Pond and Wetland BMPs, Retrofitting Detention Basins

100
Pond and Wetland BMPs, Retrofitting Detention Basins

description

Pond and Wetland BMPs, Retrofitting Detention Basins. WET PONDS. Wet Pond Treatment Processes. Settling Plant Uptake and Adsorption Infiltration Evaporation. Wet Ponds - Criteria. Provide Quantity and Quality Control (not volume control) - PowerPoint PPT Presentation

Transcript of Pond and Wetland BMPs, Retrofitting Detention Basins

Page 1: Pond and Wetland BMPs, Retrofitting Detention Basins

Pond and Wetland BMPs, Retrofitting Detention Basins

Page 2: Pond and Wetland BMPs, Retrofitting Detention Basins

WET PONDS

Page 3: Pond and Wetland BMPs, Retrofitting Detention Basins
Page 4: Pond and Wetland BMPs, Retrofitting Detention Basins

Wet Pond Treatment Processes

• Settling

• Plant Uptake and Adsorption

• Infiltration

• Evaporation

Page 5: Pond and Wetland BMPs, Retrofitting Detention Basins

Wet Ponds - Criteria

• Provide Quantity and Quality Control(not volume control)

• Drainage Area: Minimum of 10 Acres (>25 Acres Preferred)

• Treat Water Quality Volume• Retrofit Opportunities• Maintenance

sediment removal

Inlet & outlet

vegetation

Page 6: Pond and Wetland BMPs, Retrofitting Detention Basins

Wet Ponds – Primary Design Parameters

• Storage VolumeChannel Protection & Flood Control

• Detention Time (24-48 Hours)Water Quality

• Release RateChannel Protection & Flood Control

Page 7: Pond and Wetland BMPs, Retrofitting Detention Basins

Wet Pond – Other Design Criteria

• Treat Up to 75 Acres

• Include Forebay

• Depth: 4-6 Feet

• Geometry Affects Performancedead storage

short circuiting

Page 8: Pond and Wetland BMPs, Retrofitting Detention Basins
Page 9: Pond and Wetland BMPs, Retrofitting Detention Basins
Page 10: Pond and Wetland BMPs, Retrofitting Detention Basins
Page 11: Pond and Wetland BMPs, Retrofitting Detention Basins

Extended Detention Pond

Page 12: Pond and Wetland BMPs, Retrofitting Detention Basins

Wet Pond

Page 13: Pond and Wetland BMPs, Retrofitting Detention Basins

Multiple Pond System

Page 14: Pond and Wetland BMPs, Retrofitting Detention Basins

Pocket Pond

Page 15: Pond and Wetland BMPs, Retrofitting Detention Basins

Wet Pond – Hydraulic Design

• Design Pond Using Acceptable Methodology– NRCS…TR55…TR20– Penn State Runoff Model (PSRM)– Modified Rational Method– Other

• Hydrograph Routing Is Necessary

Page 16: Pond and Wetland BMPs, Retrofitting Detention Basins
Page 17: Pond and Wetland BMPs, Retrofitting Detention Basins

Wet Pond – Area Ratio

Area Ratio = Drainage Area

Pond Area

Should Be Less Than 100

For Maximum Efficiency

Page 18: Pond and Wetland BMPs, Retrofitting Detention Basins

Wet Ponds – Pollutant Removal

Sediment………….. 50-90%

Total Phosphorus… 30-90%

Soluble Nutrients….40-80%

Lead……………….. 70-80%

Zinc…………………40-50%

Page 19: Pond and Wetland BMPs, Retrofitting Detention Basins
Page 20: Pond and Wetland BMPs, Retrofitting Detention Basins
Page 21: Pond and Wetland BMPs, Retrofitting Detention Basins
Page 22: Pond and Wetland BMPs, Retrofitting Detention Basins
Page 23: Pond and Wetland BMPs, Retrofitting Detention Basins
Page 24: Pond and Wetland BMPs, Retrofitting Detention Basins
Page 25: Pond and Wetland BMPs, Retrofitting Detention Basins
Page 26: Pond and Wetland BMPs, Retrofitting Detention Basins

Wet Pond Criteria

1. Minimum Contributory Area: 10 Acres2. Pretreatment: Sediment Forebay

Sized to Contain 0.1 inches per impervious area

3. Design to Treat Water Quality Volume4. Multiple Treatment Pathways Increase

Performance…Multiple Cells…Pond-Wetland Train

Page 27: Pond and Wetland BMPs, Retrofitting Detention Basins

Wet Pond Criteria

5. Pond Benches

A. Safety Bench – 6%Maximum Slope

B. Aquatic Bench – Maximum Depth 18” Below Normal Pool

6. Provide for Maintenance Access

Page 28: Pond and Wetland BMPs, Retrofitting Detention Basins
Page 29: Pond and Wetland BMPs, Retrofitting Detention Basins
Page 30: Pond and Wetland BMPs, Retrofitting Detention Basins
Page 31: Pond and Wetland BMPs, Retrofitting Detention Basins
Page 32: Pond and Wetland BMPs, Retrofitting Detention Basins
Page 33: Pond and Wetland BMPs, Retrofitting Detention Basins
Page 34: Pond and Wetland BMPs, Retrofitting Detention Basins
Page 35: Pond and Wetland BMPs, Retrofitting Detention Basins
Page 36: Pond and Wetland BMPs, Retrofitting Detention Basins
Page 37: Pond and Wetland BMPs, Retrofitting Detention Basins
Page 38: Pond and Wetland BMPs, Retrofitting Detention Basins
Page 39: Pond and Wetland BMPs, Retrofitting Detention Basins

Types of Wetlands

• Shallow Wetland

• Extended Detention Wetland

• Pond-Wetland System

• Pocket Wetland

Page 40: Pond and Wetland BMPs, Retrofitting Detention Basins
Page 41: Pond and Wetland BMPs, Retrofitting Detention Basins
Page 42: Pond and Wetland BMPs, Retrofitting Detention Basins
Page 43: Pond and Wetland BMPs, Retrofitting Detention Basins
Page 44: Pond and Wetland BMPs, Retrofitting Detention Basins
Page 45: Pond and Wetland BMPs, Retrofitting Detention Basins
Page 46: Pond and Wetland BMPs, Retrofitting Detention Basins
Page 47: Pond and Wetland BMPs, Retrofitting Detention Basins
Page 48: Pond and Wetland BMPs, Retrofitting Detention Basins
Page 49: Pond and Wetland BMPs, Retrofitting Detention Basins
Page 50: Pond and Wetland BMPs, Retrofitting Detention Basins
Page 51: Pond and Wetland BMPs, Retrofitting Detention Basins
Page 52: Pond and Wetland BMPs, Retrofitting Detention Basins
Page 53: Pond and Wetland BMPs, Retrofitting Detention Basins
Page 54: Pond and Wetland BMPs, Retrofitting Detention Basins
Page 55: Pond and Wetland BMPs, Retrofitting Detention Basins

Component Design

Outlet Structure

Page 56: Pond and Wetland BMPs, Retrofitting Detention Basins
Page 57: Pond and Wetland BMPs, Retrofitting Detention Basins
Page 58: Pond and Wetland BMPs, Retrofitting Detention Basins
Page 59: Pond and Wetland BMPs, Retrofitting Detention Basins
Page 60: Pond and Wetland BMPs, Retrofitting Detention Basins
Page 61: Pond and Wetland BMPs, Retrofitting Detention Basins
Page 62: Pond and Wetland BMPs, Retrofitting Detention Basins
Page 63: Pond and Wetland BMPs, Retrofitting Detention Basins
Page 64: Pond and Wetland BMPs, Retrofitting Detention Basins

Wetland Treatment Criteria

1. Surface Area: At least 1% of total Drainage Area

2. 25% of WQv Should Be In Deep Water Zones (4’)

3. Minimum of 35% of Area: Depth of 6” or less

4. At least 65% of Area: Shallower than 18”

Page 65: Pond and Wetland BMPs, Retrofitting Detention Basins
Page 66: Pond and Wetland BMPs, Retrofitting Detention Basins
Page 67: Pond and Wetland BMPs, Retrofitting Detention Basins
Page 68: Pond and Wetland BMPs, Retrofitting Detention Basins
Page 69: Pond and Wetland BMPs, Retrofitting Detention Basins
Page 70: Pond and Wetland BMPs, Retrofitting Detention Basins
Page 71: Pond and Wetland BMPs, Retrofitting Detention Basins
Page 72: Pond and Wetland BMPs, Retrofitting Detention Basins
Page 73: Pond and Wetland BMPs, Retrofitting Detention Basins
Page 74: Pond and Wetland BMPs, Retrofitting Detention Basins

Existing Conditions – (Pre-Construction)

Page 75: Pond and Wetland BMPs, Retrofitting Detention Basins

Proposed Conditions (Post-construction)

Page 76: Pond and Wetland BMPs, Retrofitting Detention Basins
Page 77: Pond and Wetland BMPs, Retrofitting Detention Basins
Page 78: Pond and Wetland BMPs, Retrofitting Detention Basins
Page 79: Pond and Wetland BMPs, Retrofitting Detention Basins
Page 80: Pond and Wetland BMPs, Retrofitting Detention Basins
Page 81: Pond and Wetland BMPs, Retrofitting Detention Basins
Page 82: Pond and Wetland BMPs, Retrofitting Detention Basins

Proposed Conditions (Post-construction)

Page 83: Pond and Wetland BMPs, Retrofitting Detention Basins
Page 84: Pond and Wetland BMPs, Retrofitting Detention Basins

Retrofitting Detention Basins

Page 85: Pond and Wetland BMPs, Retrofitting Detention Basins

Conventional Detention Basins

• Designed For Flood Control & Channel Protection

large storm events (50 year…100 year)

• Do Not Control: runoff volumewater quality

• Do Not Provideaestheticswildlife habitat

Page 86: Pond and Wetland BMPs, Retrofitting Detention Basins

Retrofitting Detention Basins - Benefits

• Pollutant Removal

• Water Quality Improvement

• Wildlife Habitat Creation

• Aesthetic Improvement

• Reduced Maintenance

Page 87: Pond and Wetland BMPs, Retrofitting Detention Basins

Retrofitting Detention Basins - Modifications

• Modify Outfall Structurecreate two-stage release

treat small storms for water quality

• Eliminate Paved Low-Flow Channelsuse meandering vegetated swales

increase detention time for small storms

Page 88: Pond and Wetland BMPs, Retrofitting Detention Basins

Retrofitting Detention Basins - Modificatons

• Use Stilling and Settling Basins at Inlets & Outlets

remove sediment & attached pollutantsplant with wetland plants

• Regrade to Provide Micro-Habitats

• Create Wetland - Pond Areas

Page 89: Pond and Wetland BMPs, Retrofitting Detention Basins

Extended Detention Basin Conversion

Page 90: Pond and Wetland BMPs, Retrofitting Detention Basins

Wet Pond Conversion

Page 91: Pond and Wetland BMPs, Retrofitting Detention Basins
Page 92: Pond and Wetland BMPs, Retrofitting Detention Basins
Page 93: Pond and Wetland BMPs, Retrofitting Detention Basins
Page 94: Pond and Wetland BMPs, Retrofitting Detention Basins
Page 95: Pond and Wetland BMPs, Retrofitting Detention Basins
Page 96: Pond and Wetland BMPs, Retrofitting Detention Basins
Page 97: Pond and Wetland BMPs, Retrofitting Detention Basins
Page 98: Pond and Wetland BMPs, Retrofitting Detention Basins
Page 99: Pond and Wetland BMPs, Retrofitting Detention Basins

Proposed Conditions – Post Construction Construction

Page 100: Pond and Wetland BMPs, Retrofitting Detention Basins