Slide 1 of 512012 Congreso Andino de Carreteras , Lima 20.- 22.8.2012.
Gernot Beer,
Professor, Graz University of Technology, Austria
conjoint Professor, University of Newcastle, Australia
Slide 2 of 51
1. Why tunnels ?
2. Large tunneling projects in LA
3. Agua Negra tunnel project
4. State of the art of tunneling technologies
5. Emerging and Future technologies
6. Summary and conclusions
2012 Congreso Andino de Carreteras , Lima 20.- 22.8.2012.
Slide 3 of 51
The trans European traffic network
2012 Congreso Andino de Carreteras , Lima 20.- 22.8.2012.
-
7/27/2019 CACBeer Tunnels
2/17
28.07.2012
2
Slide 4 of 51
Paso Libertadores
2012 Congreso Andino de Carreteras , Lima 20.- 22.8.2012.
4 Million tons/year !!
Slide 5 of 51
Paso Libertadores
2012 Congreso Andino de Carreteras , Lima 20.- 22.8.2012.
Shut down inwinter5000 !! trucksstranded
High economic cost, CO2 emissions
Slide 6 of 512012 Congreso Andino de Carreteras , Lima 20.- 22.8.2012.
1. Los Olmos, Water tunnel, Peru, 20 km, US $ 247 M, completed2. Bioceanico Aconcagua: Railway tunnel, 54 km long base tunnel, cost US$ 4 Billion3. Agua Negra: Road tunnel, 14 km, cost US$ 800 M
-
7/27/2019 CACBeer Tunnels
3/17
28.07.2012
3
Slide 7 of 512012 Congreso Andino de Carreteras , Lima 20.- 22.8.2012.
High mountainpass,Gravel road,Open only for 3-4months/year
Slide 8 of 512012 Congreso Andino de Carreteras , Lima 20.- 22.8.2012.
Planned tunnel
Slide 9 of 512012 Congreso Andino de Carreteras , Lima 20.- 22.8.2012.
-
7/27/2019 CACBeer Tunnels
4/17
28.07.2012
4
Slide 10 of 512012 Congreso Andino de Carreteras , Lima 20.- 22.8.2012.
Slide 11 of 51
Conventional Tunneling Method
(New Austrian Tunneling Method, NATM)
Tunnel Boring Machine (TBM)
2012 Congreso Andino de Carreteras , Lima 20.- 22.8.2012.
Slide 12 of 51
Tunnel Boring Machine (TBM)
2012 Congreso Andino de Carreteras , Lima 20.- 22.8.2012.
Advantages:Fast advance rates (if all goes well)Segments can be the final liningEconomic (if all goes well)Disadvantages:High initial cost (Tailor made TBM for project)Problems with changing geological conditionsNeed a plant for production of segmentsOnly circular cross-section possible
-
7/27/2019 CACBeer Tunnels
5/17
28.07.2012
5
Slide 13 of 51
Conventional tunneling (NATM)
2012 Congreso Andino de Carreteras , Lima 20.- 22.8.2012.
Advantages:Flexible, can be adjusted to geological conditionsAny cross-section possibleLow initial costDisadvantages:Lower advance rates than TBM (if all goes well with TBM)Need to construct final lining
Slide 14 of 51
Experiences with TBM in Andean region:
2012 Congreso Andino de Carreteras , Lima 20.- 22.8.2012.
The use of TBM in the Andes has been of mixedsuccess with world records of progress as well asnearly un-completed projects with machines beingabandonedD. Brox and G. Venturini, Rapid Tunnelling Conference , 2009
Slide 15 of 51
Geological conditions in Andean region:
2012 Congreso Andino de Carreteras , Lima 20.- 22.8.2012.
The Andes are a relatively young geologicalenvironment with highly variable rock conditions,highly altered and extremely strong and abrasiveandesites. The rocks are extremely folded and faultedin some areasD. Brox and G. Venturini, Rapid Tunnelling Conference , 2009
-
7/27/2019 CACBeer Tunnels
6/17
28.07.2012
6
Slide 16 of 51
Weakness of TBM:
2012 Congreso Andino de Carreteras , Lima 20.- 22.8.2012.
Abrasive rocks (excessive tool wear)Faults (TBM gets stuck)
Source: Nick Barton
Slide 17 of 512012 Congreso Andino de Carreteras , Lima 20.- 22.8.2012.
TBMs are most appropriately applied inhomogeneous rock conditions .. D. Brox and G. Venturini, Rapid Tunnelling Conference , 2009
Slide 18 of 512012 Congreso Andino de Carreteras , Lima 20.- 22.8.2012.
Source: D. Brox and G. Venturini, Rapid Tunnelling Conference , 2009
-
7/27/2019 CACBeer Tunnels
7/17
28.07.2012
7
Slide 19 of 512012 Congreso Andino de Carreteras , Lima 20.- 22.8.2012.
1. Results from EC Project TUNCONSTRUCT2. New Developments of TBM technology in Brazil
Slide 20 of 512012 Congreso Andino de Carreteras , Lima 20.- 22.8.2012.
34 RTD partners + 7 clients
Budget: 26 M Euros
Start: 1.9.2005
End: 30.11.2009
Slide 21 of 512012 Congreso Andino de Carreteras , Lima 20.- 22.8.2012.
Use of virtual reality andinteractive tools
-
7/27/2019 CACBeer Tunnels
8/17
28.07.2012
8
Slide 22 of 512012 Congreso Andino de Carreteras , Lima 20.- 22.8.2012.
User friendly simulation
EKATE
Slide 23 of 51
User friendly simulation
2012 Congreso Andino de Carreteras , Lima 20.- 22.8.2012.
FLAC3D (500 000 Elements) BEFE++ (5 000 Elements)
Slide 24 of 51
User friendly simulation
Example: Hudson river crossing Simulation, CAD Data
2012 Congreso Andino de Carreteras , Lima 20.- 22.8.2012.
-
7/27/2019 CACBeer Tunnels
9/17
28.07.2012
9
Slide 25 of 51
User friendly simulation
Example: Hudson river crossing Simulation, Mesh
2012 Congreso Andino de Carreteras , Lima 20.- 22.8.2012.
Slide 26 of 51
User friendly simulation
Example: Hudson river crossing Simulation, Results
2012 Congreso Andino de Carreteras , Lima 20.- 22.8.2012.
Slide 27 of 512012 Congreso Andino de Carreteras , Lima 20.- 22.8.2012.
Koralm tunnel, Austria
-
7/27/2019 CACBeer Tunnels
10/17
28.07.2012
10
Slide 28 of 512012 Congreso Andino de Carreteras , Lima 20.- 22.8.2012.
Slide 29 of 512012 Congreso Andino de Carreteras , Lima 20.- 22.8.2012.
Monitored disk cutters
Slide 30 of 512012 Congreso Andino de Carreteras , Lima 20.- 22.8.2012.
Monitored disk cutters
Results:
Display of actual disc cutter load
Display of rotation speed
Mapping of geological faceconditions
-
7/27/2019 CACBeer Tunnels
11/17
28.07.2012
11
Slide 31 of 512012 Congreso Andino de Carreteras , Lima 20.- 22.8.2012.
Monitored disk cutters
Slide 32 of 512012 Congreso Andino de Carreteras , Lima 20.- 22.8.2012.
Underground Construction Information System
Slide 33 of 512012 Congreso Andino de Carreteras , Lima 20.- 22.8.2012.
Underground Construction Information System
-
7/27/2019 CACBeer Tunnels
12/17
28.07.2012
12
Slide 34 of 512012 Congreso Andino de Carreteras , Lima 20.- 22.8.2012.
Underground Construction Information System
Slide 35 of 512012 Congreso Andino de Carreteras , Lima 20.- 22.8.2012.
Underground Construction Information System
Slide 36 of 512012 Congreso Andino de Carreteras , Lima 20.- 22.8.2012.
Underground Construction Information System
DisplacementsShotcrete thickness
Bolt forces
-
7/27/2019 CACBeer Tunnels
13/17
28.07.2012
13
Slide 37 of 512012 Congreso Andino de Carreteras , Lima 20.- 22.8.2012.
Underground Construction Information System
Slide 38 of 512012 Congreso Andino de Carreteras , Lima 20.- 22.8.2012.
Slide 39 of 512012 Congreso Andino de Carreteras , Lima 20.- 22.8.2012.
-
7/27/2019 CACBeer Tunnels
14/17
28.07.2012
14
Slide 40 of 512012 Congreso Andino de Carreteras , Lima 20.- 22.8.2012.
Innovations in use:
Underground information system Monitored disc cutters Innovations being transferred to industry:
Numerical simulation (Hudson river crossing, Koralm) ..Innovations still needing further development
Virtual reality TBM technology
Slide 41 of 512012 Congreso Andino de Carreteras , Lima 20.- 22.8.2012.
www.tunconstruct.org
Slide 42 of 512012 Congreso Andino de Carreteras , Lima 20.- 22.8.2012.
Disadvantages of TBM:High initial cost (Tailor made TBM for project)Problems with changing geological conditionsAbrasive rockNeed a plant for production of segmentsOnly circular cross-section possible
-
7/27/2019 CACBeer Tunnels
15/17
28.07.2012
15
Slide 43 of 512012 Congreso Andino de Carreteras , Lima 20.- 22.8.2012.
Brute force !!
Slides courtesy of Prof.Marcos NoronhaFlorianopolis, Brazil
Slide 44 of 512012 Congreso Andino de Carreteras , Lima 20.- 22.8.2012.
Tailor made machinesHigh initial cost !!
Slide 45 of 512012 Congreso Andino de Carreteras , Lima 20.- 22.8.2012.
High maintenance costs !!
-
7/27/2019 CACBeer Tunnels
16/17
28.07.2012
16
Slide 46 of 512012 Congreso Andino de Carreteras , Lima 20.- 22.8.2012.
Current technology
Slide 47 of 512012 Congreso Andino de Carreteras , Lima 20.- 22.8.2012.
Future technology
Slide 48 of 512012 Congreso Andino de Carreteras , Lima 20.- 22.8.2012.
Water jet
-
7/27/2019 CACBeer Tunnels
17/17
28.07.2012
17
Slide 49 of 512012 Congreso Andino de Carreteras , Lima 20.- 22.8.2012.
Extruded lining superfast setting concrete engineered material
Slide 50 of 512012 Congreso Andino de Carreteras , Lima 20.- 22.8.2012.
Advantages:Flexible, can be adjusted to geologicalconditionsAny cross-section possibleReusable
Can be used in abrasive rockHigh advance ratesNo need for concrete segment plant
Slide 51 of 512012 Congreso Andino de Carreteras , Lima 20.- 22.8.2012.
State of development:Research grant approvedLab for prototype testing nearing completionPrototype testing completed in 3 years