Open House February 26, 2020 THE PTH 1 and PTH 1A West Interchange Study

Transcript of THE PTH 1 and PTH 1A West Interchange Study · 2020. 2. 27. · PTH 1 and PTH 1A West Interchange...

  • Open HouseFebruary 26, 2020

    THE

    PTH 1 and PTH 1AWest Interchange Study

  • PTH 1 and PTH 1A West Interchange Study

    2

    WELCOME & PURPOSE

    The intent of today’s open house is to:

    • Provide information on the purpose and scope of the PTH 1 and PTH 1A Interchange Study;

    • Present the interchange alternatives, as well as the advantages and disadvantages associated with each alternative; and

    • Offer the public an opportunity to review the interchange alternatives, provide feedback, and ask questions of the project team.

    Completing a comment sheet here today or online at: https://www.gov.mb.ca/mit/wms/structures/design.html

    Members of the project team are here to discuss the study and answer any questions you may have. Look for a person wearing a WSP or Manitoba Infrastructure nametag.

    Provide your input by: Have a question?

  • PTH 1 and PTH 1A West Interchange Study

    3

    The existing overpass structure (bridge) at PTH 1 and

    PTH 1A was constructed in 1968 as part of the Trans-Canada

    Highway (PTH 1) by-pass around Portage la Prairie (Portage).

    The bridge is located west of Portage and was designed to

    convey 3 lanes of PTH 1A traffic (2 northbound lanes into

    Portage and 1 southbound lane out of Portage) over 4 lanes

    of PTH 1 traffic (2 eastbound lanes and 2 westbound lanes).

    Over the years, the bridge has been damaged by several

    vehicle impacts, and many bridge elements are exhibiting

    significant deterioration. As a result, the bridge is

    currently restricted to a single lane.

    Manitoba Infrastructure (MI) has determined that it is

    not cost effective to rehabilitate the bridge and a new

    structure is required at this location. As part of this

    study, MI is also looking to improve the interchange.

    BACKGROUND

    Top of New Deck SurfaceHighway 1A

    Top of Road SurfaceHighway 1

    Min

    imum

    Ex

    isti

    ng C

    lear

    ance

    4.9

    m

    Min

    imum

    Pr

    opos

    ed C

    lear

    ance

    5.4

    m

    Old Bridge to be Removed

    New Bridge

  • PTH 1 and PTH 1A West Interchange Study

    4

    Study Area LimitStudy Area Limit

    RailRail

    LEGENDLEGEND

    Roa

    d 40

    WR

    oad

    40W

    Roa

    d 39

    WR

    oad

    39W

    CN Rivers SubdivisonCN Rivers Subdivison

    Trans-Canada Highway

    Trans-Canada Highway

    PTH 1 (Portage Bypass)

    PTH 1 (Portage Bypass)

    Service Road SWService Road SW

    Port

    age

    Div

    ersi

    onPo

    rtag

    e D

    iver

    sion

    PTH 1PTH 1

    CP Carberry SubdivisionCP Carberry Subdivision

    NExisting Bridge to be

    Replaced

    To BrandonTo Brandon

    To Winnipeg

    To Winnipeg

    To Portage la PrairieTo Portage la Prairie

    Can Oat D

    riveCan O

    at Drive

    PTH 1A (City route)

    PTH 1A (City route)

    STUDY AREA

  • PTH 1 and PTH 1A West Interchange Study

    5

    1. Replace the bridge;

    2. Improve traffic operations and safety by bringing the interchange to current design standards; and

    3. Accommodate the access needs of the public and established industry in Portage.

    Manitoba Infrastructure has engaged WSP (an engineering and planning service provider) to complete a functional design study for the future reconstruction of all roadways and the bridge structure within the PTH 1 and PTH 1A interchange to:

    A functional design study is an early phase of the design process in which the road and bridge designs are established based on projected travel patterns, design standards, site conditions, environmental regulations, user demands, and project constraints.

    project constraints,

    including funding

    design standards

    environmental regulations

    user demands

    projected travel

    patterns

    site conditions

    A Functional

    Design Study

    SCOPE

    Note: Due to funding constraints Manitoba Infrastructure may need to complete this project in phases with the initial phase including the replacement of the overpass.

  • PTH 1 and PTH 1A West Interchange Study

    6

    The public engagement process for the study involves local governments, landowners, business owners, other stakeholders, and the public.

    The objectives of the public engagement process are to convey clear information about the project, including its scope and timing, while also gathering input regarding the proposed interchange alternatives and preferred interchange alternative.

    Public engagement techniques will include:

    - Group stakeholder meetings;

    - Two public open houses;

    - Project webpage; and

    - Online survey.

    PUBLIC ENGAGEMENT PROCESS

  • PTH 1 and PTH 1A West Interchange Study

    7

    The public engagement process has been divided into three phases:

    1 2 3Phase 1:

    Introduce the project and gather initial feedback.

    Phase 2:

    Present two interchange alternatives and gather feedback.

    Phase 3:

    Present the preferred interchange alternative.

    WE ARE HERE

    PUBLIC ENGAGEMENT PROCESS

  • PTH 1 and PTH 1A West Interchange Study

    8

    PTH 1

    CA

    N-O

    AT

    DR

    IVE

    RO

    AD

    39

    W

    PTH 1

    To Brandon

    To Portage la PrairieTo W

    innipeg

    New Two-Lane Undivided Bridge

    with Increased Clearance

    Improved Ramp

    Geometry

    Proposed Right-of-Way South Limit

    New Right-in and Right-out

    Access

    Extended Acceleration

    Lane

    NLegend

    Proposed Alignment

    Access to PTH 1 Closed, Median to be

    Removed

    RO

    AD

    40

    W

    Truck

    Turnaround

    Advantages: • Improved interchange geometry

    Disadvantages: • Requires additional land

    • Access to property south of interchange is limited

    INTERCHANGE ALTERNATIVE 1: IMPROVED EXISTING

    Increased Roadway Width

    Under Bridge Will Accomodate

    Agricultural Vehicles

  • PTH 1 and PTH 1A West Interchange Study

    9

    PTH 1 PTH 1A

    CA

    N-O

    AT

    DR

    IVE

    RO

    AD

    39

    W

    PTH 1

    To Brandon

    To Portage la PrairieTo W

    innipeg

    New Two-Lane Undivided Bridge

    with Increased Clearance

    New All Directional

    Access

    Extended

    Acceleration

    Lane

    NLegend

    Proposed Alignment R

    OA

    D 4

    0W

    New

    Roundabouts Will Accommodate

    Agricultural Vehicles

    Truck

    Turnaround

    INTERCHANGE ALTERNATIVE 2: ROUNDABOUTS

    Increased Roadway Width

    Under Bridge Will Accomodate

    Agricultural Vehicles

    Advantages: • Improved interchange geometry

    • No additional land requirement

    • Improved driver safety

    • Access to property south of interchange is improved

    Disadvantages: • Roundabouts unfamiliar to some drivers

    Access to PTH 1 Closed, Median to be

    Removed

  • PTH 1 and PTH 1A West Interchange Study

    10

    Alternative 2 roundabouts would be similar to the recently constructed PTH 2 and PTH 3 roundabout

    INTERCHANGE ALTERNATIVE 2: ROUNDABOUTS

  • PTH 1 and PTH 1A West Interchange Study

    11

    PTH 1A

    CA

    N-O

    AT

    DR

    IVE

    RO

    AD

    39

    W

    PTH 1

    To Brandon To Portage la Prairie

    To Winnipeg

    N

    Legend

    PTH 1 and PTH 1A Eastbound Traffic

    PTH 1 and PTH 1A Westbound Traffic

    RO

    AD

    40

    W

    POTENTIAL CONSTRUCTION DETOUR

    Temporary Intersection

    Treatment to be DeterminedAccess Right

    In/Right Out

    No Left Turns In or Out During Construction

    Bridge

    Replacement

    Local Access Eastbound Traffic

    Local Access Westbound Traffic

  • PTH 1 and PTH 1A West Interchange Study

    12

    PTH 1PTH 1PTH 1A (City route)

    PTH 1A (City route)

    Roa

    d 40

    WR

    oad

    40W

    PTH 1PTH 1

    Due to safety concerns, the intersection at PTH 1 and Road 40 W will be closed in both of the proposed interchange alternatives.

    This will impact access to and from the lands to the south of the interchange.

    Alternative access and routes will be provided for both of the proposed designs, as illustrated on the Interchange Alternative #1 and #2 drawings. The intersection will not be permanently closed until alternate access is provided via the interchange.

    CLOSURE OF ROAD 40 W ACCESS TO PTH 1

    Access to PTH 1 Closed, Median to be

    Removed

  • PTH 1 and PTH 1A West Interchange Study

    13

    DEC 2019

    JAN2020

    FEB2020

    MAR2020

    APR2020

    Gain an Understanding of Existing Conditions

    Develop Draft Interchange Alternatives

    Open House #1 to Review Interchange

    Alternatives

    Evaluate and Select Preferred Interchange

    Alternative

    Open House #2 to Present Preferred

    Interchange Alternative

    END OF APRIL

    Preliminary Design Complete

    2020We Are Here

    STUDY TIMELINE

  • PTH 1 and PTH 1A West Interchange Study

    14

    OCT 2019

    JUN2020

    Preliminary Design

    MAR2021

    APR2020

    Detailed Design

    JUN 2021

    Replacement of Bridge and

    Associated Roadworks

    Construction

    NOV2022

    We Are Here

    OVERALL PROJECT TIMELINE

    Future Phases

    Highway and Intersection

    Works

  • PTH 1 and PTH 1A West Interchange Study

    15

    Chat with a member of the project team and ask any questions you may

    have.

    Complete a comment sheet and leave it with us

    today or email it to [email protected]

    Complete the comment sheet as part of the

    project’s online survey at: https://www.gov.mb.ca/

    mit/wms/structures/design.html

    Join us at Open House #2

    in early April 2020 to learn more about the preferred interchange

    alternative.

    Stay up-to-date on the project by visiting the project webpage at:

    https://www.gov.mb.ca/mit/wms/structures/

    design.html

    NEXT STEPS

  • PTH 1 and PTH 1A West Interchange Study

    16

    Thank you for attending tonight’s open house.

    For additional information, please contact Lauren Lange at:

    Email: [email protected]: (204) 943-3178

    Or visit the project webpage at: https://www.gov.mb.ca/mit/wms/structures/design.html

    THANK YOU