Practicalities and Technical Implementation of a Synchronised Call Christian Listabarth.

21
Practicalities and Technical Implementation of a Synchronised Call Christian Listabarth

Transcript of Practicalities and Technical Implementation of a Synchronised Call Christian Listabarth.

Page 1: Practicalities and Technical Implementation of a Synchronised Call Christian Listabarth.

Practicalities and Technical Implementation

of a Synchronised Call

Christian Listabarth

Page 2: Practicalities and Technical Implementation of a Synchronised Call Christian Listabarth.

INSO 12-2014

• Elements (scope)

• New instrument/pilot within ERA (no precedence)

• Impact: call text & to be defined by consortium

• Implementation: technical & practical solutions

Page 3: Practicalities and Technical Implementation of a Synchronised Call Christian Listabarth.

Summary of INSO 12-2014• Objectives / Elements – 1 call, synchronized, based on bundled national calls– peer review evaluationminimum implications: agreed topic, one language, joint evaluation

• Background/input– your national call, peer review evaluation, joint calls

• Foreground/outcome– practice of implementation (feasibility and practicality)– technical modalities (solutions for implementation)– proof of concept (efforts v. added value)

Page 4: Practicalities and Technical Implementation of a Synchronised Call Christian Listabarth.

Mechanics

• national call v. synchronized call => bundle nat. calls• joint call v. synchronized call => no new set-up– no transnational dimension of projects– no fresh money needed – BUT: consider experience & good practice of joint calls

• national tasks & joint tasks => coordinate – timeline – evaluation

• practical implications along a standard timeline

Page 5: Practicalities and Technical Implementation of a Synchronised Call Christian Listabarth.

Hypothetical timeline (flexible)

joint activities: the coordinator + participating agenciesnational level activities

Call cyclenational & joint calls have same cycle (in principle)synchronized call has very same cyclecall cycle is a generic matter and involves certain essential aspects (ERA-LEARN cycle)

use it as a standarduse it as a draft, but not literally

Joint activtiesmajor joint actions in synchronized call:

planning, evaluation, (submission)agreed call timeline

partly joint actions (dependent on settings):call preparation(submission)

1 planning2 preparation3 submission

4 evaluation

5 decision6 aftercall

Page 7: Practicalities and Technical Implementation of a Synchronised Call Christian Listabarth.

Phase 1 – 3 (example)

Page 8: Practicalities and Technical Implementation of a Synchronised Call Christian Listabarth.

Phase 4 – 6 (example)

Page 9: Practicalities and Technical Implementation of a Synchronised Call Christian Listabarth.

Synchronization of national calls

Call planning Call preparation Submission Evaluation Funding decision After the Call

National timelines: same principle, but individual characteristics (position and length of phases)

Submission deadline: eligibility check and start of evaluation

Deadline and eligibility: could be planned as a (short) phase

Approach: optimized (negotiated)

•date of funding decision fixed: evaluation must be ready at that date (minimum requirement)•national timelines flexible: => optimize for joint evaluation

Page 10: Practicalities and Technical Implementation of a Synchronised Call Christian Listabarth.

Planning I (for proposal)

• Consortium building – compatible participating nat. programs?

• Management/coordination– who/how/which tasks– plan meetings

• Call topic (apt for all?)• Timeline for the action period (feasibility)• Number of expected proposals (cost estimate) • Evaluation scheme (basics at least) • Confidentiality of proposals/results (is there a problem?)

Page 11: Practicalities and Technical Implementation of a Synchronised Call Christian Listabarth.

Planning II (for proposal)

• Evaluation procedure– centralized v. decentralized (but identical within

consortium)– 1-step v. 2-step – with/without panel– selection of evaluators (EC database)– costs for evaluation (data from practice)

Page 12: Practicalities and Technical Implementation of a Synchronised Call Christian Listabarth.

Evaluation: 1 or 2-step

Synchronized Call Office National programs

Pros:•legal constraints, tradition•less in depth evaluation effortCons:•longer timeline•double administrative effort

Evaluation outcome:•proposals assessed •project quality compared•above threshold

Page 13: Practicalities and Technical Implementation of a Synchronised Call Christian Listabarth.

Planning III (for proposal)

• Electronic Evaluation and Submission System– national v. central– which systems, what can they do?– availability (within / outside consortium)– interaction with provider, desired complexity

Page 14: Practicalities and Technical Implementation of a Synchronised Call Christian Listabarth.

Workflow of a call & role of electronicEvaluation and Submission System (ESS)

Call announcement Submission Proposal Evaluation Result Decision

Start………………………..…….…Call life cycle………………………………………End

Start Project life cycle…

ESS: Interface between actors/activities and deliverables (documents)

ESS functionality: Interface establishedData administrated and managedDatabase / documentation generated

ESS: Information hub for: proposal up- and download (actors: applicants, agencies and evaluators)evaluation results up- and download (actors: agencies and evaluators)

Page 15: Practicalities and Technical Implementation of a Synchronised Call Christian Listabarth.

Participating agencies ESS Provider

Outcome: tailor-made ESS and explanation of use

• Using ESS for submission• Provide list of evaluators for access distribution

• Define call specifications• Develop evaluation procedure and timeline• Define access rights accordingly

(general and specific to each phase)• Formulate order for ESS

• Provide consult and experience to client(feasibility of procedure and timeline, constraints, additional functions)

• Design ESS from existing system for specified variables, explain operation to client

• Return access rights• Prepare database• Perform evaluation

• download of projects by respective referees• upload of reviews by referees• administrate data for consensus meeting

Outcome: evaluation report (with scores)

Workflow of interaction with ESS provider

Everything you expect from operation must be specified here

Page 16: Practicalities and Technical Implementation of a Synchronised Call Christian Listabarth.

Budget• Evaluation budget– Variable costs (fees for experts, panel)– Fixed costs (secretariat)

• Coordination budget– Preparation and coordination (PM costs)– Call promotion (PM, material)– Meetings (travel)– IT Tool / ESS (subcontracting)

• Dependent on: – Number of proposals expected, fees, in-kind– Consider Call settings: 0.2-0.5 Mio €

Page 17: Practicalities and Technical Implementation of a Synchronised Call Christian Listabarth.

Planning IV (for proposal)

Competition for excellence Quality and efficiency of implementation consider/resolve

•state of the art•as many aspects as possible•impact on costs

Page 18: Practicalities and Technical Implementation of a Synchronised Call Christian Listabarth.

Implementation I (start of project)

• Install management and task forces• Refine all previous issues, particularly:– topic (agreed range of eligible topics, definitions)– timeline, fix dates– eligibility: national and joint criteria – evaluation criteria (identical)– submission and evaluation process

Page 19: Practicalities and Technical Implementation of a Synchronised Call Christian Listabarth.

Implementation II (start of project)

• Call preparation (promotion and documents)– intrinsically dependent on national v. central setting– usually, applicants are attracted mainly by national promotion

• national elements– inform applicants on your purpose for synchronized call– inform on validity of national standards– argue for positioning of national science community within ERA

• central elements– announce call and focus on joint image– explain the European dimension of the call– refer to national program owners for details (national rules apply)

– Documents may differ, but must contain the same elements

Page 20: Practicalities and Technical Implementation of a Synchronised Call Christian Listabarth.

Summary

• no precedence – much room for creativity• take professional help (ERA-LEARN)• main joint task (general): manage call operatively• main challenge (specific): agree and accept

evaluation procedure (and results)• main prerequisites: trust and commitment• main factors (technical): sound concept and

compliant coordinator

Page 21: Practicalities and Technical Implementation of a Synchronised Call Christian Listabarth.

Thank you for your attention

http://netwatch.jrc.ec.europa.eu/web/lp/learning-platform/toolbox/call-implementation