Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell
Transcript of Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell
![Page 1: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell](https://reader036.fdocuments.net/reader036/viewer/2022081622/613c675cf237e1331c5157c1/html5/thumbnails/1.jpg)
NORTH SHORE CONNECTORNORTH SHORE CONNECTOR
TUNNELS AND STATION SHELLTUNNELS AND STATION SHELLTUNNELS AND STATION SHELLTUNNELS AND STATION SHELLLIGHT RAIL PROJECTLIGHT RAIL PROJECT
PAUL ZICK, PE
NORTH SHORE CONSTRUCTORS JV
![Page 2: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell](https://reader036.fdocuments.net/reader036/viewer/2022081622/613c675cf237e1331c5157c1/html5/thumbnails/2.jpg)
North Shore Connector Alignment
•• 7300 lf 7300 lf Extension to existing 25 mile systemExtension to existing 25 mile system
•• 18 Contracts18 Contracts
• $435 Million$435 Million
![Page 3: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell](https://reader036.fdocuments.net/reader036/viewer/2022081622/613c675cf237e1331c5157c1/html5/thumbnails/3.jpg)
Funding – $ 435 Million
80%
17%17%3%
![Page 4: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell](https://reader036.fdocuments.net/reader036/viewer/2022081622/613c675cf237e1331c5157c1/html5/thumbnails/4.jpg)
Project Location006006007007
Future- to Airport North ShoreNorth Shore
003003
006006007007
Airport North Shore North Shore Connector Connector Light Rail Light Rail E iE iExpansionExpansion
004 New Gateway Station004 New Gateway Station
Existing
EXISTING GATEWAY EXISTING GATEWAY STATIONSTATION
Existing Light Rail System
![Page 5: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell](https://reader036.fdocuments.net/reader036/viewer/2022081622/613c675cf237e1331c5157c1/html5/thumbnails/5.jpg)
Project Team• Owner
–– Port Authority of Allegheny CountyPort Authority of Allegheny County
• Construction ManagerTriGoldTriGold–– TriGoldTriGold
• Jacobs Civil
• HDR
• Kwame
![Page 6: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell](https://reader036.fdocuments.net/reader036/viewer/2022081622/613c675cf237e1331c5157c1/html5/thumbnails/6.jpg)
Project Team• Design Engineer
–– DMJMDMJM
• ContractorNorth Shore Constructors JVNorth Shore Constructors JV–– North Shore Constructors JVNorth Shore Constructors JV
• Obayashi Corp.
• Trumbull Corp.
![Page 7: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell](https://reader036.fdocuments.net/reader036/viewer/2022081622/613c675cf237e1331c5157c1/html5/thumbnails/7.jpg)
What we are building
• Two Contracts
• Combined Contract Value - $156 500 000Combined Contract Value $156,500,000
• Time ––– NTPNTP Oct 2, 2006Oct 2, 2006
–– 003 Tunnels 003 Tunnels 1243 days1243 days Feb 26, 2010Feb 26, 2010
–– 006 Station / C&C006 Station / C&C 870 days870 days Feb 18, 2009Feb 18, 2009
![Page 8: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell](https://reader036.fdocuments.net/reader036/viewer/2022081622/613c675cf237e1331c5157c1/html5/thumbnails/8.jpg)
Four Major Structure Types
• Boat Section – 340 lf–– SOE SOE -- Steel Soldier Piles and Wood LaggingSteel Soldier Piles and Wood LaggingSOSO Stee So d e es a d ood agg gStee So d e es a d ood agg g
• Cut and Cover – 1200 lfSOESOE C t D S il Mi i W ll (CDSM)C t D S il Mi i W ll (CDSM)–– SOE SOE -- Cement Deep Soil Mixing Wall (CDSM)Cement Deep Soil Mixing Wall (CDSM)
–– SOE SOE –– Cement Bentonite Wall (CB)Cement Bentonite Wall (CB)
• Top Down Construction - Station–– SOE SOE -- Slurry WallSlurry Wallyy
• Bored Tunnel – 2240 lfSOESOE P t C t S t l Li iP t C t S t l Li i–– SOE SOE -- Precast Concrete Segmental LiningPrecast Concrete Segmental Lining
![Page 9: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell](https://reader036.fdocuments.net/reader036/viewer/2022081622/613c675cf237e1331c5157c1/html5/thumbnails/9.jpg)
Boat Section – Soldier pile and lagging• Excavation – 0 to 35 feet
• Soldier Piles and Wood Lagging
• Above or at the water table
• Deep Wells
Walls and Waterproofing
EXISTING SOILSEXISTING SOILS
![Page 10: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell](https://reader036.fdocuments.net/reader036/viewer/2022081622/613c675cf237e1331c5157c1/html5/thumbnails/10.jpg)
Boat Section - SOE - Soldier Piles & Lagging
Soldier Piles andSoldier Piles andSoldier Piles and Soldier Piles and LaggingLagging
![Page 11: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell](https://reader036.fdocuments.net/reader036/viewer/2022081622/613c675cf237e1331c5157c1/html5/thumbnails/11.jpg)
Cut & Cover – SOE CDSM Walls
BACKFILLCDSM Walls
60’ +/60’ +/-
Cut off ground water
ROCK
![Page 12: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell](https://reader036.fdocuments.net/reader036/viewer/2022081622/613c675cf237e1331c5157c1/html5/thumbnails/12.jpg)
Cut & Cover / Launch Pit – CDSM Walls
![Page 13: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell](https://reader036.fdocuments.net/reader036/viewer/2022081622/613c675cf237e1331c5157c1/html5/thumbnails/13.jpg)
Cut & Cover / Launch Pit - CDSM WALLSI l il i d ithIn place soils mixed with Bentonite Slurry going down
Cement Slurry mixed going up
Insert Steel Soldier Piles
![Page 14: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell](https://reader036.fdocuments.net/reader036/viewer/2022081622/613c675cf237e1331c5157c1/html5/thumbnails/14.jpg)
CDSM –SOE – Drill Rock Socket
![Page 15: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell](https://reader036.fdocuments.net/reader036/viewer/2022081622/613c675cf237e1331c5157c1/html5/thumbnails/15.jpg)
CDSM WALLS – Temporary Bridge
![Page 16: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell](https://reader036.fdocuments.net/reader036/viewer/2022081622/613c675cf237e1331c5157c1/html5/thumbnails/16.jpg)
Excavation / Mud Slab / WP/ Base Slab
ROCK
![Page 17: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell](https://reader036.fdocuments.net/reader036/viewer/2022081622/613c675cf237e1331c5157c1/html5/thumbnails/17.jpg)
Structural Concrete
Waterproofing
ROCK
![Page 18: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell](https://reader036.fdocuments.net/reader036/viewer/2022081622/613c675cf237e1331c5157c1/html5/thumbnails/18.jpg)
Structural Concrete – Cut and Cover
![Page 19: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell](https://reader036.fdocuments.net/reader036/viewer/2022081622/613c675cf237e1331c5157c1/html5/thumbnails/19.jpg)
Backfill
BACKFILL
ROCK
![Page 20: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell](https://reader036.fdocuments.net/reader036/viewer/2022081622/613c675cf237e1331c5157c1/html5/thumbnails/20.jpg)
Bridge to hold the Bridge
Support two Bents
![Page 21: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell](https://reader036.fdocuments.net/reader036/viewer/2022081622/613c675cf237e1331c5157c1/html5/thumbnails/21.jpg)
Cut & Cover – InstrumentationInstruments
Stain gauges
Weather
Tilt MetersTilt Meters
MotorizedMotorized Total Station
![Page 22: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell](https://reader036.fdocuments.net/reader036/viewer/2022081622/613c675cf237e1331c5157c1/html5/thumbnails/22.jpg)
Underpinning – SR-65
Drilled PierDrilled PierDrilled PierDrilled Pier
Drilled PierDrilled Pier
![Page 23: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell](https://reader036.fdocuments.net/reader036/viewer/2022081622/613c675cf237e1331c5157c1/html5/thumbnails/23.jpg)
Underpinning – SR-65
ROCK
![Page 24: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell](https://reader036.fdocuments.net/reader036/viewer/2022081622/613c675cf237e1331c5157c1/html5/thumbnails/24.jpg)
Underpinning – SR-65
Drilled PierDrilled Pier
![Page 25: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell](https://reader036.fdocuments.net/reader036/viewer/2022081622/613c675cf237e1331c5157c1/html5/thumbnails/25.jpg)
Underpinning – SR-65
ROCK
![Page 26: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell](https://reader036.fdocuments.net/reader036/viewer/2022081622/613c675cf237e1331c5157c1/html5/thumbnails/26.jpg)
Underpinning – SR-65
ROCK
![Page 27: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell](https://reader036.fdocuments.net/reader036/viewer/2022081622/613c675cf237e1331c5157c1/html5/thumbnails/27.jpg)
North Side Station Shell
![Page 28: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell](https://reader036.fdocuments.net/reader036/viewer/2022081622/613c675cf237e1331c5157c1/html5/thumbnails/28.jpg)
North Shore Station - Slurry Walls
SEA PARKING GARAGE
Concourse
![Page 29: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell](https://reader036.fdocuments.net/reader036/viewer/2022081622/613c675cf237e1331c5157c1/html5/thumbnails/29.jpg)
North Shore Station - Slurry Walls
![Page 30: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell](https://reader036.fdocuments.net/reader036/viewer/2022081622/613c675cf237e1331c5157c1/html5/thumbnails/30.jpg)
North Shore Station – Slurry WallsDESANDING
P iP iP i
DESANDING
Excavate Slot Primary Panel
Primary Panel
Primary Panel
SecondarySecondary Panel
![Page 31: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell](https://reader036.fdocuments.net/reader036/viewer/2022081622/613c675cf237e1331c5157c1/html5/thumbnails/31.jpg)
North Side Station – Slurry walls
Concrete P iP iP iConcrete Primary Panel
Primary Panel
Primary Panel
Secondary Secondary
Rebar
Tremie pipeSecondary
PanelSecondary
Panel
Rebar
![Page 32: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell](https://reader036.fdocuments.net/reader036/viewer/2022081622/613c675cf237e1331c5157c1/html5/thumbnails/32.jpg)
Slurry Walls - Rebar Cage
![Page 33: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell](https://reader036.fdocuments.net/reader036/viewer/2022081622/613c675cf237e1331c5157c1/html5/thumbnails/33.jpg)
North Side Station – Top Down
ROCK
![Page 34: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell](https://reader036.fdocuments.net/reader036/viewer/2022081622/613c675cf237e1331c5157c1/html5/thumbnails/34.jpg)
North Side Station – Pour Roof Slab
Roof SlabRoof Slab
ROCK
![Page 35: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell](https://reader036.fdocuments.net/reader036/viewer/2022081622/613c675cf237e1331c5157c1/html5/thumbnails/35.jpg)
Excavate to Concourse
BackfillRoof Slab
CONCOURSE
Roof Slab
ROCK
![Page 36: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell](https://reader036.fdocuments.net/reader036/viewer/2022081622/613c675cf237e1331c5157c1/html5/thumbnails/36.jpg)
Excavate to Concourse
BackfillRoof Slab
Soldier Piles installed by building Soldier Piles installed by building contractorcontractor
CONCOURSE
Roof Slabcontractorcontractor
ROCK
![Page 37: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell](https://reader036.fdocuments.net/reader036/viewer/2022081622/613c675cf237e1331c5157c1/html5/thumbnails/37.jpg)
Excavate to first row of struts
BackfillRoof Slab
CONCOURSE
Roof Slab
ROCK
![Page 38: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell](https://reader036.fdocuments.net/reader036/viewer/2022081622/613c675cf237e1331c5157c1/html5/thumbnails/38.jpg)
Station Roof Slab Excavation
60 ft
40 ft40 ft
![Page 39: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell](https://reader036.fdocuments.net/reader036/viewer/2022081622/613c675cf237e1331c5157c1/html5/thumbnails/39.jpg)
Excavate to Invert – Pour Base Slab
BackfillRoof Slab
CONCOURSE
Roof Slab
SLAB ANCHORS
ROCK
![Page 40: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell](https://reader036.fdocuments.net/reader036/viewer/2022081622/613c675cf237e1331c5157c1/html5/thumbnails/40.jpg)
Station Ground Anchors
Ground Anchors
![Page 41: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell](https://reader036.fdocuments.net/reader036/viewer/2022081622/613c675cf237e1331c5157c1/html5/thumbnails/41.jpg)
Construct Platform & Deck
BackfillRoof Slab
CONCOURSE
Roof Slab
ROCK
![Page 42: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell](https://reader036.fdocuments.net/reader036/viewer/2022081622/613c675cf237e1331c5157c1/html5/thumbnails/42.jpg)
TBM Launch Pit - SOE
CDSM WALL
![Page 43: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell](https://reader036.fdocuments.net/reader036/viewer/2022081622/613c675cf237e1331c5157c1/html5/thumbnails/43.jpg)
TBM Launch Pit - SOE – Tie Backs
![Page 44: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell](https://reader036.fdocuments.net/reader036/viewer/2022081622/613c675cf237e1331c5157c1/html5/thumbnails/44.jpg)
Launch Pit - SOE – Tie Backs
TIE BACKS
TIE BACKS
TBM
ROCK
![Page 45: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell](https://reader036.fdocuments.net/reader036/viewer/2022081622/613c675cf237e1331c5157c1/html5/thumbnails/45.jpg)
Ground Improvement - Jet Grouting
![Page 46: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell](https://reader036.fdocuments.net/reader036/viewer/2022081622/613c675cf237e1331c5157c1/html5/thumbnails/46.jpg)
Launch Pit - Jet Grout
Jet Grout column construction
Drill Down
Grout bottom up
![Page 47: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell](https://reader036.fdocuments.net/reader036/viewer/2022081622/613c675cf237e1331c5157c1/html5/thumbnails/47.jpg)
Launch Pit – Entrance Packing
Soft Eye
![Page 48: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell](https://reader036.fdocuments.net/reader036/viewer/2022081622/613c675cf237e1331c5157c1/html5/thumbnails/48.jpg)
TBM – Move to Launch Pit
![Page 49: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell](https://reader036.fdocuments.net/reader036/viewer/2022081622/613c675cf237e1331c5157c1/html5/thumbnails/49.jpg)
TBM – Move to Launch Pit
150 feet fully assembled150 feet fully assembled
![Page 50: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell](https://reader036.fdocuments.net/reader036/viewer/2022081622/613c675cf237e1331c5157c1/html5/thumbnails/50.jpg)
Launch Pit – TBM Launch
JET
GROUTJET
GROUT
21
GROUT
3 21 3
![Page 51: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell](https://reader036.fdocuments.net/reader036/viewer/2022081622/613c675cf237e1331c5157c1/html5/thumbnails/51.jpg)
Launch Pit – Structure Work
JET
GROUT
![Page 52: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell](https://reader036.fdocuments.net/reader036/viewer/2022081622/613c675cf237e1331c5157c1/html5/thumbnails/52.jpg)
Stanwix St. Receiving Pit Location
GATEWAY II
HORNE BUILDING
RECEIVING PIT
![Page 53: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell](https://reader036.fdocuments.net/reader036/viewer/2022081622/613c675cf237e1331c5157c1/html5/thumbnails/53.jpg)
Ground Improvement - Jet Grout
75% COVERAGE
Receiving Pit
100%
100% Coverage
6’ Around Tunnel6 Around Tunnel
![Page 54: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell](https://reader036.fdocuments.net/reader036/viewer/2022081622/613c675cf237e1331c5157c1/html5/thumbnails/54.jpg)
Ground Improvement - Jet Grout – 75%HORNE BLGHORNE BLG.
MinimizeMinimize Angular Distortion due t dto ground loss
![Page 55: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell](https://reader036.fdocuments.net/reader036/viewer/2022081622/613c675cf237e1331c5157c1/html5/thumbnails/55.jpg)
Jet Grouting Stanwix Street
![Page 56: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell](https://reader036.fdocuments.net/reader036/viewer/2022081622/613c675cf237e1331c5157c1/html5/thumbnails/56.jpg)
Stanwix Street Receiving Pit – CB Wall
![Page 57: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell](https://reader036.fdocuments.net/reader036/viewer/2022081622/613c675cf237e1331c5157c1/html5/thumbnails/57.jpg)
Bored Tunnels
Tunnel Tunnel Boring Boring M hiM hiMachine Machine Launch PitLaunch Pit
TBM Tunnels – 2200 lfNORTH SHORENORTH SHORE
Receiving Pit
SOUTH SHORESOUTH SHORE
![Page 58: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell](https://reader036.fdocuments.net/reader036/viewer/2022081622/613c675cf237e1331c5157c1/html5/thumbnails/58.jpg)
Bored Tunnel SectionPRECASTPRECAST SEGMENTLININGLINING
Segment Lining 20’ inside diameter
CAST IN PLACEPLACE INVERT
![Page 59: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell](https://reader036.fdocuments.net/reader036/viewer/2022081622/613c675cf237e1331c5157c1/html5/thumbnails/59.jpg)
TBM TunnelsSl P B l TBM (SPBTBM)• Slurry Pressure Balance TBM (SPBTBM)
–– Mixed Shield (Soft Ground and Rock)Mixed Shield (Soft Ground and Rock)
–– Working Pressure 3 barWorking Pressure 3 bar
![Page 60: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell](https://reader036.fdocuments.net/reader036/viewer/2022081622/613c675cf237e1331c5157c1/html5/thumbnails/60.jpg)
Mining Cycle – Mine 4’ & Grout
Mine 4’Mine 4’
GROUT MAINTAINEDGROUT MAINTAINED BEHIND SHIELD
![Page 61: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell](https://reader036.fdocuments.net/reader036/viewer/2022081622/613c675cf237e1331c5157c1/html5/thumbnails/61.jpg)
Mining Cycle – Install 4’ Segment Ring
Build 4’ RingBuild 4 Ring
![Page 62: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell](https://reader036.fdocuments.net/reader036/viewer/2022081622/613c675cf237e1331c5157c1/html5/thumbnails/62.jpg)
Mining Cycle – Ring Complete - Mine
Mine 4’Mine 4’
GROUT MAINTAINEDGROUT MAINTAINED BEHIND SHIELD
![Page 63: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell](https://reader036.fdocuments.net/reader036/viewer/2022081622/613c675cf237e1331c5157c1/html5/thumbnails/63.jpg)
Segment Grouting
Segments Grout Nozzle
Grout
![Page 64: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell](https://reader036.fdocuments.net/reader036/viewer/2022081622/613c675cf237e1331c5157c1/html5/thumbnails/64.jpg)
TBM – SLURRY – MIX SHIELD
22’-9”
![Page 65: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell](https://reader036.fdocuments.net/reader036/viewer/2022081622/613c675cf237e1331c5157c1/html5/thumbnails/65.jpg)
SPTBM Mixed Shield
![Page 66: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell](https://reader036.fdocuments.net/reader036/viewer/2022081622/613c675cf237e1331c5157c1/html5/thumbnails/66.jpg)
Slurry TBM – 22’- 9” dia (6.92 m)24 17 i h t i• 24 -17 inch twin disk cutters
• 20 - Scrapers20 Scrapers
• Bucket lips
• 3 - Wear• 3 - Wear detection devices
• 0-2.7 rpm
• Left or Right
![Page 67: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell](https://reader036.fdocuments.net/reader036/viewer/2022081622/613c675cf237e1331c5157c1/html5/thumbnails/67.jpg)
Cutting Tools – After first tunnelDi k C tt• Disk Cutters
• Scrappers• Bucket Lips
![Page 68: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell](https://reader036.fdocuments.net/reader036/viewer/2022081622/613c675cf237e1331c5157c1/html5/thumbnails/68.jpg)
Rock Crusher
![Page 69: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell](https://reader036.fdocuments.net/reader036/viewer/2022081622/613c675cf237e1331c5157c1/html5/thumbnails/69.jpg)
TBM Assembly – Man Locks – 3 Bar (45 psi)
Material Lock
![Page 70: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell](https://reader036.fdocuments.net/reader036/viewer/2022081622/613c675cf237e1331c5157c1/html5/thumbnails/70.jpg)
Cutter Head Drive
• Motors - 8 – 101 hp
• Total - 808 hp18
2Total 808 hp
• Variable Frequency Drive (VFD)
7
Drive (VFD)
• 480 v AC 4
3
5
6
• 0-2.7 rpm (l or r)
• Main bearing 8 5 ft
45
• Main bearing – 8.5 ft
![Page 71: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell](https://reader036.fdocuments.net/reader036/viewer/2022081622/613c675cf237e1331c5157c1/html5/thumbnails/71.jpg)
TBM – Rear of Middle Shield5 Cylinders 4 Steering Groups
6 Cylinders
7 Cylinders
![Page 72: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell](https://reader036.fdocuments.net/reader036/viewer/2022081622/613c675cf237e1331c5157c1/html5/thumbnails/72.jpg)
TBM – Rear of Middle Shield• Propel Cylinders - 24
• Piston Diameter - 260 mm
• Rod Diameter - 220 mm
• Max Stroke - 1750 mmMax Stroke 1750 mm
• Advance force - 38227 kN (4,296 tn)
![Page 73: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell](https://reader036.fdocuments.net/reader036/viewer/2022081622/613c675cf237e1331c5157c1/html5/thumbnails/73.jpg)
TBM Operation
Excavation Chamber
Working Chamber
Hydrostatic and Soil
Slurry In
and Soil Pressure
Slurry OutSlurry Out
![Page 74: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell](https://reader036.fdocuments.net/reader036/viewer/2022081622/613c675cf237e1331c5157c1/html5/thumbnails/74.jpg)
TBM – Operation Plan
455 hp PUMP
SLURRY IN
2 EA 455 h PUMPSSLURRY OUT2 EA - 455 hp PUMPS
![Page 75: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell](https://reader036.fdocuments.net/reader036/viewer/2022081622/613c675cf237e1331c5157c1/html5/thumbnails/75.jpg)
Slurry Separation Plant
Plant Capacity Plant Capacity 1000 m1000 m33/hr/hr1000 m1000 m /hr/hr
![Page 76: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell](https://reader036.fdocuments.net/reader036/viewer/2022081622/613c675cf237e1331c5157c1/html5/thumbnails/76.jpg)
Segment ErectorH d li l iH d li l i•• Hydraulic telescopic arm type Hydraulic telescopic arm type
•• 6 ranges of movement6 ranges of movement
•• TelescopeTelescope
R t tiR t ti•• RotationRotation
•• TravelTravel
•• Independent Independent Roll & YawRoll & Yaw–– Roll & YawRoll & Yaw
•• Controlled by joy stickControlled by joy stick
![Page 77: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell](https://reader036.fdocuments.net/reader036/viewer/2022081622/613c675cf237e1331c5157c1/html5/thumbnails/77.jpg)
Segment Erector
• Thrust rams retracted 4’- 6”
![Page 78: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell](https://reader036.fdocuments.net/reader036/viewer/2022081622/613c675cf237e1331c5157c1/html5/thumbnails/78.jpg)
Segment Installation
BOLTBOLT
Segment ErectorSegment ErectorSegment ErectorSegment Erector
![Page 79: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell](https://reader036.fdocuments.net/reader036/viewer/2022081622/613c675cf237e1331c5157c1/html5/thumbnails/79.jpg)
Key Segment Installation
TBM Shield
![Page 80: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell](https://reader036.fdocuments.net/reader036/viewer/2022081622/613c675cf237e1331c5157c1/html5/thumbnails/80.jpg)
Key Segment Installation
MOVE OUT
KEY SEGMENT MOVE FORWARD
![Page 81: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell](https://reader036.fdocuments.net/reader036/viewer/2022081622/613c675cf237e1331c5157c1/html5/thumbnails/81.jpg)
TBM Mining – Start North SideNORTH SHORESOUTH SHORE
Equitable
NORTH SHORESOUTH SHORE
Equitable Resources
Building
Soft Ground
![Page 82: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell](https://reader036.fdocuments.net/reader036/viewer/2022081622/613c675cf237e1331c5157c1/html5/thumbnails/82.jpg)
Fluvioglacial Material• Gravel 40% - 57%
• Sand 50% - 38%
• Fines 10% - 5%
• Cobbles - up to 2’Cobbles up to 2
![Page 83: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell](https://reader036.fdocuments.net/reader036/viewer/2022081622/613c675cf237e1331c5157c1/html5/thumbnails/83.jpg)
TBM Mining - River CrossingNORTH SHORESOUTH SHORE
Equitable
NORTH SHORESOUTH SHORE
Equitable Resources
Building
Mixed Face
![Page 84: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell](https://reader036.fdocuments.net/reader036/viewer/2022081622/613c675cf237e1331c5157c1/html5/thumbnails/84.jpg)
TBM – North River Wall
Alluvium
Claystone
Fluvioglacial
Siltstone
![Page 85: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell](https://reader036.fdocuments.net/reader036/viewer/2022081622/613c675cf237e1331c5157c1/html5/thumbnails/85.jpg)
TBM North River Wall - Grouting
Alluvium
Claystone
Fluvioglacial
Siltstone
![Page 86: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell](https://reader036.fdocuments.net/reader036/viewer/2022081622/613c675cf237e1331c5157c1/html5/thumbnails/86.jpg)
River CrossingNORTH SHORESOUTH SHORE
Equitable
NORTH SHORESOUTH SHORE
Equitable Resources
Building
Rock
![Page 87: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell](https://reader036.fdocuments.net/reader036/viewer/2022081622/613c675cf237e1331c5157c1/html5/thumbnails/87.jpg)
River Crossing
25 feet ALLEGHENY RIVER
RIVER SILTS (ALLUVIAL)22 feet
Top of Rock FLUVIOGLACIAL
( )22 feet
SILTY SHALE (5,400 SILTY SHALE (5,400 –– 11,800 psi)11,800 psi)
CLAYSTONE (200CLAYSTONE (200 4 400 psi)4 400 psi)COALCOAL
10 feet
CLAYSTONE (200CLAYSTONE (200-- 4,400 psi)4,400 psi)
SILTSTONE (3 400SILTSTONE (3 400--11 000 psi)11 000 psi)SILTSTONE (3,400SILTSTONE (3,400--11,000 psi)11,000 psi)
![Page 88: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell](https://reader036.fdocuments.net/reader036/viewer/2022081622/613c675cf237e1331c5157c1/html5/thumbnails/88.jpg)
River CrossingNORTH SHORESOUTH SHORE
Equitable
NORTH SHORESOUTH SHORE
Equitable Resources
Building
Well Horne Blg.
Soft GroundJet Grout
Mixed Face
![Page 89: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell](https://reader036.fdocuments.net/reader036/viewer/2022081622/613c675cf237e1331c5157c1/html5/thumbnails/89.jpg)
TBM Guidance System – VMT
Total StationTotal Station Operator’s DisplayOperator’s Display
80 mm
TargetTarget
![Page 90: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell](https://reader036.fdocuments.net/reader036/viewer/2022081622/613c675cf237e1331c5157c1/html5/thumbnails/90.jpg)
Precast Segments – Universal RingSix pieces + Key4’ – Long
20’ ID
4 Long
Bolted
Two tapers 2-3/8 & 1-5/8
![Page 91: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell](https://reader036.fdocuments.net/reader036/viewer/2022081622/613c675cf237e1331c5157c1/html5/thumbnails/91.jpg)
Segment Rebar Cages
![Page 92: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell](https://reader036.fdocuments.net/reader036/viewer/2022081622/613c675cf237e1331c5157c1/html5/thumbnails/92.jpg)
Seg Plant – cycle 4 rings X 2/ day
![Page 93: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell](https://reader036.fdocuments.net/reader036/viewer/2022081622/613c675cf237e1331c5157c1/html5/thumbnails/93.jpg)
Segment Finishing Line•• Rotate Segments Rotate Segments ––
curve upcurve up
•• Repair SurfacesRepair Surfaces
•• Add GasketAdd Gasket
•• Add Joint PackingAdd Joint Packing
•• Stack in reverse order Stack in reverse order of installationof installation
![Page 94: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell](https://reader036.fdocuments.net/reader036/viewer/2022081622/613c675cf237e1331c5157c1/html5/thumbnails/94.jpg)
Secondary Steam Curing
• 5 day Secondary Cure
• 8000 psi8000 psi
![Page 95: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell](https://reader036.fdocuments.net/reader036/viewer/2022081622/613c675cf237e1331c5157c1/html5/thumbnails/95.jpg)
Multi Purpose Vehicle (MVP)
![Page 96: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell](https://reader036.fdocuments.net/reader036/viewer/2022081622/613c675cf237e1331c5157c1/html5/thumbnails/96.jpg)
Multi Purpose Vehicle (MVP)
![Page 97: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell](https://reader036.fdocuments.net/reader036/viewer/2022081622/613c675cf237e1331c5157c1/html5/thumbnails/97.jpg)
Heading Segment Unloading
![Page 98: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell](https://reader036.fdocuments.net/reader036/viewer/2022081622/613c675cf237e1331c5157c1/html5/thumbnails/98.jpg)
Heading Segment Unloading
![Page 99: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell](https://reader036.fdocuments.net/reader036/viewer/2022081622/613c675cf237e1331c5157c1/html5/thumbnails/99.jpg)
Segment Erection
![Page 100: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell](https://reader036.fdocuments.net/reader036/viewer/2022081622/613c675cf237e1331c5157c1/html5/thumbnails/100.jpg)
Tunnel Infrastructure
50,000 CFM Ventilation50,000 CFM VentilationTemporary Temporary LightingLighting
2 - 4” water
8” Discharge
Walkwayy
![Page 101: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell](https://reader036.fdocuments.net/reader036/viewer/2022081622/613c675cf237e1331c5157c1/html5/thumbnails/101.jpg)
First Tunnel to Receiving Pit - July 10, 2008
Soft eye Soft eye ––Fiberglass pilesFiberglass piles
![Page 102: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell](https://reader036.fdocuments.net/reader036/viewer/2022081622/613c675cf237e1331c5157c1/html5/thumbnails/102.jpg)
First Tunnel to Receiving Pit - July 10, 2008
Containment Wall
![Page 103: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell](https://reader036.fdocuments.net/reader036/viewer/2022081622/613c675cf237e1331c5157c1/html5/thumbnails/103.jpg)
TBM U-Turn
![Page 104: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell](https://reader036.fdocuments.net/reader036/viewer/2022081622/613c675cf237e1331c5157c1/html5/thumbnails/104.jpg)
TBM U-Turn- Rotate 180 deg
![Page 105: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell](https://reader036.fdocuments.net/reader036/viewer/2022081622/613c675cf237e1331c5157c1/html5/thumbnails/105.jpg)
TBM U-Turn- Rotate 180 deg
![Page 106: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell](https://reader036.fdocuments.net/reader036/viewer/2022081622/613c675cf237e1331c5157c1/html5/thumbnails/106.jpg)
TBM U-Turn- Rotate 180 deg
![Page 107: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell](https://reader036.fdocuments.net/reader036/viewer/2022081622/613c675cf237e1331c5157c1/html5/thumbnails/107.jpg)
TBM U-Turn- Rotate 180 deg
![Page 108: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell](https://reader036.fdocuments.net/reader036/viewer/2022081622/613c675cf237e1331c5157c1/html5/thumbnails/108.jpg)
Invert Clean Up
![Page 109: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell](https://reader036.fdocuments.net/reader036/viewer/2022081622/613c675cf237e1331c5157c1/html5/thumbnails/109.jpg)
Invert Placement
![Page 110: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell](https://reader036.fdocuments.net/reader036/viewer/2022081622/613c675cf237e1331c5157c1/html5/thumbnails/110.jpg)
Thank YouThank You