Portfolio (en) : architect and researcher at Waseda university, Tokyo

39
Jon Álvarez Fernández Architect (master degree) Researcher and PhD candidate PORTFOLIO: PROFES- SIONAL, RESEARCH AND TEACHING ACTI- VITY

description

 

Transcript of Portfolio (en) : architect and researcher at Waseda university, Tokyo

  • 1. Jon lvarez Fernndez Architect (master degree) Researcher and PhD candidate PORTFOLIO: PROFES- SIONAL, RESEARCH AND TEACHING ACTI- VITY

2. Jon lvarez Fernndez Architect (master degree) Researcher and PhD candidate PERSONAL RESUME AND WORK LIST Personal data: Jon lvarez Fernndez, architect, researcher at Waseda University-Tokyo Born February 15th 1980 in Bergara (Spain) Address: 2-171 Suzuki-cho, Kodaira-shi. Tokyo 187-0011 Phone: +81 50 3145 2875; cellphone +81 80 3734 8358 e-mail: [email protected] Academic background: 2014-current PhD candidate, Waseda University, Department of Architecture, Nakatani Lab. 2012-2013 Master degree in Intervention and Global Management of Architectural Heritage, University of Basque Country UPV/EHU (thesis to be finished at September 2013: Housing Architecture and Economy at early 60s in the Basque Country). 1998 2006 Master degree in architecture, Catalonia University of Technology - UPC (Barcelona). Speciality in Architectural Heritage Restoration. 2008 - 2010 Postgraduate in Urban planning (Escuela Sert, Catalonia Association of Architects, COAC). Specialization course for professional architects, 220 lecture hours. Others: 2010 Course on Sustainable Building (National Employment Service, 84 lecture hours). 2008 Certificate on Teaching Aptitude, University of Navarra. 2008 Course on Architectural Photography Photo Center Pati Llimona, Barcelona. Conferences, awards, exhibitions and publications: 2014-current MEXT - Monbukagakusho Scholarship for Doctor Degree researchers. Japan Government. 2012 Collective publication of the website www.industrializadarchitecture.com, dedicated to research on industrialization processes in architecture; directed by Prof. Dr. Rufino Hernndez and Dr. Olatz Irulegi. and with collaboration of Koldo Atxa. 2010 Attended 2nd National Conference on Ethnologic Heritage (Barcelona) 2008 Attended XXXI Course on Heritage: Historical Town Centers and Contemporary Life, organized by the Association of Architects in Defense of Architectural Heritage AADIPA (Barcelona). 2008 Collective exhibition Photography and architecture, Center Pati Llimona, Barcelona. 2007 Exhibition Special Award for Outstanding Master Final Projects, by Catalonia University of Technology - UPC, for the final project Theater Hall in Sant Andreu de la Barca, 2006 Finalist Special Award for Outstanding Master Final Projects, graded 9/10. 2002 Attended II Biennal on Monument Restoration (Vitoria-Gasteiz). Professional background: Self-employed freelance experience: 2011-2012 Project for refurbishment of country house Can Bellavista Vella, in Sant Mart de Centelles (Barcelona), collaboration with the architect Daniel Cases Armengol. 2010 Project and building for refurbishment of an appartment in Bergara (Gipuzkoa). 2009 Contest for refurbishment of the casino La Violeta, Barcelona. 2009 Contest for a new building for the City Councilor of Youth in the old town of Burgos. 3. 2008 Contest for a music hall, music school, library and third sector services in Morro Jable (Fuerteventura island). Teamed with Oriol Hostench, Prof. Dr. Fernando lvarez and Alejandro Ros. 2007 Contest by Architects Savings Bank: Work on the edge, house and workshop above the water. Experience on other companies, architectural bureaus and teaching: 2011-2013 EHU / UPV. Department of architecture. Teacher on building technology: traditional and industrialized techniques applied to buildings. Member of research group on industrialized architecture (along with the other teachers of this subject). 2010 Casadevall Export, S. A., Barcelona. Timber and furniture design. -Tasks: design of projects for shops and commercial stores. 2009 Escola Gravi sccl (High School), Barcelona -Tasks: teacher of mathematics, IT and technology subjects. 2009 Ingel Centro de Estudios, Barcelona - Tasks: teacher of course on AutoCAD beginner and advanced level. 2006 2007 Josep Val Ravell architectural bureau, Barcelona. - Tasks: -development of building projects, and urban planning. -adaptation of drawings and forms to new Spanish building quality laws CTE and LOE. - Works: - Urban and building project for 128 appartments in Ripollet (Barcelona); contest, ranked second. - Project for 186 appartments and urban planning, in UP-E section, Colonia Castells, Barcelona; contest, WINNER - Urban regeneration planning, Colonia Castells, Barcelona - Project for Police Station in Sarri Sant Gervasi district, Barcelona; contest, finalist. - Project for new Public High School in Cabrils (Barcelona); contest, WINNER. - Project and execution of 3 houses in Campllong (Girona). 2003 2005 Dr. Fernando lvarez Prozorovich architectural bureau, in Castelldefels (Barcelona) - Tasks: - development of housing projects, from design to execution. - management of workmanship. - Works: - 4 detached houses in Castelldefels (Barcelona) - House in old town, Lloret de Mar (Girona). - 25 detached houses in Matar. urban and building project. - Detached house in Begues (Barcelona). 2000 - 2002 Private teacher on Drawing, Mathematics and History of Art to architecture students (1st and 2nd years). Experience on research: 2008 Research on the Urban Plan of Architectural Heritage of Pamplona (Spain): its results and its management. XXXI Course on Heritage (AADIPA). 2003 2008 Land Photogammetry Lab, Catalonia University of Technology - UPC. Research student with scholarship (2003- 2005) and external partner (2006-2008). - Tasks: coordination of research works on several monuments and production of present-state drawings; support at field work (topography, photogrammetry). - Works: - Miravet Castle, 3 campaigns: south wall, east wall, external walls. - Castell dEmpries cathedral, 2 campaigns. - Escaladei monastery, 1 campaign. Language skills and levels: (other than native Spanish) Basque (C1): oral and written, high level. EGA certificate, Basque Government (Eusko Jaurlaritza Gobierno Vasco). Catalan (C1): oral and written, high level. Nivel C certificate, Government of Catalonia (Generalitat de Catalunya). English (B2): oral and written, business level. FCE certificate, University of Cambridge. Italian (B2): oral and written, business level. CELI3 certificate, Universit di Perugia. Japanese (B1): oral and written, intermediate level. Intermediate certificate, Spain National Language School. 4. A R C H I T E C T U R A L PROJECTS ON SELF- EMPLOYMENT 5. Authors: Daniel Cases Armengol (head) Jon Alvarez Fernndez Type: Project (2011-2012). Refurbishment of the country house Can Bellavista, para for residential use. CAN BELLAVISTA, S. MART DE CENTE- LLES, BARCELONA Re S E1 Ma1 Ma2 A I Pati B1 K M 1,7 1,7 1,7 0,7 0,460,46 0,57 0,5 0,80,8 1,6 1,9 0,80,50,5 0,8 1,7 0,98 1,26 2,58 1,000.75 0,92 Di1 2 0,45 1,07 0,7 1,831,78 0,82,760,81,37 0,81,37 0,9 22% 33% 22-32% 30% PLACA A.C.S. 33% 22-32% 30% E2 H1H2 B2 Di3 Di2 PLACA A.C .S. 1,580,70,45 0,45 0,7 0,8 0,65 +0.00 -0.22 -0.39 -0.18 +0.33 -0.22 -0.39 +0.00 +0.44 +2.83 +2.43 -0.45 +1.61 0,9 0.70 +0.00 +2.43 -0.13 +4.66 +2.43 6. A0-1 A1-1 A3-3A3-1 A3-1 A3-1 A3-1 A2-1 A2-1 A5-1 A5-1 A5-2 A1-2 A6-2 A3-3 A6-1 A3-1 A2-3 A2-1 A2-1 A0-1 A6-3 A3-2 A5-1 A3-1 A5-1 A3-3 A5-1 4,03 4,28 3,954,4 4,2 4,46 A0-3 H5H6 H7 Di H4 A5-1 A5-1 A5-1 A4-2 A3-3 A3-1 A3-1 A3-3 A3-4 A3-4 A6-1 33% 22-32% 30% A0-2 A0-2 ZONA DE COBERTA DE FIBROCIMENT AMB AMIANT 30% A0-1 1,352,14 2,08 A2-1 A5-1 A6-1 A3-1 A3-1 A0-4 A0-2 A6-3A6-3 A6-1 2,75 A6-1 A0-2 A0-2 A2-1 A2-1 A2-1 22% 33% 22-32% 30% A2-1 A2-2 A2-3A2-3 30% 3,85 4,04 4,21 3,92 4,48 4,05 8,69 6,38 6,05 9,04 A0-1 A0-1 A0-1 H1 K H3 H2 C5 C4 C3 C2 C1 A1-1 A3-3 A3-3 A3-3 A3-3 A3-3 A3-4A5-1 A3-2 A5-1 A4-1 A3-1 A3-1 A3-1 A3-1 A6-1 A3-3 A0-1 A6-2 A6-1 A6-2 A6-2 A6-1 A5-1 A3-1 A6-3 BASSA D'AIGUA BASSA D'AIGUA A3-4 A6-3 A3-4 A3-5 A3-5 A3-5 A4-4 A6-1 A3-1 A0-2 A4-3 2,432,08 2,08 A1-1 A2-1 A0-1 A6-2A6-2 A6-1 A0-3 A2-1 A3-3 A6-3 A5-1 A3-1 A0-2 A0-2 A5-1 LLEGENDA D'ACTUACIONS DE CONSOLIDACI A2-1 Desmuntatge i muntatge de coberta afegint allament trmic: - Reparaci / substituci de bigues o llates malmeses. Bigues de nova aportaci en cas necessari - Raspatllat de bigues i peces cermiques del sotacoberta. Envernissat dels elements de fusta existents - Substituci de tauler malms per tauler similar a l'existent. - Collocaci d'allament trmic - Acabat amb teula rab cermica de recuperaci (cobertora) o de subsituci similar a l'existent (canal), amorterada - Aiguafons, careners i minvells amb planxa de zinc A1 - ENTORN A2 - COBERTA A3 - PARAMENTS VERTICALS A4 - PARAMENTS HORITZONTALS A1-1 Modificaci de perfil del terreny i esbrossat de vegetaci. Drenatge i evacuaci d'aiges. A3-2 Reparaci d'arc. Rejuntat d'esquerdes amb morter de cal, raspat i repintat de perfil metllic, mur refs de bloc cermic i arrebossat de morter de cal A3-3 Obertura de finestra o porta incls fusteria nova A4-1 Substituci de bigues malmeses per bigues de formig pretensat de caracterstiques similars a les actuals A2-2 Desmuntatge i muntatge de coberta sense afegir allament trmic: - Reparaci / substituci de bigues malmeses - Aportaci de bigues noves - Retirada de planxes de fibrociment, complint els requeriments del Centre de Seguretat i Condicions de Salut en el Treball - Collocaci de tauler de fusta de pi i llates per a suport de la teula, amb tractament contra humitat, fungicida i insecticida - Acabat amb teula rab cermica de recuperaci (cobertora) o de subsituci similar a l'existent (canal), collocada a llata per canal - Aiguafons, careners i minvells amb planxa de zinc A3-1 Repicat d'arrebossats existent i ciments portland. Aplicaci de nou arrebossat de morter de cal A0 - ENDERROCS A0-1 Enderroc de dipsits d'acumulaci d'aigua, construccions i elements auxiliars A6 - PAVIMENTS A6-1 Paviment nou de rajola cermica A6-2 Paviment nou de rajola cermica sobre solera de formig de cal en massa o terra millorada A2-3 Reps de coberta d'entrada: - reparaci / substituci de bigues o llates malmeses - substituci de teules trencades A0-2 Enderroc d'envans A0-3 Enderroc de fals sostre de guix A5 - REHABILITACI DE FUSTERIES A5-1 Reps de fusteries existents. Raspat, envernissat amb verns de porus obert. Substituci de vidres existents per vidres amb cambra d'aire. Refor de ferramentes A3-4 Paret de tancament de ma A4-2 Substituci de bigues malmeses per bigues de fusta de pi asserrada A6-3 Reperfilat de graons A3-5 Rejuntat del mur i reparaci mitjanant filtracions de beurada de cal A1-2 Anullaci de pou mort existent (en dess) mitjanant reblert amb terres A4-4 Escala d'accs A5-2 Fusteria nova i vidre amb cambra d'aire. Reconstrucci del buit d'obra A4-3 Substituci de llinda malmesa per llinda de fusta de pi asserrada, similar a l'existent 7. Authors: Jon Alvarez Fernndez Daniel Cases Armengol Type: Contest (not awarded); Project of refurbishment of the casino La Violeta for public use; 500m2. LA VIO- LETA CENTER, B A R C E L O N A 8. CUADRO DE SUPERFICIES Planta segunda 144.77 m2 Torre escenario - tramoya 31.67 m2 Reguladores 3.61 m2 Escaleras-pasos restringidos 16.43 m2 Anfiteatro 59.93 m2 Instalaciones 36.38 m2 Lavabos 7.38 m2 Escaleras-pasos generales 21.04 m2 Planta primera 293.45 m2 Escenario 37.26 m2 Sala de entrada 6.70 m2 Escaleras-pasos restringidos 17.65 m2 Almacn sala de baile 2.74 m2 Cabina control 3.45 m2 Teatro - sala de baile 154.85 m2 Sala polivalente 1 35.87 m2 Lavabos 16.75 m2 Escaleras-pasos generales 18.20 m2 Planta altillo 51.81 m2 Camerino 10.23 m2 Foso escenario 29.25 m2 Escaleras-pasos restringidos 12.33 m2 Planta baja 260.98 m2 Almacn bar 12.25 m2 Escaleras-pasos restringidos 13.80 m2 Acceso - Bar - Billares 153.52 m2 Cocina 8.96 m2 Lavabos 6.06 m2 Recepcin - dinamizadores 30.06 m2 Sala polivalente 2 25.72 m2 Escaleras-pasos generales 10.61 m2 Planta stano 122.53 m2 Sala polivalente 3 10.09 m2 Oficina entitades 32.08 m2 Escaleras-pasos restringidos 7.27 m2 Lavabo 2.13 m2 Almacn pirotecnia 4.01 m2 Taller 13.49 m2 Almacn 28.19 m2 Buque de ensayo 25.28 m2 SUPERFICIE TIL TOTAL 873.34 m2 Esquema de funciones y circulaciones verticales Zonas de uso general: recepcin, dinamiza- dores, sala baile, salas polivalentes Zonas de uso restringido: espacios para las entidades, escenario, camerino, almacenes Bar - Acceso comn 9. Authors: Jon Alvarez Fernndez Daniel Cases Armengol Miriam Buenaposada Comabella Type: Contest (not awarded); Project of public equipment for youth council. 550 m2. YOUTH COUN- CIL OFFICE B U R G O S 857.00 (planta acceso) 855.90 (planta exposicin) 858.20 (planta baja) 862.00 (planta primera) 864.80 (planta segunda) 866.60 (planta tico) 857.15 858.20 CON SU LADO joven ESPACIOS Y VISIONES EQUIPAMIENTOS Y PLAZAS TRNSITO RODADO TRNSITO PEATONAL ESQUEMA DE EDIFICACIN ESPACIOS Y VISIONES EQUIPAMIENTOS Y PLAZAS TRNSITO RODADO TRNSITO PEATONAL ESQUEMA DE EDIFICACIN ESPACIOS Y VISIONES EQUIPAMIENTOS Y PLAZAS ESQUEMA DE EDIFICACIN ESPACIOS Y VISIONES EQUIPAMIENTOS Y PLAZAS TRNSITO RODADO ESQUEMA ESP 10. 8% 13% 10% 13% 866.60 Atico 866.75 Oce Aula 1 Aula 2 Aula 3 Climatizacin 857.00 Acceso 1 855.90 Planta 0 Sala exposiciones Centro de Arte Joven Almacn fotografa Laboratorio fotogrco Estudio grabacin-ensayo Aseo 2 Paso Maquinaria ascensor Antesala Distribuidor Vestbulo Direccin Administracin Ocina de emancipacin juvenil Espacio europeo Asesora jurdica Emancipacin juvenil Animacin Otras administraciones 862.00 Planta 1 Almacn-archivo Concejal juventud Aseo 4 Vestbulo-sala espera Aseo 3 Paso Ocina salud 864.80 Planta 2 Almacn-archivoDocumentacin Aseo 6 Vestbulo-taquillas Aseo 5 Biblioteca Paso 858.20 Acceso 2 857.00 Acceso 1 858.20 Acceso 2 858.95 858.54 Conserjera Almacn Vestbulo Sala prensa Paso Porche-espacio informacin multimedia 8% 13% 10% 13% 866.60 Atico 866.75 Oce Aula 1 Aula 2 Aula 3 Climatizacin Laboratorio fotogrco Estudio grabacin-ensayo As Antesala Dis Direccin Administracin Ocina de emancipacin juvenil Espacio europeo Asesora jurdica Emancipacin juvenil Animacin Otras administraciones 862.00 Planta 1 Almacn-archivo Concejal juventud Aseo 4 Vestbulo-sala espera Aseo 3 Paso Ocina salud Almacn-arcDocumentacin Paso 858.20 Acceso 2 857.00 Acceso 1 858.20 Acceso 2 858.95 858.54 Conserjera Almacn Vestbulo Sala prensa Paso Porche-espacio informacin multimedia 8% 13% 10% 13% 866.60 Atico 866.75 Oce Aula 1 Aula 2 Aula 3 Climatizacin 857.00 Acceso 1 855.90 Planta 0 Sala exposiciones Centro de Arte Joven Almacn fotografa Laboratorio fotogrco Estudio grabacin-ensayo Aseo 2 Paso Maquinaria ascensor Antesala Distribuidor Vestbulo Direccin Administracin Ocina de emancipacin juvenil Espacio europeo Asesora jurdica Emancipacin juvenil Animacin Otras administraciones 862.00 Planta 1 Almacn-archivo Concejal juventud Aseo 4 Vestbulo-sala espera Aseo 3 Paso Ocina salud 864.80 Planta 2 Almacn-archivoDocumentacin Aseo 6 Vestbulo-taquillas Aseo 5 Biblioteca Paso 858.20 Acceso 2 857.00 Acceso 1 858.20 Acceso 2 858.95 858.54 Conserjera Almacn Vestbulo Sala prensa Paso Porche-espacio informacin multimedia 8% 13% 10% 13% 866.60 Atico 866.75 Oce Aula 1 Aula 2 Aula 3 Climatizacin 857.00 Acceso 1 855.90 Planta 0 Sala exposiciones Centro de Arte Joven Almacn fotografa Laboratorio fotogrco Estudio grabacin-ensayo Aseo 2 Paso Maquinaria ascensor Antesala Distribuidor Vestbulo Direccin Administracin Ocina de emancipacin juvenil Espacio europeo Asesora jurdica Emancipacin juvenil Animacin Otras administraciones 862.00 Planta 1 Almacn-archivo Concejal juventud Aseo 4 Vestbulo-sala espera Aseo 3 Paso Ocina salud 864.80 Planta 2 Almacn-archivoDocumentacin Aseo 6 Vestbulo-taquillas Aseo 5 Biblioteca Paso 858.20 Acceso 2 857.00 Acceso 1 858.20 Acceso 2 858.95 858.54 Conserjera Almacn Vestbulo Sala prensa Paso Porche-espacio informacin multimedia 8% 13% 10% 13% 866.60 Atico 866.75 Oce Aula 1 Aula 2 Aula 3 Climatizacin 857.00 Acceso 1 855.90 Planta 0 Sala exposiciones Centro de Arte Joven Almacn fotografa Laboratorio fotogrco Estudio grabacin-ensayo Aseo 2 Paso Maquinaria ascensor Antesala Distribuidor Vestbulo Direccin Administracin Ocina de emancipacin juvenil Espacio europeo Asesora jurdica Emancipacin juvenil Animacin Otras administraciones 862.00 Planta 1 Almacn-archivo Concejal juventud Aseo 4 Vestbulo-sala espera Aseo 3 Paso Ocina salud 864.80 Planta 2 Almacn-archivoDocumentacin Aseo 6 Vestbulo-taquillas Aseo 5 Biblioteca Paso 858.20 Acceso 2 857.00 Acceso 1 858.20 Acceso 2 858.95 858.54 Conserjera Almacn Vestbulo Sala prensa Paso Porche-espacio informacin multimedia CON SU LADO JOVEN SECCIN A-A1/100 857.00 (planta acceso) Calle interior-acceso Acceso al Centro de Arte Joven 855.90 (planta exposicin) Centro de Arte Joven Estudio grabacin-ensayos Aseos Maquinaria ascensor 858.20 (planta baja) Calle interior-acceso Conserje 862.00 (planta primera) Atencin al pblico: sala espera Consulta centro de salud Concejala Sala de reuniones Aseos 864.80 (planta segunda) Biblioteca: acceso, taquillas, zona de consultas, archivo Documentacin-tratamiento info. Aseos 866.60 (planta tico) Aulas polivalentes Sala de mquinas 857.00 (planta acceso) Acceso a Centro de Arte Joven 855.90 (planta exposicin) Centro de Arte Joven Sala de exposiciones Laboratorio fotogrco Almacn fotografa 858.20 (planta baja) Sala de prensa Almacn 862.00 (planta primera) Ocina de gestin y administracin Espacios de atencin al ciudadano 864.80 (planta segunda) Biblioteca-sala de estudio 866.60 (planta tico) 11. CULTURAL COMPLEX, FU E R T E V E N T U R A ISLAND, SPAIN Authors: Jon Alvarez Fernndez Oriol Hostench Dr. Fernando A. Prozorovich Alejandro Ros Type: Contest; Music hall, music school, library and services building 12. Author: Jon Alvarez Fernndez Type: Private customer. Project of refurbishment of daytime zones and installations; bathroom and bedrooms remain unchanged. REFURBISHMENT OF APPARTMENT IN BERGARA 13. Author: Jon Alvarez Fernndez Typy: Contest (finalist); Project of house and music studio above a lake. WORKING ON THE EDGE, WORKSHOP FOR A MUSICIAN 14. Author: Jon Alvarez Fernndez Type: Project for Master degree Thesis; town theater hall composed of 2 halls (450 and 100 seats) and classrooms. THEATER HALL IN SANT ANDREU DE LA BARCA 100.75 100.75 100.82 24.80 m2 11.34 m2 MONTACARGAS E.T. MAQUINARIA CONTADORES 4,170,158,070,108,410,104,160,104,483,63 2,200,105,750,253,710,3011,080,303,700,253,920,201,65 3,030,152,52 3,910,172,660,101,210,25 1,550,1715,670,171,540,254,020,101,65 2,140,076,340,251,700,1011,324,471,510,255,90 6,5119,256,08 3,860,4411,360,252,540,106,33 2,55 0,07 4,18 2,54 0,25 0,30 0,10 3,81 0,10 4,43 0,15 4,36 0,15 1,98 0,20 5,25 1,86 1,83 5,95 0,15 2,69 0,10 5,81 0,10 9,95 0,07 4,31 3,79 4,31 4,31 4,31 4,31 3,62 6,24 4,47 8,57 0,64 2,700,101,500,101,500,102,700,202,440,204,040,508,84 2,02 0,10 4,48 2,72 0,07 15,08 3,81 0,10 1,75 0,10 2,58 2,82 3,82 8,64 0,07 9,01 0,10 1,99 1,86 0,07 4,03 1,16 0,10 2,35 1,50 1,50 1,65 6,85 0,15 9,96 0,15 4,95 5,40 3,28 3,28 5,02 4,60 2,38 1,38 4,18 4,31 2,410,25 73.10 m2 ALMACN 53.03 m2 TALLER 26.30 m2 DESPACHO 31.06 m2 PASO 54.51 m2 VESTBULO AULARIO 6.80 m2 (AGUA) INSTALACIONES 46.71 m2 ASEOS 7.63 m2 MAQUINARIA ASCENSOR 46.71 m2 ASEOS 54.50 m2 VESTBULO SALA PEQUEA 464.33 m2 VESTBULO GUARDARROPA 217.00 m2 FOSO 55.85 m2 CUARTO MQUINAS 1 7.65 m2 CONTROL 94.61 m2 PATIO BUTACAS SALA PEQUEA 55.85 m2 ENTRADA ARTISTAS 37.41 m2 ESCENARIO 24.45 m2 ACCESO ARTISTAS 22.35 m2 GREEN ROOM 40.02 m2 PASO 17.30 m2 CAMERINO 2 17.30 m2 CAMERINO 1 9.60 m2 ESCALERA ARTISTASMONTACARGAS CUARTO LIMPIEZA 7.50 m2 PASO 18.75 m2 12.04 m2 TAQUILLAS 18.49 m2 ACCESO 66.70 m2 BAR 99.87 100.75 100.75 100.85 Planta 0 1.5% 2.0% 3.0% 100.85 Planta 0 100.15 98.91 98.01 98.91 99.39 100.25 100.47 100.48 100.55 100.85 Planta 0 100.82 100.78 100.85 Planta 0 100.82 100.85 Planta 0 100.80 100.85 Planta 0 2.0% 1.5% 100.72 100.85 Planta 0 100.85 Planta 0 98.30 98.30 100.85 Planta 0 98.30 100.85 Planta 0 99.40 4,020,101,65 15. 115.24 m2 PLATEA ALTA ESCENARIO 105.20 MONTACARGAS 78.35 m2 AULA 2 79.12 m2 AULA 1 ALMACN AULA 2 11.95 m2 ALMACN AULA 1 11.95 m2 ESCALERA 23.10 m2 84.95 m2 PASO PASO 26.00 m2 Impar 1 22 asientos Centro 1 40 asientos Par 1 22 asientos Impar 2 46 asientos Par 2 46 asientos Centro 2 81 asientos Impar 3 42 asientos Par 3 42 asientos Centro 3 96 asientos 243.35 m2 2,34 3,96 3,02 0,07 15,08 10.30 m2 CUARTO 1 35.56 m2 ASEOS 17.32 m2 ESCALERA 3.85 m2 CUARTO 2 53.39 m2 ACCESO SALA 1 40.02 m2 PASO 1,76 0,10 2,53 0,10 1,95 2,82 3,820,101,80 6,20 2,54 0,25 0,30 0,10 4,39 0,10 1,95 0,15 4,36 0,15 1,98 0,20 3,51 5,320,10 1,80 0,10 2,200,105,73 1,560,173,95 3,910,171,260,172,520,25 12,650,1012,773,760,100,101,930,101,93 6,20 0,10 2,54 0,10 16,04 0,10 0,49 11,55 17,19 5,18 12,91 14,92 2,710,101,750,102,291,710,202,440,204,04 3,970,151,65 5,700,601,49 0,371,970,882,48 17,22 8,82 9,43 0,371,970,882,91 11,36 2,65 3,21 2,88 1,92 5,76 19,10 2,11 21,84 2,11 0,94 2,66 0,94 2,72 4,75 1,73 0,231,151,02 6,66 72.05 m2 ACCESO SALA 2 241.62 m2 PLATEA 161.12 FOYER 1,840,851,3611,001,360,851,83 100.85 Planta 0 105.20 Planta 1 105.20 Planta 1 105.20 Planta 1 105.20 Planta 1 105.20 Planta 1 105.03 105.03 103.93 105.20 106.90 Planta 1 17,110,206,500,158,740,327,050,251,47 8,80 0,10 6,85 0,20 28,73 0,550,32 5,766,54 9,51 3,840,212,260,156,150,152,340,16 4,25 5,52 3,760,154,12 5,75 5,18 3,75 2,36 3,23 5,74 3,20 5,74 3,14 2,62 3,70 4,75 27,03 6,66 1,03 2,08 1,07 3,28 34,13 9,891,502,761,502,761,502,761,502,761,505,71 2,25 3,80 1,00 14,01 20,45 1,73 1,021,140,246,13 105.20 Planta 1 109.86 Planta 2 109.86 Planta 2 105.20 Planta 1 109.86 Planta 2 108.59 108.59 240.54 m2 AZOTEA MAQUINARIA 70.18 m2 CUARTO MQUINAS 2 24.40 m2 CUARTO CALDERAS 26.75 m2 CUARTO MQUINAS 3 161.12 FOYER 14.00 m2 ACCESO SALA 4 6.64 m2 ACCESO SALA 3 26.30 m2 CONTROL 30.86 m2 CUARTO MQUINAS 5 50.58 m2 CUARTO REGULADORES 39.38 m2 CUARTO MQUINAS 4 2,850,150,600,734,680,703,580,733,510,070,730,125,490,771,20 4,11 0,14 4,17 0,14 4,17 0,14 4,17 0,14 4,17 0,14 1,44 0,250,70 0,16 0,700,163,830,160,700,163,830,160,700,10 3,530,7010,700,703,52 3,550,2211,620,223,55 0,400,122,200,1013,500,102,220,100,40 6,18 9,97 0,16 4,19 6,47 9,48 1,510,2615,630,261,50 3,920,1511,13 113.98114.43114.86115.29115.72 114.05 114.34 114.34 115.24 m2 PLATEA ALTA ESCENARIO 105.20 MONTACARGAS 78.35 m2 AULA 2 79.12 m2 AULA 1 ALMACN AULA 2 11.95 m2 ALMACN AULA 1 11.95 m2 ESCALERA 23.10 m2 84.95 m2 PASO PASO 26.00 m2 Impar 1 22 asientos Centro 1 40 asientos Par 1 22 asientos Impar 2 46 asientos Par 2 46 asientos Centro 2 81 asientos Impar 3 42 asientos Par 3 42 asientos Centro 3 96 asientos 243.35 m2 2,34 3,96 3,02 0,07 15,08 10.30 m2 CUARTO 1 35.56 m2 ASEOS 17.32 m2 ESCALERA 3.85 m2 CUARTO 2 53.39 m2 ACCESO SALA 1 40.02 m2 PASO 1,76 0,10 2,53 0,10 1,95 2,82 3,820,101,80 6,20 2,54 0,25 0,30 0,10 4,39 0,10 1,95 0,15 4,36 0,15 1,98 0,20 3,51 5,320,10 1,80 0,10 2,200,105,73 1,560,173,95 3,910,171,260,172,520,25 12,650,1012,773,760,100,101,930,101,93 6,20 0,10 2,54 0,10 16,04 0,10 0,49 11,55 17,19 5,18 12,91 14,92 2,710,101,750,102,291,710,202,440,204,04 3,970,151,65 5,700,601,49 0,371,970,882,48 17,22 8,82 9,43 0,371,970,882,91 11,36 2,65 3,21 2,88 1,92 5,76 19,10 2,11 21,84 2,11 0,94 2,66 0,94 2,72 4,75 1,73 0,231,151,02 6,66 72.05 m2 ACCESO SALA 2 241.62 m2 PLATEA 161.12 FOYER 1,840,851,3611,001,360,851,83 100.85 Planta 0 105.20 Planta 1 105.20 Planta 1 105.20 Planta 1 105.20 Planta 1 105.20 Planta 1 105.03 105.03 103.93 105.20 106.90 Planta 1 17,110,206,500,158,740,327,050,251,47 8,80 0,10 6,85 0,20 28,73 0,550,32 5,766,54 9,51 3,840,212,260,156,150,152,340,16 4,25 5,52 3,760,154,12 5,75 5,18 3,75 2,36 3,23 5,74 3,20 5,74 3,14 2,62 3,70 4,75 27,03 6,66 1,03 2,08 1,07 3,28 34,13 9,891,502,761,502,761,502,761,502,761,505,71 2,25 3,80 1,00 14,01 20,45 1,73 1,021,140,246,13 105.20 Planta 1 109.86 Planta 2 109.86 Planta 2 105.20 Planta 1 109.86 Planta 2 108.59 108.59 240.54 m2 AZOTEA MAQUINARIA 70.18 m2 CUARTO MQUINAS 2 24.40 m2 CUARTO CALDERAS 26.75 m2 CUARTO MQUINAS 3 161.12 FOYER 14.00 m2 ACCESO SALA 4 6.64 m2 ACCESO SALA 3 26.30 m2 CONTROL 30.86 m2 CUARTO MQUINAS 5 50.58 m2 CUARTO REGULADORES 39.38 m2 CUARTO MQUINAS 4 2,850,150,600,734,680,703,580,733,510,070,730,125,490,771,20 4,11 0,14 4,17 0,14 4,17 0,14 4,17 0,14 4,17 0,14 1,44 0,250,70 0,16 0,700,163,830,160,700,163,830,160,700,10 3,530,7010,700,703,52 3,550,2211,620,223,55 0,400,122,200,1013,500,102,220,100,40 6,18 9,97 0,16 4,19 6,47 9,48 1,510,2615,630,261,50 3,920,1511,13 113.98114.43114.86115.29115.72 114.05 114.34 114.34 105.20 (planta 1) 100.85 (planta baja) 110.87 108.59 (planta 2 - mquinas) 109.86 (planta 2 - foyer) 105.03 (escenario) 103.93 (fila 1 sala) 114.34 117.04 119.74 122.16 123.22 118.54 105.20 (planta 1) 100.85 (planta baja) 114.34 117.04 119.74 110.87 108.59 (planta 2 - mquinas) 109.86 (planta 2 - foyer) 105.03 (escenario) 122.16 123.22 118.54 103.93 (fila 1 sala) 100.75 98.30 (fila 1 sala pequea) 16. C O L L A B O R A T I O N ON OTHER ARCHI- TECTS PROJECTS 17. HOUSING IN COLO- NIA CASTELLS, UP-E, BARCELONA Author: Josep Val Ravell Collaborators: Jon Alvarez Fernndez Luis Candeias Gens Rota Acn Type: Concurso, awarded as winner: urban plan, 186 flats and services 18. ELS PINETONS HOUSING, RIPO- LLET - BARCELONA Author: Josep Val Ravell Collaborators: Jon Alvarez Fernndez Anna Figelius Type: Contest, 2nd prize; urban plan, 114 flats and services 112 11 4 11 8 11 6 12 0 118 106.59 19. Author: Fernando lvarez Prozorovich Collaborators: Jon Alvarez Fernndez Oriol Hostench Type: Private customer, 350m2 house. D E T A C H E D HOUSE IN BEGUES ( B A R C E L O N A ) 20. Author: Fernando lvarez Prozorovich Collaborators: Jon Alvarez Fernndez Oriol Hostench Type: Private customer. 25 houses (3 different house types). 25 DETACHED HOUSES, MATAR ( B A R C E L O N A ) type 1 type 2 alfonsoderojas 21. type 3 alfonsoderojas 1 2 4 3 21 2.50 alfonsoderojas alfonsoderojas 207.5 0 21 0.00 21 7.50 215.00 230.0 0 227.50 23 5.00 237 .50 240.0 0 247 .50 245.00 242.50 250.00 252.50 22 5.0 0 24 0.00 22 0.00 242.50 240.00 245.00 24 5.00 24 2.50 24 7.50 247.50 23 2.50 23 7.50 235.0 0 24 0.00 alfonsoderojas alfonsoderojas alfonsoderojas 21 5.00 alfonsoderojas alfonsoderojas alfonsoderojas alfonsoderojas 22. Author: Fernando lvarez Prozorovich Collaborators: Jon Alvarez Fernndez Oriol Hostench Type: Private customer. 4 houses, 450m2 each. 4 DETACHED HOUSES IN CAS- T E L L D E F E L S 13 12 11 10 14 9 8 6 5 7 1 2 3 15 4 13 12 11 10 14 9 8 6 5 7 1 2 3 15 4 13 12 11 10 14 9 8 6 5 7 1 2 3 15 4 23. F 24. RESEARCH WORK ON ARCHITECTURAL H E R I T A G E 25. Promotor: Generalitat de Catalunya Author: Catalonia University of Technology Director: Dr. Fernando lvarez Prozorovich Coordinator: Jon lvarez Fernndez Topography: Francesc Calaf (Infraplan) E S C A L A D E I M O N A S T E R Y 26. Compr ovar aix Mesur ar profun ditat i definir escale s Compr ovar a camp Falta revisar profun ditat forat Compr ovar aquest a obertu ra (molta vegeta ci) 46 1.6 0 46 4.0 4 47 0.1 3 46 1.2 1 46 3.9 7 46 3.4 5 46 1.0 0 46 4.8 3 46 2.6 7 46 0.8 0 46 2.7 3 46 2.2 4 46 0.2 6 45 9.7 9 45 9.8 4 46 0.2 1 46 0.2 1 45 9.7 8 46 0.4 5 46 5.1 5 46 5.1 3 46 4.1 2 46 9.1 8 46 5.1 9 46 6.2 4 46 6.4 6 46 5.0 6 46 6.4 0 46 4.1 4 47 0.7 1 46 5.6 2 46 6.8 3 46 7.2 7 46 7.1 0 47 1.1 5 46 4.3 5 46 9.2 1 47 0.4 1 46 6.1 0 46 6.1 0 46 4.0 8 47 1.3 5 47 2.3 9 46 4.8 1 47 1.3 1 46 6.0 9 46 8.0 2 46 7.8 9 46 7.8 9 46 2.5 8 46 9.9 2 47 0.4 3 46 8.3 8 46 3.7 5 46 6.5 5 46 5.4 5 47 0.0 7 46 6.1 0 46 6.1 1 46 6.6 0 46 4.0 8 46 5.7 7 45 5.6 2 45 9.3 7 45 7.0 9 45 4.9 3 46 2.8 9 45 7.3 9 45 2.4 2 45 6.6 1 45 5.5 4 45 8.7 2 45 6.2 1 45 5.6 2 46 2.7 4 45 7.0 0 45 6.1 9 45 6.4 1 45 5.6 5 45 8.2 2 45 5.7 3 45 5.1 6 46 3.1 2 45 6.6 0 46 3.0 0 45 6.7 7 45 5.8 1 45 8.1 7 45 6.7 8 45 7.1 0 46 3.3 5 45 6.0 7 45 7.5 3 45 6.6 5 46 3.3 6 45 5.7 8 46 2.7 1 45 6.9 0 45 6.4 4 45 7.7 5 46 3.5 3 45 5.4 6 46 2.7 6 45 6.9 2 45 5.2 4 45 4.2 9 45 5.4 9 45 5.9 3 45 3.2 3 46 2.7 5 46 1.6 9 45 6.7 1 45 5.5 6 45 7.7 6 45 2.7 7 45 5.4 7 45 9.5 7 45 6.2 4 45 4.9 2 45 7.6 1 45 2.5 4 47 9.0 2 46 2.2 2 46 1.0 6 45 8.5 9 45 2.9 9 45 9.2 4 45 8.4 3 46 0.3 3 45 2.5 7 45 6.3 3 45 1.2 6 46 3.2 6 45 5.9 3 46 0.3 2 47 8.5 7 46 0.9 7 46 6.5 2 45 2.7 1 45 6.3 9 46 3.7 9 45 6.4 2 45 3.0 5 45 7.7 1 45 2.4 6 45 1.0 9 48 2.0 2 45 6.4 1 48 0.5 3 46 3.2 4 45 6.7 5 46 0.5 8 45 7.1 8 45 6.2 6 45 9.2 0 46 0.7 7 45 2.4 7 45 6.0 7 45 5.4 6 45 9.2 8 45 2.7 6 46 2.7 2 45 7.3 2 45 1.4 8 45 9.9 2 45 5.8 9 47 9.9 7 46 3.2 5 46 0.8 6 45 7.2 4 45 6.3 8 46 3.6 2 45 9.2 2 45 8.5 9 46 0.0 4 45 5.6 3 45 9.5 1 45 2.1 9 46 1.5 0 45 1.3 7 48 2.0 6 46 0.6 9 45 5.8 8 47 9.8 8 46 1.4 8 45 7.0 7 45 6.3 5 45 9.3 9 45 6.5 9 46 0.9 8 45 0.3 0 45 8.9 5 46 1.3 9 45 6.1 7 46 0.1 3 46 5.4 0 45 1.2 7 48 2.0 0 45 8.6 3 45 8.1 8 46 0.0 0 45 9.6 6 45 6.6 4 45 7.5 4 45 0.8 9 46 2.2 4 45 7.9 2 45 6.7 8 46 0.1 5 45 1.4 2 46 0.9 9 46 5.4 3 45 9.6 0 45 9.4 7 48 2.6 8 46 1.5 2 46 1.2 6 45 9.9 7 45 7.5 0 46 5.1 0 46 0.0 4 46 1.4 4 45 8.8 3 46 2.2 8 46 1.0 3 46 4.8 3 48 1.4 8 45 7.2 4 45 9.4 4 45 9.7 4 45 9.7 7 45 2.2 9 45 6.2 9 46 2.0 7 45 5.2 9 45 8.6 9 46 2.2 2 46 5.0 5 46 6.6 4 46 1.2 9 46 0.9 2 45 7.8 2 45 9.3 7 45 8.5 2 45 5.5 1 47 9.3 0 45 7.6 5 46 0.0 4 45 9.6 5 46 1.5 4 46 1.3 6 46 1.0 4 45 3.7 3 46 2.0 6 45 9.3 4 46 1.2 9 45 9.3 2 45 9.1 4 46 2.4 3 45 6.0 6 46 0.9 7 45 7.4 1 45 8.8 7 45 5.7 0 48 2.6 1 47 8.7 9 45 9.1 5 45 9.9 2 46 1.4 4 46 0.9 3 45 3.4 8 46 1.9 9 45 7.2 6 46 3.6 3 45 9.3 4 45 9.8 4 46 1.0 3 46 3.9 2 45 7.1 9 46 0.8 9 45 6.7 7 45 5.5 7 45 8.6 0 45 9.8 0 Claus tre Gran o Maius Pa ti Fa a na de Sa nta Maria Claus tre Gran o Maius Pa ti de l'A ve Maria Po rte ria Hos tatgeria Se go n Claus tre Pa ti d'en tra da Cap ella de Sa nt Br u Ed ifici de ls se rveis IP1 6 IP1 5 IP1 4 IP9 IP1 1 IP8 IP7 IP6 IP5 IP4 IP3 IP1 IP1 0 SORRENCA MA ARREBOSSAT CARREUS AMB PATOLOGIES-EROSIONS O POC DEFINITS VEGETACI ESQUERDES TERRENY FORATS Fbrica de pedra sorrenca labrada Fbrica de cermica Revestiment continu de qualsevol tipus Carreus amb prdua de material o contorn erosionat Vegetaci sobre els paraments o sobre el terra Fbrica de pedra sorrenca labrada Secci terreny natural Forats passants al mur capa 09 - Sorrenca Sempre polilinies tancades capa 17 - Maons Noms per representar maons ja existents, no geros d'una restauraci capa 06 - Arrebosats Sempre polilinies tancades Si l'acabat est erosionat, s'hi afegeix una trama de punts (a capa 02 - Carreus Patologies Linia ByLayer (a punts); escala 0.01 capa 07 - Vegetacio Linia ByLayer; escala 0.01 Evitar geometries d'angles massa aguts (com si fossin crestes capa 05 - Patologies Una polilinia per l'eix de l'esquerda Linia: capa 19 - Linies Terra Trama: capa 24 - Trames Seccio Terreny; tipus User-defined, limits: capa 31- Aux; linia Bylayer; escala 0.035 Linia: capa 08 - Forats Trama: capa 26 - Trames Forats ; tipus User-defined, 45, 0 ZONES EROSIONADES Zones del mur amb prdua de material superficial capa 27 - Trama zones erosionades Si es dibuixa una polilinia per delimitar la zona, a la mateixa trama User-defined, 45, 0.02 ZONES RESTAURADES Fbrica de pedra indefinida pel rejuntament d'una restauraci capa 03 - Paredat Polilinies obertes on es vegi l'aresta de la pedra LINIES PRINCIPALS Contorn del parament OBERTURES Portes i finestres 27. MIRAVET CASTLE (SOUTH WALL) Promotor: Generalitat de Catalunya Author: Catalonia University of Technology. Director: Dr. Fernando lvarez Prozorovich Coordinator: Jon lvarez Fernndez Topography: Francesc Calaf (Infraplan) 104.74 m 95.00 m 119.37 m 128.63 m 112.51 m 111.30 m 110.48 m 105.01 m 104.24 m 100.54 m 94.00 m 113.90 m 112.59 m 112.75 m 103.18 m 28. 104.48 m 112.18 m 113.07 m IP5 IP2 IP3 IP4 IP7 106,69 106,48 109,02 109,58 108,61 112,76 112,82 112,89 106,98 107,68 106,21 105,34 105,10 106,21 104,34 101,06 100,94 102,12 101,11 101,69 101,53 101,38 101,66 102,02 101,12 100,19 100 102 103 104 99 104 106 101 102 105 101 10 3 102 10110 0 105.17 107 106 105 103 100 102 101 126,37 118,65 113,94 125,75 125,26 107,04 IP6 104,75 104,82 104,91 106,85 104,05 104,70 99,63 101,85 101,26 104,08 104,39 102,58 102,11 105,77 107,24 112,91 112,75 112,67 112,98 108.34 113 108.42 29. Promotor: Generalitat de Catalunya Author: Catalonia University of Technology Director: Dr Fernando lvarez Prozorovich Coordinator: Oriol Hostench Assistant: Jon lvarez Fernndez Topography: Francesc Calaf (Infraplan) C A S T E L L D E M P R I E S C A T H E D R A L 31.43m 30.84m 36.65m 39.63m 32.49m 23.13m 23.91m 15.16m 14.97m 14.93m 16.14m 14.92m 23.27m 36.41m 24.07m 32.51m 34.85m 28.69m 36.62m 24.11m 15.36m 51.06m 49.35m 44.14m 44.14m 31.07m 32.52m 42.81m 17.10m 17.13m 17.21m 31.18m 32.50m 36.48m 24.61m 27.18m 23.77m 25.02m 21.18m 25.02m 16.31m 15.82m 25.36m 38.58m 37.32m 39.63m 37.20m 16.10m 14.92m 16.03m 26.45m 17.31m 18.92m 19.52m 21.13m 31.64m 34.05m 30.29m 26.54m 23.87m 30.18m 30.89m 34.79m 16.26m 16.15m 23.71m 22.93m 36.23m 24.02m 23.67m 22.46m 18.78m 16.27m 16.83m 20.35m 16.99m 17.88m 20.68m 26.44m 20.82m 17.01m 16.42m 25.53m 24.06m 23.32m 24.27m 16.47m 16.04m 16.44m 19.46m 22.45m 16.37m 20.84m 27.67m 30.91m 39.63m 26.16m 30.56m 29.94m 23.56m 16.13m16.10m 23.85m 22.51m 23.28m 23.56m 22.25m 35.92m 35.65m 35.83m 35.86m 23.77m 27.93m 21.12m 22.14m 35.76m 36.16m 36.14m 30.56m 15.38m 16.30m 16.04m 30.84m 30.29m 29.60m 38.53m 16.99m 20.69m 16.69m 18.91m 23.87m 24.08m 27.73m 19.57m 35.80m 30.45m 23.87m 37.53m 30. 67 5 4 3 2 11211 10 9 8 42.45m 41.01m 36.63m 39.37m 36.95m 33.52m 31.08m 28.73m 51.14m 49.40m 44.11m 38.79m 33.85m 38.78m 44.09m 33.86m 27.59m 23.29m 23.38m 33.85m 35.77m 36.16m 33.03m 16.66m 30.84m 36.54m 32.24m 31.05m 15.16m 15.37m 15.46m15.48m 16.10m 15.64m 15.93m 36.52m 19.03m 20.63m 17.81m 18.11m 30.14m 31.24m 29.38m 20.75m 16.43m 32.47m 31.25m 22.96m 16.44m 16.13m 16.58m 24.11m 24.17m 16.42m 16.12m 16.15m 16.58m 19.92m 23.90m 27.45m 36.94m 34.85m 39.62m 42.78m 41.10m 16.39m 18.58m 23.46m 24.12m 32.74m 30.52m 24.26m 38.47m 34.42m 34.87m 31.40m 36.81m 32.78m 32.41m 31.75m 30.80m 32.12m 27.45m 36.40m 35.40m 30.90m 23.03m 23.35m 23.13m 22.70m 30.99m 23.68m 15.04m