Page 1
Page 3
Rock storage pad
Page 4
Reed AEP Longitudinal Section
Page 5
Existing Infrastructure at
Reed AEP Construction
Camp
Page 6
Reed AEP Site looking north, southern reach of Reed Lake approximately 3km in
background (August 2012)
Page 7
Access Road and Main Gate
Access Road – Looking East
Page 8
Page 9
Rock storage pad
Page 10
Reed Area Water Bodies
Reed Site
Scope of Assessment
SNOW LAKE
ANDERSON TIA
Project Site
Project Area
Project Region
(10 km)
(2 km)
Page 12
Reed Area Water Bodies
Reed Site
Mine Development Process
Page 15
Access Road and Main Gate
Access Road – Looking East
Page 16 Cold Storage
Page 17 Site Office and Dry
Page 18 New Office Trailers
Page 19
Mining Equipment at Site
Page 20
Trench and Portal Face
Trench Excavation – Fall 2012
Page 21
Decline Development – Fall 2012
Page 22
Looking East Toward AEP Site Along Existing Access Road (2011)
Access Road
PTH 39
Page 23
Looking West Along Existing Access Road (2011)
Access Road
PTH 39
Page 24 Waste Rock Pad Under Construction