Technical data - 2002
1,641 km of high-pressure pipelines
137 MRSs
DC/SCADA
Transmission - 2.95 bcm of gas
max. capacity 560.000 m³/h
Technical data - 2007
2,085 km of high-pressure pipelines
9 entry points
151 exit points
DC - new SCADA, CS system
Transmission - 3.1 bcm of gas
max. capacity 860.000 m³/h
Technical data - 2014
2,775 km of high-pressure pipelines
10 entry points
172 exit points
2 interconnections
Transmission - 4.5 bcm of gas
max. capacity 1.200.000 m³/h
UGS Okoli
Working Gas Volume: 558 mil m3
Max. withdrawal rate: 275.000 m3/h
Injection rate: 160.000 m3/h
Development of new UGS capacity
3
CROATIA - HUNGARY
INTERCONNECTION
SLOBODNICA-DONJI MIHOLJAC-
DRAVASZERDAHELY - VAROSFELD
- Diameter: DN800
- Operating pressure: 75 bar
- Total lenght: 300 km
- two-way gas flow
- min. border preassure 50 bar
- total capacity 6,5 bcm / y
- in operation 2011
- JDA signed March 2009
- joint technical group formed
4
SLOBODNICA-DONJI MIHOLJAC DN800/75
- Location permit ✔
- Building permit ✔
- Material ✔
- Execution of work – in progress (75 % completed)
- Planed completion – end 2010
DONJI MIHOLJAC – DRAVASZERDAHELY DN800/75
- Location permit ✔
- Building permit ✔
- Material ✔
- Execution of work – in progress (90% completed)
- Planed completion – end 2010
CROATIA - HUNGARY
INTERCONNECTION
GAS TRANSMISSION SYSTEM OF
LIKA AND DALMATIA
5
I Part Podrebar – Josipdol: 30,7 km
- Location permit ✔
- Building permit ✔
- Contract✔
- Execution of work – 100 % completed
- Commission ✔
II Part Josipdol – Gospić: 94,6 km
- Location permit ✔
- Building permit ✔
- Contract✔
- Execution of work – 90 % completed
- Planed completion – end of 2010
III Part Gospić – Benkovac:146,6 km
- Location permit ✔
- Building permit ✔
- Contract✔
- Execution of work – 50 % completed
- Planed completion – spring 2011
IV Part Benkovac – Split:– 164,9 km
- Location permit ✔
- Building permit ✔
- Contract - undergoing
- Planed commencement of work – June 2011
- Planed completion – end of 2012
6
DEVELOPMENT PROJECT
DEVELOPMENT PROJECTS
7
Interconnections:
- Serbia
- Slovenia
- Bosnia & Herzegovina
- Italy (offshore)
Projects:
- Adria LNG
- South Stream
- Ionian – Adriatic Pipeline (IAP)
- LNG RV
- UGS
- NETS
8
IONIAN ADRIATIC PIPELINE (IAP)
PROJECT
SOL
TAG
IAP
TAP
Pula
Gorizia
Tarvisio
Zagreb
Casalborsetti
existing
planned
Bosiljevo
Fieri
Ploce
Tirana
Montenegro
0 km
237 km
75 km
420 km
825 km
1.0 BCM
0.5 BCM
1.0 BCM
2.5 BCM
D. Miholjac
Varosfold
September 2007- Albania, Montenegro and
Croatia signed Ministerial Declaration.
December 2008 - Bosnia and Herzegovina
signed Ministerial Declaration.
EGL and Plinacro signed Memorandum of
Understanding.
Preparatory work - ongoing
To establish – Intergovernmental
Steering Committee
SOUTH STREAM
9
Source: South Stream
Intergovernmental Agreement
between the Russian Federation & the
Republic of Croatia signed 02 March
2010.
Status: Feasibility Study - in progress
10
NETS(New European Transmission System)
● LNG terminal
● LNG terminal
North-South
Gas Corridor
NETS
Original way
of gas-flow
Source: FGSZ
NETS currently is…
1. …an open joint initiative to address challenges
in the CEE region and to provide feasible
solutions and recommendations on how to:
- establish a competitive & liquid CEE gas market
- ensure regional infrastructure development
- attract new gas supply to CEE
2. … a study company registered in Brussels
serving as a vehicle for strategic cooperation of
the CEE region’s gas TSOs, and a TEN-E project
financially supported by the EU
3. …is a think-tank-like organization preparing
recommendations on regional gas market
integration that are considered as important
input source for the work of V4 High Level
Energy Working Group and DG Energy on the
North South Gas Corridor
11
LNG CROATIA
Founded 1 June 2010
Owners: 50% Plinacro Ltd and 50% HEP
(Croatian Power Supply Company)
Take of 11% share in Adria LNG
Other owners of Adria LNG:
E.ON Ruhrgas,
OMV Gas & Power
Total
Geoplin
Substitute project:
LNG RV
- Construction of the installations for the
connection of LNG RV to the gas
transmission system
- Smaller investment
- Shorter construction deadlines
- Bridging the period until the large LNG
terminal is put into operation
EXISTING GAS STORAGE
UGS OKOLI
12
- Founded in 1987
- Upgraded two times (in 1995 and 2004)
- January 2009 - takeover by Plinacro
Storage operating parameters:
-Working Gas Volume: = 550 ×10⁶ m³
-Max. withdrawal rate: = 5,8 ×10⁶ m³/day (240.000 m³/h) >
upgrade in 2010 to 275.000 m³/h
- Max. injection rate: = 3,8 ×10⁶ m3/day (160.000 m3/h)
NEW PEAK LOAD STORAGE
UGS Grubišno Polje
13
Fig. Geological cross section
Storage forming zone
Grubišno Polje
Depth: 800 m
Permeability: > 100 mD (kg*hef > 3000 mDm - HDM)
Res. pressure: 92 bar
Litology: limestone
Reservoir fluid: dry gas
OGIP: 143 ×106 m3
Parameters Value
Operating Reservoir Pressure (bar) 77 - 92
Max. Deliverability (m3/h) 100.000
Min. Deliverability (m3/h) 70.000
Working Gas Volume (106 m3) 25 +
Withdrawal Period (days) 12-15 +
Gas
Water
14
GAS TRANSMISSION SYSTEM
IN SE EUROPE
Thanks!
6th Emerging Europe Energy Summit
Istanbul, 04 – 05 November 2010
Goran Frančić
Plinacro, Director of Development Division