DiscretionaryDependency
Cost ofQuality (COQ)
Summary Activity
Baseline
ActivitySplitting
Gantt Chart
PMP EXAM FLASHCARDS
By Jonathan Donado
Over 500 dynamic Flashcards in PowerPoint
PART 2 of
5
![Page 2: PMP Exam Flashcards presentation 2 of 5 ( PMBOK - 5th Edition - PMI ) Download it in PowerPoint](https://reader035.fdocuments.net/reader035/viewer/2022062310/58a2fbc21a28ab5d1c8b69fd/html5/thumbnails/2.jpg)
52
About me
Linkedin.com/in/jonathandonado
www.branded.me/jonathandonado
Twitter.com/donadosays
Bilingual senior general management executive with expertise in international
business and Mergers & Acquisitions (M&A)
If you like the Flashcards, please give a ”Like” in SlideShare. It’s much appreciated !
o Education: - Senior Executive Fellow – Harvard University- MBA – IESE
o Certifications:- Six Sigma Black Belt (CSSBB) – ASQ Certified- Agile (ACP) – PMI Certified
Jonathan Donado
![Page 3: PMP Exam Flashcards presentation 2 of 5 ( PMBOK - 5th Edition - PMI ) Download it in PowerPoint](https://reader035.fdocuments.net/reader035/viewer/2022062310/58a2fbc21a28ab5d1c8b69fd/html5/thumbnails/3.jpg)
Data Date
A point in time when the status of the
project is recorded
Linkedin.com/in/jonathandonadoJONATHAN DONADO
![Page 4: PMP Exam Flashcards presentation 2 of 5 ( PMBOK - 5th Edition - PMI ) Download it in PowerPoint](https://reader035.fdocuments.net/reader035/viewer/2022062310/58a2fbc21a28ab5d1c8b69fd/html5/thumbnails/4.jpg)
DecisionTree Analysis
A diagramming and calculation technique for
evaluating the implications of a
chain of multiple options in the presence of
uncertainty
Linkedin.com/in/jonathandonadoJONATHAN DONADO
![Page 5: PMP Exam Flashcards presentation 2 of 5 ( PMBOK - 5th Edition - PMI ) Download it in PowerPoint](https://reader035.fdocuments.net/reader035/viewer/2022062310/58a2fbc21a28ab5d1c8b69fd/html5/thumbnails/5.jpg)
Decomposition
A technique used for dividing and
subdividing the project scope and project deliverables into
smaller, more manageable parts
Linkedin.com/in/jonathandonadoJONATHAN DONADO
![Page 6: PMP Exam Flashcards presentation 2 of 5 ( PMBOK - 5th Edition - PMI ) Download it in PowerPoint](https://reader035.fdocuments.net/reader035/viewer/2022062310/58a2fbc21a28ab5d1c8b69fd/html5/thumbnails/6.jpg)
Defect Repair
An intentional activity to modify a
nonconforming product or product component
Linkedin.com/in/jonathandonadoJONATHAN DONADO
![Page 7: PMP Exam Flashcards presentation 2 of 5 ( PMBOK - 5th Edition - PMI ) Download it in PowerPoint](https://reader035.fdocuments.net/reader035/viewer/2022062310/58a2fbc21a28ab5d1c8b69fd/html5/thumbnails/7.jpg)
Dedicated Project Time
The amount of time that a resource is
available to the project taking into account the resource’s non-project
activities
Linkedin.com/in/jonathandonadoJONATHAN DONADO
![Page 8: PMP Exam Flashcards presentation 2 of 5 ( PMBOK - 5th Edition - PMI ) Download it in PowerPoint](https://reader035.fdocuments.net/reader035/viewer/2022062310/58a2fbc21a28ab5d1c8b69fd/html5/thumbnails/8.jpg)
Define Scope
A process of developing a detailed
description of the project and the
product
Linkedin.com/in/jonathandonadoJONATHAN DONADO
![Page 9: PMP Exam Flashcards presentation 2 of 5 ( PMBOK - 5th Edition - PMI ) Download it in PowerPoint](https://reader035.fdocuments.net/reader035/viewer/2022062310/58a2fbc21a28ab5d1c8b69fd/html5/thumbnails/9.jpg)
Define Estimate
An estimating technique usually made during the
planning phase that assigns a cost estimate range to
each work package in the WBS. This estimate typically falls between -5% and +10%
of the actual budget. Also known as bottom-up
estimating
Linkedin.com/in/jonathandonadoJONATHAN DONADO
![Page 10: PMP Exam Flashcards presentation 2 of 5 ( PMBOK - 5th Edition - PMI ) Download it in PowerPoint](https://reader035.fdocuments.net/reader035/viewer/2022062310/58a2fbc21a28ab5d1c8b69fd/html5/thumbnails/10.jpg)
Deliverable
Any unique and verifiable product,
result, or capability to perform a service that is produced to complete a process,
phase, or project
Linkedin.com/in/jonathandonadoJONATHAN DONADO
![Page 11: PMP Exam Flashcards presentation 2 of 5 ( PMBOK - 5th Edition - PMI ) Download it in PowerPoint](https://reader035.fdocuments.net/reader035/viewer/2022062310/58a2fbc21a28ab5d1c8b69fd/html5/thumbnails/11.jpg)
Deflection
The act of transferring all or part of a risk to another party, usually
by some form ofcontract
Linkedin.com/in/jonathandonadoJONATHAN DONADO
![Page 12: PMP Exam Flashcards presentation 2 of 5 ( PMBOK - 5th Edition - PMI ) Download it in PowerPoint](https://reader035.fdocuments.net/reader035/viewer/2022062310/58a2fbc21a28ab5d1c8b69fd/html5/thumbnails/12.jpg)
Dependency
The relationship between project
activities
Linkedin.com/in/jonathandonadoJONATHAN DONADO
![Page 13: PMP Exam Flashcards presentation 2 of 5 ( PMBOK - 5th Edition - PMI ) Download it in PowerPoint](https://reader035.fdocuments.net/reader035/viewer/2022062310/58a2fbc21a28ab5d1c8b69fd/html5/thumbnails/13.jpg)
Direct Costs
Costs incurred for the exclusive benefit of
the project
Linkedin.com/in/jonathandonadoJONATHAN DONADO
![Page 14: PMP Exam Flashcards presentation 2 of 5 ( PMBOK - 5th Edition - PMI ) Download it in PowerPoint](https://reader035.fdocuments.net/reader035/viewer/2022062310/58a2fbc21a28ab5d1c8b69fd/html5/thumbnails/14.jpg)
DiscreteEffort
An activity that can be planned and
measured and that yields a specific
output Note: Discrete effort is one of three earned value management (EVM)
types of activities used to measure work performance
Linkedin.com/in/jonathandonadoJONATHAN DONADO
![Page 15: PMP Exam Flashcards presentation 2 of 5 ( PMBOK - 5th Edition - PMI ) Download it in PowerPoint](https://reader035.fdocuments.net/reader035/viewer/2022062310/58a2fbc21a28ab5d1c8b69fd/html5/thumbnails/15.jpg)
DiscretionaryDependency
A preferred order of sequencing project
activities
Linkedin.com/in/jonathandonadoJONATHAN DONADO
![Page 16: PMP Exam Flashcards presentation 2 of 5 ( PMBOK - 5th Edition - PMI ) Download it in PowerPoint](https://reader035.fdocuments.net/reader035/viewer/2022062310/58a2fbc21a28ab5d1c8b69fd/html5/thumbnails/16.jpg)
Dummy
An arrow in an AOA diagram that does not represent any actual work but is used to
show the relationship between two activities
Linkedin.com/in/jonathandonadoJONATHAN DONADO
![Page 17: PMP Exam Flashcards presentation 2 of 5 ( PMBOK - 5th Edition - PMI ) Download it in PowerPoint](https://reader035.fdocuments.net/reader035/viewer/2022062310/58a2fbc21a28ab5d1c8b69fd/html5/thumbnails/17.jpg)
Duration
The total number of work periods required to complete an activity
or work breakdown structure component,
expressed in hours, days, or weeks
Linkedin.com/in/jonathandonadoJONATHAN DONADO
![Page 18: PMP Exam Flashcards presentation 2 of 5 ( PMBOK - 5th Edition - PMI ) Download it in PowerPoint](https://reader035.fdocuments.net/reader035/viewer/2022062310/58a2fbc21a28ab5d1c8b69fd/html5/thumbnails/18.jpg)
Duration Compression
Shortening the project completion time
without changing the scope of the project
Linkedin.com/in/jonathandonadoJONATHAN DONADO
![Page 19: PMP Exam Flashcards presentation 2 of 5 ( PMBOK - 5th Edition - PMI ) Download it in PowerPoint](https://reader035.fdocuments.net/reader035/viewer/2022062310/58a2fbc21a28ab5d1c8b69fd/html5/thumbnails/19.jpg)
Early FinishDate
In the critical path method, the earliest
possible point in time when the uncompleted portions of a schedule
activity can finish based on the schedule network logic, the data date, and any schedule constraints
Linkedin.com/in/jonathandonadoJONATHAN DONADO
![Page 20: PMP Exam Flashcards presentation 2 of 5 ( PMBOK - 5th Edition - PMI ) Download it in PowerPoint](https://reader035.fdocuments.net/reader035/viewer/2022062310/58a2fbc21a28ab5d1c8b69fd/html5/thumbnails/20.jpg)
Early StartDate
In the critical path method, the earliest
possible point in time when the uncompleted portions of a schedule
activity can start based on the schedule network
logic, the data date, and any schedule constraints
Linkedin.com/in/jonathandonadoJONATHAN DONADO
![Page 21: PMP Exam Flashcards presentation 2 of 5 ( PMBOK - 5th Edition - PMI ) Download it in PowerPoint](https://reader035.fdocuments.net/reader035/viewer/2022062310/58a2fbc21a28ab5d1c8b69fd/html5/thumbnails/21.jpg)
Earned Value(EV)
The measure of work performed expressed
in terms of the budget authorized
for that work
Explanation: Sum of costs estimates for activities completed during a given project
Linkedin.com/in/jonathandonadoJONATHAN DONADO
![Page 22: PMP Exam Flashcards presentation 2 of 5 ( PMBOK - 5th Edition - PMI ) Download it in PowerPoint](https://reader035.fdocuments.net/reader035/viewer/2022062310/58a2fbc21a28ab5d1c8b69fd/html5/thumbnails/22.jpg)
Earned Value(EV) Analysis
The measurement of actual project status
versus expected project status as of the
measurement date
Explanation: Sum of costs estimates for activities completed during a given project
Linkedin.com/in/jonathandonadoJONATHAN DONADO
![Page 23: PMP Exam Flashcards presentation 2 of 5 ( PMBOK - 5th Edition - PMI ) Download it in PowerPoint](https://reader035.fdocuments.net/reader035/viewer/2022062310/58a2fbc21a28ab5d1c8b69fd/html5/thumbnails/23.jpg)
Earned ValueManagement
A methodology that
combines scope, schedule, and resource
measurements to assess project performance and
progress
Linkedin.com/in/jonathandonadoJONATHAN DONADO
![Page 24: PMP Exam Flashcards presentation 2 of 5 ( PMBOK - 5th Edition - PMI ) Download it in PowerPoint](https://reader035.fdocuments.net/reader035/viewer/2022062310/58a2fbc21a28ab5d1c8b69fd/html5/thumbnails/24.jpg)
Effort
The number of labor units required to
complete a schedule activity or work
breakdown structure component, often
expressed in hours, days, or weeks
Linkedin.com/in/jonathandonadoJONATHAN DONADO
![Page 25: PMP Exam Flashcards presentation 2 of 5 ( PMBOK - 5th Edition - PMI ) Download it in PowerPoint](https://reader035.fdocuments.net/reader035/viewer/2022062310/58a2fbc21a28ab5d1c8b69fd/html5/thumbnails/25.jpg)
Effort Estimate
Calculation of the number of person hours
or days needed to complete an activity
Linkedin.com/in/jonathandonadoJONATHAN DONADO
![Page 26: PMP Exam Flashcards presentation 2 of 5 ( PMBOK - 5th Edition - PMI ) Download it in PowerPoint](https://reader035.fdocuments.net/reader035/viewer/2022062310/58a2fbc21a28ab5d1c8b69fd/html5/thumbnails/26.jpg)
EMV
A statistical technique that calculates the
average outcome when the future includes
scenarios that may or may not happen
Linkedin.com/in/jonathandonadoJONATHAN DONADO
![Page 27: PMP Exam Flashcards presentation 2 of 5 ( PMBOK - 5th Edition - PMI ) Download it in PowerPoint](https://reader035.fdocuments.net/reader035/viewer/2022062310/58a2fbc21a28ab5d1c8b69fd/html5/thumbnails/27.jpg)
End User
The person or group who will use the product
produced by the project
Linkedin.com/in/jonathandonadoJONATHAN DONADO
![Page 28: PMP Exam Flashcards presentation 2 of 5 ( PMBOK - 5th Edition - PMI ) Download it in PowerPoint](https://reader035.fdocuments.net/reader035/viewer/2022062310/58a2fbc21a28ab5d1c8b69fd/html5/thumbnails/28.jpg)
EnterpriseEnvironmental
Factor
Conditions, not under the immediate control of the
team, that influence, constrain, or direct the
project, program, or portfolio
Linkedin.com/in/jonathandonadoJONATHAN DONADO
![Page 29: PMP Exam Flashcards presentation 2 of 5 ( PMBOK - 5th Edition - PMI ) Download it in PowerPoint](https://reader035.fdocuments.net/reader035/viewer/2022062310/58a2fbc21a28ab5d1c8b69fd/html5/thumbnails/29.jpg)
Estimate at Completion
(EAC)
The expected total cost of completing all work
expressed as the sum of the actual cost to date and the estimate to complete
EAC = AC + ETC
Linkedin.com/in/jonathandonadoJONATHAN DONADO
![Page 30: PMP Exam Flashcards presentation 2 of 5 ( PMBOK - 5th Edition - PMI ) Download it in PowerPoint](https://reader035.fdocuments.net/reader035/viewer/2022062310/58a2fbc21a28ab5d1c8b69fd/html5/thumbnails/30.jpg)
Estimate to Complete
(ETC)
The expected cost to finish all the remaining
project work
Linkedin.com/in/jonathandonadoJONATHAN DONADO
![Page 31: PMP Exam Flashcards presentation 2 of 5 ( PMBOK - 5th Edition - PMI ) Download it in PowerPoint](https://reader035.fdocuments.net/reader035/viewer/2022062310/58a2fbc21a28ab5d1c8b69fd/html5/thumbnails/31.jpg)
Ethics
In the conduct of their operations, state organizations and their
employees will employ information technology in a legal
and ethical manner consistent with government statutes, rules,
and regulations. Information technology will not be used for
purposes that are unrelated to the state organization’s mission or
violates state or federal law
Linkedin.com/in/jonathandonadoJONATHAN DONADO
![Page 32: PMP Exam Flashcards presentation 2 of 5 ( PMBOK - 5th Edition - PMI ) Download it in PowerPoint](https://reader035.fdocuments.net/reader035/viewer/2022062310/58a2fbc21a28ab5d1c8b69fd/html5/thumbnails/32.jpg)
Execution Process Group
Those processes performed to complete
with work define in project management
plan to satisfy the project specifications
Linkedin.com/in/jonathandonadoJONATHAN DONADO
![Page 33: PMP Exam Flashcards presentation 2 of 5 ( PMBOK - 5th Edition - PMI ) Download it in PowerPoint](https://reader035.fdocuments.net/reader035/viewer/2022062310/58a2fbc21a28ab5d1c8b69fd/html5/thumbnails/33.jpg)
Expectancy
Theory that proposes that employees’ effort will lead to effective performance and the
employees will be rewarded for
accomplishments
Linkedin.com/in/jonathandonadoJONATHAN DONADO
![Page 34: PMP Exam Flashcards presentation 2 of 5 ( PMBOK - 5th Edition - PMI ) Download it in PowerPoint](https://reader035.fdocuments.net/reader035/viewer/2022062310/58a2fbc21a28ab5d1c8b69fd/html5/thumbnails/34.jpg)
Expected Monetary Value
The product of an event's probability of occurrence and
the gain or loss that will result. For example, if there is a 60 percent probability that
it will rain, and rain will result in a $100 loss, the expected monetary value of the rain
event is $60 (.6 x $100)
Linkedin.com/in/jonathandonadoJONATHAN DONADO
![Page 35: PMP Exam Flashcards presentation 2 of 5 ( PMBOK - 5th Edition - PMI ) Download it in PowerPoint](https://reader035.fdocuments.net/reader035/viewer/2022062310/58a2fbc21a28ab5d1c8b69fd/html5/thumbnails/35.jpg)
Expert Judgement
Using subject matter experts to assist in
decision making
Linkedin.com/in/jonathandonadoJONATHAN DONADO
![Page 36: PMP Exam Flashcards presentation 2 of 5 ( PMBOK - 5th Edition - PMI ) Download it in PowerPoint](https://reader035.fdocuments.net/reader035/viewer/2022062310/58a2fbc21a28ab5d1c8b69fd/html5/thumbnails/36.jpg)
External Dependency
A relationship between a project activity and a
factor outside the scope of the project that
influences the completion of that activity
Linkedin.com/in/jonathandonadoJONATHAN DONADO
![Page 37: PMP Exam Flashcards presentation 2 of 5 ( PMBOK - 5th Edition - PMI ) Download it in PowerPoint](https://reader035.fdocuments.net/reader035/viewer/2022062310/58a2fbc21a28ab5d1c8b69fd/html5/thumbnails/37.jpg)
Fast Tracking
A schedule compression technique, in which activities or phases normally done in
sequence are performed in parallel or overlapping for at least a portion of
their duration
Linkedin.com/in/jonathandonadoJONATHAN DONADO
![Page 38: PMP Exam Flashcards presentation 2 of 5 ( PMBOK - 5th Edition - PMI ) Download it in PowerPoint](https://reader035.fdocuments.net/reader035/viewer/2022062310/58a2fbc21a28ab5d1c8b69fd/html5/thumbnails/38.jpg)
Feasibility Study
A study undertaken to determine whether a
project is viable
Linkedin.com/in/jonathandonadoJONATHAN DONADO
![Page 39: PMP Exam Flashcards presentation 2 of 5 ( PMBOK - 5th Edition - PMI ) Download it in PowerPoint](https://reader035.fdocuments.net/reader035/viewer/2022062310/58a2fbc21a28ab5d1c8b69fd/html5/thumbnails/39.jpg)
Financial Audit
A thorough examination of a project by an evaluation team
which includes a detailed overview of the project’s
financial procedures, budgets, records, etc. It may deal with
a project as a whole or the separate individual parts of a
project
Linkedin.com/in/jonathandonadoJONATHAN DONADO
![Page 40: PMP Exam Flashcards presentation 2 of 5 ( PMBOK - 5th Edition - PMI ) Download it in PowerPoint](https://reader035.fdocuments.net/reader035/viewer/2022062310/58a2fbc21a28ab5d1c8b69fd/html5/thumbnails/40.jpg)
Financial Closure
The process of completing and terminating the financial and budgetary aspects of the project being performed. It
includes both (external) contract closure and(internal)
project account closure
Linkedin.com/in/jonathandonadoJONATHAN DONADO
![Page 41: PMP Exam Flashcards presentation 2 of 5 ( PMBOK - 5th Edition - PMI ) Download it in PowerPoint](https://reader035.fdocuments.net/reader035/viewer/2022062310/58a2fbc21a28ab5d1c8b69fd/html5/thumbnails/41.jpg)
Finish-to-Finish
A logical relationship in which a successor activity cannot finish until a predecessor
activity has finished
Linkedin.com/in/jonathandonadoJONATHAN DONADO
![Page 42: PMP Exam Flashcards presentation 2 of 5 ( PMBOK - 5th Edition - PMI ) Download it in PowerPoint](https://reader035.fdocuments.net/reader035/viewer/2022062310/58a2fbc21a28ab5d1c8b69fd/html5/thumbnails/42.jpg)
Finish-to-FinishDependency
When the completion of an activity is
dependent on the completion of the preceding activity
Linkedin.com/in/jonathandonadoJONATHAN DONADO
![Page 43: PMP Exam Flashcards presentation 2 of 5 ( PMBOK - 5th Edition - PMI ) Download it in PowerPoint](https://reader035.fdocuments.net/reader035/viewer/2022062310/58a2fbc21a28ab5d1c8b69fd/html5/thumbnails/43.jpg)
Finish-to-Start
A logical relationship in which a successor activity cannot start until a predecessor
activity has finished
Linkedin.com/in/jonathandonadoJONATHAN DONADO
![Page 44: PMP Exam Flashcards presentation 2 of 5 ( PMBOK - 5th Edition - PMI ) Download it in PowerPoint](https://reader035.fdocuments.net/reader035/viewer/2022062310/58a2fbc21a28ab5d1c8b69fd/html5/thumbnails/44.jpg)
Finish-to-StartDependency
When the start of an activity is dependent on the completion of the previous activity
Linkedin.com/in/jonathandonadoJONATHAN DONADO
![Page 45: PMP Exam Flashcards presentation 2 of 5 ( PMBOK - 5th Edition - PMI ) Download it in PowerPoint](https://reader035.fdocuments.net/reader035/viewer/2022062310/58a2fbc21a28ab5d1c8b69fd/html5/thumbnails/45.jpg)
Firm Fixed Price
Contract where buyer pays the seller a set
amount, regardless of the seller’s cost
Linkedin.com/in/jonathandonadoJONATHAN DONADO
![Page 46: PMP Exam Flashcards presentation 2 of 5 ( PMBOK - 5th Edition - PMI ) Download it in PowerPoint](https://reader035.fdocuments.net/reader035/viewer/2022062310/58a2fbc21a28ab5d1c8b69fd/html5/thumbnails/46.jpg)
Fishbone Diagram
A graphical diagram that shows how causes or
potential causes relate to create potential
problems. Also known as Ishikawa diagram
Linkedin.com/in/jonathandonadoJONATHAN DONADO
![Page 47: PMP Exam Flashcards presentation 2 of 5 ( PMBOK - 5th Edition - PMI ) Download it in PowerPoint](https://reader035.fdocuments.net/reader035/viewer/2022062310/58a2fbc21a28ab5d1c8b69fd/html5/thumbnails/47.jpg)
Fixed Cost
A cost that remains constant regardless of a
change in production
Linkedin.com/in/jonathandonadoJONATHAN DONADO
![Page 48: PMP Exam Flashcards presentation 2 of 5 ( PMBOK - 5th Edition - PMI ) Download it in PowerPoint](https://reader035.fdocuments.net/reader035/viewer/2022062310/58a2fbc21a28ab5d1c8b69fd/html5/thumbnails/48.jpg)
Fixed FormulaMethod
A method of estimating Earned Value in which a
specified percentage of the budget value of a work
package is assigned to the start milestone and the remaining percentage is assigned when the work
package is complete
Linkedin.com/in/jonathandonadoJONATHAN DONADO
![Page 49: PMP Exam Flashcards presentation 2 of 5 ( PMBOK - 5th Edition - PMI ) Download it in PowerPoint](https://reader035.fdocuments.net/reader035/viewer/2022062310/58a2fbc21a28ab5d1c8b69fd/html5/thumbnails/49.jpg)
Fixed Price Contract
(FPC)
A contract where work is performed or a product
is provided for a predetermined price
Linkedin.com/in/jonathandonadoJONATHAN DONADO
![Page 50: PMP Exam Flashcards presentation 2 of 5 ( PMBOK - 5th Edition - PMI ) Download it in PowerPoint](https://reader035.fdocuments.net/reader035/viewer/2022062310/58a2fbc21a28ab5d1c8b69fd/html5/thumbnails/50.jpg)
Fixed Price Incentive (FPI) Fee Contract
A fixed price contract that contains incentives
for meeting or exceeding predetermined specifications
Linkedin.com/in/jonathandonadoJONATHAN DONADO
![Page 51: PMP Exam Flashcards presentation 2 of 5 ( PMBOK - 5th Edition - PMI ) Download it in PowerPoint](https://reader035.fdocuments.net/reader035/viewer/2022062310/58a2fbc21a28ab5d1c8b69fd/html5/thumbnails/51.jpg)
Fixed Resources An amount of a
resource (human, equipment, material)
that cannot be changed
Linkedin.com/in/jonathandonadoJONATHAN DONADO
![Page 52: PMP Exam Flashcards presentation 2 of 5 ( PMBOK - 5th Edition - PMI ) Download it in PowerPoint](https://reader035.fdocuments.net/reader035/viewer/2022062310/58a2fbc21a28ab5d1c8b69fd/html5/thumbnails/52.jpg)
Float
Another term for Slack. The amount of time a task can be delayed
without delaying the project’s completion
Linkedin.com/in/jonathandonadoJONATHAN DONADO
![Page 53: PMP Exam Flashcards presentation 2 of 5 ( PMBOK - 5th Edition - PMI ) Download it in PowerPoint](https://reader035.fdocuments.net/reader035/viewer/2022062310/58a2fbc21a28ab5d1c8b69fd/html5/thumbnails/53.jpg)
Flowchart A diagram showing the
steps in a process or system from beginning
to end
Linkedin.com/in/jonathandonadoJONATHAN DONADO
![Page 54: PMP Exam Flashcards presentation 2 of 5 ( PMBOK - 5th Edition - PMI ) Download it in PowerPoint](https://reader035.fdocuments.net/reader035/viewer/2022062310/58a2fbc21a28ab5d1c8b69fd/html5/thumbnails/54.jpg)
Forecast A prediction of future project status
Linkedin.com/in/jonathandonadoJONATHAN DONADO
![Page 55: PMP Exam Flashcards presentation 2 of 5 ( PMBOK - 5th Edition - PMI ) Download it in PowerPoint](https://reader035.fdocuments.net/reader035/viewer/2022062310/58a2fbc21a28ab5d1c8b69fd/html5/thumbnails/55.jpg)
Forward
Pass
A critical path method technique for calculating the early start and early finish dates by working
forward through the schedule model from the
project start date or a given point in time
Linkedin.com/in/jonathandonadoJONATHAN DONADO
![Page 56: PMP Exam Flashcards presentation 2 of 5 ( PMBOK - 5th Edition - PMI ) Download it in PowerPoint](https://reader035.fdocuments.net/reader035/viewer/2022062310/58a2fbc21a28ab5d1c8b69fd/html5/thumbnails/56.jpg)
Formal Acceptance
When the authorized stakeholder provides
sign-off, indicating the product has been
received and is acceptable
Linkedin.com/in/jonathandonadoJONATHAN DONADO
![Page 57: PMP Exam Flashcards presentation 2 of 5 ( PMBOK - 5th Edition - PMI ) Download it in PowerPoint](https://reader035.fdocuments.net/reader035/viewer/2022062310/58a2fbc21a28ab5d1c8b69fd/html5/thumbnails/57.jpg)
Free Float
The amount of time that a schedule activity can be delayed without delaying the early start date of any
successor or violating a schedule constraint
Linkedin.com/in/jonathandonadoJONATHAN DONADO
![Page 58: PMP Exam Flashcards presentation 2 of 5 ( PMBOK - 5th Edition - PMI ) Download it in PowerPoint](https://reader035.fdocuments.net/reader035/viewer/2022062310/58a2fbc21a28ab5d1c8b69fd/html5/thumbnails/58.jpg)
Functional
Organization
An organizational structure in which staff is
grouped by areas of specialization and the project manager has
limited authority to assign work and apply resources
Linkedin.com/in/jonathandonadoJONATHAN DONADO
![Page 59: PMP Exam Flashcards presentation 2 of 5 ( PMBOK - 5th Edition - PMI ) Download it in PowerPoint](https://reader035.fdocuments.net/reader035/viewer/2022062310/58a2fbc21a28ab5d1c8b69fd/html5/thumbnails/59.jpg)
FunctionalManager
The person responsible for the activities of a
specific functional department
Linkedin.com/in/jonathandonadoJONATHAN DONADO
![Page 60: PMP Exam Flashcards presentation 2 of 5 ( PMBOK - 5th Edition - PMI ) Download it in PowerPoint](https://reader035.fdocuments.net/reader035/viewer/2022062310/58a2fbc21a28ab5d1c8b69fd/html5/thumbnails/60.jpg)
Functional
Requirements
Conditions that the product must meet to
support how the end users will interact with the
product
Linkedin.com/in/jonathandonadoJONATHAN DONADO
![Page 61: PMP Exam Flashcards presentation 2 of 5 ( PMBOK - 5th Edition - PMI ) Download it in PowerPoint](https://reader035.fdocuments.net/reader035/viewer/2022062310/58a2fbc21a28ab5d1c8b69fd/html5/thumbnails/61.jpg)
Gantt Chart
A bar chart of schedule information where
activities are listed on the vertical axis, dates are
shown on the horizontal axis, and activity durations
are shown as horizontal bars placed according to
start and finish dates
Linkedin.com/in/jonathandonadoJONATHAN DONADO
![Page 62: PMP Exam Flashcards presentation 2 of 5 ( PMBOK - 5th Edition - PMI ) Download it in PowerPoint](https://reader035.fdocuments.net/reader035/viewer/2022062310/58a2fbc21a28ab5d1c8b69fd/html5/thumbnails/62.jpg)
Grade
A category or rank used to distinguish items having the same functional use (e.g.,"hammer"), but do
not share the same requirements for quality (e.g., different hammers may need to withstand
different amounts of force)
Linkedin.com/in/jonathandonadoJONATHAN DONADO
![Page 63: PMP Exam Flashcards presentation 2 of 5 ( PMBOK - 5th Edition - PMI ) Download it in PowerPoint](https://reader035.fdocuments.net/reader035/viewer/2022062310/58a2fbc21a28ab5d1c8b69fd/html5/thumbnails/63.jpg)
GERT
Network analysis technique that allows
for loops or conditional branches
Linkedin.com/in/jonathandonadoJONATHAN DONADO
![Page 64: PMP Exam Flashcards presentation 2 of 5 ( PMBOK - 5th Edition - PMI ) Download it in PowerPoint](https://reader035.fdocuments.net/reader035/viewer/2022062310/58a2fbc21a28ab5d1c8b69fd/html5/thumbnails/64.jpg)
Governance
The overall structure of the roles, responsibilities
and relationships between the project decision
makers and the organization’s long-term
operational decision makers
Linkedin.com/in/jonathandonadoJONATHAN DONADO
![Page 65: PMP Exam Flashcards presentation 2 of 5 ( PMBOK - 5th Edition - PMI ) Download it in PowerPoint](https://reader035.fdocuments.net/reader035/viewer/2022062310/58a2fbc21a28ab5d1c8b69fd/html5/thumbnails/65.jpg)
Guideline
Used to define a collection of steps that are recommendations to be followed to meet
a stated policy(s)
Linkedin.com/in/jonathandonadoJONATHAN DONADO
![Page 66: PMP Exam Flashcards presentation 2 of 5 ( PMBOK - 5th Edition - PMI ) Download it in PowerPoint](https://reader035.fdocuments.net/reader035/viewer/2022062310/58a2fbc21a28ab5d1c8b69fd/html5/thumbnails/66.jpg)
Hammock
An aggregate or summary activity (a group of related activities is shown as one
and reported at a summary level). A
hammock may or may not have an internal sequence
Linkedin.com/in/jonathandonadoJONATHAN DONADO
![Page 67: PMP Exam Flashcards presentation 2 of 5 ( PMBOK - 5th Edition - PMI ) Download it in PowerPoint](https://reader035.fdocuments.net/reader035/viewer/2022062310/58a2fbc21a28ab5d1c8b69fd/html5/thumbnails/67.jpg)
Hanger
An unintended break in a network path. Hangers are usually caused by missing activities or missing logical
relationships
Linkedin.com/in/jonathandonadoJONATHAN DONADO
![Page 68: PMP Exam Flashcards presentation 2 of 5 ( PMBOK - 5th Edition - PMI ) Download it in PowerPoint](https://reader035.fdocuments.net/reader035/viewer/2022062310/58a2fbc21a28ab5d1c8b69fd/html5/thumbnails/68.jpg)
Historical Information
Records of past projects that are used to assist in planning
future projects
Linkedin.com/in/jonathandonadoJONATHAN DONADO
![Page 69: PMP Exam Flashcards presentation 2 of 5 ( PMBOK - 5th Edition - PMI ) Download it in PowerPoint](https://reader035.fdocuments.net/reader035/viewer/2022062310/58a2fbc21a28ab5d1c8b69fd/html5/thumbnails/69.jpg)
Human ResourcesManagement
Plan
A component of the project or program
management plan that describes the roles and
responsibilities, reporting relationships, and staff management
Linkedin.com/in/jonathandonadoJONATHAN DONADO
![Page 70: PMP Exam Flashcards presentation 2 of 5 ( PMBOK - 5th Edition - PMI ) Download it in PowerPoint](https://reader035.fdocuments.net/reader035/viewer/2022062310/58a2fbc21a28ab5d1c8b69fd/html5/thumbnails/70.jpg)
Human ResourcesPlanning
The process of planning and hiring the project team, outlining roles, responsibilities and
reporting structure and defining team development
Linkedin.com/in/jonathandonadoJONATHAN DONADO
![Page 71: PMP Exam Flashcards presentation 2 of 5 ( PMBOK - 5th Edition - PMI ) Download it in PowerPoint](https://reader035.fdocuments.net/reader035/viewer/2022062310/58a2fbc21a28ab5d1c8b69fd/html5/thumbnails/71.jpg)
Identify Risk
The process of determining which risks may affect the project and documenting their
characteristics
Linkedin.com/in/jonathandonadoJONATHAN DONADO
![Page 72: PMP Exam Flashcards presentation 2 of 5 ( PMBOK - 5th Edition - PMI ) Download it in PowerPoint](https://reader035.fdocuments.net/reader035/viewer/2022062310/58a2fbc21a28ab5d1c8b69fd/html5/thumbnails/72.jpg)
Impact Statement
A cause and effect report generated at the manager level to show the impact
that new projects will have on current schedules
and resources as they enter the work stream
Linkedin.com/in/jonathandonadoJONATHAN DONADO
![Page 73: PMP Exam Flashcards presentation 2 of 5 ( PMBOK - 5th Edition - PMI ) Download it in PowerPoint](https://reader035.fdocuments.net/reader035/viewer/2022062310/58a2fbc21a28ab5d1c8b69fd/html5/thumbnails/73.jpg)
Implementation
Occurs when products
have completed testing are moved into production
or into their working environment
Linkedin.com/in/jonathandonadoJONATHAN DONADO
![Page 74: PMP Exam Flashcards presentation 2 of 5 ( PMBOK - 5th Edition - PMI ) Download it in PowerPoint](https://reader035.fdocuments.net/reader035/viewer/2022062310/58a2fbc21a28ab5d1c8b69fd/html5/thumbnails/74.jpg)
Independent Project Oversight
A process that employs a variety of quality control,
inspection, testing measurement, and other observation processes to
ensure that planned project objectives are achieved in
accordance with an approved plan
Linkedin.com/in/jonathandonadoJONATHAN DONADO
![Page 75: PMP Exam Flashcards presentation 2 of 5 ( PMBOK - 5th Edition - PMI ) Download it in PowerPoint](https://reader035.fdocuments.net/reader035/viewer/2022062310/58a2fbc21a28ab5d1c8b69fd/html5/thumbnails/75.jpg)
Information Distribution
Enacting the communications plan
and providing stakeholders with
needed information in a timely manner
Linkedin.com/in/jonathandonadoJONATHAN DONADO
![Page 76: PMP Exam Flashcards presentation 2 of 5 ( PMBOK - 5th Edition - PMI ) Download it in PowerPoint](https://reader035.fdocuments.net/reader035/viewer/2022062310/58a2fbc21a28ab5d1c8b69fd/html5/thumbnails/76.jpg)
Initiation
Formal definition and authorization of a new project or continuation of an ongoing project
Linkedin.com/in/jonathandonadoJONATHAN DONADO
![Page 77: PMP Exam Flashcards presentation 2 of 5 ( PMBOK - 5th Edition - PMI ) Download it in PowerPoint](https://reader035.fdocuments.net/reader035/viewer/2022062310/58a2fbc21a28ab5d1c8b69fd/html5/thumbnails/77.jpg)
Inputs
Information that is required for a process
to begin
Linkedin.com/in/jonathandonadoJONATHAN DONADO
![Page 78: PMP Exam Flashcards presentation 2 of 5 ( PMBOK - 5th Edition - PMI ) Download it in PowerPoint](https://reader035.fdocuments.net/reader035/viewer/2022062310/58a2fbc21a28ab5d1c8b69fd/html5/thumbnails/78.jpg)
Inspection
A quality control method to examine and
measure work results against baseline
specifications and requirements
Linkedin.com/in/jonathandonadoJONATHAN DONADO
![Page 79: PMP Exam Flashcards presentation 2 of 5 ( PMBOK - 5th Edition - PMI ) Download it in PowerPoint](https://reader035.fdocuments.net/reader035/viewer/2022062310/58a2fbc21a28ab5d1c8b69fd/html5/thumbnails/79.jpg)
Indirect Costs
Overhead costs allocated to the project by the organization, as a cost of doing business
Linkedin.com/in/jonathandonadoJONATHAN DONADO
![Page 80: PMP Exam Flashcards presentation 2 of 5 ( PMBOK - 5th Edition - PMI ) Download it in PowerPoint](https://reader035.fdocuments.net/reader035/viewer/2022062310/58a2fbc21a28ab5d1c8b69fd/html5/thumbnails/80.jpg)
Integration Change Control
Coordinating and managing change across the entire
project scope, schedule and budget
Linkedin.com/in/jonathandonadoJONATHAN DONADO
![Page 81: PMP Exam Flashcards presentation 2 of 5 ( PMBOK - 5th Edition - PMI ) Download it in PowerPoint](https://reader035.fdocuments.net/reader035/viewer/2022062310/58a2fbc21a28ab5d1c8b69fd/html5/thumbnails/81.jpg)
Integration Planning
The planning process to establish how all
elements of the project will be coordinated and
how changes will be managed throughout
the project
Linkedin.com/in/jonathandonadoJONATHAN DONADO
![Page 82: PMP Exam Flashcards presentation 2 of 5 ( PMBOK - 5th Edition - PMI ) Download it in PowerPoint](https://reader035.fdocuments.net/reader035/viewer/2022062310/58a2fbc21a28ab5d1c8b69fd/html5/thumbnails/82.jpg)
Integration Management
Plan
A plan that documents how elements of the
project will be integrated and outlines
how changes will be managed across the
project
Linkedin.com/in/jonathandonadoJONATHAN DONADO
![Page 83: PMP Exam Flashcards presentation 2 of 5 ( PMBOK - 5th Edition - PMI ) Download it in PowerPoint](https://reader035.fdocuments.net/reader035/viewer/2022062310/58a2fbc21a28ab5d1c8b69fd/html5/thumbnails/83.jpg)
Invitation to Bid
Another term for Request For Proposal
(RFP)
Linkedin.com/in/jonathandonadoJONATHAN DONADO
![Page 84: PMP Exam Flashcards presentation 2 of 5 ( PMBOK - 5th Edition - PMI ) Download it in PowerPoint](https://reader035.fdocuments.net/reader035/viewer/2022062310/58a2fbc21a28ab5d1c8b69fd/html5/thumbnails/84.jpg)
Ishikawa Diagram
Another term for the Fishbone Diagram or
the Cause-Effect Diagram
Linkedin.com/in/jonathandonadoJONATHAN DONADO
![Page 85: PMP Exam Flashcards presentation 2 of 5 ( PMBOK - 5th Edition - PMI ) Download it in PowerPoint](https://reader035.fdocuments.net/reader035/viewer/2022062310/58a2fbc21a28ab5d1c8b69fd/html5/thumbnails/85.jpg)
Issue
An identified element or event that may have
a negative impact on the project and needs
to be avoided or resolved
Linkedin.com/in/jonathandonadoJONATHAN DONADO
![Page 86: PMP Exam Flashcards presentation 2 of 5 ( PMBOK - 5th Edition - PMI ) Download it in PowerPoint](https://reader035.fdocuments.net/reader035/viewer/2022062310/58a2fbc21a28ab5d1c8b69fd/html5/thumbnails/86.jpg)
Issue Log
A document that outlines each project issue, along with the
person responsible for resolving it, status and
expected resolution date
Linkedin.com/in/jonathandonadoJONATHAN DONADO
![Page 87: PMP Exam Flashcards presentation 2 of 5 ( PMBOK - 5th Edition - PMI ) Download it in PowerPoint](https://reader035.fdocuments.net/reader035/viewer/2022062310/58a2fbc21a28ab5d1c8b69fd/html5/thumbnails/87.jpg)
Iterating
Updating project plans to reflect changes that
occur during the planning phase and
throughout the project
Linkedin.com/in/jonathandonadoJONATHAN DONADO
![Page 88: PMP Exam Flashcards presentation 2 of 5 ( PMBOK - 5th Edition - PMI ) Download it in PowerPoint](https://reader035.fdocuments.net/reader035/viewer/2022062310/58a2fbc21a28ab5d1c8b69fd/html5/thumbnails/88.jpg)
Kick-off Meeting
A meeting held at the end of major planning activities for
all stakeholders to provide an overview of the project and
outline expectations, ensure a common understanding of the
project and to build consensus and excitement
about the project
Linkedin.com/in/jonathandonadoJONATHAN DONADO
![Page 89: PMP Exam Flashcards presentation 2 of 5 ( PMBOK - 5th Edition - PMI ) Download it in PowerPoint](https://reader035.fdocuments.net/reader035/viewer/2022062310/58a2fbc21a28ab5d1c8b69fd/html5/thumbnails/89.jpg)
Lag
The amount of time whereby a successor
activity will be delayed with respect
to a predecessor activity
Linkedin.com/in/jonathandonadoJONATHAN DONADO
![Page 90: PMP Exam Flashcards presentation 2 of 5 ( PMBOK - 5th Edition - PMI ) Download it in PowerPoint](https://reader035.fdocuments.net/reader035/viewer/2022062310/58a2fbc21a28ab5d1c8b69fd/html5/thumbnails/90.jpg)
Late FinishDate (LF)
In the critical path method, the latest possible point in
time when the uncompleted portions of a schedule
activity can finish based on the schedule network logic, the project completion date,
and any schedule constraints
Linkedin.com/in/jonathandonadoJONATHAN DONADO
![Page 91: PMP Exam Flashcards presentation 2 of 5 ( PMBOK - 5th Edition - PMI ) Download it in PowerPoint](https://reader035.fdocuments.net/reader035/viewer/2022062310/58a2fbc21a28ab5d1c8b69fd/html5/thumbnails/91.jpg)
Late StartDate (LS)
In the critical path method, the latest possible point in
time when the uncompleted portions of a schedule
activity can start based on the schedule network logic, the project completion date,
and any schedule constraints
Linkedin.com/in/jonathandonadoJONATHAN DONADO
![Page 92: PMP Exam Flashcards presentation 2 of 5 ( PMBOK - 5th Edition - PMI ) Download it in PowerPoint](https://reader035.fdocuments.net/reader035/viewer/2022062310/58a2fbc21a28ab5d1c8b69fd/html5/thumbnails/92.jpg)
Lead
The amount of time whereby a successor
activity can be advanced with respect
to a predecessor activity
Linkedin.com/in/jonathandonadoJONATHAN DONADO
![Page 93: PMP Exam Flashcards presentation 2 of 5 ( PMBOK - 5th Edition - PMI ) Download it in PowerPoint](https://reader035.fdocuments.net/reader035/viewer/2022062310/58a2fbc21a28ab5d1c8b69fd/html5/thumbnails/93.jpg)
Lessons Learned
The knowledge gained during a project which
shows how project events were addressed or should be addressed
in the future for the purpose of improving future performance
Linkedin.com/in/jonathandonadoJONATHAN DONADO
![Page 94: PMP Exam Flashcards presentation 2 of 5 ( PMBOK - 5th Edition - PMI ) Download it in PowerPoint](https://reader035.fdocuments.net/reader035/viewer/2022062310/58a2fbc21a28ab5d1c8b69fd/html5/thumbnails/94.jpg)
Level of Effort
An activity that does not produce definitive
end products and is measured by the passage of time
Note: Level of effort is one of three earned value management (EVM) types of activities used to measure work performance
Linkedin.com/in/jonathandonadoJONATHAN DONADO
![Page 95: PMP Exam Flashcards presentation 2 of 5 ( PMBOK - 5th Edition - PMI ) Download it in PowerPoint](https://reader035.fdocuments.net/reader035/viewer/2022062310/58a2fbc21a28ab5d1c8b69fd/html5/thumbnails/95.jpg)
Lessons Learned
The learning that takes place
during the project and is documented to provide
information on what went well and which aspects could have been improved. Lessons learned serve as references
for future projects
Linkedin.com/in/jonathandonadoJONATHAN DONADO
![Page 96: PMP Exam Flashcards presentation 2 of 5 ( PMBOK - 5th Edition - PMI ) Download it in PowerPoint](https://reader035.fdocuments.net/reader035/viewer/2022062310/58a2fbc21a28ab5d1c8b69fd/html5/thumbnails/96.jpg)
Life Cycle Costing
Estimation of acquisition, operating
and disposal costs related to a product; not just project costs
to develop the product
Linkedin.com/in/jonathandonadoJONATHAN DONADO
![Page 97: PMP Exam Flashcards presentation 2 of 5 ( PMBOK - 5th Edition - PMI ) Download it in PowerPoint](https://reader035.fdocuments.net/reader035/viewer/2022062310/58a2fbc21a28ab5d1c8b69fd/html5/thumbnails/97.jpg)
LogicalRelationship
A dependency between two activities or
between an activity and a milestone
Linkedin.com/in/jonathandonadoJONATHAN DONADO
![Page 98: PMP Exam Flashcards presentation 2 of 5 ( PMBOK - 5th Edition - PMI ) Download it in PowerPoint](https://reader035.fdocuments.net/reader035/viewer/2022062310/58a2fbc21a28ab5d1c8b69fd/html5/thumbnails/98.jpg)
Loop
A network path that passes the same node twice. Loops cannot be
analyzed using traditional network analysis
techniques such as CPM and PERT. Loops are
allowed in GERT
Linkedin.com/in/jonathandonadoJONATHAN DONADO
![Page 99: PMP Exam Flashcards presentation 2 of 5 ( PMBOK - 5th Edition - PMI ) Download it in PowerPoint](https://reader035.fdocuments.net/reader035/viewer/2022062310/58a2fbc21a28ab5d1c8b69fd/html5/thumbnails/99.jpg)
52
Connect with me
Linkedin.com/in/jonathandonado
www.branded.me/jonathandonado
Twitter.com/donadosays
Bilingual senior general management executive with expertise in international
business and Mergers & Acquisitions (M&A)
If you like the Flashcards, please give a ”Like” in SlideShare. It’s much appreciated !
o Education: - Senior Executive Fellow – Harvard University- MBA – IESE
o Certifications:- Six Sigma Black Belt (CSSBB) – ASQ Certified- Agile (ACP) – PMI Certified
Jonathan Donado
> Check my other Project Management presentations on SlideShare <
THANK YOU