PUNJAB COLLEGE OF ENGG AND TECHNOLOGY SIX MONTHS INDUSTRIAL TRAINING AT SONALIKA INTERNATIONAL TRACTORS LTD. SUBMITTED TO: SUBMITTED BY: ER.BEANT SINGH AKASH HOD ME 100531131254

Transcript of ppt on sonalika engine assembly

PUNJAB COLLEGE OF ENGG AND TECHNOLOGY

SIX MONTHS INDUSTRIAL TRAINING AT SONALIKA INTERNATIONAL TRACTORS LTD.

SUBMITTED TO: SUBMITTED BY:ER.BEANT SINGH AKASHHOD ME 100531131254

Sonalika group is one of the top automobile and agriculture machinery manufacturers in India. Apart from tractors its product line includes multi utility vehicles, three-wheelers, engines and various farm equipment’s and implements. Established in 1969, Sonalika group since the inception has tried to understand customer need to be facilitating them with its value for money products. The Company has a state of art manufacturing facilities, spread in acres, located in the free shrubs of Punjab and Himachal Pradesh .Sonalika is the one of the top 3 tractor manufacturing companies in India, other products include of, Multi utility vehicles, engines and various farm equipment’s. Today the group stands tall with an approximate turnover of 5000 Crore INR. An average growth of 30% makes it one of the fastest growing corporate in India. It is also one of the few debt free companies. Group has strength of about 2000 employee technocrats.

Sonalika Group

TRAINING ATENGINE ASSEMBLY DIVISION AT Sonalika engine assembly shop the engine is assembled in 13 stages.

Stage 1:This stage primarily involves the cleaning and washing up of the freshly machined engine block to make it free from chips and any adhering dust particles. Procedure :

Loading of engine block in the circular fixture of the machine.

Stationary washing of the engine block inside the wash machine.

Air is blown from the bock to make it free from cleaning agent

All the bored and threaded holes are blown manually to remove any chips that may be left inside.

Then block is ready to be sent to the assembly line.

Stage 2: This is the inspection stage of the engine block.

Procedure: Inspection of crankcase Blowing air to clear any

remaining particles Stamping engine

number on the block Plugging of the holes leading

out of the main gallery Fitment of sealing rings

on the liner.

STAGE 3:Pressing timing gear on crankshaft.Pressing pin into bottom intermediate gear.Fitment of bearing liners on all bearing caps and main journals.Fitment of crankshaft sub-assembly, bearing holder and pilot bearing

Stage 4:Fitment of cap on the rear end of the camshaft bore of crankcaseSliding the camshaft into the crankcaseFitting the timing gears one by one (i.e. cam gear, idler gear).Pressing the bearing on the I.P.D. shaft.Fixing the I.P.D. shaft.Fitment of gear on it.

Stage 5: Fixing the liners in the big end of the connecting rod.Mounting of piston rings onto the piston.Fitment of small end of the connecting rod with the piston through the gudgeon pin, locked from both its sides by circular clips.Placing the piston assembly in the cylinder and marking the piston.Fitment of big end on the crankpin.

Fitment of lube oil pump.Fitment of delivery pipe.Fitment of reduction valve.Fitment of suction strainer.

Stage 6:

Fixing the seal in the rear cover with the help of hydraulic press.

Fixing the rear cover.Fixing the 3 studs on the front side.Placing the oil splash cover on the crankshaft

over crank gear.Bolting the front cover.Fixing oil seal in front cover.

Stage 7:

Fit the pulley on the crankshaft.Fix the dowel pins on the crankcase.The heads (previously tested, lapped and

fitted with valve assembly) are fixed after placing the gasket.

The bolts are torqued at 21 kg-m.

Stage 8:

Stage 9:Fitment of flywheel.Fitment of oil pan.

Stage 10: Fitment of tappet and push

rod. Fitment of rocker arm

assembly. Setting up of tappet

clearance, with the help of filler gauge.

STAGE 11: Fitment of inlet manifold,

return line and exhaust manifold.

Water pump and side cover fitment.

STAGE 12:

Fitment of valve cover. Fitment of alternator.

Fitment of injector nozzles. Feet attachment.

STAGE 13:

Timing of the fuel injection pump done.

Lubricating oil filter fitment.

Fitment of self starter

ENGINE TESTING DEPARTMENT This department lies adjacent to the engine assembly

section from where the assembled engines are send on roller conveyor to this department for testing under loaded conditions.

There are a number of testing beds in this section for carrying out the test. Each of the test beds has individual control rooms for monitoring engine performance.

The test beds are made sound proof from inside to reduce noise pollution. Also there is provision for discharge of emission of the engine into the atmosphere so to prevent pollution inside the section.

Each of the test beds are interconnected and are facilitated by electric overhead cranes for mounting and unmounting the engines onto the test bench as and when required.

The engines tested and passed from this section are taken directly to the Tractor Assembly Section for final assembly to the Chassis.

As the name suggests this is the final place of assembly of complete tractor. The tested engine from the engine assembly, differential, gear box, front wheel assembly, steering mechanism, clutch assembly, brakes etc. are completely assembled here to form a complete chassis of the tractor followed by painting and final fitment of the external metallic body, other accessories and wheels to complete the assembly. The assembly of chassis is carried out while it being suspended from a continuous overhead conveyor system.

The differential as well as the complete gear box is assembled here and later on sent to the final assembly line of the tractor assembly. The complete chassis is formed here, followed by passing it through the painting and drying sections lying in between the assembly line.

TRACTOR ASSEMBLY SECTION

Thank you