PRACTICAL WORK REPORT PT RINA INDONESIA – BATAM OFFICE JULY – AUGUST 2015 Bayu Mahardika 4312100135

Transcript of Practical Work Report fix

Page 1: Practical Work Report fix

PRACTICAL WORK REPORTPT RINA INDONESIA – BATAM OFFICEJULY – AUGUST 2015

Bayu Mahardika 4312100135

Page 2: Practical Work Report fix

REGISTRO ITALIANO NAVALEMain Activities of RINA RINA Indonesia Office in Batam

Page 3: Practical Work Report fix

MAIN ACTIVITIES OF RINA RINA offers a broad range of services such as

ship classification surveys, statutory surveys and certification on behalf of Flag States based on both international conventions, codes, national statutes, as well as RINA’s own rules and regulations.

Page 4: Practical Work Report fix

REGISTRO ITALIANO NAVALE Main Activities of RINARINA Indonesia Office in Batam

Page 5: Practical Work Report fix

RINA INDONESIA OFFICE IN BATAM RINA Batam Office is located at Graha Pena

Batam, 9th Floor, 502B, Jalan Raya Batam Centre, Batam.

Figure 1. RINA Batam Office Figure 2. RINA Meeting Room

Page 6: Practical Work Report fix

RINA INDONESIA OFFICE IN BATAM Main activities of RINA Batam Office are to

held surveys of ships within region of Indonesia, such as: Classification Surveys Including Classification

Surveys for Ships During Construction and for Ships Not Built Under Survey,

Class Maintenance Surveys including Statutory Surveys,

ISM (International Safety Management), ISM provides an international standard for the safe management and operation of ships and for pollution prevention.

Page 7: Practical Work Report fix

SURVEY AND CERTIFICATIONClassification Survey

Survey for New BuildingSurvey for Ship in Service

Class Maintenance Survey Periodic Survey Non-Periodic Survey

Page 8: Practical Work Report fix

CLASSIFICATION SURVEY Survey for New Building

Visual and Scantling CheckScantling check is a verification process of construction’s size based on the drawing that have been approved by RINA as a reference, and match with the actual dimensions.

Page 9: Practical Work Report fix

CLASSIFICATION SURVEY Survey for New Building

Welding CheckWelding check is an inspection of welding result on the new construction of ship when there is a weld defect.

Page 10: Practical Work Report fix

CLASSIFICATION SURVEY Survey for New Building

Leak TestLeak test aims to test for leaks in the vessel body. There are 3 types of leak test, there are hydro test, air test, and hose test.

Page 11: Practical Work Report fix

CLASSIFICATION SURVEY Survey for Ship in ServiceThis survey is survey for existing ship which will be registered in RINA, they must be surveyed first to ensure the society that the vessel are meet the requirements of safety for human life, environment, and property during the operational life of the ship based on RINA rules.

Page 12: Practical Work Report fix

SURVEY AND CERTIFICATION Classification Survey

Survey for New Building Survey for Ship in Service

Class Maintenance SurveyPeriodic SurveyNon-Periodic Survey

Page 13: Practical Work Report fix

CLASS MAINTENANCE SURVEY Periodic Survey

Note: AS : Annual SurveyIS : Intermediate SurveyDS : Docking SurveySS : Special Survey

Page 14: Practical Work Report fix

CLASS MAINTENANCE SURVEY Non-Periodic Survey

Tail Shaft SurveyPropeller Shaft and Sterntube Shaft Survey (PS) is a survey to the propeller shafting and sterntube shafting systems onboard a ship to make sure the systems are still meet the requirements of the Society.

Page 15: Practical Work Report fix

CLASS MAINTENANCE SURVEY Non-Periodic Survey

Boiler SurveyBoiler Surveys are to be carried out at Annual Surveys, Intermediate Surveys, and Special Surveys.

Page 16: Practical Work Report fix

SURVEY ACTIVITYGeneral Survey Item

Visual and Scantling Check Welding Check Leak Test Inclining Test Safety Device Function Test Sea Trial

Page 17: Practical Work Report fix

GENERAL The equipments required for survey :

Figure 3. Wearpack Figure 4. Safety Gloves Figure 5. Safety Shoes Figure 6. Safety

Helmet

Figure 7. Safety Glasses Figure 8. Torchlight Figure 9. Marker Chalk Figure 10. Inspection Mirror

Page 18: Practical Work Report fix

SURVEY ACTIVITY GeneralSurvey Item

Visual and Scantling CheckWelding CheckLeak TestInclining TestSafety Device Function TestSea Trial

Page 19: Practical Work Report fix

SURVEY ITEM Visual and Scantling CheckVisual and scantling check is a verification process of construction’s size based on the drawing that have been approved by RINA as a reference, and match with the actual dimensions.

Figure 11. Skeg Construction Drawing Figure 12. Missing Scallop

Page 20: Practical Work Report fix

SURVEY ITEM Welding CheckWelding check is an inspection of welding result on the new construction of ship when there is a weld defect. There are many kind of weld defect, there are crack, porosity, undercut, undersize, slag, and spatter.

Figure 12. Crack Figure 13. Undercut Figure 14. Undersize Figure 15. Slag and Spatter

Page 21: Practical Work Report fix

SURVEY ITEM Leak Test

Hydro TestHydro test conducted by pumping water up to 1.5 times the working pressure or design pressure. After that surveyor check the leak on the connection of flange pipe. If there is water on the connection of flange pipe, it means there is a leak.

Figure 16. Pumping Water Up To 1.5 Times The Design

Pressure

Figure 17. Surveyor Check The Leak On Flange

Connection

Page 22: Practical Work Report fix

SURVEY ITEM Leak Test

Air TestThe first step was filled the air inside the tank that to be tested. Then the outside sprayed using soapy water. Surveyor will monitor the outside of the tank thoroughly. If there were air bubbles on the surface of the tank, it indicates a leak.

Figure 18. Soapy Water

Hose

Figure 19. Air Pump Tools

Figure 20. Air Test Process On

Side Shell

Figure 21. Leak On Side Shell

Page 23: Practical Work Report fix

SURVEY ITEM Leak Test

Hose TestProcess conducted is by spraying high-pressure water from the water jet pump in the area will be checked for leaks. Equipment needed is a water jet pump and a nozzle for spraying pressurized water.

Figure 22. WaterJet Pump

Figure 23. Water Spraying Process

Page 24: Practical Work Report fix

SURVEY ITEM Inclining TestInclining test is a test to determine metacentric height.

Before we did inclining test, we checked draft on this vessel. At fore in starboard side show 1.04m, at port side show 1.08m, at after in starboard side show 1.50m, and at port side show 1.49 m. Draft should be measured before and after testing to assure that no major additions to the condition of the ship during the test.

There were four areas that placed ballasts. Each area had 6 ballasts, that a ballast had a weight 5.3 ton. It means an area had 21.2 ton ballasts.

Figure 24. Ballasts

Page 25: Practical Work Report fix

SURVEY ITEM Inclining Test

This vessel had LPP = 42m. Vessel that had LPP > 32 use two pendulums to did inclining test, on fore and after.

When inclining test happen, the hull of the vessel was not allowed to touch jetty

Figure 25. Pendulum Figure 26. Hull Was Not Allowed to Touch Jetty

Page 26: Practical Work Report fix

SURVEY ITEM Inclining Test

Table 1. Result of Inclining Test

Page 27: Practical Work Report fix

SURVEY ITEM Safety Device Function Test

Bilge AlarmTechnician set up from day tank panel. When the red indicator lamp turned on, it means it worked on high level. But when the yellow indicator lamp turned on, it means it worked on low level.

Figure 27. Technician Set Up Valve

Figure 28. Bilge Alarm

Figure 29. Alarm Turned On

Page 28: Practical Work Report fix

SURVEY ITEM Safety Device Function Test

CompressorSafety device on compressor aims to decrease pressure inside the compressor to prevent the blow out. This safety device will release some air from the compressor automatically to release pressure when it reached maximum pressure

Figure 30. Compressor

Page 29: Practical Work Report fix

SURVEY ITEM Safety Device Function Test

Emergency Lamp and Alarm (Black Out Simulation)This is simulation when black out happened in the vessel. Emergency lamp and alarm have to functioning properly. Technician turning off all of system or black out to testing emergency lamp and emergency alarm. Emergency lamp and alarm will turn on automatically when the system down.

Figure 31. Black Out Simulation

Page 30: Practical Work Report fix

SURVEY ITEM Safety Device Function Test

Steering GearThe safety device function test aims to set maximum angle of rudder. This test conducted by drive rudder in captain room first, and surveyor check the angle at steering gear room. Rudder move by hydraulic system. Each rudder has limit switch. Limit switch is a safety device to limiting the angle of rudder

Figure 32. Rudder with Hydraulic System

Figure 33. Limit Switch

Page 31: Practical Work Report fix

SURVEY ITEM Safety Device Function Test

Smoke DetectorSmoke detector is safety device for fire protection system. When there are smoke in the vessel, emergency alarm have to turned on automatically, to prevent

Figure 34. Smoke Detector

Page 32: Practical Work Report fix

SURVEY ITEM Safety Device Function Test

Fire ExtinguisherFire extinguisher is also safety device for fire protection system. The test aims to know that the fire extinguisher functioning properly.

Figure 35. Fire Extinguisher

Page 33: Practical Work Report fix

SURVEY ITEM Safety Device Function Test

Oil Water SeparatorOWS serves to separate water and oil, oil spills came from the engine. The separated water will be discharged into the sea. Water discharged into the sea should be qualified at less than 15 ppm.

Figure 36. Oil Water Separator

Page 34: Practical Work Report fix

SURVEY ITEM Safety Device Function Test

Engine Safety DeviceThis test aims to know that safety device functioning properly when the engine turned in over speed condition.

Figure 37. Main Engine Figure 38. Monitor in Engine Room

Figure 39. Monitor in Wheelhouse

Page 35: Practical Work Report fix

SURVEY ITEM Sea Trial

Progressive Speed TrialProgressive speed trial to be carried out to confirm the ship’s performance and cover the guarantee speed based on contract. Speed trial have been conducted over a recognized mile.

Table 2. Result of Progressive Speed Trial

Page 36: Practical Work Report fix

SURVEY ITEM Sea Trial

Turning Circle TestTurning test to be carried out to know ship’s turning performance and characteristics, and minimum diameter of ship turning.

Table 3. Result of Turning Circle Test

Page 37: Practical Work Report fix

SURVEY ITEM Sea Trial

Zig-Zag Maneuver TestZig-zag maneuver test to be carried out to investigate the maneuvering performance.

Table 4. Result of Zig-Zag Maneuver Test

Page 38: Practical Work Report fix

SURVEY ITEM Sea Trial

Steering Gear TestThis test to be carried out to measuring time at order given to operate the steering gear system. In main steering, move steering to 35º port and then 30º starboard using hydraulic pump, requirements of maximum standard time is 28 sec. In emergency steering, move steering to 25º port and then 15º starboard using steering wheel, requirements of maximum standard time is 60 sec.

Page 39: Practical Work Report fix

SURVEY ITEM Sea Trial

Anchor TestThis test to be carried out to inspect the conditions of lowering, heaving, stowing, and to measuring time of hoisting speed at order given to operate it. The requirement of maximum standard of hoisting speed time is 9 min on 3 shackles.

Page 40: Practical Work Report fix

CONCLUSION Class is expression of the degree of reliance a

ship deserves on the whole in relation to the service and trade on which the ship is engaged, or to be engaged.

Class gives credence to client, client in this case is shipping company, so that they are sure if the ship has met the criteria comply with the requirements, related to the service of ships.

Page 41: Practical Work Report fix