Possibilities for the development of the gas transmission system in the Republic of Croatia 2010-2014 6th Emerging Europe Energy Summit Istanbul, 04 05 November 2010 Goran Frančić Plinacro, Director of Development Division

Transcript of Possibilities for the development of the gas transmission...

Page 1: Possibilities for the development of the gas transmission ...conventure.ro/energy2010/public/documente/Goran_Francic.pdfPossibilities for the development of the gas transmission system

Possibilities for the development of the

gas transmission system in the

Republic of Croatia

2010-2014

6th Emerging Europe Energy Summit

Istanbul, 04 – 05 November 2010

Goran Frančić

Plinacro, Director of Development Division

Page 2: Possibilities for the development of the gas transmission ...conventure.ro/energy2010/public/documente/Goran_Francic.pdfPossibilities for the development of the gas transmission system

EXISTING NETWORK & NETWORK

UNDER CONSTRUCTION

2

Technical data - 2002

1,641 km of high-pressure pipelines

137 MRSs

DC/SCADA

Transmission - 2.95 bcm of gas

max. capacity 560.000 m³/h

Technical data - 2007

2,085 km of high-pressure pipelines

9 entry points

151 exit points

DC - new SCADA, CS system

Transmission - 3.1 bcm of gas

max. capacity 860.000 m³/h

Technical data - 2014

2,775 km of high-pressure pipelines

10 entry points

172 exit points

2 interconnections

Transmission - 4.5 bcm of gas

max. capacity 1.200.000 m³/h

UGS Okoli

Working Gas Volume: 558 mil m3

Max. withdrawal rate: 275.000 m3/h

Injection rate: 160.000 m3/h

Development of new UGS capacity

Page 3: Possibilities for the development of the gas transmission ...conventure.ro/energy2010/public/documente/Goran_Francic.pdfPossibilities for the development of the gas transmission system

3

CROATIA - HUNGARY

INTERCONNECTION

SLOBODNICA-DONJI MIHOLJAC-

DRAVASZERDAHELY - VAROSFELD

- Diameter: DN800

- Operating pressure: 75 bar

- Total lenght: 300 km

- two-way gas flow

- min. border preassure 50 bar

- total capacity 6,5 bcm / y

- in operation 2011

- JDA signed March 2009

- joint technical group formed

Page 4: Possibilities for the development of the gas transmission ...conventure.ro/energy2010/public/documente/Goran_Francic.pdfPossibilities for the development of the gas transmission system

4

SLOBODNICA-DONJI MIHOLJAC DN800/75

- Location permit ✔

- Building permit ✔

- Material ✔

- Execution of work – in progress (75 % completed)

- Planed completion – end 2010

DONJI MIHOLJAC – DRAVASZERDAHELY DN800/75

- Location permit ✔

- Building permit ✔

- Material ✔

- Execution of work – in progress (90% completed)

- Planed completion – end 2010

CROATIA - HUNGARY

INTERCONNECTION

Page 5: Possibilities for the development of the gas transmission ...conventure.ro/energy2010/public/documente/Goran_Francic.pdfPossibilities for the development of the gas transmission system

GAS TRANSMISSION SYSTEM OF

LIKA AND DALMATIA

5

I Part Podrebar – Josipdol: 30,7 km

- Location permit ✔

- Building permit ✔

- Contract✔

- Execution of work – 100 % completed

- Commission ✔

II Part Josipdol – Gospić: 94,6 km

- Location permit ✔

- Building permit ✔

- Contract✔

- Execution of work – 90 % completed

- Planed completion – end of 2010

III Part Gospić – Benkovac:146,6 km

- Location permit ✔

- Building permit ✔

- Contract✔

- Execution of work – 50 % completed

- Planed completion – spring 2011

IV Part Benkovac – Split:– 164,9 km

- Location permit ✔

- Building permit ✔

- Contract - undergoing

- Planed commencement of work – June 2011

- Planed completion – end of 2012

Page 6: Possibilities for the development of the gas transmission ...conventure.ro/energy2010/public/documente/Goran_Francic.pdfPossibilities for the development of the gas transmission system

6

DEVELOPMENT PROJECT

Page 7: Possibilities for the development of the gas transmission ...conventure.ro/energy2010/public/documente/Goran_Francic.pdfPossibilities for the development of the gas transmission system

DEVELOPMENT PROJECTS

7

Interconnections:

- Serbia

- Slovenia

- Bosnia & Herzegovina

- Italy (offshore)

Projects:

- Adria LNG

- South Stream

- Ionian – Adriatic Pipeline (IAP)

- LNG RV

- UGS

- NETS

Page 8: Possibilities for the development of the gas transmission ...conventure.ro/energy2010/public/documente/Goran_Francic.pdfPossibilities for the development of the gas transmission system

8

IONIAN ADRIATIC PIPELINE (IAP)

PROJECT

SOL

TAG

IAP

TAP

Pula

Gorizia

Tarvisio

Zagreb

Casalborsetti

existing

planned

Bosiljevo

Fieri

Ploce

Tirana

Montenegro

0 km

237 km

75 km

420 km

825 km

1.0 BCM

0.5 BCM

1.0 BCM

2.5 BCM

D. Miholjac

Varosfold

September 2007- Albania, Montenegro and

Croatia signed Ministerial Declaration.

December 2008 - Bosnia and Herzegovina

signed Ministerial Declaration.

EGL and Plinacro signed Memorandum of

Understanding.

Preparatory work - ongoing

To establish – Intergovernmental

Steering Committee

Page 9: Possibilities for the development of the gas transmission ...conventure.ro/energy2010/public/documente/Goran_Francic.pdfPossibilities for the development of the gas transmission system

SOUTH STREAM

9

Source: South Stream

Intergovernmental Agreement

between the Russian Federation & the

Republic of Croatia signed 02 March

2010.

Status: Feasibility Study - in progress

Page 10: Possibilities for the development of the gas transmission ...conventure.ro/energy2010/public/documente/Goran_Francic.pdfPossibilities for the development of the gas transmission system

10

NETS(New European Transmission System)

● LNG terminal

● LNG terminal

North-South

Gas Corridor

NETS

Original way

of gas-flow

Source: FGSZ

NETS currently is…

1. …an open joint initiative to address challenges

in the CEE region and to provide feasible

solutions and recommendations on how to:

- establish a competitive & liquid CEE gas market

- ensure regional infrastructure development

- attract new gas supply to CEE

2. … a study company registered in Brussels

serving as a vehicle for strategic cooperation of

the CEE region’s gas TSOs, and a TEN-E project

financially supported by the EU

3. …is a think-tank-like organization preparing

recommendations on regional gas market

integration that are considered as important

input source for the work of V4 High Level

Energy Working Group and DG Energy on the

North South Gas Corridor

Page 11: Possibilities for the development of the gas transmission ...conventure.ro/energy2010/public/documente/Goran_Francic.pdfPossibilities for the development of the gas transmission system

11

LNG CROATIA

Founded 1 June 2010

Owners: 50% Plinacro Ltd and 50% HEP

(Croatian Power Supply Company)

Take of 11% share in Adria LNG

Other owners of Adria LNG:

E.ON Ruhrgas,

OMV Gas & Power

Total

Geoplin

Substitute project:

LNG RV

- Construction of the installations for the

connection of LNG RV to the gas

transmission system

- Smaller investment

- Shorter construction deadlines

- Bridging the period until the large LNG

terminal is put into operation

Page 12: Possibilities for the development of the gas transmission ...conventure.ro/energy2010/public/documente/Goran_Francic.pdfPossibilities for the development of the gas transmission system

EXISTING GAS STORAGE

UGS OKOLI

12

- Founded in 1987

- Upgraded two times (in 1995 and 2004)

- January 2009 - takeover by Plinacro

Storage operating parameters:

-Working Gas Volume: = 550 ×10⁶ m³

-Max. withdrawal rate: = 5,8 ×10⁶ m³/day (240.000 m³/h) >

upgrade in 2010 to 275.000 m³/h

- Max. injection rate: = 3,8 ×10⁶ m3/day (160.000 m3/h)

Page 13: Possibilities for the development of the gas transmission ...conventure.ro/energy2010/public/documente/Goran_Francic.pdfPossibilities for the development of the gas transmission system

NEW PEAK LOAD STORAGE

UGS Grubišno Polje

13

Fig. Geological cross section

Storage forming zone

Grubišno Polje

Depth: 800 m

Permeability: > 100 mD (kg*hef > 3000 mDm - HDM)

Res. pressure: 92 bar

Litology: limestone

Reservoir fluid: dry gas

OGIP: 143 ×106 m3

Parameters Value

Operating Reservoir Pressure (bar) 77 - 92

Max. Deliverability (m3/h) 100.000

Min. Deliverability (m3/h) 70.000

Working Gas Volume (106 m3) 25 +

Withdrawal Period (days) 12-15 +

Gas

Water

Page 14: Possibilities for the development of the gas transmission ...conventure.ro/energy2010/public/documente/Goran_Francic.pdfPossibilities for the development of the gas transmission system

14

GAS TRANSMISSION SYSTEM

IN SE EUROPE

Page 15: Possibilities for the development of the gas transmission ...conventure.ro/energy2010/public/documente/Goran_Francic.pdfPossibilities for the development of the gas transmission system

Thanks!

6th Emerging Europe Energy Summit

Istanbul, 04 – 05 November 2010

Goran Frančić

Plinacro, Director of Development Division