower ( on going )

57 Saudi Aramco – Khafji Angus Fire UK Supply, Engineering, FM-200 Fire Protection System

58 KFUPM – Bldg # 14 KFUPM Supply, Engineering, Installation, Testing Commissioning of FM-200 System for Bldg # 14. ( on going )

59 Warehouse – Tabuk Tabuk Pharm. Company

Deluge Foam Spray System in warehose complete with design, supply and installation.

Page 110: Pre Qualification -Firefreeze - 2014a

LIST OF PROJECTS Completed By M/s FIREFREEZE is as follows :

Sr.No.

Project Client Description Of Project Work

60 Shifting of 5000 GPM fire fighting pump set.

SWCC – Al Khobar

Complete shifting of fire fighting pump set at SWCC Al khobar.

61 Communication Room – Sea Island

Saudi Aramco Supply, Engineering, Installation, Testing Commissioning of CO2 System in Communication Room on Sea Island

62 Generator Room & Boiler Room

Movenpick Hotel / Saudi

Pan Gulf

Supply, Engineering, Installation, Testing Commissioning of Dry Chemical System in Generator Room & Boiler Room in MovenPick Hotel.

63 Faras Power Plant SEC / Al Toukhi

Supply, Engineering, Installation, Testing Commissioning of Complete Fire Alarm , Fire Protection & Gas Detection System for Extension of Faras Power Plant ( Recently awarded )

64 ABHA East Sub Stn SEC / ABB Supply, Engineering, Installation, Testing Commissioning of Complete Fire Alarm System for ABHA East Sub Station.

Page 111: Pre Qualification -Firefreeze - 2014a

LIST OF PROJECTS Completed By M/s FIREFREEZE is as follows :

Sr.No.

Project Client Description Of Project Work

65 Crystal Plant – Yanbu , sub Station

ABB Design, supply , Engineering of Deluge spray system and complete fire alarm system.

66 Ministry Of Petroleum – Server Room

InfoSys Global Supply, Engineering, Installation, Testing Commissioning of FM-200 System in Server Room.

67 CATV & RADIO Room R.C. Jubail

Seder Telcom Supply, Engineering, Installation, Testing Commissioning of FM-200 Fire Protection System in CATV and Radio Room.

68 Amal field Libya ABB Supply, Engineering, Installation, Testing Commissioning of FM-200 Fire Protection System in Prtable Sub Stations.

69 Saudi Aramco – Hawtah Al Nassar Supply, Engineering, Installation, Testing Commissioning of Complete Fire Alarm System , Water sprinkler system, fire extinguishers, wet chemical system.

Page 112: Pre Qualification -Firefreeze - 2014a

LIST OF PROJECTS Completed By M/s FIREFREEZE is as follows :

Sr.No.

Project Client Description Of Project Work

70 Saudi Kayan – Jubail KAMCO Supply of equipments for water sprinkler system and fire extinguishers.

71 Video Library – Saudi Aramco – Dhahran

Saudi Aramco Supply, Engineering, Installation, Testing Commissioning of FM-200 System in Video Library.

72 Muhayel Sub Stn Siemens Supply, Engineering, Installation, Testing Commissioning of CO2 fire protection system

73 Namerah Sub Stn Siemens Supply, Engineering, Installation, Testing Commissioning of CO2 fire protection system

74 Majardah Sub Stn Siemens Supply, Engineering, Installation, Testing Commissioning of CO2 fire protection system

75 Server Room Arab Medical Supply

Al hussaini Supply, Engineering, Installation, Testing Commissioning of FM-200 fire protection system

76 Fire Alarm System Saudi Aramco – Rabigh

Isam Kabbani Supply,Testing & Commissioning of Fire Alarm system

Page 113: Pre Qualification -Firefreeze - 2014a

LIST OF PROJECTS Completed By M/s FIREFREEZE is as follows :

Sr.No.

Project Client Description Of Project Work

77 Deluge Water Spray System Guard Dryer – United

SABIC HK SadiqSons

Design and Supply & Installation of Deluge System for Guard Dryer .

78 Server Room Enirepsa 135 / 136

EniRepSa Supply, Engineering, Installation, Testing Commissioning of FM-200 fire protection system- Two server Rooms

79 Server Room South Ruba Khali co.

South Ruba Khali

Supply, Engineering, Installation, Testing Commissioning of FM-200 fire protection system- One server Rooms

80 Control Room Abqaiq

Saudi Aramco Supply, Engineering, Installation, Testing Commissioning of Reserve FM-200 fire protection system

81 Piping Work SWCC

SWCC Installation of piping work in SWCC Al Khobar

82 Wet chemical system Saudi Aramco

Saudi Aramco Supply, Engineering, Installation, Testing Commissioning of Wet Chemical Fire Protection System in Saudi Aramco Abqaiq

83 Wet chemical system Saudi Aramco

Saudi Aramco Supply, Engineering, Installation, Testing Commissioning of Wet Chemical Fire Protection System in Saudi Aramco Riyadh

Page 114: Pre Qualification -Firefreeze - 2014a

LIST OF PROJECTS Completed By M/s FIREFREEZE is as follows :

Sr.No.

Project Client Description Of Project Work

84 Fire Alarm System ABB Supply and testing commissioning of fire alarm system for ABB Tihama Project.

85 Heat Detector Replacement Petrokemya Replacement of all exisitng heat detector by new technology Detect-A-Fire heat detectors.

86 Water Sprinkler System NABISCO Complete design and installation of water sprinkler system in finished good warehouse and raw material warehouse.

87 PQA LAB sharq Sharq Supply, Engineering, Installation, Testing Commissioning of NOVEC 1230 fire protection system

88 Control Room - SABIC Isam Kabbani Supply, Engineering, Installation, Testing Commissioning of FM-200 fire protection system

89 Weapon Test Facility MAC Supply, Engineering, Installation, Testing Commissioning of FM-200 fire protection system

Page 115: Pre Qualification -Firefreeze - 2014a

LIST OF PROJECTS Completed By M/s FIREFREEZE is as follows :

Sr.No.

Project Client Description Of Project Work

90 Data Centre & Security Room – Weather Ford Facility

ARCON Supply, Engineering, Installation, Testing Commissioning of FM-200 fire protection system for two rooms

91 Industrial Training – Saudi Aramco Wet chemical system

OSAIS Supply, Engineering, Installation, Testing Commissioning of wet chemical system for kitchen.

92 SEC Sub stations – 6 nos. Siemens Supply, Engineering, Installation, Testing Commissioning of co2 fire protection system and fire extinguishers on SEC sub stations

93 SHARQ – SABIC Detection for NOVEC-1230

SHARQ Supply, Engineering, Installation, Testing Commissioning of fire extinguishing panel and devices addressable to control 3 NOVEC 1230 systems.

94 Dry chemical system Olaya Tower

SFFECO Supply, Engineering, Testing Commissioning of Dry chemical fire protection system.

95 Saudi Aramco – Shedgum Plant NOVEC-1230

Saudi Aramco Supply, Engineering, Installation, Testing Commissioning of Novec 1230 fire extinguishing system in raised floor of control room.

Page 116: Pre Qualification -Firefreeze - 2014a

LIST OF PROJECTS Completed By M/s FIREFREEZE is as follows :

Sr.No.

Project Client Description Of Project Work

96 WeatherFord Facility Wet chemical system

ARCON Supply, Engineering, Installation, Testing Commissioning of wet chemical system for kitchen.

97 Nesma – Camp – Jubail Refinery Wet chemical system

Nesma Supply, Engineering, Installation, Testing Commissioning of wet chemical system for kitchen.

98 Die Sub Station – Fire Alarm System

Saudik Supply, Engineering, Installation, Testing Commissioning of fire alarm system for complete sub station.

99 Tihama Sub Station – co2 fire protection system

ABB Supply, Engineering, Installation, Testing Commissioning of co2 fire protection system in two portable sub stn.

100 Petrokemya heat detector replacement

Petrokemya Supply, Engineering, Installation, Testing Commissioning of new heat detector in place of existing smoke detectors

101 Sharq Deluge Fog System

Sharq Supply, Engineering, Installation, Testing Commissioning of water fog system , fire alarm and complete fire protection on unloading bays.

Page 117: Pre Qualification -Firefreeze - 2014a

LIST OF PROJECTS Completed By M/s FIREFREEZE is as follows :

Sr.No.

Project Client Description Of Project Work

102 Nesma – Camp2 – Jubail Refinery Wet chemical system

Nesma Supply, Engineering, Installation, Testing Commissioning of wet chemical system for kitchen.project 2

103 Al Rashed Tower–Riyadh FM-200 system

Al Rashed Supply, Engineering, Installation, Testing Commissioning of FM-200 fire extinguishing system in 3 nos. server rooms. On going

104 Fire Alarm System – P1 Saudi Aramco - Tanajib

Saudi Aramco Supply, installation and testing commissioning of fire alarm system for control room – Tanajib Project 1 – on going

105 Fire Alarm System – P2 Saudi Aramco - Tanajib

Saudi Aramco Supply, installation and testing commissioning of fire alarm system for control room – Tanajib Project 2 – on going

106 Fire Alarm System – Saudi Aramco - Uthmaniya

Saudi Aramco Supply, installation and testing commissioning of fire alarm system for control room – Uthmaniya – on going

107 Saudi Aramco – Bakery – UdhailiyaWet chemical system

Rezayat Supply, Engineering, Installation, Testing Commissioning of wet chemical system for kitchen.project 2

Page 118: Pre Qualification -Firefreeze - 2014a

LIST OF PROJECTS Completed By M/s FIREFREEZE is as follows :

Sr.No.

Project Client Description Of Project Work

108 FM-200 System Package # 1 Jubail Export Refinery Project

Tecnicas Reunidas

Supply, Engineering, Installation, Testing Commissioning of FM-200 fire protection system. On going

109 FM-200 System Package # 4 Jubail Export Refinery Project

Nesma Supply, Engineering, Installation, Testing Commissioning of FM-200 fire protection system. On going

110 FM-200 System Package # 2A Jubail Export Refinery Project

SFFECO Supply, Engineering, Installation, Testing Commissioning of FM-200 fire protection system. On going

111 Weatherford Base Facility FM-200 Fire Protection System

ARCON Supply, Engineering, Installation, Testing Commissioning of FM-200 fire protection system

112 Weatherford Base Facility Wet Chemical Fire Suppression System

ARCON Supply, Engineering, Installation, Testing Commissioning of Wet Chemical fire suppression system

113 Tecnimount Arabia Co. Ltd. FM-200 Fire Protection System

TecnimountArabia.

Supply, Engineering, Installation, Testing Commissioning of FM-200 fire protection system

114 Aramco Riyadh Bldg. 370 Wet Chemical Fire Suppression System

Saudi Aramco Supply, Engineering, Installation, Testing Commissioning of Wet Chemical fire suppression system

Page 119: Pre Qualification -Firefreeze - 2014a

LIST OF PROJECTS Completed By M/s FIREFREEZE is as follows :

Sr.No.

Project Client Description Of Project Work

115 Fire Alarm System Ras-Tanura, Saudi Aramco

Saudi Aramco Supply, Engineering, Installation, Testing Commissioning of Fire Alarm System. On going

116 FM-200 Fire Protection System King Abdullah Financial District Riyadh

ETA Star Supply, Enigneering, Testing & Commissioning of FM200 Fire Protection System

117 FM-200 Fire Protection System Jubail Export Refinery Project – Package 5C

MR Al-Khathlan

Supply, Engineering, Installation, Testing & Commissioning of FM-200 Fire Protection System

118 FM-200 Fire Protection System P-3 Technology Center Baker Huges

ARCON Supply, Engineering, Installation, Testing & Commissioning of FM-200 Fire Protection System

119 Wet Chemical Fire Protection System Jubail Export Refinery Project – Package 2A

Ali Bin Ghashash Al

OmairiTrading

Supply, Engineering, Testing & Commissioning of Wet Chemical Fire Protection System

120 FM-200 Fire Protection System King Abdullah Financial Disctric, Riyadh

Sterling & Wilson

Supply, Engineering Testing & Commissioning of FM-200 Fire Protection System

121 Fire Alarm & Detection System, MARAFIQ, JUBAIL

MARAFIQ Supply, Engineering, Installation, Testing & Commissioning of Fire Alarm & Detection System

Page 120: Pre Qualification -Firefreeze - 2014a

LIST OF PROJECTS Completed By M/s FIREFREEZE is as follows :

122 Fire Protection System, Construction of Safaniyah 380/230 kV BSP

Siemens Supply, Engineering, Installation, Testing & Commissioning of FM-200 Fire Protection System, Fire Alarm System & Fire Hydrants.

123 Installation of Flame Detectors, Saudi Aramco Riyadh Refinery, Riyadh

Saudi Aramco Supply, Engineering Installation, Testing & Commissioning of Flame Detectors.

124 Fire Fighting System, MARAFIQ, Yanbu

Hanbu Supply, Engineering, Testing & Commissioning of Fire Fighting System

125 Fire Alarm System, Gulf Connect Supply, Engineering, Installation, Testing & Commissioning of Fire Alarm System

126 Fire Alarm System, (Berri Gas Plant)

Saudi Aramco Supply, Engineering, Installation, Testing & Commissioning of Fire Alarm System

127 Fire Alarm System, (Rastanura Plant)

Saudi Aramco Supply, Engineering, Installation, Testing & Commissioning of Fire Alarm System

128 Novec 1230 System Shedgum Plant

Saudi Aramco Supply, Engineering, Installation, Testing & Commissioning of Novec 1230 in raised floor of Computer Room (On - Going)

129 FM-200 System Al-Rashid Tower

RTCC Supply, Engineering, Installation, Testing & Commissioning of FM-200 system in few Room st Rashid Tower - Riyadh

Page 121: Pre Qualification -Firefreeze - 2014a

LIST OF PROJECTS Completed By M/s FIREFREEZE is as follows :

130 FM-200 System SAMCO Project

Samsung Supply, Engineering, Installation, Testing & Commissioning of FM-200 system on SAMCO Plant Jubail (On-Going)

131 FM-200 System SOCC Project

Samsung / INDECO

Supply, Engineering, Installation, Testing & Commissioning of FM-200 system on SOCC Plant (On-Going)

132 FM-200 System Tasnee Plant, CCR Room

Samsung Supply, Engineering, Installation, Testing & Commissioning of One Room FM-200 system and modification in CCR Room (On-Going)

133 Novec 1230 System SAMAPCO CA EDC Project

Daelim / INDECO

Supply, Engineering, Testing & Commissioning of Two Rooms Novec 1230 system (On-Going)

134 Novec 1230 System Marafiq Stg. Unit 5 & 6

Hanwha / INDECO

Supply, Engineering, Installation, Testing & Commissioning of five Rooms Novec 1230 system (On-Going)

135 Novec 1230 System Ibn Sina Plant

Ibn Sina Supply, Engineering, Installation, Testing & Commissioning of Novec 1230 system five Rooms (On-Going)

136 Faisal Steel CO2 System

Faisal Steel Supply, Engineering, Testing & Commissioning of CO2 system (On-Going)

Page 122: Pre Qualification -Firefreeze - 2014a

LIST OF PROJECTS Completed By M/s FIREFREEZE is as follows :

137 King Abdullah Financial District Foam System

ETA Star Supply, Engineering, Testing & Commissioning of foam system in Generator Rooms & fuel Rooms at many tower (On-Going)

138 King Abdullah Financial District Foam System

Sterling Wilson Supply, Engineering, Testing & Commissioning of foam system in Generator Rooms & fuel Rooms at many tower (On-Going)

139 Novec 1230 System (Deluge & other Fire Fighting System) KJO Plant – Aramco Gulf Water Treatment Plant

JGC Supply, Engineering, Installation, Testing & Commissioning of Novec 1230 system Deluge System (On-Going)

140 FM - 200 System (Deluge & other Fire Fighting System) KJO Plant – Aramco Switchgear Transfer Project

JGC Supply, Engineering, Installation, Testing & Commissioning of FM - 200 system (On-Going)

141 CO2 Fire Protection SystemSharourah PP1 Sub Station (SEC Project)

AL Gihaz Supply, Engineering, Installation, Testing & Commissioning of CO2 fire suppression system and complete fire alarm & detection system for Sub Station (On-Going)

142 CO2 Fire Protection SystemSharourah PP2 Sub Station (SEC Project)

AL Gihaz Supply, Engineering, Installation, Testing & Commissioning of CO2 fire suppression system and complete fire alarm & detection system for Sub Station (On-Going)

Page 123: Pre Qualification -Firefreeze - 2014a

LIST OF PROJECTS Completed By M/s FIREFREEZE is as follows :

143 Wet Chemical System Sprinkler System Fire Alarm System Saudi Aramco Gulf Course Project

Al-Hammam Supply, Engineering, Testing & Commissioning of subject system (On-Going)

144 Wet Chemical System Saudi Aramco – Dhahran

Alasco Supply, Testing & Commissioning of wet chemical system (On-Going)

145 NOVEC-1230 Fire Protection System Hilton Hotel & Residential Tower Riyadh

ETA Star Supply, Engineering, Testing & Commissioning of subject system (On-Going)

146 Foam Fire Suppression System. (KAFD) King Abdullah Financial District Riyadh. KSA.

ETA Star Supply, Engineering, Testing & Commissioning of subject system (On-Going)

147 Co2 Fire Protection System Mikwah Substation KSA.

ISCOSA Supply, Engineering, Installation, Testing & Commissioning of subject system (On-Going)

148 FM-200 & CO2 Fire Protection System at Zuluf Safania Offshore. GOSP-1 & GOSP-4.

Saudi Aramco Supply, Engineering, Installation, Testing & Commissioning of subject system (On-Going)

149 FM-200 & CO2 Fire Protection System at Marjan Safania Offshore. GOSP-2 & GOSP-3.

Saudi Aramco Supply, Engineering, Installation, Testing & Commissioning of subject system (On-Going)

Page 124: Pre Qualification -Firefreeze - 2014a

150 FM-200 Fire Protection System at Saudi Railway

Yapi Markazi Supply, Engineering, Installation, Testing & Commissioning of subject system (On-Going)

151 FM-200 & Co2 Fire Protection System & fire alarm system at Tihama CPS, Bisha CPS & Bisha South

ISCOSA Supply, Engineering, Installation, Testing & Commissioning of subject system (On-Going)

Page 125: Pre Qualification -Firefreeze - 2014a

10 : Authorization Certificates Please find enclosed certifications that the company engineer holds.

Page 126: Pre Qualification -Firefreeze - 2014a
Page 127: Pre Qualification -Firefreeze - 2014a
Page 128: Pre Qualification -Firefreeze - 2014a
Page 129: Pre Qualification -Firefreeze - 2014a
Page 130: Pre Qualification -Firefreeze - 2014a
Page 131: Pre Qualification -Firefreeze - 2014a
Page 132: Pre Qualification -Firefreeze - 2014a
Page 133: Pre Qualification -Firefreeze - 2014a
Page 134: Pre Qualification -Firefreeze - 2014a
Page 135: Pre Qualification -Firefreeze - 2014a
Page 136: Pre Qualification -Firefreeze - 2014a
Page 137: Pre Qualification -Firefreeze - 2014a
Page 138: Pre Qualification -Firefreeze - 2014a
Page 139: Pre Qualification -Firefreeze - 2014a
Page 140: Pre Qualification -Firefreeze - 2014a
Page 141: Pre Qualification -Firefreeze - 2014a
Page 142: Pre Qualification -Firefreeze - 2014a
Page 143: Pre Qualification -Firefreeze - 2014a
Page 144: Pre Qualification -Firefreeze - 2014a

11 : Partners/Associates

FIREFREEZE partners include the following:

Page 145: Pre Qualification -Firefreeze - 2014a

As the providerelatedfirefightConsumeand comlife safe

Chemguunmatchto meecertifiedproven mChemgudisplacefrom cofor foam

Potter RGlee K.modernAngeles)equipme1930’s.protectiCabinetsConnect

world’s larsolutions thazards. F

ters have rers will fin

mmercial smety product

ard serveshed custom

et customed, we leadmanufacturard also

ement foamrrosion-res

m concentra

Roemer waPotter anheadquar

), CA, Pottent, while Over the yon equipms, Fire Hotions, Speci

rgest manuthat protec

For more threlied on Knd that sammoke alarms.

the fire sumer supporter requiremd throughring excellemanufactu

m concentraistant brasate pump p

as foundednd Ray H. rters and er Roemerchanging dyears, our

ment and aose & Accialty Equipm

ufacturer oct people han 90 yea

Kidde to deme advancems, carbon

uppressiont, high-quaments thro

advancedence, and pres a lineate pumpsss and stainperformanc

in 1937 aRoemer. Omanufacturemains de

dramaticallproduct raccessories

cessories,ment and a

of fire safeand proper

ars industryeliver supeed fire safemonoxide

and speciaality and fieough produ

research,prompt serve of UL L

for the firnless steel,e and relia

as a manufOperating furing faciliedicated toly from theange has gto includeFire Exting

a refined lin

ety producrty from thy leaders, rior fire deety technolalarms, fir

alty chemiceld-testeduct custom

exactingvice and deListed andre-protecti, the pumpability.

facturer’sfrom its neity in Cityo its core be companyrown to co

e Fire Extinguishers, Fne of Archi

cts, Kidde’he effectsthe militaretection anlogy in Kidre extinguis

cals fields wproducts,

mization. engineerin

elivery. d FM Appron industry

ps have set

representaew 110,000y of Indusbusiness of that was over a widnguisher, HFire Departectural Pr

s mission of fire an

ry, airlinesnd suppresde's resideshers and o

worldwideand the abISO 9001:

ng and de

roved posiy. Construnew stand

ative agenc0 sq. ft. ustry (nearfire protecfounded ine range ofHose and Vrtment Varoducts.

is to d its

s and sion.

ential other

withbility 2008

esign,

itive-ucted dards

cy by ultra-

Los ction n the f fire Valvealves,

Page 146: Pre Qualification -Firefreeze - 2014a

KennedyAWWA a

The VikValves,

MuellerPreferreSince 1Productspotablesystem f

Jones Wgreatly e

water diquality w

y Valve hasand UL/FM

king CorporSystems, a

ed Source fo857, the s of superioWater Dis

from source

Water Produexpanded s

istributionwater distr

the countrhydrants a

ration is a Lnd Devices

or Water DMueller naor quality. Wstribution Pe to custom

ucts featureselection of

systems. Cribution val

ry's most cond valves.

Leading Ma. Providing

istribution Pame has bWe are NorProducts. Omer.

e the leadinf bronze wa

Customers cves, hydran

omplete pr

anufacturer the World

Products fobeen knowrth AmericaOur produc

ng brand ofater service

can dependnts and fitt

roduct line

r of Fire Pro with Fire P

or more thanwn for innoa's largest acts are us

f Wet Barree valves an

d on Jones ftings.

and suppor

otection SpProtection.

n 150 yearsovative Waand only fused through

el Fire Hydrnd fittings f

for a reliab

rt system o

prinklers, .

s...ater Distribllline supplihout the w

rants, and afor potable

ble source o

of

ution ier of water

a

of

Page 147: Pre Qualification -Firefreeze - 2014a

Amerexand INNworldwiextinguisystemsdevices.

Sierra MEnvironmthat is dthe safeautomatbetweenSierra Msafety oand tele

CorporatioNOVATIVEde as a lishers, pre-, gas dete.

Monitor Corment Measudeployed oety, efficiention industn subsystem

Monitor provof personneecom remot

on is an affirefightingleader in -engineered

ection, clea

poration, aurement ann proprietancy and cotries. Embems using provides gas d

el and plantte site man

ffiliate of Mg productsthe manufd automatian agent s

a public cond Controlary hardwammunicatioedded softotocol anddetection syts, protoconagement s

McWane Ins for overfacture ofic restaurasystems, ind

rporation,by developre platformons capabilware in thphysical mystems, fla

ol gatewaysystems.

nc. and hasr 40 yearsf hand pornt systemsdustrial sys

delivers Inping speciams. These plities in prohese produ

medium traname detects to interfa

s been provs. Amerexrtable ands, vehicle fstems and

nformationalized embeproduct solocess contructs enablenslation.tors, and gace devices

viding QUAis recogn

d wheeledfire suppre

fire detec

Technologyedded softwlutions enhrol and buie data tran

as monitors and netwo

ALITYnized

fire ssionction

y for wareance ldingnsfer

rs for orks,

Page 148: Pre Qualification -Firefreeze - 2014a

o

Fire Detqualitydistinguat preseproductsqualityEuropelong-ter

tection Profire dete

ished by itent buildss per yearcontrol toensures ev

rm reliable

oducts fromectors andts experien

in excessr. By emploo ISO 9001very producfire detect

m Hochiki,alarms f

ce and expof 500,00

oying the and Envirct installedtion.

one of thfor commepertise in t0 conventilatest manronmentald will conti

he Worlds' ercial andthis field siional and nufacturing

Managemeinue to en

leading ma industriance 1918. intelligent

g techniqueent to ISOhance Hoc

anufacturel applicatHochiki Eufire detec

es and rigo14001, Ho

chiki's name

rs of ions,

uropection orousochikie for

Page 149: Pre Qualification -Firefreeze - 2014a
Page 150: Pre Qualification -Firefreeze - 2014a

July 2, 2003

To Whom It May Concern;

FIREFREEZE, P.O. Box 14148, Dammam – 31424 Saudi Arabia is an authorized

distributor of Sierra Monitor Corporation products which includes a complete range of

gas monitoring system. The systems are comprised of sensor modules, controllers and

various ancillary equipments necessary for full integration of complete gas detection

systems. FIREFREEZE has the technical capability and the factory direct assistance to

engineering and install our products and systems.

We recommend FIREFREEZE as our representatives and resellers in Saudi Arabia, our

experience with the principals of the company has been excellent and their customer

feedback has been positive. We remain committed to supporting FIREFREEZE with

high quality engineering support, strong customer service and rapid response to

application inquiries.

Sincerely,

Gordon Arnold, President

Sierra Monitor Corporation

1991 Tarob Court

Milpitas, CA USA

[email protected]

Page 151: Pre Qualification -Firefreeze - 2014a

To: Whom It May Concern June 20, 2011

SUB: KING ABDULLAH FINANCIAL DISTRICT PROJECT

FIREFREEZE is an authorized non-exclusive distributor to Chemguard in the Kingdom of Saudi Arabia. We have already quoted them the above mentioned project and they will receive our support till all the involved bodies are satisfied.

FIREFREEZE is capable of the following responsibilities in the project: marketing, quotations, sales, supply, commission, inspection and after sales service of Chemguard’s foam equipment, foam concentrates and discharge devices.

We would also like to inform you that as long as the materials are still being manufactured the spare parts would be available for purchase within the next 10 – 15 years. We would have no control over items that are discontinued or no longer manufactured. Please note that our bid does not include any spare parts.

Chemguard offers a full scope of supply including fire fighting foam concentrates, fire fighting dry chemicals and all related foam equipment hardware. For further information, you are directed to our web site: www.chemguard.com or contact the undersigned for clarifications.

Duly approved and confirmed this date by:

Mahmoud Omar Senior Manager – Fire Suppression Division Middle East – Africa – EuropeChemguard Inc. GSM: + 2 01 139 38 36 [email protected]

Page 152: Pre Qualification -Firefreeze - 2014a

� ������������������������������������ �

MGC Systems International Limited

Sales Office: Business Center World, Jafza View 18 & 19 | Dubai, U.A.E., P.O. Box 262746

Administrator: 25 Interchange Way | Vaughan (Toronto) ON L4K 5W3 | T 905 660-4655 | F 905 660-4113

�������������

��������������� ��������� � �

�������������������������������������������������� �� �������������� ���������������� �!�"�����������!�#�$���������� �������������������������%��&�%�'����'����()����*��'&��+����,�&�-��������&��*�&�&������&��.�&������#&��&(/�0��+&���&�&����(��)����&(�,/�1.2��32���

4&��������������������+�(&������&����������(�-������/��)������-��������,��5&(�)��,/���&����'��������)����)�&����

���5��'�/�)���(����)���'�/�)�����)��,&������&��������(��&�+��&�����������&���

$���&�&�/�/�)���

6'���7�'�+&&+� � � � � � � � � � � ��������������&������������'&�� � � � � � � � � � � �����������1.2�"�+����������32�6��&���������� � � � � � � � � ������������3��)�����2������&��

Page 153: Pre Qualification -Firefreeze - 2014a

� ������������������������������������ �

MGC Systems International Limited

Sales Office: Business Center World, Jafza View 18 & 19 | Dubai, U.A.E., P.O. Box 262746

Administrator: 25 Interchange Way | Vaughan (Toronto) ON L4K 5W3 | T 905 660-4655 | F 905 660-4113

����������� ��

��������������� ��������� � �

�������������������������������������������������� �� �������������� ������������� � !�"�#������$� �"�%�&�'�������� �������������������������(���(�)����)���*+����,��)������-��-��.����'�������*��+//-��*��0�123��43���

5���-�������������/���*���--���������-���*�.����0��+//���.�����������6�*�+/��0�������)���-����+����+���

����6��)�0�+���*����+��)�0�+�����+������������������*������������--��������

&�����-0�0�+���

7)��8�)������ � � � � � � � � � � �������������/������������)�� � � � � � � � � � � �����������123�#������������43�7����������-� � � � � � � � � �����������4�+/����3��/������

Page 154: Pre Qualification -Firefreeze - 2014a

400 Main Street Ashland, MA 01721 USA

508.881.2000

Sunday, May 20, 2012

To whom it may concern:

Dear Sir / Madam,

Herby to confirm that: Firefreeze located in Dammam, P.O.Box 14148, Kingdom of

Saudi Arabia, is our fully authorized distributor for the Eastern Provinces of The

Kingdom of Saudi Arabia. As our certified distributor Firefreeze is fully capable of

calculating, designing, commissioning, installing and servicing clean agent

suppression systems (FM-200, Novec 1230, Argonite and CO2), wet and dry

chemical suppression systems as well as specialized detection systems. (Linear

Heat Detection, HSSD, Kidde Panels, and Detect-A-Fire)

Firefreeze has full access to spare parts, technical and commercial information. All

Kidde Fire systems installed and commissioned by Firefreeze will be covered by our

manufacturer’s warranty as stated in our terms and conditions of sale.

Nothing further

Sincerely,

Sincerely,

Michael Z. Yakine

Regional Manager, MEA

971(0)566967745

[email protected]

Page 155: Pre Qualification -Firefreeze - 2014a

Accredited Body: UL DQS Inc., 1130 West Lake Cook Road, Suite 340, Buffalo Grove, IL 60089 USA 1 / 2

CERTIFICATEThis is to certify that

Kidde Fenwal Inc.400 Main StreetAshland, MA 01721United States of America

with the organizational units/sites as listed in the annex

has implemented and maintains a Quality Management System.

Scope:The design, production and distribution of gas ignition systems, process control equipment,controlling devices, industrial explosion protection equipment, fire detection systems, firesuppression systems and testing services.

Through an audit, documented in a report, it was verified that the management systemfulfills the requirements of the following standard:

ISO 9001 : 2008

Certificate registration no.

Date of original certification

Date of revision

Date of certification

Valid until

10001342 QM08

1999-08-20

2012-03-15

2012-01-25

2015-01-24

UL DQS Inc.

Ganesh RaoManaging Director

Page 156: Pre Qualification -Firefreeze - 2014a

Annex to CertificateRegistration No. 10001342 QM08

Kidde Fenwal Inc.400 Main StreetAshland, MA 01721United States of America

This annex (edition: 2012-03-12) is only valid in connectionwith the above-mentioned certificate. 2 / 2

Location Scope

10003832Kidde Fenwal Inc.184 Meadowlake ParkwaySwainsboro, GA 30401United States of America

The site at Swainsboro, GA performs The productionand distribution of fire prevention equipment, firedetection systems and fire suppression systemsincluding water mist, foam skids and foam equipmentand big flow products.

Remote Location Scope

10009653Kidde Fenwal Inc.90 Brook StreetHolliston, MA 01746United States of America

The remote location at Holliston, MA performs thefollowing primary functions: the provision of testingservices.

10011051Kidde Fenwal Inc.dba Chemetron Fire Systems16 W 361 South Frontage RoadBurr Ridge, IL 60527United States of America

The remote location at Matteson, IL performs thefollowing primary functions: design and customer servicecenter.

Page 157: Pre Qualification -Firefreeze - 2014a

CERTIFICATE

UL DQS Inc.Management Systems Solutions

hereby certifies that the company

has implemented and maintains a Quality Management System.

Through an audit, documented in a report, it was verified that the management systemfulfills the requirements of the following standard:

ISO 9001 : 2008

Certificate Registration No. 10001342 QM08

Date of Certification 2009-02-24

Valid until 2012-02-23

Ganesh RaoPresident

1130 West Lake Cook Road, Suite 340, Buffalo Grove, IL 60089 USA

UTC Fire & Security North America Operations400 Main StreetAshland, MA 01721USA

Scope:The design, production and distribution of fire detection and fire alarm systems andcomponents, gas ignition systems, process control equipment, controlling devices, industrialexplosion protection equipment, testing services and fire prevention equipment including thedesign and manufacture of gaseous fixed fire fighting components, foam skids, foamequipment and Big Flow products.

Page 158: Pre Qualification -Firefreeze - 2014a

Annex to CertificateRegistration No. 10001342 QM08

UTC Fire & Security North America Operations

400 Main StreetAshland, MA 01721USA

Including the following site

UTC Fire & Security

184 Meadowlake Parkway,Swainsboro, GA 30401Reference No. 10003832

xxx

This annex is only valid in connection with the above-mentioned certificate.

Page 159: Pre Qualification -Firefreeze - 2014a
Page 160: Pre Qualification -Firefreeze - 2014a
Page 161: Pre Qualification -Firefreeze - 2014a
Page 162: Pre Qualification -Firefreeze - 2014a

HMRZ.EX783Gate Valves

Page Bottom

Gate Valves

See General Information for Gate Valves

KENNEDY VALVE, DIV OF MCWANE INC EX783

1021 E WATER ST

ELMIRA, NY 14901 USA

O.S. and Y. pattern, Model "Ken-Seal", iron body resilient wedge, 3, 4, 6 and 8 in. sizes, 200 psig rated pressure; (ductile iron) 300 psig rated pressure: flanged ends only.

N.R.S., Model "Ken-Seal", iron body, resilient wedge, 3, 4, 6 and 8 in. sizes, 200 psig rated pressure: Slip Joint Ends, Flanged by Slip Joint Ends, Flanged by Mechanical Joint Tapping Valve.

N.R.S. and O. S. and Y. pattern, Model "KS II" (Ken-Seal II), resilient wedge, iron body 2-1/2, 3, 4, 6, 8, 10 and 12 in. sizes for working pressure of 200 psi with flanged, mechanical joint, push-on, PVC, ring-tite and threaded end connections.

NRS and OS and Y pattern, Model KS-FW, resilient wedge, iron body 2-1/2, 3, 4, 6, 8, 10 and 12 in. for working pressure of 200 psig with flanged, SMJ, flg X smJ, SMJ X Tap, PVC, Tyton, and flg X Tyton ends.

The O.S. and Y. pattern, Models "Ken Seal", "KS II" (Ken-Seal II) and KS-FW valves, may be supplied with a factory installed valve position signal attachment.

N.R.S. pattern, Model "KS-D" (Ken-Seal-D) resilient wedge, iron body 4, 6, 8, 10 and 12 in. sizes for rated pressure of 200 psi with flanged, mechanical joint, push-on and PVC end connections.

N.R.S and O.S. and Y. pattern, Model KS300, ductile iron body, resilient wedge, 2-1/2, 3, 4, 6 and 8 in. sizes, 300 psig rated pressure.

Model KS-RW gate valves in the 4, 6, 8, 10, and 12 in. sizes (NRS) and 2/1/2, 3, 4, 6, 8, 10 and 12 in. (OS&Y), for a rated pressure of 200 psig. The valves incorporate a ductile iron body, resilient wedge and various type end configurations.

N. R. S. pattern, Model 2620, iron body 2-1/2, 3, 4, 5, 6, 8 and 10 in. sizes for rated pressure of 200 psig, 12 in., 14 in. size for rated pressure of 175 psig.

Page 163: Pre Qualification -Firefreeze - 2014a

N.R

.S.

and O

.S.&

Y.

pat

tern

, M

odel

KS-R

W r

esili

ent

wed

ge,

duct

ile iro

n b

ody,

4,

6,

8,

10 a

nd 1

2 in.

size

s fo

r ra

ted p

ress

ure

of

200 p

sig w

ith fla

nged

, m

echan

ical

join

t, g

roove

d,

Tyt

on a

nd P

VC e

nds.

N.R

.S.

pat

tern

, M

odel

KS-R

W r

esili

ent

wed

ge,

duct

ile iro

n b

ody,

14 a

nd 1

6 in.

size

s fo

r ra

ted p

ress

ure

of

200

psi

g w

ith f

langed

, m

echan

ical

join

t, g

roove

d,

MJ

by

flan

ge

,MJ

by

tappin

g a

nd T

yton e

nds.

N.R

.S a

nd O

.S&

.Y p

atte

rn,

Model

KS-F

W r

esili

ent

wed

ge,

iro

n b

ody

2-1

/2,

3,

4,

6,

8,

10 a

nd 1

2 in.

for

rate

d

pre

ssure

of

200 p

sig w

ith f

langed

, flan

ged

by

gro

ove

d,

gro

ove

d,

SM

J, fla

nged

by

MJ,

MJ

by

tappin

g,

Tyt

on,

Tyt

on

by

flan

ged

, th

read

ed a

nd P

VC e

nd c

onfigura

tions.

Tra

dem

ark

and/o

r Tra

den

ame:

Last

Updat

ed o

n 2

006-1

0-1

3

Ques

tions?

Notice

of D

iscl

aim

erPa

ge

Top

Copyr

ight

© 2

007 U

nder

write

rs L

abora

tories

Inc.

®

The

appea

rance

of

a co

mpan

y's

nam

e or

pro

duct

in t

his

dat

abas

e does

not

in its

elf

assu

re t

hat

pro

duct

s so

id

entified

hav

e bee

n m

anufa

cture

d u

nder

UL'

s Fo

llow

-Up S

ervi

ce.

Only

those

pro

duct

s bea

ring t

he

UL

Mar

k sh

ould

be

consi

der

ed t

o b

e Li

sted

and c

ove

red u

nder

UL'

s Fo

llow

-Up S

ervi

ce.

Alw

ays

look

for

the

Mar

k on t

he

pro

duct

.

UL

per

mits

the

repro

duct

ion o

f th

e m

ater

ial co

nta

ined

in t

he

Onlin

e Cer

tifica

tion D

irec

tory

subje

ct t

o t

he

follo

win

g c

onditio

ns:

1.

The

Guid

e In

form

atio

n,

Des

igns

and/o

r Li

stin

gs

(file

s) m

ust

be

pre

sente

d in t

hei

r en

tire

ty

and in a

non-m

isle

adin

g m

anner

, w

ithout

any

man

ipula

tion o

f th

e dat

a (o

r dra

win

gs)

. 2.

The

stat

emen

t "R

eprinte

d f

rom

the

Onlin

e Cer

tifica

tions

Direc

tory

with p

erm

issi

on fro

m U

nder

write

rs L

abora

tories

Inc.

" m

ust

ap

pea

r ad

jace

nt

to t

he

extr

acte

d m

ater

ial. I

n a

dditio

n,

the

reprinte

d m

ater

ial m

ust

incl

ude

a co

pyr

ight

notice

in

the

follo

win

g f

orm

at:

"Copyr

ight

© 2

007 U

nder

write

rs L

abora

tories

Inc.

®"

Page 164: Pre Qualification -Firefreeze - 2014a

Dosyalanmam

Page 165: Pre Qualification -Firefreeze - 2014a

Dry-chemical Extinguishers, Hand and Wheeled

Cartridge-activated-type Extinguishers

Stored-pressure-type Extinguishers

GBAR.EX2764 Dry-chemical Extinguishers, Hand and Wheeled

Page Bottom

See General Information for Dry-chemical Extinguishers, Hand and Wheeled

AMEREX CORP EX2764

7595 GADSDEN HWY E

PO BOX 81

TRUSSVILLE, AL 35173 USA

Model

Nominal Agent

Capacity, lb

Min Use Temp, °F

Rating

Marine Type

Ammonium phosphate

470, 467, 450 125 -65 30-A:240-B:C Yes

491 300 -65 40-A:320-B:C Yes

Potassium bicarbonate

452, 469, 472 125 -65 320-B:C Yes

493 300 -65 320-B:C Yes

Sodium bicarbonate

451, 468, 471 150 -65 240-B:C Yes

492 350 -65 320-B:C Yes

Model

Nominal Agent

Capacity, lb

Min Use Temp, °F

Rating

Marine Type

Ammonium phosphate

B417 2.5 -65 1-A:10-B:C Yes

B424, B500 5 -65 2-A:10-B:C Yes

B402 5 -65 3-A:40-B:C Yes

B461, B443 6 -65 3-A:40-B:C Yes

720 10 -65 1-A:20-B:C Yes

B456, B441 10 -65 4-A:80-B:C Yes

592 13.2 -65 4-A:80-B:C Yes

594 13.2 -65 2-A:40-B:C Yes

581 20 -65 4-A:40-B:C Yes

760 20 -65 4-A:60-B:C Yes

Page 166: Pre Qualification -Firefreeze - 2014a

423, 564, A411 20 -65 10-A:120-B:C Yes

589 30 -65 10-A:160-B:C Yes

567 30 -65 4-A:40-B:C Yes

763 30 -65 4-A:80-B:C Yes

495 50 -40 20-A:160-B:C Yes

488 125 -65 30-A:240-B:C Yes

573 250 -40 40-A:160-B:C Yes

Potassium bicarbonate

B410 2 .5 -65 10-B:C Yes

B416 5 -65 10-B:C Yes

B479 5 -65 30-B:C Yes

722 10 -65 20-B:C Yes

B460 10 -65 80-B:C Yes

595 13.2 -65 40-B:C Yes

599 13.2 -65 80-B:C Yes

584 20 -65 20-B:C Yes

580 20 -65 40-B:C Yes

762 20 -65 60-B:C Yes

566, A413, 415 20 -65 120-B:C Yes

569 30 -65 40-B:C Yes

764 30 -65 80-B:C Yes

591 30 -65 160-B:C Yes

497 50 -40 160-B:C Yes

689, 690 125 -40 120-B:C Yes

490 125 -65 320-B:C Yes

575 250 -40 160-B:C Yes

Sodium bicarbonate

A620 1 -65 2-B:C No

B403, C403 2.5 -65 10-B:C Yes

B409 5 -65 10-B:C Yes

B453 5.5 -65 40-B:C Yes

B459, B462 6 -65 40-B:C Yes

721 10 -65 20-B:C Yes

B457, B447 10 -65 60-B:C Yes

593 13.2 -65 40-B:C Yes

A412, 408 20 -65 120-B:C Yes

582 20 -65 40-B:C Yes

761 20 -65 60-B:C Yes

568 30 -65 40-B:C Yes

496 50 -40 160-B:C Yes

489 150 -65 240-B:C Yes

574, 579

Page 167: Pre Qualification -Firefreeze - 2014a

High-flow Extinguishers

Trademark and/or Tradename: "Sure Shot"

© 2013 UL LLC

When the UL Leaf Mark is on the product, or when the word "Environment" is included in the UL Mark, please search the UL Environment database for additional information regarding this product's certification.

The appearance of a company's name or product in this database does not in itself assure that products so identified have been manufactured under UL's Follow-Up Service. Only those products bearing the UL Mark should be considered to be Listed and covered under UL's Follow-Up Service. Always look for the Mark on the product.

UL permits the reproduction of the material contained in the Online Certification Directory subject to the following conditions: 1. The Guide Information, Designs and/or Listings (files) must be presented in their entirety and in a non-misleading manner, without any manipulation of the data (or drawings). 2. The statement "Reprinted from the Online Certifications Directory with permission from UL" must appear adjacent to the extracted material. In addition, the reprinted material must include a copyright notice in the following format: "© 2013 UL LLC".

250 -40 160-B:C Yes

Extinguishing Agent Model

Ammonium phosphate 581, 567, 495, 470, 467, 450, 488, 573, 491, 720, 760, 763

Potassium bicarbonate 580, 569, 584, 497, 689, 690, 490, 575, 452, 469, 472, 493, 722, 762, 764

Sodium bicarbonate 582, 568, 496, 489, 574, 579, 451, 468, 471, 492, 721, 761

Last Updated on 2011-06-16

Questions? Print this page Terms of Use Page Top

Page 168: Pre Qualification -Firefreeze - 2014a

HBOR.EX1774Hydrants

Page Bottom

Hydrants

See General Information for Hydrants

KENNEDY VALVE, DIV OF MCWANE INC EX1774

1021 E WATER ST

ELMIRA, NY 14901 USA

Base valve design.

ModelBase Valve

Size In.Hose Outlet

In.Pumper Outlet

In.Rated Pressure

(psig)

K-81 4-1/2 (2) 2-1/2 — 175

"Traffic Type"

K-81 5-1/4 (2) 2-1/2 — 175

"Traffic Type"

K-81 4-1/2 (2) 2-1/2 (1) 4-1/2 or 5 175

"Traffic Type"

K-81 5-1/4 (2) 2-1/2 (1) 4-1/2 or 5 175

"Traffic Type"

K-81D 4-1/2 (2) 2-1/2 — 175

"Traffic Type"

K-81D 5-1/4 (2) 2-1/2 — 175

"Traffic Type"

K-81D 4-1/2 (2) 2-1/2 (1) 4-1/2 or 5 175

"Traffic Type"

K-81D 5-1/4 (2) 2-1/2 (1) 4, 4-1/2 or 5 175

"Traffic Type"

Note — The model K-81 with 5-1/4 in. base valve may be supplied with a 3 in. monitor elbow and/or gate valve flange.

Last Updated on 1996-07-23

Questions? Print this page Notice of Disclaimer Page Top

Copyright © 2010 Underwriters Laboratories Inc.®

The appearance of a company's name or product in this database does not in itself assure that products so identified have been manufactured underUL's Follow-Up Service. Only those products bearing the UL Mark should be considered to be Listed and covered under UL's Follow-Up Service.Always look for the Mark on the product.

UL permits the reproduction of the material contained in the Online Certification Directory subject to the following conditions: 1. The GuideInformation, Designs and/or Listings (files) must be presented in their entirety and in a non-misleading manner, without any manipulation of the data(or drawings). 2. The statement "Reprinted from the Online Certifications Directory with permission from Underwriters Laboratories Inc." mustappear adjacent to the extracted material. In addition, the reprinted material must include a copyright notice in the following format: "Copyright ©2010 Underwriters Laboratories Inc.®"

Page 169: Pre Qualification -Firefreeze - 2014a

Carbon Dioxide Extinguishers

© 2013 UL LLC

When the UL Leaf Mark is on the product, or when the word "Environment" is included in the UL Mark, please search the UL Environment database for additional information regarding this product's certification.

The appearance of a company's name or product in this database does not in itself assure that products so identified have been manufactured under UL's Follow-Up Service. Only those products bearing the UL Mark should be considered to be Listed and covered under UL's Follow-Up Service. Always look for the Mark on the product.

UL permits the reproduction of the material contained in the Online Certification Directory subject to the following conditions: 1. The Guide Information, Designs and/or Listings (files) must be presented in their entirety and in a non-misleading manner, without any manipulation of the data (or drawings). 2. The statement "Reprinted from the Online Certifications Directory with permission from UL" must appear adjacent to the extracted material. In addition, the reprinted material must include a copyright notice in the following format: "© 2013 UL LLC".

FXHV.EX2835 Carbon Dioxide Extinguishers

Page Bottom

See General Information for Carbon Dioxide Extinguishers

AMEREX CORP EX2835

7595 GADSDEN HWY E

PO BOX 81

TRUSSVILLE, AL 35173 USA

Model

Nom Agent Capacity, lb

Min Use Temp, °F

Rating

Marine Type

322 5 -22 5-B:C Yes

330 10 -22 10-B:C Yes

331 15 -22 10-B:C Yes

332 20 -22 10-B:C Yes

333 50 -22 20-B:C Yes

334 100 -22 20-B:C Yes

Last Updated on 2010-12-27

Questions? Print this page Terms of Use Page Top

Page 170: Pre Qualification -Firefreeze - 2014a

Dry-chemical Extinguishers, Portable, Marine

Stored-pressure-type Extinguishers

GPCZ.EX2764 Dry-chemical Extinguishers, Portable, Marine

Page Bottom

See General Information for Dry-chemical Extinguishers, Portable, Marine

AMEREX CORP EX2764

7595 GADSDEN HWY E

PO BOX 81

TRUSSVILLE, AL 35173 USA

Model

Nominal Agent

Capacity lb

Min Use Temp, °F

Rating

Marine Classification

Type A Size

Type B:C Size

Ammonium phosphate

B417 2.5 -65 1-A:10-B:C — I

B424, B500 5 -65 2-A:10-B:C II I

B402 5 -65 3-A:40-B:C II I

B461, B443 6 -65 3-A:40-B:C II I

B456, B441 10 -65 4-A:80-B:C II II

592 13.2 -65 4-A:80-B:C II II

594 13.2 -65 2-A:40-B:C II II

581 20 -65 4-A:40-B:C II III

423, 564, A411 20 -65 10-A:120-B:C II III

589 30 -65 10-A:160-B:C II IV

567 30 -65 4-A:40-B:C II IV

763 30 -65 4-A:80-B:C II IV

Potassium Bicarbonate

B410 2.5 -65 10-B:C — I

B416 5 -65 10-B:C — I

B479 5 -65 30-B:C — I

B460 10 -65 80-B:C — II

595 13.2 -65 40-B:C — II

599 13.2 -65 80-B:C — II

584 20 -65 20-B:C — III

580 20 -65 40-B:C — III

566, A413, 415 20 -65 120-B:C — III

569 30 -65 40-B:C — IV

764 30 -65 80-B:C — IV

Page 171: Pre Qualification -Firefreeze - 2014a

© 2013 UL LLC

When the UL Leaf Mark is on the product, or when the word "Environment" is included in the UL Mark, please search the UL Environment database for additional information regarding this product's certification.

The appearance of a company's name or product in this database does not in itself assure that products so identified have been manufactured under UL's Follow-Up Service. Only those products bearing the UL Mark should be considered to be Listed and covered under UL's Follow-Up Service. Always look for the Mark on the product.

UL permits the reproduction of the material contained in the Online Certification Directory subject to the following conditions: 1. The Guide Information, Designs and/or Listings (files) must be presented in their entirety and in a non-misleading manner, without any manipulation of the data (or drawings). 2. The statement "Reprinted from the Online Certifications Directory with permission from UL" must appear adjacent to the extracted material. In addition, the reprinted material must include a copyright notice in the following format: "© 2013 UL LLC".

693 30 -65 120-B:C — IV

591 30 -65 160-B:C — IV

Sodium bicarbonate

B403, C403 2.5 -65 10-B:C — I

B409 5 -65 10-B:C — I

B453 5.5 -65 40-B:C — I

B459, B462 6 -65 40-B:C — I

B457, B447 10 -65 60-B:C — II

593 13.2 -65 40-B:C — II

A412, 408 20 -65 120-B:C — III

582 20 -65 40-B:C — III

568 30 -65 40-B:C — IV

Last Updated on 2011-06-16

Questions? Print this page Terms of Use Page Top

Page 172: Pre Qualification -Firefreeze - 2014a

Strainers, Pipeline

Strainers, basket type, Fig. N. 595 in the 4, 6, 8, 10, 12 in. sizes for working pressures not exceeding 175 psi.

Loss of head will approximate 3.95 psi for the 12 in. size at 5233 GPM.

Strainers, "Y" type, Fig. 911, 911CS in sizes 2-1/2, 3, 4, 5, 6, 8, 10 and 12 in. for working pressures not exceeding 175 psig. Loss of head will approximate 3.3 psi for the 3 in. size at 350 GPM, 3.2 psi for the 4 in. size at 600 GPM, 3.6 psi for the 5 in. size at 950 GPM, 3.6 psi for the 6 in size at 1350 GPM, 3.1 psi for the 8 in. size at 2350 GPM and 3 psi for the 10 in. size at 3700 GPM .

© 2012 UL LLC

When the UL Leaf Mark is on the product, or when the word "Environment" is included in the UL Mark, please search the UL Environment database for additional information regarding this product's certification.

The appearance of a company's name or product in this database does not in itself assure that products so identified have been manufactured under UL's Follow-Up Service. Only those products bearing the UL Mark should be considered to be Listed and covered under UL's Follow-Up Service. Always look for the Mark on the product.

UL permits the reproduction of the material contained in the Online Certification Directory subject to the following conditions: 1. The Guide Information, Designs and/or Listings (files) must be presented in their entirety and in a non-misleading manner, without any manipulation of the data (or drawings). 2. The statement "Reprinted from the Online Certifications Directory with permission from UL" must appear adjacent to the extracted material. In addition, the reprinted material must include a copyright notice in the following format: "© 2012 UL LLC".

HLCV.EX3258 Strainers, Pipeline

Page Bottom

See General Information for Strainers, Pipeline

MUELLER STEAM SPECIALTY, DIV OF CORE INDUSTRIES INC EX3258

HWY 20 W

SAINT PAULS, NC 28384 USA

Last Updated on 2004-12-09

Questions? Print this page Terms of Use Page Top

Page 173: Pre Qualification -Firefreeze - 2014a

Fire Hose, Lined, Uncoupled, for Municipal and Industrial Use Certified for Canada

"Proflo" 38.1, 50.8, 63.5 and 76.2 mm nitrile rubber/polyvinyl chloride hose having a reinforcement of polyester filament synthetic warp threads and Polyamide nylon filament filler threads and nitrile/polyvinyl chloride cover judged equivalent to single-jacketed 250 psig service test pressure fire hose.

"Proflo" 101.6 and 127 mm nitrile rubber/polyvinyl chloride hose having a reinforcement of polyester filament synthetic warp threads and Polyamide nylon filament filler threads and nitrile/polyvinyl chloride cover judged equivalent to double-jacketed 200 psig service test pressure fire hose.

"DuraFlo" 44.5 and 63.5 mm nitrile rubber/polyvinyl chloride hose having a reinforcement of polyester filament synthetic warp threads and Polyamide nylon filament filler threads and nitrile/polyvinyl chloride cover judged equivalent to single-jacketed 250 psig service test pressure fire hose.

Single-jacketed fire hose, 1-1/2 in. size ("SP15"), 2 in. size ("SP20"), and 2-1/2 in. size ("SP25").

Double-jacketed fire hose, 1-1/2 in. size ("DP15"), 1-3/4 in. size ("DP17"), 2 in. size ("DP20"), 2-1/2 in. size *("DP25"), 3 in. size ("DP30"), 3-1/2 in. size ("DP35"), and *4 in. size ("DP40").

© 2012 UL LLC

When the UL Leaf Mark is on the product, or when the word "Environment" is included in the UL Mark, please search the UL Environment database for additional information regarding this product's certification.

The appearance of a company's name or product in this database does not in itself assure that products so identified have been manufactured under UL's Follow-Up Service. Only those products bearing the UL Mark should be considered to be Listed and covered under UL's Follow-Up Service. Always look for the Mark on the product.

UL permits the reproduction of the material contained in the Online Certification Directory subject to the following conditions: 1. The Guide Information, Designs and/or Listings (files) must be presented in their entirety and in a non-misleading manner, without any manipulation of the data (or drawings). 2. The statement "Reprinted from the Online Certifications Directory with permission from UL" must appear adjacent to the extracted material. In addition, the reprinted material must include a copyright notice in the following format: "© 2012 UL LLC".

MZQE7.EX4211 Fire Hose, Lined, Uncoupled, for Municipal and Industrial Use Certified for Canada

Page Bottom

See General Information for Fire Hose, Lined, Uncoupled, for Municipal and Industrial Use Certified for Canada

KEY FIRE HOSE CORP EX4211

2926 COLUMBIA HWY

DOTHAN, AL 36303 USA

Last Updated on 2012-09-17

Questions? Print this page Terms of Use Page Top

Page 174: Pre Qualification -Firefreeze - 2014a

Fire Hose, Lined, Uncoupled, for Municipal and Industrial Use

"Proflo" 1-1/2, 2. 2-1/2 and 3 in. nitrile rubber/polyvinyl chloride hose having a reinforcement of polyester filament synthetic warp threads and Polyamide nylon filament filler threads and nitrile/polyvinyl chloride cover judged equivalent to single-jacketed 250 psig service test pressure fire hose.

"Proflo" 4 and 5 in. nitrile rubber/polyvinyl chloride hose having a reinforcement of polyester filament synthetic warp threads and Polyamide nylon filament filler threads and nitrile/polyvinyl chloride cover judged equivalent to double-jacketed 200 psig service test pressure fire hose.

"DuraFlo" 1-3/4 and 2-1/2 in. nitrile rubber/polyvinyl chloride hose having a reinforcement of polyester filament synthetic warp threads and Polyamide nylon filament filler threads and nitrile/polyvinyl chloride cover judged equivalent to single-jacketed 250 psig service test pressure fire hose.

Single-jacketed fire hose, 1-1/2 in. size ("SP15"), 2 in. size ("SP20"), and 2-1/2 in. size ("SP25").

Double-jacketed fire hose, 1-1/2 in. size ("DP15"), 1-3/4 in. size ("DP17"), 2 in. size ("DP20"), 2-1/2 in. size *("DP25"), 3 in. size ("DP30"), 3-1/2 in. size ("DP35"), and *4 in. size ("DP40").

© 2012 UL LLC

When the UL Leaf Mark is on the product, or when the word "Environment" is included in the UL Mark, please search the UL Environment database for additional information regarding this product's certification.

The appearance of a company's name or product in this database does not in itself assure that products so identified have been manufactured under UL's Follow-Up Service. Only those products bearing the UL Mark should be considered to be Listed and covered under UL's Follow-Up Service. Always look for the Mark on the product.

UL permits the reproduction of the material contained in the Online Certification Directory subject to the following conditions: 1. The Guide Information, Designs and/or Listings (files) must be presented in their entirety and in a non-misleading manner, without any manipulation of the data (or drawings). 2. The statement "Reprinted from the Online Certifications Directory with permission from UL" must appear adjacent to the extracted material. In addition, the reprinted material must include a copyright notice in the following format: "© 2012 UL LLC".

MZQE.EX4211 Fire Hose, Lined, Uncoupled, for Municipal and Industrial Use

Page Bottom

See General Information for Fire Hose, Lined, Uncoupled, for Municipal and Industrial Use

KEY FIRE HOSE CORP EX4211

2926 COLUMBIA HWY

DOTHAN, AL 36303 USA

Last Updated on 2012-09-17

Questions? Print this page Terms of Use Page Top