PIERS 5 – 8, SEWAGE PUMPING FACILITIES Municipal Class Environmental Assessment, Schedule B May 2014

Transcript of PIERS 5 8, SEWAGE PUMPING FACILITIES - … 5 – 8, SEWAGE PUMPING FACILITIES Municipal Class...

Page 1: PIERS 5 8, SEWAGE PUMPING FACILITIES - … 5 – 8, SEWAGE PUMPING FACILITIES Municipal Class Environmental Assessment, Schedule B May 2014 i Tab ...

 

  

  

PIERS 5 – 8, SEWAGE PUMPING FACILITIES Municipal Class Environmental Assessment, Schedule B 

  

  

   

May 2014

Page 2: PIERS 5 8, SEWAGE PUMPING FACILITIES - … 5 – 8, SEWAGE PUMPING FACILITIES Municipal Class Environmental Assessment, Schedule B May 2014 i Tab ...

    i 

Table of Contents  1.  Introduction and Background .................................................................................... 1 

1.1.  Background .................................................................................................... 1 1.1.1.  Previous Studies .............................................................................. 1 

1.2.  Class EA Process ............................................................................................. 3 1.3.  Problem Statement and Description of the Project ...................................... 5 1.4.  Public Consultation ........................................................................................ 6 

2.  Existing Conditions ..................................................................................................... 8 2.1.  Natural Environment ..................................................................................... 8 

2.1.1.  Fisheries .......................................................................................... 8 2.1.2.  Terrestrial ........................................................................................ 8 2.1.3.  Species at Risk ............................................................................... 11 

2.2.  Social, Economic, and Cultural Environments ............................................. 11 2.2.1.  Socio‐Economic ............................................................................. 11 2.2.2.  Archaeology .................................................................................. 11 2.2.3.  Built and Cultural Heritage Landscapes ........................................ 12 

2.3.  Technical Environment ................................................................................ 12 2.3.1.  Existing Sewage Infrastructure ..................................................... 12 2.3.2.  Existing Pumping Station .............................................................. 15 

3.  IDENTIFICATION OF ALTERNATIVES ......................................................................... 16 3.1.  Alternative 1 ‐ Do Nothing ........................................................................... 18 3.2.  Alternative 2 ‐ Construction of New Pumping Stations and Forcemains .... 18 3.3.  Alternative 3 ‐ Construction of a Central Pumping Station and Forcemain 19 

4.  ASSESSMENT OF ALTERNATIVES .............................................................................. 20 4.1.  Evaluation of Criteria ................................................................................... 20 4.2.  Evaluation Methodology .............................................................................. 23 4.3.  Assessment of Alternatives .......................................................................... 23 4.4.  Selection of Preferred Alternative ............................................................... 28 

5.  PREFERRED ALTERNATIVE ........................................................................................ 30 5.1.  Description of Preferred Alternative ........................................................... 30 5.2.  Approvals ..................................................................................................... 32 

5.2.1.  City of Hamilton ............................................................................ 32 5.2.2.  Ministry of the Environment (MOE) ............................................. 32 5.2.3.  Hamilton Conservation Authority ................................................. 32 5.2.4.  Ministry of Culture, Tourism and Sport ........................................ 32 5.2.5.  Other ............................................................................................. 32 

6.  MITIGATION AND MONITORING RECOMMENDATIONS ......................................... 34 6.1.  Social and Economic .................................................................................... 34 

6.1.1.  Traffic ............................................................................................ 34 6.1.2.  Noise, Dust, Vibrations ................................................................. 34 6.1.3.  Public Notifications ....................................................................... 34 

6.2.  Cultural and Archaeological Environment ................................................... 34 6.3.  Natural Environment Impacts ...................................................................... 40 

Page 3: PIERS 5 8, SEWAGE PUMPING FACILITIES - … 5 – 8, SEWAGE PUMPING FACILITIES Municipal Class Environmental Assessment, Schedule B May 2014 i Tab ...

    ii 

6.4.  Pumping Station and Forcemain Impacts .................................................... 42 7.  Public Consultation .................................................................................................. 44 

7.1.  Project Notices and Consultation Activities ................................................. 44 7.1.1.  Notice of Commencement and Public Information Centre No. 1  44 7.1.2.  Public Information Centre No. 1 ................................................... 44 7.1.3.  Notice of Public Information Centre No. 2 ................................... 44 7.1.4.  Public Information Centre No. 2 ................................................... 44 7.1.5.  Notice of Completion .................................................................... 45 

7.2.  Agency Consultation .................................................................................... 45 7.3.  Public and Agency Comments and Responses ............................................ 53 

7.3.1.  Public Information Centre No. 1 Comments ................................ 53   

List of Figures  

Figure 1 ‐ Existing Conditions Study Area ........................................................................... 2 Figure 2 ‐ Municipal Class EA Process (Schedule ‘B’ Project) ............................................. 4 Figure 3 ‐ Existing Infrastructure 1 ...................................................................................... 9 Figure 4 ‐ Existing Infrastructure 2 .................................................................................... 10 Figure 5 ‐ Photo of Existing Parks Canada Pumping Station ............................................. 15 Figure 6 ‐ Conceptual Sanitary Plan .................................................................................. 31 Figure 7 ‐ Built Heritage .................................................................................................... 36 Figure 8 ‐ Cultural Landscape Elements ............................................................................ 37 Figure 9 ‐ Archaeology ...................................................................................................... 39 Figure 10 ‐ Tree Inventory ................................................................................................ 41 

 

List of Tables  

Table 1 ‐ Existing Pumping Station Facility Operator Survey ............................................ 14 Table 2 ‐ Long‐list Screening of Alternatives .................................................................... 16 Table 3 ‐ Evaluation Criteria and Key Considerations ....................................................... 21 Table 4 ‐ Short List Evaluation – Pumping Station Facilities Alternatives ........................ 24 Table 5 ‐ Summary of Comments Received from Agencies .............................................. 46 Table 6 ‐ PIC No. 1 Comments and General Comments Received Post PIC No. 1 ............ 54 Table 7 ‐ PIC No. 2 and Comments Received Post PIC No. 2 ............................................ 62 

 

List of Appendices  

Appendix A  ‐  Terrestrial Appendix B  ‐  Stage 1 Archaeological Report Appendix C  ‐  Heritage Impact Assessment Report Appendix D  ‐  Consultation

Page 4: PIERS 5 8, SEWAGE PUMPING FACILITIES - … 5 – 8, SEWAGE PUMPING FACILITIES Municipal Class Environmental Assessment, Schedule B May 2014 i Tab ...

    1 

1. Introduction and Background 

1.1. Background 

The study area includes Piers 5 to 8 along the Hamilton Waterfront and is adjacent to a mixed  use/residential  neighbourhood  immediately  to  the  south.  The  study  area  is located  approximately  3  kilometres  from  downtown  Hamilton  and  is  located  in  the North  End  Neighbourhood.  Existing  development  on  Piers  5,  6,  7  and  8  is  currently serviced with water services that connect to municipal watermains & sanitary services,  either connect to the municipal sewer system by a gravity connection or by a number of pumping  facilities  and  forcemains.  Located  on  Pier  8  is  the  Parks  Canada  Sewage Pumping  Station  (See  Figures  3  and  5).  The  pumping  station  and  associated infrastructure was  constructed  to  service  the  Parks  Canada Marine Discovery  Centre which opened in 2004 and operated until its closure in 2010 when management of the building was transferred to the Hamilton Waterfront Trust. The City of Hamilton and the Hamilton Waterfront Trust have assessed upgrading alternatives to the pumping station as well as the private pumping facilities located in the study area. 

1.1.1. Previous Studies 

Setting Sail Secondary Plan Setting Sail is a land use plan for the West Harbour, with an emphasis on three areas of major change: the Waterfront, the area south of the CN rail yard (Barton‐Tiffany), and the former industrial lands along Ferguson Avenue (Ferguson‐Wellington Corridor). The Secondary Plan  also  focuses on  commercial  and mixed use  corridors within  the  area, where  strategic  redevelopment  and  streetscape  improvements would  strengthen  the economic  vitality  of  the  corridors,  provide  additional  amenities  to  adjacent neighbourhoods and generally beautify the area. Setting Sail Secondary Plan came  into effect in December 2012.  West Harbour Waterfront Recreational Master Plan The West Harbour Waterfront Recreation Master Plan was  initiated  in 2005  following Hamilton  Council’s  adoption  of  the  Setting  Sail  Secondary  Plan.  The  Master  Plan contains policies  and principles  relating  to design  guidelines,  architecture, waterfront precincts  and  implementation  to  ensure  that  public  and  privately  funded  initiatives develop  in  a  fashion  that  highlight  the  areas  heritage, while  creating  a  vibrant  and contemporary place within  the West Harbour.  It was  received by Hamilton Council  in April 2010.    Hamilton West Harbour Piers 5‐8 Servicing Studies and Pro Forma Analysis (2014) The 2014 Servicing Studies Report and Pro Forma Analysis report explores the servicing requirements  and  redevelopment  potential  for  Piers  5‐8,  identifies  the  opportunities and  constraints  to  development  and  recommends  the  immediate  next  steps  for facilitating  redevelopment.  The  study  identified  the  need  for

Page 5: PIERS 5 8, SEWAGE PUMPING FACILITIES - … 5 – 8, SEWAGE PUMPING FACILITIES Municipal Class Environmental Assessment, Schedule B May 2014 i Tab ...

      2 

Figure 1 ‐ Existing Conditions Study Area  

 

Page 6: PIERS 5 8, SEWAGE PUMPING FACILITIES - … 5 – 8, SEWAGE PUMPING FACILITIES Municipal Class Environmental Assessment, Schedule B May 2014 i Tab ...

    3

a new pumping station or pumping facilities to address current and future development needs. As part of this study a functional servicing concept was completed. The study was received by Hamilton Council in January, 2014.   North End Traffic Management Study The North End Traffic Management Study was endorsed by Hamilton Council in October 2010. The study is about improving conditions as well as protecting the integrity of the neighbourhood  now  and  in  the  future  as  growth  and  change  occurs.  The  study was initiated  largely  in  response  to  concerns about  the  redevelopment of Pier 8, which  is planned for mixed‐use residential and commercial uses.  

 1.2. Class EA Process 

This Project  is being conducted  in accordance with  the  requirements of  the Provincial Class  EA  process.  The  Class  EA  planning  process  allows  for  the  integration  of  sound engineering judgment, prudent long‐term planning, and protection of all aspects of the environment  (natural,  social,  economic,  and  cultural).  This  includes  consultation with the  public  and  affected  agencies  to  obtain  comments  and  input,  ensure  regulatory compliance and ultimately achieve acceptance of the preferred alternative.  The Class EA process was developed as a method for planning municipal  infrastructure projects  (including roads, water and wastewater projects), which display  the  following common characteristics: 

Recurring; 

Usually similar in nature; 

Generally limited in scale; 

Have a predictable range of environmental effects; and,  

Responsive to mitigating measures.  The requirements for undertaking a Class EA are described  in the document Municipal Class  Environmental  Assessment,  October  2000  as  amended  in  2007  and  2011, Municipal Engineers Association (MEA). A Class EA applies to a group of projects that are permitted under the Environmental Assessment Act as long as they follow the approved planning process. The specific requirements depend on the type and complexity of the project  as well  as  the  significance  of  potential  impacts.  The  following  three  types  of projects are identified:  

Schedule ‘A’ and ‘A+’ Projects are limited in scale and have minimal adverse impacts. This  type  of  project  is  pre‐approved  and  may  proceed  to  construction  without further work following the Class EA process 

 

Schedule  ‘B’  Projects  have  the  potential  for  some  adverse  environmental  impacts and  are  approved  provided  they  are  “screened”  by  the  public  and  government 

Page 7: PIERS 5 8, SEWAGE PUMPING FACILITIES - … 5 – 8, SEWAGE PUMPING FACILITIES Municipal Class Environmental Assessment, Schedule B May 2014 i Tab ...

    4

review agencies. This type of project requires the completion of Phases 1 and 2 of the EA planning process. 

 

Schedule  ‘C’  Projects  are  more  complex  and  the  potential  for  significant environmental  impacts.  These  projects  generally  include  the  construction  of  new facilities and major expansions to existing facilities. This type of project is subject to the  full Class  EA process  and  requires  the preparation of  an  Environmental  Study Report (ESR). 

  The Class EA process in Ontario follows a rational decision‐making process and includes: 

Identifying the problem or need for the project (Phase 1); 

Identification and evaluation of planning options or alternative solutions to address the problem (Phase 2); 

An assessment of design alternatives (Phase 3); 

The completion of documentation for the public record (phase 4); and 

The  implementation  of  the  project  including  design, with  appropriate monitoring during construction (Phase 5). 

 This EA project is required to determine the preferred alternative to upgrade the Piers 5 – 8  sewer pumping  station or pumping  facilities  to ensure  reliable  service  for existing uses  and  future  development.  The  project  requires  upgrading  the  pumping  station, installation of standby power equipment,  forcemain upgrades, and potentially  retiring and  decommissioning  the  existing  sewer  pumping  station.  Accordingly,  it  has  been determined that this project will follow the Schedule ‘B’ process.  As a Schedule ‘B’ project, Phase 1 and Phase 2 of the Class EA process are required (see Figure 2). The Schedule ‘B’ Class EA concludes with the Notice of Completion and filing of the Class EA Project File Report for a minimum 30‐day public review period.  The Municipal Class EA process includes an appeal provision, also referred to as a Part II Order.  If  concerns  regarding  a  project  cannot  be  resolved  in  discussions  with  the proponent (for this study, the proponent is the City of Hamilton), then members of the public,  interest  groups  or  technical  agencies  may  request  the  Minister  of  the Environment to “bump‐up” (Part II Order) a project to an individual EA. The Minister of the Environment then decides whether a “bump‐up” is appropriate or necessary.  If  no  “bump‐up”  (Part  II Orders)  requests  are  outstanding  by  the  completion  of  the review period, the project  is considered to have met the requirements of the Class EA and the proponent may complete contract drawings, proceed to tender and construct the project.  Figure 2 ‐ Municipal Class EA Process (Schedule ‘B’ Project) 

Page 8: PIERS 5 8, SEWAGE PUMPING FACILITIES - … 5 – 8, SEWAGE PUMPING FACILITIES Municipal Class Environmental Assessment, Schedule B May 2014 i Tab ...

    5

  1.3. Problem Statement and Description of the Project 

With the approval of the Setting Sail Secondary Plan and the proposed land use for Piers 5  to  8  at  the West Harbour,  the  City  of Hamilton  is  currently  reviewing wastewater infrastructure needs at  the West Harbour  to  support both existing and  future growth needs  of  the  area.      Existing  development  at  Piers  5  to  8  are  currently  serviced  by sewage  infrastructure which  includes a number of existing pumping stations or private sanitary  servicing with pumped  sewage  to municipal  sewers. One existing municipally maintained pumping station  is  located on Pier 8.   The existing municipally maintained pumping station on Pier 8 was constructed to service the former Parks Canada Marine Discovery Centre  in 2004  (now known as  the Hamilton Waterfront Trust Centre) now services existing development at the north and west side area of Pier 8. This pumping station has operational deficiencies which include:   

No  standby  power  generator  to  provide  a  backup  power  source  in  the  event  of  

power failure; and,  

Inadequate capacity to manage existing development sewage flows and / or service 

future development. 

Page 9: PIERS 5 8, SEWAGE PUMPING FACILITIES - … 5 – 8, SEWAGE PUMPING FACILITIES Municipal Class Environmental Assessment, Schedule B May 2014 i Tab ...

    6

In  addition  to  the  sanitary  sewage  servicing  needs  on  Pier  8,  the  City  also  reviewed sanitary  infrastructure needs on Piers 5  to 7 which may require new sewage pumping infrastructure to service existing and future development needs.    The  objectives  of  the  Schedule  B,  Class  EA  project  will  be  to  review  and  compare alternative  solutions  for  either  the  rehabilitation  of  the  existing  pumping  station(s), replacement  of  the  existing  pumping  stations  with  a  new  facility,  new  pumping station(s) or  sanitary  sewage  infrastructure  including  the construction of new  sanitary forcemains. A  review  of  the  alternative  locations  for  a  replacement or  new  pumping station(s)  is required  in order to address the above noted concerns and to  identify the preferred solution. If the replacement or new pumping station(s) alternative is selected as  the  preferred  solution,  then  the  existing  pumping  station(s) may  also  need  to  be decommissioned.     1.4. Public Consultation 

Public Consultation is a key feature of the Class EA process. Through an effective public consultation program, the City of Hamilton can provide an opportunity for the exchange of  ideas  and  information with  the  public  and  affected  agencies. One  of  the  principle goals of public consultation  is  to achieve  resolution of different points of view on  the project  thus  reducing  or  averting  controversy  and  obtaining  general  public  support. Appropriate and timely contact with government agencies will ensure compliance with all public policy and regulatory requirements.  For this Schedule B, Class Environmental Assessment project, the following consultation activities were undertaken:  

Notice of Commencement 

Public Information Centres (2) (including notices) 

Regulatory Agency Consultation  

Operators Consultation  

Notice of Completion  For  a  Schedule  ‘B’  project,  there  are  two  mandatory  points  of  consultation:  A consultation  with  review  agencies  and  the  public,  and  issuance  of  the  “Notice  of Completion”.  The first consultation for this project occurred during the beginning of Phase 1 (refer to Figure  2).  The  purpose  of  the  first  public  consultation  was  to  introduce  the  study, outline  the  issues  and  opportunities,  highlight  the  existing  system,  list  alternative solutions, and  identify the criteria to be used to evaluate the alternatives. The second public  consultation occurred during Phase 2, once  the  alternative  solutions had been evaluated.  A  general  inventory  of  the  natural,  social,  economic  and  cultural environments were made  to determine  the possible  impacts each alternative solution 

Page 10: PIERS 5 8, SEWAGE PUMPING FACILITIES - … 5 – 8, SEWAGE PUMPING FACILITIES Municipal Class Environmental Assessment, Schedule B May 2014 i Tab ...

    7

may have on the environment. The intent of this consultation activity was to explain the evaluation process, illustrate the potential alternatives, and provide the public with the opportunity to comment prior to finalizing the selection of the preferred solution.  The  issuance  of  a  “Notice  of  Completion”  represents  the  completion  of  Phase  2  for Schedule  ‘B’  projects.  The  Notice  identifies  the  preferred  solution,  and  provides  the public with a review period, the date by which “Part II Order” requests are required and where comments are to be submitted. If no “Part II Order” requests are received during the  specified period  (a minimum 30  calendar days)  then  the proponent may proceed with design and construction of the project.  Specific public and agency consultation activities  for this project –  including Aboriginal and First Nations consultation‐ are discussed in Section 7 of this document.   

Page 11: PIERS 5 8, SEWAGE PUMPING FACILITIES - … 5 – 8, SEWAGE PUMPING FACILITIES Municipal Class Environmental Assessment, Schedule B May 2014 i Tab ...

    8

2. Existing Conditions 

2.1. Natural Environment 

As  part  of  the  environmental  assessment  work  the  existing  infrastructure  has  been reviewed  (see  Figure  3  and  Figure  4).  A  summary  of  the  project  area’s  natural environment existing conditions, assessment of potential  for Species at Risk  (SAR) and Species of Conservation Concern (SCC) habitat has been reviewed.  2.1.1. Fisheries 

The shoreline along Piers 5, 6, 7 and 8 consists primarily of concrete, steel and wooden vertical walls with limited shoreline diversity. Two short lengths adjacent to the Williams Fresh  Café  and  Trolley  Ticket  Booth  (Pier  8)  are  comprised  of  rip‐rap  and  also  have limited cover for fish and/or mussel species. Most of the open water area is exposed to heavy wave action with  the only area  that would shelter  fish being  the Marine Police Unit  area  located  at  Pier  7.  This  area  is  partially  enclosed  and  provides  shelter  from waves and heavy boating activity.  The construction or upgrades  to  the sanitary sewer  infrastructure within Piers 5, 6, 7, and 8 that discharge to the municipal sanitary sewer system will not impact the fisheries resources of Hamilton Harbour as the municipal sanitary sewer system does not have a hydrological  connection  to  the Harbour  at  this  location  and  proposed works  are  not anticipated to be located in or directly adjacent to the water’s edge.   2.1.2. Terrestrial 

Terrestrial vegetation within Piers 5, 6, 7 and 8  is very  limited, with most of  the area comprised of built structures (i.e. concrete and asphalt). Vegetation is found in the form of  manicured  lawns,  gardens  and  hedgerows  associated  with  the  redeveloped northwest corner of Pier 8. There is also limited vegetation along the rip‐rap shorelines, which  is comprised of very common species  found  in  the urban environment. Further details on vegetation that was observed in the study area can be found in Appendix A.   Habitat for wild life within Piers 5, 6, 7, and 8 is also limited. Use of the project area as habitat is restricted to species with a high tolerance for human disturbance and species that have adapted their behaviour. Further details on wildlife that was observed  in the study area can be found in Appendix A.  

Page 12: PIERS 5 8, SEWAGE PUMPING FACILITIES - … 5 – 8, SEWAGE PUMPING FACILITIES Municipal Class Environmental Assessment, Schedule B May 2014 i Tab ...

    9 

Figure 3 ‐ Existing Infrastructure 1 

  

Page 13: PIERS 5 8, SEWAGE PUMPING FACILITIES - … 5 – 8, SEWAGE PUMPING FACILITIES Municipal Class Environmental Assessment, Schedule B May 2014 i Tab ...

    10 

Figure 4 ‐ Existing Infrastructure 2 

  

Page 14: PIERS 5 8, SEWAGE PUMPING FACILITIES - … 5 – 8, SEWAGE PUMPING FACILITIES Municipal Class Environmental Assessment, Schedule B May 2014 i Tab ...

    11 

2.1.3. Species at Risk and Species of Conservation Concern 

A  list  of  80  Species  at  Risk  (SAR)  and  Species  of  Conservation  Concern  (SCC)     with potential  to  occur  within  the  Hamilton  Area  was  gathered  from  secondary  source information. Using  this  list  and  the  results  of  the  site  investigation,  a  SAR  screening exercise  was  completed  (see  Appendix  A  for  complete  screening  information).  This screening  examined  the  habitat  requirements  for  SAR  and  SCC  identified  during  the background  review  and  determined  if  the  habitat  available  in  the  project  area  could support those species.  As outlined in Appendix A, there is potential habitat for Barn Swallow (Hirundo rustica) in the warehouses/garages that occupy parts of Pier 6 and Pier 8.    2.2. Social, Economic, and Cultural Environments 

2.2.1. Socio‐Economic 

The  study  area  includes  Piers  5‐8  along  the  Hamilton  Waterfront,  the  mixed use/residential neighbourhood immediately to the south and is located approximately 3 kilometres from downtown Hamilton in an area referred to as the North End.  The West Harbour area is home to a number of older, well established recreational and boating related uses, such as Bayfront Park, the Royal Hamilton Yacht Club and several boat repair/service operations. The area also includes recreational and commercial uses.  2.2.2. Archaeology 

A  Stage  1  Archaeology  study was  completed  for  the  study  area.  The  purpose  of  the study was to determine if there is any potential for the presence of any undocumented cultural  heritage  resources,  and  secondly  to  determine  whether  known  cultural resources are extant on the subject lands.   The  study area  is  located  in  the historic  township of Barton, Wentworth County. The study area includes the Hamilton Harbour from Piers 5 to 8 as well as roads just south of the  Harbour. Most  of  the  roads  for  the  proposed  and  alternative  sewage  servicing routes are bound by mid to  late 19th century buildings,  including houses and factories. However, one of the alternative forcemain routes does run through the eastern edge of the study area.  The general  topography  is  flat where  the piers are  located, mainly due  to  infilling and modifications  of  the  wharves.    The  natural  landscape  includes  a  relatively  smooth descent from the foot of the Niagara Escarpment north towards the waterfront where the old shoreline, which once had a steep slope down to the water’s edge can still be seen in some areas. The neighbourhood provides evidence of this old shoreline through 

Page 15: PIERS 5 8, SEWAGE PUMPING FACILITIES - … 5 – 8, SEWAGE PUMPING FACILITIES Municipal Class Environmental Assessment, Schedule B May 2014 i Tab ...

    12 

the cut  in and gently sloping roads. Eastwood Park  is slightly  irregular and rising to the south, with a raised soccer pitch and playground on the north section.  The Stage 1 Archaeology work included a search of the Ministry of Tourism, Culture and Sport’s  (MTCS)  registered  sites database  for archaeological  sites within one kilometre  radius  of  the  study  area.  Although  there  are  no  registered  sites  in  or  within  one kilometre of  the  study  area or  surrounding  the  study  area,  there  is  still potential  for Aboriginal and or European find spots or sites.  One unregistered site that was recorded was the Burlington Glass Factory located on the north‐west corner of MacNab St. North and Burlington St. The site is now a park and is just  south  of  the  study  area.  The  full  Stage  1  Archaeology  Report  can  be  found  in Appendix B.  2.2.3. Built and Cultural Heritage Landscapes 

A  Heritage  Impact  Assessment  Report  was  completed  for  the  study  area  including historical overview of the study area’s development, a description of the built heritage and cultural landscapes resources within or adjacent to the study area, a description of the proposed development, an analysis of any impacts of the proposed development on identified cultural heritage resources, and mitigation measures to avoid adverse impacts to any significant  cultural heritage resources.  The proposed pumping  station works are  to be  limited  to existing municipal  rights of way  or  municipal  lands,  installed  below  ground  although  small  structures  may  be erected for the pumping stations. These developments will not have any adverse impact on built heritage resources or cultural heritage landscapes in the study area.   The full Heritage Impact Report can be found in Appendix ‘C’.  2.3. Technical Environment 

2.3.1. Existing Sewage Infrastructure 

Existing development on Piers 5 to 8 are predominately serviced by aged sanitary sewer infrastructure  which  includes  a  number  of  pumping  stations  or  pumping  facilities. Sewage  is  generally pumped  to  the existing  sewer  system on Guise  Street, Catharine Street or  connected  to  the more  recently  constructed  sewers at  the west end of  the study area on Pier 5 that drain to the Strachan Combined Sewage Overflow (CSO) tank located at Bayfront Park. In addition to the Strachan CSO tank there are two other CSO tanks in the study area, the James Street CSO tank located on Pier 6 and the Eastwood Park CSO tank located in Eastwood Park.  

Page 16: PIERS 5 8, SEWAGE PUMPING FACILITIES - … 5 – 8, SEWAGE PUMPING FACILITIES Municipal Class Environmental Assessment, Schedule B May 2014 i Tab ...

    13 

Nine pumping  stations or  facilities were  identified at;  (i) Parks Canada  lands at Pier 8 operated  by  the  Hamilton Waterfront  Trust  /  City  of  Hamilton,  (ii)  Navy  League  of Canada operated by the Navy League, (iii) Pier 8 Warehouse operated by the Hamilton Port  Authority,  (iv)  Brewers Marine  Supply  site  operated  by  the  Brewers Marine,  (v) Hamilton Police Marine Facility operated by the City of Hamilton, (vi) James Street Pier operated by  the Hamilton Port Authority,  (vii) Hamilton Port Authority Marina Office operated by the Hamilton Port Authority, (viii) Royal Hamilton Yacht Club site operated by the Royal Hamilton Yacht Club and (ix) Pier Washrooms site operated by the City of Hamilton.  A survey of the existing pumping facilities was conducted with the operators of the pumping facilities. The results of the operator survey are included in Table 1.  In addition to sanitary infrastructure, there are existing watermains, water services and storm sewers that service existing development within the study area. There is one Sun Canadian Oil pipeline (active) and two Imperial Oil pipelines (not active) that are located on Pier 8. Existing infrastructure is shown on the Existing Infrastructure Figures 3 and 4.  

Page 17: PIERS 5 8, SEWAGE PUMPING FACILITIES - … 5 – 8, SEWAGE PUMPING FACILITIES Municipal Class Environmental Assessment, Schedule B May 2014 i Tab ...

    14 

Table 1 ‐ Existing Pumping Station Facility Operator Survey  

EXISTING PUMPING FACILITY OPERATOR SURVEY 

  

  

Parks Canada PS  (Pier 8) 

Navy League (Pier 8)  Pier 8 N/E Corner  Brewers Marine Supply PS (Pier 8)  Hamilton Marine Police 

Facility PS (Pier 7) 

James St PS (Pier 6)  HPA Marina (Pier 6)  Royal Hamilton Yacht Club (Pier 5) 

Pier Washroom PS (Pier 5) 

1.  What is age of pumping facility  11 years  67 years  50 years  Data Not Available  approx 60 years In‐ground cement tank estimate 30+ years 

In‐ground cement tank estimate 30+ years 

Data Not Available  16 years 

2.   Upgrades  since pumping  facility original installation 

No 

(1987‐1988) work done (new pumps), 2012 new pumps, 2 pumps 

float operated 

Both pumps were rebuilt within the last 6 

years, the original control system located inside the chamber has been replaced with a very basic system 

outside of the chamber (float switch and a 

starter). 

Data Not Available 

Upgraded 16‐18 years ago with the 

installation of 2 new pumps 

Tank ‐ no, Service hatch ‐ yes, Pumps ‐ yes 

Tank ‐ no, Service hatch  ‐ yes, Pumps ‐ yes 

Data Not Available  No 

3.  Identified operational issues  Yes  No  Yes  Data Not Available  Yes  No  Yes  Data Not Available  No 

4.  Does  the  facility  have  a  monitoring system or alarm/call‐out system. 

Yes  Yes  No  Data Not Available  Yes  Yes  Yes  Data Not Available  Yes 

5.  Who  currently  maintains  the  pumping facility 

City of Hamilton  Private Contractor  Hamilton Port Authority  Data Not Available  Owner Maintained  In‐house  In‐house  Data Not Available  City of Hamilton 

6.  How often is maintenance conducted on the facility? 

As required Call when there is an 

issue (no major servicing) 

Monthly level inspection 

Data Not Available I check to ensure the pumps are working as designed every month. 

Semi‐annually & seasonally used 

Semi‐annually  Data Not Available Semi‐annually and as 

required 

7.  Pump facility details (if available)                            

a. Current capacity (flow/pressure) 60 gallons per min. per 

pump 2hp each   Data Not Available  Data Not Available  Data Not Available  

5" impeller Barnes pumps 

5" impeller Barnes pumps 

Data Not Available  Not sure 

b. Number of pumps  2     2  Data Not Available  2  2  2  Data Not Available  2 high volume pumps 

c. Diameter of the wet well  8' dia. by 32' deep  8' x 8'   Data Not Available   Data Not Available  4', depth is 8'  Data Not Available   Data Not Available   Data Not Available Shallow squre approx. 

2' deep 

d. Discharge pipe diameter  3"  4" inlet  4"  Data Not Available  4"  3"  3"  Data Not Available  2" 

e. Does the wet well have an overflow  No  No  Yes  Data Not Available  No  No  No  Data Not Available  No 

8.  Any  other  comments  or  operational issues? 

None Services the Navy 

League only 5,000 sq. ft. Bldg. 

None  Data Not Available    

Pending future development uses – discharge system not protected to winter freezing conditions. 

Pumping station utilized all year 

facilitating the marina office & shop building systems (and seasonally 

with the fuel dock pleasure craft holding 

tank pump out) 

Data Not Available Discharge not 

protected to winter freezing conditions 

Page 18: PIERS 5 8, SEWAGE PUMPING FACILITIES - … 5 – 8, SEWAGE PUMPING FACILITIES Municipal Class Environmental Assessment, Schedule B May 2014 i Tab ...

    15 

2.3.2. Existing Pumping Station 

The pumping station  that  is  located on Parks Canada  lands  (Figure 5) has experienced operational  problems  which  include  inadequate  capacity  to  manage  existing development flows and / or future redevelopment. This pumping station was originally designed  to  service  the  Parks  Canada Marine Discovery  Centre  but  now  services  the Hamilton  Waterfront  Trust  (HWT)  developments  which  include  the  HWT  Centre (includes Sarcoa Restaurant), Williams Fresh Café, HWT offices, recreational facilities on Pier 8 as well as visitors to the Pier whose number has substantially increased over the years.   There  is  adequate  capacity  in  the existing  combined  sewers during dry weather  (non rain  events)  to  support  future  redevelopment  but  inadequate  capacity  to  support redevelopment during wet weather (rain) events. The study area topography gradient is sloping down from Guise Street / Bay Street to the harbour. New  infrastructure within the  study  area would  be  needed  to  support  redevelopment  along with  an  adequate location to connect the new  infrastructure to. The need for one or more new pumping stations   needs  to be  reviewed  to service any redevelopment as  the  land drains away from the municipal roads adjacent to the study area.  Figure 5 – Photo of Existing Parks Canada Pumping Station  

  

Page 19: PIERS 5 8, SEWAGE PUMPING FACILITIES - … 5 – 8, SEWAGE PUMPING FACILITIES Municipal Class Environmental Assessment, Schedule B May 2014 i Tab ...

      16 

3. IDENTIFICATION OF ALTERNATIVES 

At the onset of the project a Long‐List Screening was created.  The purpose of the Long‐list was to assess the advantages and disadvantages of different alternatives in the study area to determine which alternatives would address the problem statement and be able to accommodate the existing and future development sanitary sewage servicing needs of  in the study area.   The  long  list of alternatives  included (i), rehabilitate or upgrade existing pumping stations, (ii) construction of new on site treatment facility, (iii)  new pumping stations and forcemains, (iv) new central pumping station and forcemain, (v) gravity sewers and (vi) do nothing. The review of these different alternatives is summarized in the following table.   Table 2 – Long‐list Screening of Alternatives 

Long‐list Screening of Pumping Station Facilities Alternatives 

Alternative  Description  Advantage  Disadvantage  Results 

Rehabilitate/upgrade the existing pumping stations (P.S.) 

Pier 5 

Leander Boat Club: Gravity connection to municipal sewer ‐ Not Applicable 

Rehabilitate/upgrade  the  existing pumping  facilities  and/or  forcemain connections  (if  required)  to meet  current standards. Upgrades  to meet current and future demands. 

• Lower capital costs • Compatible with existing topography • Existing pumping facilities on Pier 5 are servicing current development. Significant redevelopment of Pier 5 is not planned under Setting Sail 

•  No  ability  to  consolidate  sewage  flows.  It  is  more  costly  to maintain  multiple  PS's  vs.  one  central  PS•  Provides  for  existing  development  but  not  a  redevelopment  of pier in the future 

Screened out Pier Washroom Facility  ‐ (City Operated) 

Royal Hamilton Yacht Club Facility ‐ (Privately Operated) 

Pier 6 

HPA Marina Office Facility ‐ (HPA) 

Rehabilitate/upgrade  the  existing pumping  facilities  and/or  forcemain connections  (if  required)  to meet  current standards. Upgrades  to meet current and future demands. 

• Lower capital costs • Compatible with existing topography • This pumping facility may be able to maintain existing development during redevelopment to allow for staging of works 

• Does not address redevelopment proposed under Setting Sail • No ability to consolidate sewage flows  • It is more costly to maintain multiple PS's vs. one central PS • City would need to assume ownership of any privately operated pumping facilities in their current condition and provide service to any private development 

Screened out 

 Pier 7 

James Street Pier Facility ‐ (HPA) 

Rehabilitate/upgrade  the  existing pumping  facilities  and/or  forcemain connections  (if  required)  to meet  current standards. Upgrades  to meet current and future demands. 

• Lower capital costs • Compatible with existing topography • These pumping stations can maintain existing development during the redevelopment period and allow for staging of the works 

• Does not address redevelopment proposed under Setting Sail• No ability to consolidate sewage flows • It is more costly to maintain multiple PS's vs. one central PS • City would need to assume ownership of any privately operated pumping facilities in their current condition and provide service to any private development • Location of some of the existing pumping facilities are not compatible with future planned development 

Screened out Hamilton Marine Police Facility ‐ (City Operated) 

 Pier 8 

Parks Canada PS ‐ (HWT / City Operated) 

Rehabilitate/upgrade  the  existing pumping  facilities  and/or  forcemain connections  (if  required)  to meet  current standards. Upgrades  to meet current and future demands. 

• Lower capital costs • Compatible with existing topography • These pumping stations can maintain existing development during the redevelopment period and allow for staging of the works 

• No ability to consolidate sewage flows • It is more costly to maintain multiple PS's vs. one central PS • Does not provide capacity to service new redevelopment under Setting Sail • City would need to assume ownership of any privately operated pumping facilities(s) in their current condition and provide service to any private development • Location of some of the existing pumping facilities are not compatible with future planned development 

Screened out 

Brewers Marine Supply Facility ‐ (Privately Operated) 

Navy League Facility ‐ (Privately Operated) 

Warehouse PS ‐ (HPA) 

Page 20: PIERS 5 8, SEWAGE PUMPING FACILITIES - … 5 – 8, SEWAGE PUMPING FACILITIES Municipal Class Environmental Assessment, Schedule B May 2014 i Tab ...

      17 

Long‐list Screening of Pumping Station Facilities Alternatives 

Alternative  Description  Advantage  Disadvantage  Results 

Provide on site treatment of collected sewage 

    Construction of new WWTP to accommodate existing and future flows in study area.     

• Less impact to existing sewer system and treatment plant (Woodward WWTP) • Compatible with existing topography 

• Difficult to get approvals for new discharge to the harbour • Higher capital and operational costs • Planning approvals needed to permit on site treatment plant • Increased complexity • Timeline for implementation. Reduction in development opportunity footprint 

Screened out 

New pumping stations and forcemains 

    • Multiple pumping stations with accompanying forcemains • Abandon/removal of existing pumping facilities • Construction of new collection sewers      

• Addresses existing and future development needs • Compatible with existing topography • Allows for flexibility in multiple sewer connection points • Some consolidation of sewage flows • Increased staging opportunities for construction • Replacement of existing aging pumping facilities • Increased operational monitoring and standardization 

•  Increased  capital  costs  by  building  multiple  pumping facilities •  Increased  O&M  costs  by  operating multiple  pumping facilities 

Carry forward for further evaluation 

New central pumping station and forcemain 

    • Single pumping station located strategically to service the needs of the entire study area.  • Abandon/removal of existing pumping facilities • Construction of new collection sewers       

• Addresses existing and future development needs • Compatible with existing topography • Complete consolidation of sewage flows • Cost effective operationally (single PS vs. multiple PS's) • Connection flexibility with one single discharge to an acceptable sewer location with available capacity • Replacement of existing aging pumping facilities • Increased operational monitoring and standardization 

• Limitations  in construction staging with single pumping station 

Carry forward for further evaluation 

Gravity sewers 

• Construction of sanitary sewers within study area which will connect to the existing sewer system  without pumping    

• Less operational and capital costs • Less complexity (i.e. no pumping facilities) 

• Current topography does not allow for gravity sewers without raising the entire site • Raising site will impact views of the harbour from area south of the study area • Existing sewers adjacent to site cannot accommodate additional flows • Ability to raise the site in certain areas is limited due to existing permanent buildings  

Screened out 

Do Nothing ‐ As required by Class EA, alternative carried forward for evaluation Carry forward for further 

evaluation  

Page 21: PIERS 5 8, SEWAGE PUMPING FACILITIES - … 5 – 8, SEWAGE PUMPING FACILITIES Municipal Class Environmental Assessment, Schedule B May 2014 i Tab ...

    18 

A number of alternatives were not carried  forward  for  further  review. These  included the rehabilitation of existing pumping stations or facilities, on site treatment of sewage through  the construction of a new  treatment  facility and  the construction of a gravity sewer system without pumping facilities.   The  rehabilitation  of  existing  pumping  stations  was  not  carried  forward  as  the replacement  of  existing  pumping  stations  would  only  partially  address  existing development and not the needs of all existing development or future development that is anticipated by the Setting Sail study. Maintaining multiple pumping facilities at their current  locations  is  not  expected  to  be  compatible  with  the  location  of  future redevelopment and would require increased costs by the City to become the operators of all of the existing facilities and maintain the aged infrastructure.  The  construction  of  a  new  treatment  facility  for  on  site  sewage  treatment was  not carried forward as  it was expected that approvals for the new treatment facility and a new discharge to the harbour would be difficult to aquire, there would be higher capital and  operational  costs  for  this  alternative  and  the  area  for  development  would  be decreased associated with the use of the study area for the treatment facility.   The  other  alternative  which  was  not  carried  forward  was  the  construction  of  new sewers to service the study area and connect to the existing municipal sewers by gravity without pumping. The topography of the study area slopes away  from Guise Street to the harbour. Without the placement of fill which would impact views to the harbour and lack of compatibility with existing development that will remain, the study area cannot be serviced by a gravity sewer system and would need to have sewage pumped to the existing municipal sewer system. The existing sewers on Guise Street do not have  the required capacity for redevelopment sewage flows for a gravity sewer system.  The remaining alternatives were carried forward for further review. These  included, (i) Do Nothing,  (ii) the construction of new pumping stations and  forcemains and  (iii) the construction of a central pumping station and forcemain.  3.1. Alternative 1 ‐ Do Nothing 

The  Do  Nothing  alternative  would  involve  maintaining  the  existing  infrastructure without the construction of new  infrastructure. Any existing deficiencies  in the existing system would  remain with  ongoing maintenance.  This  alternative  is  not  expected  to address current and future development needs but as required by the Class EA process, this alternative has been carried forward for further review.  3.2. Alternative 2 ‐ Construction of New Pumping Stations and Forcemains 

The construction of new pumping stations and forcemains was carried forward as it will address  existing  and  future  redevelopment  sewage  flow  needs.  The  new  pumping 

Page 22: PIERS 5 8, SEWAGE PUMPING FACILITIES - … 5 – 8, SEWAGE PUMPING FACILITIES Municipal Class Environmental Assessment, Schedule B May 2014 i Tab ...

    19 

stations  can  be  located  to  be  compatible with  both  the  existing  topography  and  the location of  future  redevelopment blocks. There will be  some  consolidation of  sewage flows  through  the  replacement  of  the  existing  aged  pumping  facilities  with  new infrastructure  constructed  to  current  standards  with  improved  monitoring.  The construction  of  multiple  new  pumping  stations  will  result  in  increased  capital  and operational  costs  over  a  single  new  facility  but will  have  the  advantage  of  increased construction staging opportunities.   3.3. Alternative 3 – Construction of a Central Pumping Station and Forcemain 

The construction of a single centrally located pumping station and forcemain has similar advantages as the construction of multiple pumping stations as it also addresses existing and future redevelopment sewage flow needs and was also carried forward for further review. The centrally  located pumping station  location can be placed to be compatible with  the  existing  topography  and  future  redevelopment  and would  offer  a  complete consolidation of sewage  flows  for the study area. This alternative will also replace the existing aged pumping facilities with a new facility constructed to current standards with improved monitoring and would be more cost effective than multiple pumping facilities. The  disadvantage  of  this  alternative  is  that  it may  not  have  the  flexibility  to  address other on site infrastructure constraints or the opportunities for construction staging.   

Page 23: PIERS 5 8, SEWAGE PUMPING FACILITIES - … 5 – 8, SEWAGE PUMPING FACILITIES Municipal Class Environmental Assessment, Schedule B May 2014 i Tab ...

    20 

4. ASSESSMENT OF ALTERNATIVES 

4.1. Evaluation of Criteria 

The  evaluation  criteria  used  for  the  assessment  of  the  alternatives  reviewed  the potential  environmental  (natural,  social,  economic,  cultural)  and  technical  impacts  of each alternative.  In assessing alternative solutions, the alternatives were compared on the  basis  of  each  criterion.  The  key  considerations  that  apply  to  each  criterion  are outlined in Table 3: 

Page 24: PIERS 5 8, SEWAGE PUMPING FACILITIES - … 5 – 8, SEWAGE PUMPING FACILITIES Municipal Class Environmental Assessment, Schedule B May 2014 i Tab ...

    21 

Table 3 ‐ Evaluation Criteria and Key Considerations 

Evaluation Criteria  Indicator 

Natural Environmental Considerations 

Potential Impacts on Terrestrial Environment 

Potential for displacement, disruption or improvement to vegetation/wildlife habitat during construction and operation (including SARS, Greenspaces, Wetlands, ESAs, ANSIs) 

Potential Impacts on Aquatic Habitat Potential for displacement, disruption or improvement of potential fisheries resources (including riparian zones, fish, aquatic wildlife and vegetation, wetlands) 

Technical Considerations 

Current Pumping Facilities  Operation for current and future loading 

Compatibility of "Tie‐In" with Existing Infrastructure System 

Ease of connection to existing infrastructure 

Ease of Construction (ie., construction constraints) 

Qualitative assessment of the ability to construct  

Location/Impacts of Other Utilities  Potential impacts to existing utilities, mitigation required and opportunities 

Noise/Odour  Potential for changing existing conditions 

Permits and Approvals  Ability to obtain approvals in a timely manner 

Reliability of Service  Ability to provide reliable/continuous service for the required capacity 

Social and Cultural Environmental Considerations 

Residential Buildings within 100m The potential impact or limitation on current and/or future residential  uses for the property or adjacent properties 

Institutional Buildings within 100 m The  potential  impact  or  limitation  on  current  and/or  future  land,  institutional  uses  for  the property or adjacent properties 

Page 25: PIERS 5 8, SEWAGE PUMPING FACILITIES - … 5 – 8, SEWAGE PUMPING FACILITIES Municipal Class Environmental Assessment, Schedule B May 2014 i Tab ...

    22 

Evaluation Criteria  Indicator 

Recreation The potential impact or limitation on current and/or future recreational uses for the property or adjacent properties 

Cultural/Heritage Areas within 200m The number of cultural/heritage/built heritage areas and type of  cultural area surrounding the site 

Traffic Impacts The type of roadyway amount of traffic potentially using the route (high, moderate, low), and access to private properties and parking by residents. 

Known Archaeological Features (including First Nations) 

The number and significance of known archaeological sites at the site or along the route. Potential (high or low) for undiscovered archaeological features on the site. 

Private Properties Affected  The number of private properties impacted 

Visual Landscape Impacts  Impact on views from adjacent residences (e.g.,harbour)  

Private Access Routes Affected (Driveways) 

The number of private access routes affected. 

Planning Policies or Initiatives  Impact on planning policies or planning initiatives 

Air Quality  The impact on air quailty by emissions and/ odours 

Economic Considerations 

Capital Costs  Estimated construction costs 

Operating and Maintenance Costs (Life Cycle) 

Estimated on‐going maintenance costs 

Property Acquisition  Need for new property/easements 

Page 26: PIERS 5 8, SEWAGE PUMPING FACILITIES - … 5 – 8, SEWAGE PUMPING FACILITIES Municipal Class Environmental Assessment, Schedule B May 2014 i Tab ...

    23 

4.2. Evaluation Methodology 

The proposed  alternative  solutions were  evaluated by  each of  the  evaluation  criteria presented in Table 3. The evaluation criteria is based on a descriptive manner instead of a quantitative manner. The evaluation concentrates on the strengths and weakness of each alternative to identify the best possible solution.  For  each  criteria  and  for  each  possible  alternative,  the  potential  effects  on  the environment (natural, social, cultural, economical) and technical impacts are identified. The evaluation  is based on the relative advantages and disadvantages of the potential environmental effects for each alternative. The following considerations were taken into account:  

Natural Environmental Considerations   – Protection of  the Physical  features of  the environment  

Social/Cultural  Environmental  Considerations  –  Residents,  neighbourhoods, businesses, community characteristics and heritage features of the area.  

Technical Considerations – Technical suitability and constructability 

Economic Considerations – Capital and operation/maintenance costs.   The selection of the preferred alternative is based on the advantages and disadvantages of the net environmental effects, including the results of applying mitigating measures.   4.3. Assessment of Alternatives 

Table  4  provides  a  summary  of  the  evaluation  of  three  (3)  alternatives.  There  is  an overall rating  for  the  four main criteria groupings  (natural, social & cultural,  technical, and economic considerations). At the end of the table is an overall preference rating to identify the preferred alternative based on all four categories.    

Page 27: PIERS 5 8, SEWAGE PUMPING FACILITIES - … 5 – 8, SEWAGE PUMPING FACILITIES Municipal Class Environmental Assessment, Schedule B May 2014 i Tab ...

        24 

Table 4 – Short List Evaluation – Pumping Station Facilities Alternatives 

Short List Evaluation ‐ Pumping Station Facilities Alternatives 

   New pumping stations (or facilities) and forcemains  New central pumping station and forcemain  Do Nothing 

Natural Environmental Considerations 

Potential  impacts on terrestrial environment (plant life and wildlife) 

Limited impacts to vegetation include pruning and removal of select trees. Limited impacts to wildlife Preferred 

Limited impacts to vegetation include pruning and removal of select trees. Limited impacts to wildlife Preferred 

None Most Preferred 

Potential impacts on aquatic habitat No impact during construction. Most Preferred 

No impact during construction. Most Preferred 

None Most Preferred 

Social and Cultural Environmental Considerations 

Residential Buildings within 100m Low impact on existing residential during construction. Improvement supports new development. Most Preferred 

Low impact on existing residential during construction. Improvement supports new development. Most Preferred 

Does not support new development. Least Preferred 

Institutional Buildings within 100 m No impact during construction. Preferred 

No impact during construction. Preferred 

None Preferred 

Recreation 

Low  impacts  on  existing  recreation.  Pumping  Station  may impact  future  park  development  on  Pier  8  and  forcemain construction  in  Eastwood  Park  may  impact  any  future  park uses. Least Preferred 

Low impacts on existing recreation. Pumping Station may impact future park development on Pier 8 and forcemain construction in Eastwood  Park  may  impact  any  future  park  uses. Least Preferred 

None Most Preferred 

Cultural/Heritage Areas within 200m No impacts during construction. Most Preferred 

No impacts during construction. Most Preferred 

None Most Preferred 

Page 28: PIERS 5 8, SEWAGE PUMPING FACILITIES - … 5 – 8, SEWAGE PUMPING FACILITIES Municipal Class Environmental Assessment, Schedule B May 2014 i Tab ...

        25 

Short List Evaluation ‐ Pumping Station Facilities Alternatives 

   New pumping stations (or facilities) and forcemains  New central pumping station and forcemain  Do Nothing 

Traffic Impacts 

Impact to Piers 5, 6, 8 existing development during pumping station construction / Discovery Drive and residential streets with forcemain construction.  Least Preferred 

Impact to Pier 8 existing development during pumping station construction / Discovery Drive and residential streets with forcemain construction. Least Preferred 

None Most Preferred 

Known  Archaeological  Features  (including First Nations) 

Low potential for archaeology impact with pumping station construction and limited potential with forcemain construction on Pier 8, Catharine Street, Mary Street, Brock Street, Eastwood Park and Burlington Street. Preferred 

Low potential for archaeology impact with pumping station construction and limited potential with forcemain construction on Pier 8, Catharine Street, Mary Street, Brock Street, Eastwood Park and Burlington Street. Preferred 

None Most Preferred 

Private Properties Affected Low ‐ limited impacts during construction Preferred 

Low ‐ limited impacts during construction Preferred 

None Most Preferred 

Visual Landscape Impacts Low ‐ limited impacts to visual landscape Preferred 

Low ‐ limited impacts to visual landscape Preferred 

None Most Preferred 

Private Access Routes Affected (Driveways) 

Pumping station construction on Piers 6 and 8 may temporarily impact existing development. Forcemain construction may temporarily affect Pier 8 existing development for alternate east ‐ west route selection. Forcemain construction on road allowances will have limited temporary access disruption to local residences. Least Preferred  

Pumping station construction on Pier 8 may temporarily impact existing development. Forcemain construction may temporarily affect Pier 8 existing development for alternate east ‐ west route selection. Forcemain construction on road allowances will have limited temporary access disruption to local residences. Least Preferred  

None Most Preferred 

Page 29: PIERS 5 8, SEWAGE PUMPING FACILITIES - … 5 – 8, SEWAGE PUMPING FACILITIES Municipal Class Environmental Assessment, Schedule B May 2014 i Tab ...

        26 

Short List Evaluation ‐ Pumping Station Facilities Alternatives 

   New pumping stations (or facilities) and forcemains  New central pumping station and forcemain  Do Nothing 

Planning Policies or Initiatives Pumping Station and forcemain construction supports Setting Sail redevelopment Planning Initiative. Most Preferred 

Pumping Station and forcemain construction supports Setting Sail redevelopment Planning Initiative. Most Preferred 

Existing  sewage  collection  systems  are under‐capacity  for  future  developmentLeast Preferred 

Air Quality Low ‐ limited impacts to air quality. Preferred 

Low ‐ limited impacts to air quality. Preferred 

None Most Preferred 

Technical Considerations 

Capacity Needs Addresses current and future capacity needs. Preferred 

Addresses current and future capacity needs. Most Preferred 

Does not address existing needs on Pier 8 and future capacity needs. Least Preferred 

Compatibility  of  "tie‐in"  with  Existing Infrastructure System 

Allows for added flexibilitity with multiple tie‐in locations to existing infrastructure. Additional sewer capacity on Guise Street will be needed. Preferred 

Slightly more constrained with single tie in point to existing infrastructure. Preferred 

N/A 

Ease  of  Construction  (ie.,  construction constraints) 

Limited construction constraints. Allows  for added  flexibility  in construction  phasing.  Addresses  possible  conflict with  gravity connection  to a central pumping station  in Pier 8  from Pier 6.Most Preferred 

Limited  construction  constraints  but  ability  to  service  future development  on  Pier  6  by  gravity  with  James  Street  CSO infrastructure  is  needed.  Limited  flexibility  with  phasing  of development. Preferred 

N/A 

Location/Impacts of Other Utilities 

Pumping  station  and  forcemain  construction  will  need  to accommodate  existing  pipeline  infrastructure. More  flexibility with a second pumping station in Pier 6 with mitigating conflicts with  other  infrastructure  that may  be  impacted  by  a  gravity sewer  connection  to  a  central  pumping  station  in  Pier  8.Least Preferred 

Pumping  station  and  forcemain  construction  will  need  to accommodate existing pipeline  infrastructure. Greater potential for  conflict  with  a  gravity  sewer  connection  from  Pier  5/6. Least Preferred 

None Most Preferred 

Page 30: PIERS 5 8, SEWAGE PUMPING FACILITIES - … 5 – 8, SEWAGE PUMPING FACILITIES Municipal Class Environmental Assessment, Schedule B May 2014 i Tab ...

        27 

Short List Evaluation ‐ Pumping Station Facilities Alternatives 

   New pumping stations (or facilities) and forcemains  New central pumping station and forcemain  Do Nothing 

Noise/Odour 

Low ‐ limited impacts during and after construction. Pumping stations and associated infrastructure will need to be designed for noise and odour control. Preferred 

Low ‐ limited impacts during and after construction. Pumping station and associated infrastructure will need to be designed for noise and odour control. Preferred 

Potential for unpleasant odours due to aging existing smaller pumping stations Least Preferred 

Permits and Approvals Additional permits and approvals associated with multiple pumping facilities Least Preferred 

Less  permits  and  approvals  due  to  single  pumping  station. Preferred 

No  permits  required  to  maintain  existing infrastructure. Most Preferred 

Reliability of service Good ability to provide reliable service for existing and future redevelopment is achieved. Preferred 

Good ability to provide reliable service for existing and future redevelopment is achieved. Preferred 

Current smaller pumping stations do not meet future capacity and are not as reliable. Least Preferred 

Economic Considerations 

Capital Costs Limited higher construction costs, $4,620,000 (Present Value). Preferred 

Marginally lower construction costs $4,411,000 (Present Value) Most Preferred 

Increased costs to replace aged infrastructure without increased capacity. Least Preferred 

Operating  and  Maintenance  Costs  (Life Cycle) 

Slightly higher operation and maintenance costs due to multiple pumping facilities, $682,000 Present Value over 60 year life of pumping stations. Preferred 

Slightly lower operational and maintenance costs due to single pumping station $461,000 Present Value over 60 year Life of pumping stations. Most Preferred 

Increased costs to maintain aged infrastructure without increased capacity. Least Preferred 

Property Acquisition No need for property acquisition, City owned land. Preferred 

No need for property acquisition, City owned land. Preferred 

No land needed. Preferred 

Summary of Evaluation 

  

Preferred Solution  Increased flexibility in tie‐in to existing infrastructure if gravity sewer connection from Pier 6 to Pier 8 is not feasible. Only moderately higher capital costs ($4,620,000 Present Value). Design for pumping station in Pier 8 will allow for gravity sewer connection from Piers 5/6 and 7. If gravity sewer connection is not feasible, replace existing pumping station on Pier 6 or construct new pumping station to connect to Guise Street sewer when required capacity is available. 

Eliminated  Slightly  lower construction costs. Gravity sewer connection from Piers 5/6  to  Pier 8  around  James  Street CSO  infrastructure will need  to  be  feasible.  Solution  does  not  allow  for  alternate servicing  strategy  if  connection  cannot  be  completed. Slightly  lower  capital  costs  ($4,411,000  Present  Value). Lower  life cycle costs  ($461,000 Present Value over 60 year Life of Pumping Station). 

Eliminated  Does  not meet  future  capacity  needs  with planned development. 

 

Page 31: PIERS 5 8, SEWAGE PUMPING FACILITIES - … 5 – 8, SEWAGE PUMPING FACILITIES Municipal Class Environmental Assessment, Schedule B May 2014 i Tab ...

    28 

4.4. Selection of Preferred Alternative 

Pumping Stations The three short  listed alternatives that  included (i) new pumping stations (or facilities) and  forcemains,  (ii)  central  pumping  station  and  forcemain  and  (iii)  do  nothing were evaluated  and  the  preferred  alternative  that  was  selected  was  the  new  pumping stations (or  facilities) and forcemain. The do nothing alternative was not selected as  it did not address future development capacity needs as well as existing pumping station deficiencies. A new central pumping station and forcemain would have had  less capital and  operational  costs  but  there may  be  constraints with  the  location  of  the  existing municipal  combined  sewer  overflow  infrastructure  on  Pier  6 which may  result  in  an unfeasible  gravity  sewer  connection  from  Pier  6  to  the  new  Pier  8  pumping  station. Increased  flexibility  is needed to allow  for the connection to existing  infrastructure on Guise  Street  if  a  gravity  sewer  connection  from  Pier  6  to  Pier  8  is not  feasible.    The feasibility  of  a  gravity  connection  from  Piers  6  to  8   would  be  confirmed  during  the detailed design process and if feasible the provisional pumping station located on Pier 6 and forcemain connection to Guise Street would not be constructed.  In order to allow for the provisional forcemain connection to Guise Street, sewer capacity in the existing municipal system would need to be available through the reduction of existing flows to the Guise Street sewers.   Only moderately higher  costs were expected with  the provisional pumping  station on Pier 6 and new pumping station on Pier 8 preferred alternative. This alternative solution allows for a staged approach to servicing with the new pumping station on Pier 8 being designed for provisions for a future gravity sewer connection from Piers 5/6 and 7. If a gravity sewer connection  is not  feasible, then the new provisional pumping station on Pier 6 with a  forcemain connection to Guise Street would be constructed when sewer capacity  is available on Guise Street. The  location of the preferred solution  is outlined on the Conceptual Sanitary Plan Figure 6. 

 Forcemain Alignment The location of the pumping station forcemain connection from Pier 8 that was selected was  the Burlington Street  sewer  located at  the  intersection of Ferguson Avenue. Two routes were  reviewed and  the preferred  route was  from Pier 8, southerly  to Hughson Street, easterly on Brock  Street,  southerly on Mary  Street and easterly on Burlington Street. Both road allowances and a possible location on the south side of Eastwood Park on the north side of Burlington Street are included as part of the corridor selection. The alternative  forcemain  location  also  reviewed was  Pier  8  easterly  to  Catharine  Street, southerly to Eastwood Park, easterly to Brock Street, easterly through Eastwood Park to Ferguson Avenue and southerly on Ferguson Avenue to Burlington Street. The preferred alternative  forcemain  route  is  shown  on  the  Conceptual  Sanitary  Plan  (Figure  6)  and limits  the  length of  forcemain on both Pier 8 and Eastwood Park.  It was preferred  to limit  the  location of  the  forcemain on Pier 8  to mitigate potential conflict with  future 

Page 32: PIERS 5 8, SEWAGE PUMPING FACILITIES - … 5 – 8, SEWAGE PUMPING FACILITIES Municipal Class Environmental Assessment, Schedule B May 2014 i Tab ...

    29 

redevelopment as well as on Eastwood Park which may impact future park uses through additional infrastructure placement in the park. 

Page 33: PIERS 5 8, SEWAGE PUMPING FACILITIES - … 5 – 8, SEWAGE PUMPING FACILITIES Municipal Class Environmental Assessment, Schedule B May 2014 i Tab ...

    30 

5. PREFERRED ALTERNATIVE 

5.1. Description of Preferred Alternative 

The  preferred  alternative  is  outlined  on  the  Conceptual  Sanitary  Plan  (Figure  6)  and consists  of  a  new  pumping  station  on  Pier  8  and  underground  sewer  storage infrastructure which is located in or in the vicinity of the future park in Pier 8.  The size and timing of construction of the sewer storage infrastructure will be determined during design along with the size of the pumping station.   

There is a provisional pumping station on Pier 6 that has been included in the preferred alternative. This pumping  station would be  constructed  if  a  gravity  sewer  connection from Piers 5, 6 to the Pier 8 pumping station is not feasible due to conflicts with existing combined sewer overflow infrastructure located on Pier 6 at the foot of James Street. A gravity sewer connection from Pier 7 to the Pier 8 pumping station is proposed as part of the preferred alternative. In order to allow for the provisional pumping station and an associated  forcemain  connection  to  Guise  Street,  sewer  capacity  in  the  existing municipal system would need to be available through the reduction of existing flows to the Guise  Street  sewers.  This  timing  for  the  construction  of  the  provisional  pumping station would be when there is available capacity in the Guise Street sewers. 

The Pier 8 pumping station  forcemain  is proposed  to connect  to  the Burlington Street sewer  located at the  intersection of Ferguson Avenue. The preferred alignment that  is outlined on the Conceptual Sanitary Plan  from the Pier 8 pumping station  is southerly along  or  adjacent  to  Discovery  Drive,  to  Hughson  Street,  easterly  on  Brock  Street, southerly  on  Mary  Street  and  easterly  on  Burlington  Street  to  the  intersection  of Burlington  Street  and  Ferguson Avenue.  The Burlington  Street  road  allowance or  the south side of Eastwood Park on the north side of Burlington Street will be considered for the forcemain alignment during design. 

Page 34: PIERS 5 8, SEWAGE PUMPING FACILITIES - … 5 – 8, SEWAGE PUMPING FACILITIES Municipal Class Environmental Assessment, Schedule B May 2014 i Tab ...

    31 

Figure 6 – Conceptual Sanitary Plan 

 

Page 35: PIERS 5 8, SEWAGE PUMPING FACILITIES - … 5 – 8, SEWAGE PUMPING FACILITIES Municipal Class Environmental Assessment, Schedule B May 2014 i Tab ...

    32 

5.2. Approvals 

5.2.1. City of Hamilton 

Building and Development Site Plan reviews and / or approvals will be needed  for the pumping  station  and  sewer  storage  infrastructure  which  is  not  located  on  road allowances.  In  addition  pumping  station  building  façade  and  sewer  infrastructure reviews by the Public Works Landscape Architectural Services group will be needed to ensure compatibility with park designs on Pier 8, the proposed Marina Village on Piers 6 and 7 or Eastwood Park.  

5.2.2. Ministry of the Environment (MOE) 

Environmental Compliance or Certificate of Approval for Air and Noise will be required for  the  pumping  stations.  The MOE  forcemain  approval  is  expected  to  be  through  a delegated approval process by the City.  5.2.3. Hamilton Conservation Authority (HCA) 

The pumping station(s), sewer storage  infrastructure and a section of the  forcemain  is expected  to be  in  the Hamilton Conservation Authority  regulated area of  the harbour and  therefore  will  require  a  permit.  Considerations  for  flood  proofing  of  the infrastructure which will address Regional flood levels and wave uprush will be needed. No  further  terrestrial or aquatic  reviews are anticipated.  If  there  is a  requirement  for tertiary  gravity  overflows  from  the  pumping  station  into  the  Harbour  it  will  need approval from HCA.  5.2.4. Ministry of Culture, Tourism and Sport 

A  Stage  1  Background  Archaeological  Study  for  the West  Harbour  sewage  pumping facilities Environmental Study was completed and submitted to the Ministry of Culture, Tourism and Sport (MTCS). The archaeological study  identified archaeological potential and follow up archaeological investigations will be required. An archaeological clearance from the MTCS will be required following the Stage 2 archaeological work and reporting.   A Heritage  Impact Assessment  report was  also  submitted  to  the MTCS who provided their  comments.  No  further  submissions  were  requested  by  the  Ministry  for  built heritage  and  cultural  heritage  landscapes  impacts  associated  with  the  preferred pumping stations and forecemains.  5.2.5. Other 

Other  agency  or  pipeline  considerations  include  the  Technical  Standards  and  Safety Authority (TSSA), Sun‐Canadian Pipe Line and  Imperial Oil Limited. Confirmation of the location of  the Sun‐Canadian and  Imperial Oil pipelines will be  required during design 

Page 36: PIERS 5 8, SEWAGE PUMPING FACILITIES - … 5 – 8, SEWAGE PUMPING FACILITIES Municipal Class Environmental Assessment, Schedule B May 2014 i Tab ...

    33 

for  the  proposed  forcemain  pipeline  crossings.  Communication  with  TSSA  and  the pipelines will be needed during design to confirm crossing requirements.  A Department of Fisheries and Oceans  (DFO) screening process by the City  for aquatic impacts should be undertaken. DFO approvals are not anticipated to be required for the construction of the pumping station and forcemains.  The Natural Environment Existing Conditions  review did not  identify  the need  for any Ministry  of  Natural  Resource  approvals  or  reviews  associated  with  the  preferred pumping stations and forcemains alternative. 

Page 37: PIERS 5 8, SEWAGE PUMPING FACILITIES - … 5 – 8, SEWAGE PUMPING FACILITIES Municipal Class Environmental Assessment, Schedule B May 2014 i Tab ...

    34 

6. MITIGATION AND MONITORING RECOMMENDATIONS 

6.1. Social and Economic  

6.1.1. Traffic 

The work proposed in the preferred solution is located on public lands and includes road allowances and municipally owned  land on Piers 5, 6, 7 and 8. Local access  to homes and businesses will be maintained during temporary road closures and where possible road closures will be avoided where feasible. For work on municipally owned  lands on Piers  5,  6,  7  and  8  where  businesses  are  operating,  access  to  businesses  will  be maintained and advance notice provided  to  those with active City  leases  if  the use of lands  are  impacted.  The  location of proposed pumping  stations  and  forcemains have considered existing development and minimized impacts where possible.   6.1.2. Noise, Dust, Vibrations 

Noise  impacts  during  construction  can  be  limited  by working  during  the  day where operations do not require evening work to maintain infrastructure services to business. Noise associated with pumping station equipment will be considered during design and a  Ministry  of  Environment  Environmental  Compliance  Approval  or  Certificate  of Approval for Noise obtained. Dust suppression items such as the application of water or calcium chloride will minimize impacts from dust. Vibration associated with construction can be monitored against industry accepted standards to minimize damage to adjacent buildings.   6.1.3. Public Notifications 

In order  to  inform  the public,  residences and businesses within  the construction area, notification  letters are provided prior to the commencement of construction activities. In  addition,  there  is project  signage  informing  the public of  the ongoing  construction project and project contact numbers available for inquiries during construction.   6.2. Cultural and Archaeological Environment 

Cultural Heritage A Heritage Impact Assessment was completed for the study area which included a Built Heritage and Cultural Heritage Landscapes review. This review provided comments on the conceptual pumping station  locations and  forcemain alignment. The results of  the review  concluded  that  the  proposed  work  was  not  anticipated  to  have  long  term irreversible adverse impacts to built heritage or cultural landscape resources within the study  area.  Impacts  associated  from  construction,  such  as  soil  disturbance  were considered to be short term and temporary  in duration and therefore adverse  impacts of  significant  cultural  heritage  resources  are  not  expected  as  the  works  have  been confined  to  existing municipal  right  of ways, municipal  lands  or  previously  disturbed 

Page 38: PIERS 5 8, SEWAGE PUMPING FACILITIES - … 5 – 8, SEWAGE PUMPING FACILITIES Municipal Class Environmental Assessment, Schedule B May 2014 i Tab ...

    35 

areas. A summary of  the built heritage  inventory and cultural  landscape elements are shown on Figures 7 and 8. 

Page 39: PIERS 5 8, SEWAGE PUMPING FACILITIES - … 5 – 8, SEWAGE PUMPING FACILITIES Municipal Class Environmental Assessment, Schedule B May 2014 i Tab ...

    36 

Figure 7 – Built Heritage 

 

Page 40: PIERS 5 8, SEWAGE PUMPING FACILITIES - … 5 – 8, SEWAGE PUMPING FACILITIES Municipal Class Environmental Assessment, Schedule B May 2014 i Tab ...

    37 

Figure 8 – Cultural Landscape Elements  

Page 41: PIERS 5 8, SEWAGE PUMPING FACILITIES - … 5 – 8, SEWAGE PUMPING FACILITIES Municipal Class Environmental Assessment, Schedule B May 2014 i Tab ...

    38 

Archaeology A  Stage 1 Background  Study  for  the West Harbour Piers  5  to  8 Pumping  Station  and Forcemains Environmental Assessment was completed. The report documented where there was an archaeological high potential for the conceptual pumping station locations and  forcemain alignments. The  report also noted where  there was  low archaeological potential.  These  areas  have  been  shown  on  the  Archaeological  High  Potential  for Proposed  Pipeline  Routes  figure.  The  locations  identified  to  have  high  archaeological potential will  be  reviewed  further  by  an  archaeologist  following  a  refinement  of  the location of proposed  infrastructure during  the design phase. Additional archaeological investigations will be carried out during design  for  the  locations  that are  identified  to have high archaeological potential following this review.  

Page 42: PIERS 5 8, SEWAGE PUMPING FACILITIES - … 5 – 8, SEWAGE PUMPING FACILITIES Municipal Class Environmental Assessment, Schedule B May 2014 i Tab ...

    39 

Figure 9 – Archaeology 

  

Page 43: PIERS 5 8, SEWAGE PUMPING FACILITIES - … 5 – 8, SEWAGE PUMPING FACILITIES Municipal Class Environmental Assessment, Schedule B May 2014 i Tab ...

    40 

6.3. Natural Environment Impacts 

An  existing  conditions  review  was  completed  for  the  natural  environment  for  the project area and a summary of impacts associated with the proposed pumping stations and  forcemains  identified.    The  assessment  of  potential  Species  at  Risk  (SAR)  and Species  of  Concern  (SCC)  habitat  was  included  in  the  review  along  with  potential impacts associated with the construction of new pumping stations and forcemains. The review concluded that the project area has limited natural features and landscape trees and the conceptual pumping station locations were not anticipated to impact terrestrial or  aquatic  natural  features  during  the  construction  or  operations  phase  with  the implementation of  appropriate  construction mitigation. Mitigation measures  included pruning,  limited  tree  removals  and  the  use  of  tree  protection  zones  for  trees  not required for removal that have close proximity to the construction area to minimize tree damage and root impacts associated with compaction of soil around the trees.   Wildlife habitat was noted to be scarce and the project area on Piers 5 to 8  is sparsely occupied by common urban species. Barn Swallow habitat was noted to be marginal and restricted to buildings  that may be removed during the redevelopment of Piers 5 to 8 which is not part of this pumping station and forcemain Environmental Study.   During consultation with  the Hamilton Conservation Authority a  request was  received by  the Conservation Authority  to  remove  the Tree of Heaven  that  is a highly  invasive species and is located in the vicinity of the provisional pumping station location on Pier 6. This request will be reviewed during the design phase of the work  in the vicinity of this tree. 

Page 44: PIERS 5 8, SEWAGE PUMPING FACILITIES - … 5 – 8, SEWAGE PUMPING FACILITIES Municipal Class Environmental Assessment, Schedule B May 2014 i Tab ...

    41 

Figure 10 – Tree Inventory 

  

Page 45: PIERS 5 8, SEWAGE PUMPING FACILITIES - … 5 – 8, SEWAGE PUMPING FACILITIES Municipal Class Environmental Assessment, Schedule B May 2014 i Tab ...

    42 

6.4. Pumping Station and Forcemain Impacts 

Existing The existing pumping stations, excluding the  former Parks Canada pumping station on Pier 8, that are within the study area that are maintained by private operators are not expected  to  be  impacted  by  the work  that  is  proposed  in  this  study.    Any  requests received by the operators of any privately operated pumping facilities for a connection to new  infrastructure would need  to be reviewed during the design phase of  the new pumping stations and forcemains. These new connections may only be temporary until the redevelopment of Piers 5 to 8.   The new pumping station on Pier 8 that will serve to replace the Parks Canada pumping station will provide service to the existing facilities which are managed by the Hamilton Waterfront  Trust  or  the  City  of  Hamilton.  Decommissioning  of  the  Parks  Canada pumping  station  would  need  to  be  coordinated  with  the  construction  of  the  new pumping  station  so  service  to  existing  development  is  maintained.  The  existing forcemain  that  services  the  existing  Parks  Canada  pumping  station  will  need  to  be maintained during the construction phase of any new infrastructure.   Proposed  The proposed pumping station on Pier 8 and provisional pumping station on Pier 6 will need  to  address  flood  control  associated with Regional  storm water  levels  and wave uprush. These  items will need  to be addressed during detailed design along with  the new  pumping  station(s)  being  designed  to  include  (i)  a  backup  standby  generator  to allow  for  continued  use  of  the  pumping  station  during  a  power  outage,  (ii)  passive gravity  overflow  as  a  tertiary  redundant  measure  to  further  protect  homes  from basement  flooding,  (iii) provision  for odour control of  the pumping station(s), and  (iv) provision  for  temporary storage of sanitary sewage at  the station during wet weather event(s).  Other  considerations  include  consideration  for  the  neighbourhood  and available urban design guidelines for any above ground infrastructure (buildings etc.).   In  addition  the  proposed  pumping  station  and  any  associated  underground  sewer storage  infrastructure  on  Pier  8  may  be  located  within  a  future  park.  Park  design concepts will need to be considered during the design phase of any new  infrastructure that may be  located  in the  future park  including the provision of adequate cover over underground infrastructure to construct future park elements. The design of the sewer infrastructure  in  the park will need  to be undertaken  in conjunction with park design. The location of the provisional pumping station and sewers on Piers 6 and 7 will need to be determined  in  conjunction with  the proposed Marina Village by  the Public Works Landscape Architectural Services group.  During the design phase of the forcemain, the pipeline locations at the crossings of the Imperial Oil and Sun‐Canadian pipelines will need to be confirmed. The final alignment of  the  proposed  forcemains  needs  to  consider  archaeological  potential  impacts  and 

Page 46: PIERS 5 8, SEWAGE PUMPING FACILITIES - … 5 – 8, SEWAGE PUMPING FACILITIES Municipal Class Environmental Assessment, Schedule B May 2014 i Tab ...

    43 

future park use at Eastwood Park. The opportunity for a sewer gravity connection from Pier  6  to  Pier  8 will  need  to  be  confirmed  during  design  and  provisions made  if  this gravity connection is not feasible.  The  available  capacity  in  the municipal  sewer  system will  also  need  to  be  confirmed during  design  to  determine  the  need  and  timing  for  the  construction  of  any  sewer storage infrastructure in Pier 8.   

Page 47: PIERS 5 8, SEWAGE PUMPING FACILITIES - … 5 – 8, SEWAGE PUMPING FACILITIES Municipal Class Environmental Assessment, Schedule B May 2014 i Tab ...

    44 

7. Public Consultation 

7.1. Project Notices and Consultation Activities 

Agency  and  public  consultation  plays  an  important  part  in  the  environmental assessment process. Two  (2) Public  Information Centre’s were held  to give  the public opportunity to provide input on the assessment and evaluation process for the project. All  project Notices were  circulated  to  review  agencies,  neighbouring  residents  of  the pumping station and placed  in  the  local newspaper.   The  following section provides a summary of the key points of contact that were undertaken throughout the course of the project as well as a summary of the comments received.  7.1.1. Notice of Commencement and Public Information Centre No. 1 

The Notice  of  Commencement  and  Public  Information  Centre  (PIC) No.  1  included  a description of the study area and identified the area of study on a map. The Notice was issued to agencies and public individuals expressing interest in the project on September 9th,  2013  and  published  in  the  Hamilton  Spectator  on  September  13th,  2013  and September 20th, 2013. A Notice of Commencement and Public Information Centre No. 1 as well as a list of all recipients of the mail out are included in Appendix D.    7.1.2. Public Information Centre No. 1  

A  PIC  was  held  on  September  23rd,  2013  from  6:00  pm  to  8:00  pm  at  Hamilton Waterfront  Trust  Centre  (57  Discovery  Drive)  in  Hamilton,  Ontario.  The  PIC  was organized  as  a  drop‐in  centre where  people  could  review  a  series  of  display  panels outlining  the  environmental  assessment  (EA)  process,  project  information,  the alternative  solutions,  the  evaluation  criteria  to  determine  the  preferred  alternative solution and the next steps that would be followed in the Class EA process.  The display boards presented at the PIC are included in Appendix D.  Ten  (10) people  (9 people and  the  local councillor) were  in attendance. Based on  the feedback, received, overall the PIC was well received.  7.1.3. Notice of Public Information Centre No. 2 

The Notice of PIC No. 2 was issued to agencies and public individuals expressing interest in the project on December 19th, 2013 and was published in the Hamilton Spectator on Friday December 27th, 2013 and Friday  January 3rd, 2014. A copy of  the Notice of PIC No.2 is included in Appendix D.  7.1.4. Public Information Centre No. 2 

The second PIC was held on January 6th, 2014 from 6:00 pm to 8:00 pm at the Hamilton Waterfront  Trust  Centre  (57 Discovery Drive)  in Hamilton, Ontario.  The  PIC  provided 

Page 48: PIERS 5 8, SEWAGE PUMPING FACILITIES - … 5 – 8, SEWAGE PUMPING FACILITIES Municipal Class Environmental Assessment, Schedule B May 2014 i Tab ...

    45 

information on  the evaluation of alternatives,  the  selection of  the preferred  solution, and next  steps.  The display boards presented  at  the PIC  are  included  in Appendix D. Attendees were asked  to  complete a  comment  sheet, and all  comments  received are included in Appendix D. Five (5) people were in attendance.  7.1.5. Notice of Completion  

The Notice of Completion  for this project will  identify that the preferred alternative  is the construction of a new sewage pumping station on Pier 8 and a provisional pumping station on Pier 6. The Notice will provide the public and agencies a review period for 30 days. The Notice will be placed in the Hamilton Spectator and sent to those Stakeholder and Agency mailing list as well as distributed to neighbouring residents of Piers 5 ‐ 8.  7.2. Agency Consultation 

The Notice of Commencement, PIC No. 1 and PIC No. 2, and was forwarded to agencies that may have an interest in the project. The list of agencies provided with a copy of the notice is included in Appendix D.   Table 5  summarizes  the  comments  received  from  the Agencies  and  the  responses  to their concerns or comments. 

Page 49: PIERS 5 8, SEWAGE PUMPING FACILITIES - … 5 – 8, SEWAGE PUMPING FACILITIES Municipal Class Environmental Assessment, Schedule B May 2014 i Tab ...

      46 

Table 5 ‐ Summary of Comments Received from Agencies 

Agency  Comment Received   Response 

Comments Received after Notice of Commencement and PIC 1 

Mr. Mike Stone Manager, Watershed Planning Services  Hamilton Conservation Authority 

Received  Notice  of  Commencement  and  PIC  1  Letter dated September 16th, 2013. Given a significant portion of the study area is regulated, HCA has an interest in the study would appreciate continued circulation of notices and new information as it becomes available.  

Project  team will  continue  to  keep  HCA  involved  in the Class EA process for the Pier 8 Pumping station. 

Sarah Jermyn Project Coordinator  GO, a Division of Metrolinx 

Based on  the  information provided, GO  transit have no major concerns. However, due to the projects proximity to  the  future  James  Street  North  GO  Station  we  are interested in this project and wish to be kept informed.   Below  is  a  synopsis of GO  Transits work  to date  in  the area. Please can you provide us with the PIC material to review  and  also  confirm  the  schedule  of work  for  this project, so we can ensure there are no further issues?  In  May  2011,  GO  Transit  completed  the  Niagara  Rail Service Expansion Environmental Assessment (EA) for the expansion  of  service  to  the  Niagara  Peninsula.  The Environmental  Study  Report  (ESR)  assessed  a  new  GO station located at 353 James Street North in Hamilton, as part  of  delivering more  integrated  and  effective  public transportation in the GTHA.  The ESR also assessed James 

Thank  you  for  your  email.  You  can  find  the  PIC materials on our website.  We are planning on having a second PIC closer to the year end. At the second PIC we will be presenting the preferred alternative.   We will keep you  informed on our next steps. Please review the PIC material.    

Page 50: PIERS 5 8, SEWAGE PUMPING FACILITIES - … 5 – 8, SEWAGE PUMPING FACILITIES Municipal Class Environmental Assessment, Schedule B May 2014 i Tab ...

      47 

Agency  Comment Received   Response 

Comments Received after Notice of Commencement and PIC 1 

Street North as a potential location for a layover facility, but  was  not  recommended  in  considering  the  City  of Hamilton’s vision for the waterfront area, and, as the site could only accommodate  two  trains  (most  layover  sites must accommodate a minimum of four trains).  Since  then,  in  order  to  meet  the  2015  deadline  for increased service to support the Pan Am and Parapan Am Games,  and  to  avoid  operational  impacts  such  as deadheading  of  trains  from  outside  of  Hamilton, Metrolinx  has  consulted  with  the  City  of  Hamilton regarding using the James Street North GO Station as an interim/temporary  layover for two trains, until the Lewis Road  Layover  Facility,  as  approved  in  the  EA,  is constructed.  The layover location resides within the West Harbour Secondary Plan area.  Part of the study area falls into the Barton‐Tiffany Planning Area. 

Amy Liu Project Manager  Canadian Environmental Assessment Agency 

Letter  Provided  information  on  the  Canadian Environmental Assessment Act,  2012.  If  it  appears  that CEAA  2012 may  apply  to  your  proposed  project  please contact the Canadian Environmental Assessment Agency. 

CEAA  2012  does  not  apply  to  the  Pier  8  Pumping Station EA. 

Page 51: PIERS 5 8, SEWAGE PUMPING FACILITIES - … 5 – 8, SEWAGE PUMPING FACILITIES Municipal Class Environmental Assessment, Schedule B May 2014 i Tab ...

      48 

Agency  Comment Received   Response 

Comments Received after Notice of Commencement and PIC 1 

Heather Levecque Manager, Consultation Unit  Ministry of Aboriginal Affairs  

The Ministry  of Aboriginal Affairs  (MAA)  identifies  First nation  and  Metis  communities  who  may  have  the following interests in the area of your project: ‐ Reserves; ‐ Land claims in litigation against Ontario; ‐ Existing or asserted Aboriginal or  treaty  rights,  such 

as harvesting  rights; or an  interest  in  your project’s potential environmental impacts.  

MAA is not the approval or regulatory authority for your project,  and  receives  very  limited  information  about projects in the early stages of their development.   With  respect  to  your  project  and  based  on  the  brief materials  you  have  provided,  we  can  advise  that  the project  appears  to  be  located  in  an  area  where  First Nations may have existing or asserted rights or claims in Ontario’s  land  claim process or  litigation,  that  could be impacted by your project.   ‐ Six Nations of the Grand River Territory ‐ Haudenosaunee Confederacy  ‐ Mississaugas of the new Credit First Nation 

 Please remove from mailing list. 

The  following  first  Nations  group were  advised  and consulted on the Pier 8 Pumping Station EA.  ‐ Six Nations of the Grand River ‐ Huron‐Wendat Nation Council ‐ Haudenosaunee Resource Centre ‐ Mississaugas of New Credit First Nation 

 

Rosi Zirger Heritage 

As part of  the Class Environmental Assessment process, the MTCS has an  interest  in the conservation of cultural 

The  City  of  Hamilton  will  be  completing  a  Stage  1 Archeological  Assessment  and  a  Heritage  Impact 

Page 52: PIERS 5 8, SEWAGE PUMPING FACILITIES - … 5 – 8, SEWAGE PUMPING FACILITIES Municipal Class Environmental Assessment, Schedule B May 2014 i Tab ...

      49 

Agency  Comment Received   Response 

Comments Received after Notice of Commencement and PIC 1 

Planner Ministry of Tourism, Culture & Sport 

heritage resource including: ‐ archaeological resources, ‐ built heritage resources, and  ‐ cultural heritage landscapes MTCS  would,  be  interested  in  remaining  on  the circulation  list  and  being  informed  of  the  project  as  it proceeds through the EA process. Could you advise whether an archaeological assessment and/or heritage  impact assessment  is being undertaken for  the EA project?  If  so please  forward  the  completed reports to MTCS prior to issuing a Notice of Completion.  Archaeological Resources Please  be  aware  that, while much  of  the  study  area  is reclaimed  land,  there  are  portions  of  natural  shoreline within the EA area. As such the lands that are subject of this  EA  meets  at  least  one  provincial  criteria  and  is considered to have archaeological potential.  Built Heritage and Cultural Heritage Landscapes In  order  to  determine  the  existing  cultural  conditions, known  and  potential  built  heritage  resources  and cultural  heritage  landscapes  should  be  identified.  The Ministry’s  “Screening  for  Impacts  to  Built Heritage  and Cultural Heritage  Landscapes”  checklist will help  you  in identifying  known  or  potential  built  heritage  resources and cultural heritage landscapes within the study area. 

Assessment as part of the EA work for Pier 8 Pumping Station.   

Page 53: PIERS 5 8, SEWAGE PUMPING FACILITIES - … 5 – 8, SEWAGE PUMPING FACILITIES Municipal Class Environmental Assessment, Schedule B May 2014 i Tab ...

      50 

Agency  Comment Received   Response 

Comments Received after Notice of Commencement and PIC 1 

Paul Lane  Sr. Property & Construction Technologist Sun‐Canadian Pipe Line  

Sun‐Canadian  Pipe  Line  Company  Limited  owns  and operates  a  NPS  6  oil  pipeline  across  Pier  8  lands  and confirms an  interest  in any work proposed  for the area. We attach 2  route maps outlining our  location and ask that  you  include  our  pipeline  when  evaluating  the various  pumping  station,  force  mains  and  other associated sewage facilities. 

The City of Hamilton  is aware of the existing pipeline route  and will  continue  to work with  Sun‐Canadian Pipe  Line  through  the  EA  process  for  Pier  8  Sewage pumping station.   

Cyrus Elmpak‐Mackie Hydro One Networks Inc.   

In  our  initial  review, we  can  confirm  that  there  are  no Hydro One Transmission Facilities in the subject area.  Please  be  advised  that  this  is  only  a  preliminary assessment  based  on  current  information. No  further consultation with Hydro One Networks Inc. is required if no changes are made to the current information.  

Comments were noted. 

Comments Received during PIC 2 Consultation  

Mike Stone Manager, Watershed Planning Services 

It  is  noted  that  the  pruning  or  removal  of  select landscape trees may be required as a result of some the proposed  construction  work,  including  the  possible removal of a 65cm DBH Tree‐of Heaven. HCA staff note this  is a highly  invasive  species, and would  recommend the  recorded  species be  removed at  the noted  location (and  at  any  other  locations  within  the  study  area) regardless  of  whether  or  not  construction  work necessitates its removal.  A significant portion of the study area is regulated under HCA’s  Development,  Interference  with  Wetlands  and 

A digital copy of the Hamilton West Harbour Shoreline and  Breakwater  Infrastructure  Environmental  Study Report  can  be  accessed  through  the  following  web link. 

  http://www.hamilton.ca/CityDepartments/PublicWorks/Environment_Sustainable_Infrastructure/StrategicPlanning/StrategicEnvironmentalPlanningProjects/Municipal+Class+Environmental+Assessment+%28Class+EA%29+Phases+3+and+4+for+Hamilton+West+Harbo

Page 54: PIERS 5 8, SEWAGE PUMPING FACILITIES - … 5 – 8, SEWAGE PUMPING FACILITIES Municipal Class Environmental Assessment, Schedule B May 2014 i Tab ...

      51 

Agency  Comment Received   Response 

Comments Received after Notice of Commencement and PIC 1 

Alterations  to  Shorelines  and Watercourses  Regulation 161/06  under  Ontario  Regulation  97/04.  All  proposed construction work/activities within a  regulated area will have  to be  reviewed by HCA  staff  in  the context of our regulation  and  associated  policies.  To  assist  in  this regard, HCA staff will be following up with the Hamilton Waterfront  Trust  to  obtain  a  copy  of  the  final  study completed by Shoreplan Engineering Ltd. that examined the  hazards  (wave  up‐rush)  associated  with  the waterfront  as  part    of  the  West  Harbour  Waterfront Recreation Master  Plan  and West  Harbour Waterfront Shoreline and Breakwater Infrastructure Class EA. 

ur+Waterfr.htm  

Rosi Zigler Heritage Planner, Ministry of Tourism, Culture Sport 

MTCS  has  reviewed  the  Heritage  Impact  Assessment (Piers 5‐8) and have the following comments:  The HIA  identified 19 properties  included on the City of Hamilton    Inventory  of  Buildings  of  Architectural  of Historical  Value  or  Interest,  an  additional  5  properties having potential cultural heritage value identified as part of this study and cultural landscapes  The  HIA  states  that  the  proposed  work  is  generally limited  to existing municipal  (road) rights of ways or on municipal  lands  or  located  beneath  ground  previously disturbed  park  and  Pier  lands.  As  such  the  proposed works are not anticipated to have any adverse, long‐term impacts to built heritage or cultural heritage  landscapes 

Comments have been noted. 

Page 55: PIERS 5 8, SEWAGE PUMPING FACILITIES - … 5 – 8, SEWAGE PUMPING FACILITIES Municipal Class Environmental Assessment, Schedule B May 2014 i Tab ...

      52 

Agency  Comment Received   Response 

Comments Received after Notice of Commencement and PIC 1 

within the study area.  MTC has no issues with this technical assessment report, and  the  cultural heritage  resources  identified. We note your  e‐mail  advice  that  the  City  of  Hamilton  Heritage Planning  staff  have  reviewed  the  report  and  provided comments, which have been addressed in this draft. 

Page 56: PIERS 5 8, SEWAGE PUMPING FACILITIES - … 5 – 8, SEWAGE PUMPING FACILITIES Municipal Class Environmental Assessment, Schedule B May 2014 i Tab ...

    53 

7.3. Public and Agency Comments and Responses 

The  need  for  upgrades  to  the  Pier  8  Sewage  Pumping  Station  was  recognized  and accepted  by  those  in  attendance  at  both  of  the  PIC’s  through  comment  sheets  and discussions with the project team. The concerns are summarized below:  Full comments and response are included in Appendix D.  7.3.1. Public Information Centre No. 1 Comments 

The  following  tables  (Tables  6  and  7)  provides  a  summary  of  comments  that  were received from  participants at PIC No. 1 as well as comments received after the PIC No. 1 event (Table 6) and at PIC No. 2 as well as comments received after the PIC No. 2 event (Table 7). The purpose of the table  is to provide an overview of the overall comments received and responses provided. 

Page 57: PIERS 5 8, SEWAGE PUMPING FACILITIES - … 5 – 8, SEWAGE PUMPING FACILITIES Municipal Class Environmental Assessment, Schedule B May 2014 i Tab ...

      54 

Table 6 ‐ PIC No. 1 Comments and General Comments Received Post PIC No. 1  

Comment  Response 

How was the project advertised in the Community? 

Thank you for your e‐mail and  interest on our Class Environmental Assessment for Piers 5 to 8 Pumping station facilities.   The meeting notices were posted  in the Hamilton Spectator on Friday September 13th, 2013 and Tuesday September 20th, 2013.   It’s unfortunate that you missed the first Public Information Centre (PIC). However,  that does not mean you  cannot  comment on  the  information that  was  displayed  at  the  PIC.  The  information  that  was  provided  at  the September 23rd, 2013   PIC) can be found on our website. The direct  link to the project is below:  http://www.hamilton.ca/CityDepartments/PlanningEcDev/Divisions/GrowthManagement/Infrastructure+Planning/Environmental+Assessments/Piers58PumpingStationUpgrades.htm If you have any questions or comments on the information presented at the PIC, please feel free to contact me.  If you would  like  to be kept  informed on our next PIC we can add you  to our mailing list. 

Who was the successful roster candidate for the project, if there is one?  I would like to be included on all mail lists for Notices concerning the North End of Hamilton, via e‐mail.  

   

Thank you for your e‐mail. Please note the project team has added you to our mailing list and will ensure all future communications/notices  for  Piers 5 and 8 Pumping Station Environmental Assessment (EA) study are sent via e‐mail.   Dillon Consulting Limited  is part of the EA Project Team and for this study and has  been  retained  directly  by  the  Hamilton Waterfront  Trust  but  is  on  the following related City of Hamilton ROSTERS; 

Municipal Engineer (Roster 1)   Terrestrial and Avian Ecology and Fisheries Biology (Roster 21) 

Page 58: PIERS 5 8, SEWAGE PUMPING FACILITIES - … 5 – 8, SEWAGE PUMPING FACILITIES Municipal Class Environmental Assessment, Schedule B May 2014 i Tab ...

      55 

Comment  Response 

  Environmental Planning Process (Roster 7)  Public Consultation and Facilitation (Roster 23)  Land Use Planning and Urban Design (Roster 25) 

Doug  Onishi  is  the  lead  Project  Manager  from  Dillon.  For  your  contact information I have included him on this e‐mail. 

My family and I live in the neighbourhood of Centremount, north of Fennell Avenue, east of Upper James Street. I read, on the City of Hamilton's website, of the proposed rehabilitation or re‐construction of the city's sewage pumping facilities and am wondering if you could tell me how the sewage is treated at this point in time and precisely where the sewage is being pumped after its treatment. Is the sewage stored in containers, as in a septic tank system, or is it returned to the nearest body of water? 

  

 

The sanitary sewage  from the existing development on Piers 5 to 8  is pumped from a number of pumping facilities or drain by gravity sewer connection to the existing  sewer  system.  The  flows  from  this  sewer  system  are  treated  at  the Woodward  Wastewater  Treatment  Plant  (WWTP)  and  treated  effluent  is discharged  to  Hamilton  Harbour  via  an  outfall  on  the  Red  Hill  Creek.  The West Harbour area  is predominantly serviced by combined sewers: during storm  events  or  snowmelt  rain/snowmelt  is  conveyed  along  with  sanitary sewage  via  a  single  pipe.  To  reduce  the  risk  of  basement  flooding  and  guard against  peak  flows  at  the WWTP  a  portion  of  the  flows may  be  diverted  to combined sewer overflow (CSO) tanks at Bayfront/Strachan, James St/Guise or Eastwood Park where the flows are stored and, following a storm, subsequently pumped/drained  back  into  the  system  and  conveyed  to  the  WWTP  for treatment.  During  significant  events  where  tank  capacity  is  exceeded  or  at locations  where  there  are  no  tanks  combined  sewage  may  be  discharged directly to the harbour.  The City has made significant progress in addressing CSO and pollutant loadings to receiving waters via sewer collection system upgrades and a planned upgrade in treatment process at the Woodward WWTP. Recently (2012), the City designed and built/rehabilitated a number of Real Time Control (RTC) facilities in the North End which take advantage of spare capacity that may exist in the 

Page 59: PIERS 5 8, SEWAGE PUMPING FACILITIES - … 5 – 8, SEWAGE PUMPING FACILITIES Municipal Class Environmental Assessment, Schedule B May 2014 i Tab ...

      56 

Comment  Response 

pipes during portions of a wet weather event and capture and convey a large portion of CSO which was previously discharged to the harbour. You can read more about this project at:   http://www.uimonline.com/index/webapp‐stories‐action?id=268  If you have any further questions regarding CSO tanks or our sewer collection system please contact Chris Gainham at 905‐546‐2424 x 3421.  If  you have  any  additional questions  regarding  the environmental  assessment project being completed for the pumping station facilities (Piers 5‐8), please feel free to contact me at any time. 

Hello, I have a number of questions  about the Hamilton West Harbour Waterfront Recreational Master Plan. (I have referred to it as the Waterfront Master plan in my questions, just because the title is so long!) 

1. Where are we with the Waterfront Masterplan?  As far as I can tell from my search of the City website, the Waterfront Master Plan is dated April 2010, and is RECEIVED by council, not “adopted/approved”?  If adopted is not the correct term, what is the next step after being “received”. 

 2. Please explain the difference between received and adopted/approved.  What is the 

I am the Project Manager for the Environmental Assessment work we are completing on Pumping Station (piers 5‐8) and  most of these questions were related to other projects, so it took me a little longer to gather all the information. Thank you for your e‐mail dated Friday September 13, 2013. Below I have complied answers (or contact names)  from various staff and have included their contact information if you have any additional follow up questions. Please note, any follow up questions pertaining to Piers 5‐8 Pumping Facilities can to be sent to me directly. 

1.      Where are we with the Waterfront Masterplan?  As far as I can tell from my search of the City website, the Waterfront Master Plan is dated April 2010, and is RECEIVED by council, not “adopted/approved”?  If adopted is not the correct term, what is the next step after being “received”.  

RESPONSE: At a May 10, 2010 Committee of the Whole meeting, staff presented the “Hamilton West Harbour Waterfront Recreation Master Plan” to 

Page 60: PIERS 5 8, SEWAGE PUMPING FACILITIES - … 5 – 8, SEWAGE PUMPING FACILITIES Municipal Class Environmental Assessment, Schedule B May 2014 i Tab ...

      57 

Comment  Response 

next step(s) for the Waterfront MP? 

 3. My(our) concerns are specifically on Bayview Park.  In the “planning law” how can Bayview Park be in more than one plan? (Setting Sail and HWHRMP?)  Is this contrary to the Urban Official Plan? 

 Right now it is in the Setting Sail Secondary Plan under section A.6.3.7 as a “stable area” in the public realm.  “The city shall develop a master plan to improve its amenities. . . .It is also in the Waterfront Master Plan.  At a glance one may not think that would be an issue, except that there is/will be a significant impact on the neighbourhood on the in the Waterfront Master Plan – a 400 car parking garage. 

 3.a)Does the Waterfront MP call or imply widening of MacNab Street to accommodate the parking lot entrance and exit? 

 3b) Would MacNab become 2 way at this time? 

 3c) What is the data to justify the statement that it is “an underperforming 

Council. Council endorsed the staff report recommendations and received the West Harbour Waterfront Recreation Master Plan. The next step is to  bring forward the Official Plan Amendment and Zoning By‐law Amendment to implement the Waterfront Recreation Master Plan. (Contact Michelle Sergi 905‐546‐2424 ext. 1281) 

2.      Please explain the difference between received and adopted/approved.  What is the next step(s) for the Waterfront MP? 

RESPONSE: There will be a Statutory Public Meeting in the future (no date has been set) to bring forward the Official Plan Amendment and Zoning By‐law Amendment to implement the Waterfront Recreation Master Plan. (Contact Michelle Sergi 905‐546‐2424 ext. 1281) 

3.      My(our) concerns are specifically on Bayview Park.  In the “planning law”  how can Bayview Park be in more than one plan? (Setting Sail and HWHRMP?)  Is this contrary to the Urban Official Plan?  

Right now it is in the Setting Sail Secondary Plan under section A.6.3.7 as a “stable area” in the public realm.  “The city shall develop a master plan to improve its amenities. . . .It is also in the Waterfront Master Plan.  At a glance one may not think that would be an issue, except that there is/will be a significant impact on the neighbourhood on the in the Waterfront Master Plan – a 400 car parking garage.  

RESPONSE: The West Harbour Waterfront Recreation Master Plan is being brought forward as an Official Plan Amendment to the Setting Sail Secondary 

Page 61: PIERS 5 8, SEWAGE PUMPING FACILITIES - … 5 – 8, SEWAGE PUMPING FACILITIES Municipal Class Environmental Assessment, Schedule B May 2014 i Tab ...

      58 

Comment  Response 

park” (Waterfront MP)? 

 3d) Is Bayview Park excluded from Setting Sail? If so, when and how?   

4. What is the result of the RFP responses from developers in the spring re:Piers 7 & 8?  

5. What are the City’s timelines for Piers 7 & 8? I am aware of the MOU for Piers 7&8, April 17, 2013. Does all this go through some kind of planning process? Environmental assessment?  Etc.  

In addition, please inform me of any further public meetings regarding: 

1. the Waterfront MP   

2.development of Piers (5, 6, )7& 8. 

 

 

 

 

Plan. (Contact Michelle Sergi 905‐546‐2424 ext. 1281) 

3.a)Does the Waterfront MP call or imply widening of MacNab Street to accommodate the parking lot entrance and exit?  

Please contact (Contact Steve Molloy 905‐546‐2424 ext. 2975) 

 3b) Would MacNab become 2 way at this time?  

Please contact (Contact Steve Molloy 905‐546‐2424 ext. 2975) 

 3c) What is the data to justify the statement that it is “an underperforming park” (Waterfront MP)?  

Please contact Lawrence Stasiuk (contact Lawrence Stasiuk 905‐546‐2424 ext. 2292) 

 3d) Is Bayview Park excluded from Setting Sail? If so, when and how?   

RESPONSE: Bayview Park is designated as Open Space in the Setting Sail Secondary Plan. (Contact Michelle Sergi 905‐546‐2424 ext. 1281) 

4. What is the result of the RFP responses from developers in the spring re: Piers 7 & 8?  

RESPONSE:  The City of Hamilton has not engaged in any formal RFP process to the development industry for the city‐owned lands within the Piers 7‐8 area.  The City is aware that the Hamilton Waterfront Trust engaged in a formal RFP 

Page 62: PIERS 5 8, SEWAGE PUMPING FACILITIES - … 5 – 8, SEWAGE PUMPING FACILITIES Municipal Class Environmental Assessment, Schedule B May 2014 i Tab ...

      59 

Comment  Response 

process for potential development opportunities within the Pier 8 lands they lease from Parks Canada.  

City staff would be required to obtain Council approval prior to any issuance of an RFP for the city‐owned lands on Piers 7‐8.  Staff will ensure that the NEN are kept abreast of the timeframes and processes involved prior to any report being presented to Council for the issuance of an RFP for these lands.  (Contact: Chris Phillips 905‐546‐2424 ext. 5304) 

5. What are the City’s timelines for Piers 7 & 8? I am aware of the MOU for Piers 7&8, April 17, 2013. Does all this go through some kind of planning process? Environmental assessment?  Etc. 

City Council approved an MOU with the Hamilton Port Authority in April 2013, which formally transfers the Pier 7 & 8 lands to the City of Hamilton.  Since the year 2000, these lands have been owned by the City of Hamilton, however through 2‐separate agreements, these lands were leased back to the Hamilton Port Authority until 2015 for the Pier 7 lands, and 2025 for the lands on Pier 8. 

This MOU will allow for a partial termination of these leases as of 2013, and as such, allow the City of Hamilton full control over these lands today, without waiting for the leases to expire in 2025.  This MOU will be formally executed upon  the acceptance of both parties of a formal Marina Management Agreement between the City of Hamilton and the Hamilton Port Authority.  This Agreement is expected to be considered by City Council sometime in late 2013.  

Neither the MOU or the formal termination of the leases with the Hamilton Port Authority require any Planning or Environmental Assessment process. The MOU 

Page 63: PIERS 5 8, SEWAGE PUMPING FACILITIES - … 5 – 8, SEWAGE PUMPING FACILITIES Municipal Class Environmental Assessment, Schedule B May 2014 i Tab ...

      60 

Comment  Response 

was approved by General Issues Committee and City Council in April 2013. The formal Marina Management Agreement will also be presented to General Issues Committee and require formal City Council approval, as per Council direction from April 2013. (Contact: Chris Phillips 905‐546‐2424 ext. 5304) 

In addition, please inform me of any further public meetings regarding: 

1. the Waterfront MP   

2.development of Piers (5, 6, )7& 8. 

At present, there are no specific public meetings and/or timeframes in‐place for the proposed development of the Piers 7&8 lands.  As mentioned above, the City staff will be presenting General Issues Committee with a report respecting the formal Marina Management Agreement with the Hamilton Port Authority.  This report is excepted to be presented sometime by the end of 2013. 

With this said, staff will certainly commit to ensuring the NEN is kept abreast of the actions and timelines relating to the Piers 7&8 lands, as well, will ensure we communicate all information for Public Meetings as they become available. (Contact: Chris Phillips 905‐546‐2424 ext. 5304) 

For the Evaluation Criteria presented at PIC 1 there are too many considerations. Most are moot for the obvious alternatives. 

None of the obvious choices would be any problem to the existing neighbourhood. 

Comments noted. 

Page 64: PIERS 5 8, SEWAGE PUMPING FACILITIES - … 5 – 8, SEWAGE PUMPING FACILITIES Municipal Class Environmental Assessment, Schedule B May 2014 i Tab ...

      61 

Comment  Response 

Costs the City way too much money to go thru these multiple considerations when there really are only 3 obvious choices.  

No need to run a PIC until choices are narrowed down to obvious (repair, replace). 

Pumping  Station  located  close  to  the  Lake  is there  a  chance  of  old  infrastructure  leaking contaminating waterway? 

Why are upgrades being done prior to RFP of Pier 8 development? 

 

 

 

 

Construction noise, traffic detours , air quality are all disadvantages to this project. 

The pumping station and associated infrastructure will be designed to minimize the risk of sewage leakage to the harbour.    The  existing  municipally  maintained  pumping  station  on  Pier  8  that  was constructed  to  service  the  former Canadian Marine Discovery Centre  in  2004 now services existing development at the north and west side area of Pier 8.   This pumping station has operational deficiencies which include:  

No standby power generator to provide a backup power source in the event 

of  power failure; and,  

Inadequate capacity to manage existing development sewage flows and / or 

service future development. 

Comment noted. 

 

Page 65: PIERS 5 8, SEWAGE PUMPING FACILITIES - … 5 – 8, SEWAGE PUMPING FACILITIES Municipal Class Environmental Assessment, Schedule B May 2014 i Tab ...

      62 

Table 7 ‐ PIC No. 2 and Comments Received Post PIC No. 2 

Comment  Response 

Will there be an implementation team of residents and stakeholders? 

 

Will business be relocated or property’s re‐appropriated 

 

 

 

Will the generator buildings fit in with the existing neighbourhood? 

 

Will traffic calming be consistent with existing neighbourhood? 

As part of the Pier 8 Sewage Pumping Station and Facilities EA there are no plans for an implementation team of residents and stakeholders. However, stakeholders who  connect  to  the  existing  system  and  will  be  impacted  by  the  new  sewage system will be consulted during detail design.  The conceptual location of the proposed New Sewage pumping station on Pier 8  is in  the  Hamilton Marine  Storage  Area.  The  City  owns  the  land  but  the  area  is currently leased out to the Hamilton Port Authority. The City is negotiating the end of this lease with the Hamilton Port Authority and a report to Council is expected in the  near  future.      Until  the  lease  is  terminated,  arrangements would  be made between the City and the Hamilton Port Authority to relocate the boat storage  in the area of the pumping station.    During the detail design of the new pumping stationstructure the project team will consult  The  City  of  Hamilton’s  Design  Review  Panel  to  ensure  it  fits within  the existing neighbourhood. 

 

Traffic Calming is not applicable to this project. 

Would you please advise me of the land use patterns employed by the City in developing the concept of a new pumping station for Pier 8 and the extent to which the concept is consistent with the new housing contemplated by Setting Sail.  

 

My apologies in my delay in responding to your e‐mail on the "Piers 5 to 8  Pumping  facilities  Class  EA".  The  City  of  Hamilton  is  currently  reviewing wastewater infrastructure needs at the West Harbour (Piers 5 ‐ 8)  to  support  both  existing  and  future  growth  needs  of  the  area.  The  existing pumping station located on Pier 8 has operational deficiencies which include:  •  No standby power generator to provide a backup power source in 

Page 66: PIERS 5 8, SEWAGE PUMPING FACILITIES - … 5 – 8, SEWAGE PUMPING FACILITIES Municipal Class Environmental Assessment, Schedule B May 2014 i Tab ...

      63 

Comment  Response 

  the event of  power failure; and,  • Inadequate capacity to manage existing development sewage flows and / or service future development. In  addition  to  the  sanitary  sewage  servicing  needs  on  Pier  8,  the  City  is  also reviewing  sanitary  infrastructure  needs  on  Piers  5  to  7 which may  require  new sewage pumping infrastructure to service existing and future development needs.   The  project  is  following  the  Class  Environmental  Assessment  process.  The alternative solutions and preferred alternative solution that were developed were based on  input  from a number of sources  (i.e. archaeology, natural environment, etc). The preferred  solution  recommends a new pumping  station  for  Pier 8. The new pumping station is intended to service existing development on Pier 8 as well as future Pier 8  land uses that were included in the OMB approval for  Setting Sail.  Below is a link to our website that has the all of the project information to date.  http://www.hamilton.ca/CityDepartments/PlanningEcDev/Divisions/GrowthManagement/Infrastructure+Planning/Environmental+Assessments/Piers58PumpingStationUpgrades.htm 

The documents I was able to see on the city website do not show any flow demand calculations, and thus do not show what future developments on piers 5 to 8 were assumed in terms of calculating demand.  Those assumptions are very important and will be of great interest to residents of the North End.  The other aspect I was unable to find was any indication as to how the proposed layout would or would not synchronize with future developments 

Thank you for your follow up e‐mail. For clarity purposes,  I have highlighted your comments in bold and the City's response in italics. Please feel free to contact me if you have any additional questions.   E‐mail: The  documents  I was  able  to  see  on  the  city website  do  not  show  any  flow demand calculations, and thus do not show what future developments on piers 5 to 8 were assumed in terms of calculating demand.  Those assumptions are very important and will be of great interest to residents of the North End.  

Page 67: PIERS 5 8, SEWAGE PUMPING FACILITIES - … 5 – 8, SEWAGE PUMPING FACILITIES Municipal Class Environmental Assessment, Schedule B May 2014 i Tab ...

      64 

Comment  Response in terms of location.  Putting pipes in the ground has a tendency to structure future development.  As you know, Setting Sail contemplates a design study for the future  residential development on Piers 7 and 8.  I was unable to see how that  design study would not be severely hampered by location decisions at  this stage.  In other words, where do I find the rationale for  proceeding with this work in advance of the Setting Sail mandated  design study of the future development.  

 

City Response:  The EA study recommends a preferred solution to address the problem statement which  notes  that  the City  of  Hamilton  is  currently  reviewing  wastewater infrastructure needs at the West Harbour on Piers 5 to 8 to support both existing and  future  growth  needs  of  the  area  (completes  Phase  1  and  2  of  the  EA process). One existing municipally maintained pumping station  is  located on Pier 8 and has operational deficiencies which include: 

No standby power generator to provide a backup power source in the event of power failure 

Inadequate capacity to manage existing development sewage flows and / or service future development. 

To  address  this  need  the  Class  EA  study  reviewed  and  compared  alternative solutions,  in  accordance  with  the  Municipal  Class  Environmental  Assessment Guideline.  A  preferred  solution  has  been  recommended  that  addresses  the immediate need of inadequate capacity to manage existing sanitary flows on Pier 8 and deficiencies with the existing pumping station.  Sizing of the preferred solution (i.e. new pumping station and associated infrastructure) will be determined during the detailed design stage and will consider both future and existing needs. As such only  conceptual  servicing  infrastructure  alignments  are  being  included  in  the preferred  solution. At a high  level  the preferred pumping  facilities and  forcemain solution considered a development scenario which  included 1600  residential units and  approx.  22,000  sq.  metres  of  commercial  or  institutional  floor  area.  This development scenario was only to provide guidance.   E‐mail: The other aspect I was unable to find was any indication as to how the proposed 

Page 68: PIERS 5 8, SEWAGE PUMPING FACILITIES - … 5 – 8, SEWAGE PUMPING FACILITIES Municipal Class Environmental Assessment, Schedule B May 2014 i Tab ...

      65 

Comment  Response 

layout would  or would  not  synchronize with  future  developments  in  terms  of location.   Putting  pipes  in  the  ground  has  a  tendency  to  structure  future development.  City Response:  The alignment and  location of  the preferred  solution  infrastructure on Pier 8 and existing  roads was  selected  as  it was  compatible with  the  existing  roads,  future roads and future park layout proposed in Setting Sail. Input has been received from various City staff with  respect  to  the proposed  infrastructure  locations associated with this Class EA. The proposed infrastructure on Piers 5, 6 and 7 was compatible with both the West Harbour Waterfront Recreation Master Plan and Setting Sail. A refinement of these alignments would be completed as part of the detailed design stage. The preferred alternative provides a  solution  that has  flexibility  to address future development needs.    E‐mail: As you know, Setting Sail contemplates a design study for the future residential development on Piers 7 and 8.  I was unable to see how that design study would not be  severely hampered by  location decisions  at  this  stage.   In other words, where do  I  find  the  rationale  for proceeding with  this work  in  advance of  the Setting Sail mandated design study of the future development?  City Response: The urban design study will be based on Setting Sail as is this pumping facilities EA study. The rationale for proceeding at this time is to propose a solution to address existing needs now and also future needs. Not developing a solution at this time will not  address  existing  pumping  facility  infrastructure  deficiencies  and  upgraded capacity needs. 

Page 69: PIERS 5 8, SEWAGE PUMPING FACILITIES - … 5 – 8, SEWAGE PUMPING FACILITIES Municipal Class Environmental Assessment, Schedule B May 2014 i Tab ...

      66 

Comment  Response Recently Leander Boat Club spent a considerable amount of money to repair our sewer lines. Our committee of management is concerned that this Pier 8 project may affect the club facilities. We currently rent out our banquet hall and we want to make sure there is no impact to our tenants either. 

 

The work we  are  completing  for Piers  5  to 8  includes  assessing  the  existing  and  future sewage servicing needs of Piers 5 to 8, in particular Pier 8.  Currently the existing pumping station located on Pier 8 has operational deficiencies which include: 

No  standby power generator  to provide a backup power  source  in  the event of  power failure; and, 

Inadequate  capacity  to  manage  existing  development  sewage  flows  and  /  or service future development. 

 Part of  the background work  looked at  the existing  sewage  infrastructure  located  in  the study area.  The Leander Boat Club was noted to have an existing gravity sewer connection to  the  municipal  sewer  system  and  no  changes  to  this  sewer  connection  is  being recommended in the pumping facilities EA study preferred solution.  The  conclusion  /  recommendation  of  the  sewage  servicing  environmental  assessment work is that the City of Hamilton construct a new pumping station on Pier 8 and allow for a gravity  sewer connection  from Piers 5/6 and 7  (this does not  include Leander Boat Club since you are already connected  to  the municipal  sewer). Please note  that  if  the gravity sewer connection from Piers 5/6  is not feasible, the City recommends that we replace an existing  pumping station on Pier 6 or construct a new pumping station to connect to the Guise  Street  sewer  when  required  capacity  is  available  (this  also  would  not  impact Leander). 

Sun‐Canadian  pipeline  alignment  shown  on our  existing  infrastructure  figure(s)  do  not accurately  represent  the  pipeline  location  in all  areas.  Overall  the  alignments  shown  are generally  correct,  but  near  the  proposed pipeline  /  forcemain  crossing  locations  the Sun‐Canadian  pipeline  locations will  need  to 

Paul  Lane  from  Sun‐Canadian was  informed  that during preliminary design,  Sun‐Canadian would be contacted to discuss the proposed pipeline crossings to confirm the alignment which would include survey's/locates.  

Page 70: PIERS 5 8, SEWAGE PUMPING FACILITIES - … 5 – 8, SEWAGE PUMPING FACILITIES Municipal Class Environmental Assessment, Schedule B May 2014 i Tab ...

      67 

Comment  Response 

be confirmed. 

Page 71: PIERS 5 8, SEWAGE PUMPING FACILITIES - … 5 – 8, SEWAGE PUMPING FACILITIES Municipal Class Environmental Assessment, Schedule B May 2014 i Tab ...

   

  

APPENDIX A  

Terrestrial   

Page 72: PIERS 5 8, SEWAGE PUMPING FACILITIES - … 5 – 8, SEWAGE PUMPING FACILITIES Municipal Class Environmental Assessment, Schedule B May 2014 i Tab ...

   

 

  

APPENDIX B  

Stage 1 Archaeological Report   

Page 73: PIERS 5 8, SEWAGE PUMPING FACILITIES - … 5 – 8, SEWAGE PUMPING FACILITIES Municipal Class Environmental Assessment, Schedule B May 2014 i Tab ...

   

 

  

APPENDIX C  

Heritage Impact Assessment Report   

Page 74: PIERS 5 8, SEWAGE PUMPING FACILITIES - … 5 – 8, SEWAGE PUMPING FACILITIES Municipal Class Environmental Assessment, Schedule B May 2014 i Tab ...

   

 

  